多级氧化锌避雷器直流耐压试验方法 Download PDFInfo
- Publication number
- CN101592701A CN101592701A CNA2009100325854A CN200910032585A CN101592701A CN 101592701 A CN101592701 A CN 101592701A CN A2009100325854 A CNA2009100325854 A CN A2009100325854A CN 200910032585 A CN200910032585 A CN 200910032585A CN 101592701 A CN101592701 A CN 101592701A
- Authority
- CN
- China
- Prior art keywords
- zinc
- current
- wireless
- measuring unit
- oxide arrester
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
- Testing Relating To Insulation (AREA)
Abstract
本发明涉及一种多级氧化锌避雷器直流耐压试验方法,将两级以上的氧化锌避雷器依次相连,顶级氧化锌避雷器顶部接地,下级氧化锌避雷器经第二无线电流测量单元接地;将直流高压发生器的输出端经第一无线电流测量单元接在任意两级避雷器的中间,第一和第二无线电流测量单元分别采集采样电流I1和I2,并通过各自的无线数传模块将采样电流I1和I2发送至控制器,控制器实时接收并进行分析,对直流高压发生器的输出电压进行控制,当检测的各氧化锌避雷器高压回路上的泄漏电流达到测试要求时,控制器记录直流高压发生器对应的输出电压。本发明具有操作方便,无线采样测量两路高压电流,减少接线次数,提高了工作效率和可靠性特点。
Description
技术领域
本发明涉及多级氧化锌避雷器直流耐压试验方法,属于避雷耐压试测试技术领域。
背景技术
目前电压等级比较高的氧化锌避雷器多采用多级结构,这样可以减少对单台直流耐压试验装置的电压和容量要求,但是由于现场装置一般不允许拆装,在对各级氧化锌避雷器进行直流耐压试验时,是通过改变直流试验装置在各级氧化锌避雷器的接线组合方法来测量每一级氧化锌避雷器的直流耐压值,因此现场操作人员需要经常用升降车来频繁改变直流试验装置,增加氧化锌避雷器之间的接线而带来了附加的工作量,操作繁琐,无法提高试验的工作效率。由于要频繁改变直流试验装置接在各级氧化锌避雷器上,因此也带来了极大的安全隐患。为了提高工作效率和安全系数,急需对目前的实验方案进行改进。
发明内容
本发明的目的提供一种操作方便,能提高整个试验的工作效率及可靠性的多级氧化锌避雷器直流耐压试验方法。
本发明为达到上述目的的技术方案是:一种多级氧化锌避雷器直流耐压试验方法,其特征在于:
(1)、将两级以上的氧化锌避雷器依次串连,顶级氧化锌避雷器顶部接地,下级氧化锌避雷器的底部经第二无线电流测量单元后接地;
(2)、将直流高压发生器的高压输出端经第一无线电流测量单元接在任意两级氧化锌避雷器的中间,而任意两级氧化锌避雷器的上一级氧化锌避雷器顶部接地,控制器控制直流高压发生器输出电压,第一无线电流测量单元和第二无线电流测量单元分别采集采样电流I1和I2对各氧化锌避雷器高压回路的泄漏电流进行测量,且第一无线电流测量单元的采样电流I1与第二无线电流测量单元的采样电流I2之差为上一级氧化锌避雷器高压回路的泄漏电流,第一无线电流测量单元和第二无线电流测量单元通过各自的无线数传模块将采样电流I1和I2发送至控制器,控制器实时接收并对各氧化锌避雷器高压回路的泄漏电流进行分析,对直流高压发生器的输出电压进行控制,当检测的各氧化锌避雷器高压回路上的泄漏电流达到测试要求时,控制器记录直流高压发生器对应的输出电压。
所述第一无线电流测量单元和第二无线电流测量单元中的无线数传模块均设置在屏蔽罩内。
本发明采用两组无线电流测量单元,将第二无线电流测量单元接在下级氧化锌避雷器与地之间,而第一无线电流测量单元与直流高压发生器的高压输出端连接,在测量时,只需将直流高压发生器的高压输出端接任意两级氧化锌避雷器的中间,当控制器控制直流高压发生器的高压输出端输出电压时,通过两个无线电流测量单元分别采集采样电流来对各氧化锌避雷器高压回路上的泄漏电流进行测量,达到同时测量两路泄漏电流参数的目的,而且将采集的两组采样电流通过各自无线数传模块送至控制器,控制器同时接收两路泄漏电流并进行分析,对直流高压发生器的输出电压进行自动控制,当氧化锌避雷器的泄漏电流达到设定值时,记录下施加高压电压的数值,由于一次接线能分别对两级氧化锌避雷器进行测试,二次接线能分别对三级氧化锌避雷器进行测试,减少接线次数,操作方便,提高了氧化锌避雷器进行直流耐压试验的工作效率。
