CN101592669B - Two-in-one cabinet of continuous flue gas monitoring system - Google Patents
Two-in-one cabinet of continuous flue gas monitoring system Download PDFInfo
- Publication number
- CN101592669B CN101592669B CN2008100676108A CN200810067610A CN101592669B CN 101592669 B CN101592669 B CN 101592669B CN 2008100676108 A CN2008100676108 A CN 2008100676108A CN 200810067610 A CN200810067610 A CN 200810067610A CN 101592669 B CN101592669 B CN 101592669B
- Authority
- CN
- China
- Prior art keywords
- door
- flue gas
- cabinet
- monitoring system
- rack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Investigating Or Analyzing Materials By The Use Of Fluid Adsorption Or Reactions (AREA)
- Ventilation (AREA)
Abstract
The invention discloses a two-in-one cabinet of a continuous flue gas monitoring system, which mainly comprises a base, a top cover, a front door, a rear door, a left side door, a right side door, a rear mounting plate, a mounting upright post and a U-shaped post, wherein the rear mounting plate is mounted on the U-shaped post through a hinge to form a movable mounting door, and a flue gas pretreatment unit is mounted on the movable mounting door. According to the invention, the rear mounting plate of the cabinet is set as the movable mounting door, the smoke pretreatment unit is mounted on the movable mounting door, and the electric treatment unit is mounted in the cabinet, so that the smoke pretreatment unit and the electric treatment unit are integrated into one cabinet, thereby utilizing space to the maximum extent, optimizing the mechanical structure, and having the advantages of small volume, light weight, low cost, convenient transportation and the like.
Description
Technical field:
The present invention relates to rack, specifically is a kind of two in one machine cabinet, and it is mainly used in the inside components and parts of stationary pollution source continuous blow-down monitoring system (CEMS).
Background technology:
At present; The CEMS rack adopts instrument rack and the two-shipper cabinet form of handling rack; Wherein industrial computer, analyser and electrical equipment are installed in the instrument rack, and fume treatment unit such as electronic refrigerator, moisture separator, peristaltic pump, oxides of nitrogen converter, sampling pump, constant voltage well, various solenoid valves then are installed in to be handled in the rack.
After discharged flue gas extracted through sampling pump, the system fume treatment unit of delivering to was carried out flue gas the dewaters processing of etc.ing, delivered to the concentration analysis that flue gas analyzer in the electric processing rack carries out pollutant component then, carried out the result at last and exported.Though existing two-shipper cabinet can both satisfy these requirements, but still not enough below existing:
1, moves inconvenience; In the two-shipper cabinet system; Because handling rack, flue gas to deliver to the concentration analysis that flue gas analyzer in the electric processing rack carries out pollutant component to the flue gas of handling; And electric processing rack will be handled solenoid valve in the rack, peristaltic pump etc. to flue gas and controls, when moving between two racks circuit be connected with pipeline and need dismounting.
2, there are a lot of flues and cable to connect between two racks, cause cabinet door to be not closed completely, damage the components and parts in the rack easily.
3, the two-shipper cabinet takes up room greatly, and processing capacity is big, and materials used is many, causes waste.
Summary of the invention:
For addressing the above problem; The object of the present invention is to provide a kind of two in one machine cabinet of fume continuous monitoring system; Through the flue gas pretreatment unit is installed on the dodge gate; Realization focuses on flue gas pretreatment unit and electric processing unit in the rack, thereby utilizes the space to greatest extent, optimizes physical construction.
For realizing above-mentioned purpose, the present invention adopts following technical scheme:
A kind of two in one machine cabinet of fume continuous monitoring system; Mainly constitute by base (7), top cover (3), Qianmen (1), back door (8), offside door (11), offside door (5) and installation column (10), back installing plate (9) and U-shaped post (14); Said base (7), top cover (3), back door (8), offside door (11) and offside door (5) constitute rack; Electric processing unit is installed in this rack; Said back installing plate (9) is installed on the U-shaped post (14) through hinge, and door is installed in the formation activity, and this activity is installed on the door flue gas pretreatment unit is installed.
Said flue gas pretreatment unit comprises electronic refrigerator, device for drying and filtering, moisture separator, peristaltic pump, oxides of nitrogen converter, sampling pump, constant voltage well etc.
Said electric processing unit comprises industrial computer and analyser.