附图说明
下面结合附图对本发明的实施例作进一步的详细描述。
图1是本发明耐压试验的结构框图。
图2是本发明两级氧化锌避雷器耐压试验的测试结构示意图。
图3是本发明三级氧化锌避雷器对上级氧化锌避雷器耐压试验的测试结构示意图。
图4是本发明三级氧化锌避雷器对中下级氧化锌避雷器耐压试验的测试结构示意图。
其中:1-显示器,2-控制器,3-直流高压发生器,4-第一无线电流测量单元,5-第二无线电流测量单元,6-顶级氧化锌避雷器,7-下级氧化锌避雷器,8-中级氧化锌避雷器。
具体实施方式
见图1-4所示,本发明的多级氧化锌避雷器直流耐压试验方法,将两级以上的氧化锌避雷器依次串连,顶级氧化锌避雷器6顶部接地,下级氧化锌避雷器7的底部经第二无线电流测量单元5连接后接地。测量时,将直流高压发生器3的高压输出端经第一无线电流测量单元4接在任意两级氧化锌避雷器的中间,该直流高压发生器3接地,而任意两级氧化锌避雷器的上一级氧化锌避雷器顶部接地,控制器2控制直流高压发生器3输出电压,第一无线电流测量单元4和第二无线电流测量单元5分别采集采样电流I1和I2对各氧化锌避雷器高压回路上的泄漏电流进行测量,第一无线电流测量单元4和第二无线电流测量单元5通过各自的无线数传模块将采样电流I1和I2发送至控制器2,控制器2实时接收并对各氧化锌避雷器高压回路上的泄漏电流进行分析,再对直流高压发生器3的输出电压进行控制,当检测的各氧化锌避雷器高压回路上的泄漏电流值达到测试要求时,如当泄漏电流接近1毫安时,控制器2记录直流高压发生器3对应的输出电压,在检测过程中,可通过显示器1对氧化锌避雷器高压回路上的泄漏电流以及输出电压进行显示。本发明将第一无线电流测量单元4和第二无线电流测量单元5中的无线数传模块均设置在屏蔽盒内,在测试环境中电磁干扰及直流高压发生器3与被试氧化锌避雷器所产生的电晕干扰下能实时传输测量的电流值。
见图2所示,针对两级氧化锌避雷器进行测试时,即对顶级氧化锌避雷器6和下级氧化锌避雷器7进行测试,顶级氧化锌避雷器6顶部接大地,下级氧化锌避雷器7的底端经第二无线电流测量单元5后接地,直流高压发生器3的高压输出端经第一无线电流测量单元4接在顶级氧化锌避雷器6和下级氧化锌避雷器7的中间,当控制器2控制直流高压发生器3输出高压电压时,第一无线电流测量单元4采集采样电流I1,第二无线电流测量单元5采集采样电流I2,第二无线电流测量单元5采集的采样电流I2即为下级氧化锌避雷器7高压回路的泄漏电流,而第一无线电流测量单元4的采样电流I1与第二无线电流测量单元5的采样电流I2之差为顶级氧化锌避雷器6高压回路的泄漏电流,能同时对顶级氧化锌避雷器6高压回路和下级氧化锌避雷器7高压回路上的泄漏电流进行测量,而第一无线电流测量单元4和第二无线电流测量单元5通过各自的无线数传模块将采样电流I1和I2发送至控制器2,控制器2实时接收两路采样电流并对各氧化锌避雷器高压回路上的泄漏电流进行分析,再通过直流高压发生器3的输出电压进一步加压,当泄漏电流接近1毫安时,控制器2记录直流高压发生器3对应的输出电压,无线采样,实现自动控制,一次接线完成两级测试。
见图3、4所示,本发明对三级氧化锌避雷器进行测量,当测量上级的氧化锌避雷器耐压试验时,顶级氧化锌避雷器6顶部接大地,下级氧化锌避雷器7的底端经第二无线电流测量单元5后接地,直流高压发生器3的高压输出端经第一无线电流测量单元4接在顶级氧化锌避雷器6和中级氧化锌避雷器8的中间,当控制器2控制直流高压发生器3输出高压电压时,第一无线电流测量单元4采集采样电流I1,第二无线电流测量单元5采集采样电流I2,第一无线电流测量单元4的采样电流I1与第二无线电流测量单元5的采样电流I2之差为顶级氧化锌避雷器6高压回路的泄漏电流。对下面两级氧化锌避雷器耐压试验时,将中级氧化锌避雷器8上部接地,直流高压发生器3的高压输出端经第一无线电流测量单元4接在中级氧化锌避雷器8和下级氧化锌避雷器7的中间,控制器2控制直流高压发生器3输出高压电压时,第一无线电流测量单元4的采集的采样电流I1和第二无线电流测量单元5采集的采样电流I2,第二无线电流测量单元5采集的采样电流I2即为下级氧化锌避雷器7高压回路的泄漏电流,而第一无线电流测量单元4的采样电流I1与第二无线电流测量单元5的采样电流I2之差为中级氧化锌避雷器8高压回路的泄漏电流。测量中通过第一无线电流测量单元4和第二无线电流测量单元5的无线数传模块将采样电流I1和I2发送至控制器2,控制器2实时接收两路采样电流并对各氧化锌避雷器高压回路上的泄漏电流进行分析,再通过直流高压发生器3的输出电压进一步加压,当检测的各氧化锌避雷器高压回路上的泄漏电流达到测试要求时,即泄漏电流接近1毫安时,控制器2记录直流高压发生器3对应的输出电压,无线采样,实现自动控制,两次接线完成三级测试。按上述的方法可对更多级串联的氧化锌避雷器进行直流耐压试验。
Claims (2)
1、一种多级氧化锌避雷器直流耐压试验方法,其特征在于:
(1)、将两级以上的氧化锌避雷器依次串连,顶级氧化锌避雷器顶部接地,下级氧化锌避雷器的底部经第二无线电流测量单元后接地;
(2)、将直流高压发生器的高压输出端经第一无线电流测量单元接在任意两级氧化锌避雷器的中间,而任意两级氧化锌避雷器的上一级氧化锌避雷器顶部接地,控制器控制直流高压发生器输出电压,第一无线电流测量单元和第二无线电流测量单元分别采集采样电流I1和I2对各氧化锌避雷器高压回路的泄漏电流进行测量,且第一无线电流测量单元的采样电流I1与第二无线电流测量单元的采样电流I2之差为上一级氧化锌避雷器高压回路的泄漏电流,第一无线电流测量单元和第二无线电流测量单元通过各自的无线数传模块将采样电流I1和I2发送至控制器,控制器实时接收并对各氧化锌避雷器高压回路的泄漏电流进行分析,对直流高压发生器的输出电压进行控制,当检测的各氧化锌避雷器高压回路上的泄漏电流达到测试要求时,控制器记录直流高压发生器对应的输出电压。
2、根据权利要求1所述多级氧化锌避雷器直流耐压试验方法,其特征在于:所述第一无线电流测量单元和第二无线电流测量单元中的无线数传模块均设置在屏蔽罩内。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2009100325854A CN101592701A (zh) | 2009-07-03 | 2009-07-03 | 多级氧化锌避雷器直流耐压试验方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2009100325854A CN101592701A (zh) | 2009-07-03 | 2009-07-03 | 多级氧化锌避雷器直流耐压试验方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101592701A true CN101592701A (zh) | 2009-12-02 |
Family
ID=41407466
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2009100325854A Pending CN101592701A (zh) | 2009-07-03 | 2009-07-03 | 多级氧化锌避雷器直流耐压试验方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101592701A (zh) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101833051A (zh) * | 2010-04-20 | 2010-09-15 | 武汉新电电气技术有限责任公司 | 氧化锌避雷器带电测试仪 |
CN101975913A (zh) * | 2010-09-26 | 2011-02-16 | 安徽省电力公司六安供电公司 | 两节及以上氧化锌避雷器不拆引线试验装备及试验方法 |
CN102053204A (zh) * | 2011-01-18 | 2011-05-11 | 宝鸡供电局 | 330kV金属氧化锌避雷器1mA电压的不停电测试方法 |
CN102141594A (zh) * | 2011-01-04 | 2011-08-03 | 丽水电业局 | 避雷器检测装置 |
CN103185829A (zh) * | 2013-04-02 | 2013-07-03 | 国家电网公司 | 一种泄漏电流测试方法及装置 |
CN103605040A (zh) * | 2013-11-04 | 2014-02-26 | 国家电网公司 | Gis设备内置避雷器交流泄漏电流测试方法 |
CN103901309A (zh) * | 2014-04-29 | 2014-07-02 | 国家电网公司 | 220kV氧化锌避雷器不拆高压引线试验装置试验方法 |
CN104049161A (zh) * | 2014-05-20 | 2014-09-17 | 国家电网公司 | 一种变电所现场避雷器不拆一次高压引线的试验连接结构及试验方法 |
CN104965121A (zh) * | 2015-07-16 | 2015-10-07 | 国家电网公司 | 一种多节氧化锌避雷器泄漏电流测量装置 |
CN105223407A (zh) * | 2015-09-11 | 2016-01-06 | 国家电网公司 | 500kV氧化锌避雷器不拆高压引线测量直流漏电方法 |
CN105548831A (zh) * | 2015-12-08 | 2016-05-04 | 南通大学 | 一种高压电容器分布式耐压测试装置 |
CN105807195A (zh) * | 2016-05-10 | 2016-07-27 | 苏州华电电气股份有限公司 | 一种多节避雷器串联直流耐压补偿装置 |
CN107037297A (zh) * | 2017-06-15 | 2017-08-11 | 国网辽宁省电力有限公司锦州供电公司 | 220kV避雷器免拆高压引线智能试验方法 |
CN107037257A (zh) * | 2017-06-08 | 2017-08-11 | 国网辽宁省电力有限公司沈阳供电公司 | 高压直流耐压试验通用电流测量装置 |
CN109324214A (zh) * | 2018-11-22 | 2019-02-12 | 国网新疆电力有限公司电力科学研究院 | 组合式避雷器泄漏电流测量装置 |
CN111736022A (zh) * | 2020-06-18 | 2020-10-02 | 国网新疆电力有限公司检修公司 | 一种直流高压发生器试验装置及其试验方法 |
-
2009
- 2009-07-03 CN CNA2009100325854A patent/CN101592701A/zh active Pending
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101833051B (zh) * | 2010-04-20 | 2012-03-28 | 武汉新电电气技术有限责任公司 | 氧化锌避雷器带电测试仪 |
CN101833051A (zh) * | 2010-04-20 | 2010-09-15 | 武汉新电电气技术有限责任公司 | 氧化锌避雷器带电测试仪 |
CN101975913A (zh) * | 2010-09-26 | 2011-02-16 | 安徽省电力公司六安供电公司 | 两节及以上氧化锌避雷器不拆引线试验装备及试验方法 |
CN102141594A (zh) * | 2011-01-04 | 2011-08-03 | 丽水电业局 | 避雷器检测装置 |
CN102141594B (zh) * | 2011-01-04 | 2013-10-30 | 丽水电业局 | 避雷器检测装置 |
CN102053204A (zh) * | 2011-01-18 | 2011-05-11 | 宝鸡供电局 | 330kV金属氧化锌避雷器1mA电压的不停电测试方法 |
CN103185829A (zh) * | 2013-04-02 | 2013-07-03 | 国家电网公司 | 一种泄漏电流测试方法及装置 |
CN103605040A (zh) * | 2013-11-04 | 2014-02-26 | 国家电网公司 | Gis设备内置避雷器交流泄漏电流测试方法 |
CN103901309B (zh) * | 2014-04-29 | 2017-12-08 | 国家电网公司 | 220kV氧化锌避雷器不拆高压引线试验装置试验方法 |
CN103901309A (zh) * | 2014-04-29 | 2014-07-02 | 国家电网公司 | 220kV氧化锌避雷器不拆高压引线试验装置试验方法 |
CN104049161A (zh) * | 2014-05-20 | 2014-09-17 | 国家电网公司 | 一种变电所现场避雷器不拆一次高压引线的试验连接结构及试验方法 |
CN104965121A (zh) * | 2015-07-16 | 2015-10-07 | 国家电网公司 | 一种多节氧化锌避雷器泄漏电流测量装置 |
CN105223407A (zh) * | 2015-09-11 | 2016-01-06 | 国家电网公司 | 500kV氧化锌避雷器不拆高压引线测量直流漏电方法 |
CN105548831A (zh) * | 2015-12-08 | 2016-05-04 | 南通大学 | 一种高压电容器分布式耐压测试装置 |
CN105807195A (zh) * | 2016-05-10 | 2016-07-27 | 苏州华电电气股份有限公司 | 一种多节避雷器串联直流耐压补偿装置 |
CN107037257A (zh) * | 2017-06-08 | 2017-08-11 | 国网辽宁省电力有限公司沈阳供电公司 | 高压直流耐压试验通用电流测量装置 |
CN107037257B (zh) * | 2017-06-08 | 2024-02-02 | 国网辽宁省电力有限公司沈阳供电公司 | 高压直流耐压试验通用电流测量装置 |
CN107037297A (zh) * | 2017-06-15 | 2017-08-11 | 国网辽宁省电力有限公司锦州供电公司 | 220kV避雷器免拆高压引线智能试验方法 |
CN109324214A (zh) * | 2018-11-22 | 2019-02-12 | 国网新疆电力有限公司电力科学研究院 | 组合式避雷器泄漏电流测量装置 |
CN111736022A (zh) * | 2020-06-18 | 2020-10-02 | 国网新疆电力有限公司检修公司 | 一种直流高压发生器试验装置及其试验方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101592701A (zh) | 多级氧化锌避雷器直流耐压试验方法 | |
CN103344821A (zh) | 基于cvt内置低压电容的暂态过电压在线监测系统 | |
CN205404682U (zh) | 一种无线相位同步装置 | |
CN105203930A (zh) | 一种用于高压开关柜的局部放电试验平台及方法 | |
CN102914731B (zh) | 一种基于双电极的冲击电压下变压器油中尖端放电的检测装置 | |
CN207730875U (zh) | 一种风力发电机绕组绝缘故障检测装置 | |
CN102193040A (zh) | 一种氧化锌避雷器不拆引线绝缘预防性试验的方法 | |
CN104777366A (zh) | 抗干扰输电线路高压绝缘电阻测试装置 | |
CN105259488A (zh) | 500kV高压并联电抗器匝间绝缘性能测试平台 | |
CN105423908A (zh) | 变压器绕组变形带电测试方法及系统 | |
CN105866644A (zh) | 一种自动采集变压器油纸绝缘回复电压系统及测试方法 | |
CN109470914A (zh) | 一种vfto信号测量装置 | |
CN109917246A (zh) | 一种自动雷电冲击电压试验系统 | |
CN204855722U (zh) | 一种10kV绝缘管型母线局部放电检测系统 | |
CN202486278U (zh) | 一种配电网电缆绝缘检测系统 | |
CN205404706U (zh) | 一种基于dsp的电动汽车充电桩的电能质量动态监测系统 | |
CN202141752U (zh) | 一种金属氧化锌避雷器在线监测装置 | |
CN103743993B (zh) | 一种检测变压器绕组变形的方法 | |
CN201449423U (zh) | 多级氧化锌避雷器直流耐压试验的测试装置 | |
CN101672890A (zh) | 便携式断路器合闸电阻测试装置 | |
CN104459497A (zh) | 一种冲击电压下局部放电测量与分析装置 | |
CN202041572U (zh) | 一种高压直流开关振荡回路电流离线检测装置 | |
CN102073277B (zh) | 工频绝缘试验计算机控制系统 | |
CN204925324U (zh) | 一种用于高压开关柜的局部放电试验平台 | |
CN205139307U (zh) | 500kV高压并联电抗器匝间绝缘性能测试装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20091202 |