Be provided with recessed position in the middle of the said movable installation door, in this recessed position electronic refrigerator be installed.
Said top cover (3) medial surface is equipped with fan box (12) and daylight lamp (13).
Said top cover (3) is provided with suspension ring (2).
The present invention is through being arranged to installing plate behind the rack at the movable door of installing; And on this activity installation door, the flue gas pretreatment unit is installed; At the electric processing unit of the inner installation of rack, realize flue gas pretreatment unit and electric processing unit are focused in the rack, thereby utilize the space to greatest extent; Optimize physical construction, have little, in light weight, the advantages such as cost is low, convenient transportation of volume.
Description of drawings:
Fig. 1 is a rack perspective view of the present invention.
Fig. 2 is a rack upward view of the present invention.
Fig. 3 is a top cover inner face structural representation of the present invention.
Fig. 4 is a rack front view of the present invention.
Fig. 5 is a rack schematic internal view of the present invention.
Identifier declaration among the figure: Qianmen 1, suspension ring 2, top cover 3, column 4, offside door 5, rack wheel 6, base 7, back door 8, back installing plate 9, installation column 10, offside door 11, fan box 12, daylight lamp 13, U-shaped post 14, analyser panel 15, blank panel 16, silk-screen panel 17, crossbeam 18.
Embodiment:
Core concept of the present invention is: installing plate behind the rack is arranged to the movable door of installing; And should be provided with recessed position in the activity installation door; And the flue gas pretreatment unit is installed in movable the installation in door and the recessed position, in addition, at the electric processing unit of the inner installation of rack; Make flue gas pretreatment unit and electric processing unit be positioned at same rack, and connect through corresponding pipeline or circuit.
For setting forth thought of the present invention and purpose, will combine accompanying drawing and specific embodiment that the present invention is done further explanation below.
Like Fig. 1~shown in Figure 2; A kind of two in one machine cabinet of fume continuous monitoring system; Mainly by base 7, top cover 3, Qianmen 1, back door 8, offside door 11, offside door 5, back installing plate (9) and column 10 is installed is constituted, wherein form cabinet framework by column 4 welding between base 7 and the top cover 3 with U-shaped post 14, between U-shaped post 14 and the cabinet framework with being threaded; Column 10 is installed to be installed on the U-shaped post 14 with installing plate 9; Suspension ring 2 are installed in respectively on the top cover and base of rack with rack wheel 6, and back installing plate 9 flexibly connects through hinge and U-shaped post 14, forms dodge gate.
As shown in Figure 3, said top cover 3 inner faces are equipped with fan box 12 and daylight lamp 13, wherein in the fan box 12 radiator fan are installed, and to reach the purpose of equipment cooling in the rack, daylight lamp 13 then is convenient to illumination, convenient observation and detection to equipment in the rack.
Like Fig. 4~shown in Figure 5; Said Qianmen 1, back door 8, offside door 11 and offside door 5 are installed on the cabinet framework; The formed dodge gate front panel of back installing plate (9) mainly includes silk-screen panel 17, blank panel 16, analyser panel 15; And rack inside also is provided with crossbeam 18, and these panels 17, blank panel 16, analyser panel 15 and crossbeam 18 all are fixedly mounted on to be installed on the column 10.
Said back installing plate 9 is installed on the U-shaped post 14 through hinge; Form a movable door of installing; Be used to install the flue gas pretreatment unit, said flue gas pretreatment unit comprises that some, the various solenoid valves of gas circuit Connection Element such as two of electronic refrigerators, two of devices for drying and filtering, one of moisture separator, three of peristaltic pumps, one of oxides of nitrogen converter, one of sampling pump, one in constant voltage well, three-way connection and needle-valve are some.The wherein movable middle recessed position that is provided with of door of installing; Two electronic refrigerators side by side are installed in this recessed position; Above the said recessed position device for drying and filtering is installed, up then for wire casing is installed, is used to bury cable and flue gas connecting pipe again; Three row's solenoid valves are installed above the wire casing, and every row is made up of one 0124 E 4.0 G1/4 FPM solenoid valves and a VT307-5G-02 solenoid valve; A SGVU-4 K09-B needle-valve is installed in said electronic refrigerator below; Be the installation wire casing below the needle-valve; An oxides of nitrogen converter and a SPV700EC sampling pump then are installed more side by side; Three MV-2100 peristaltic pumps down are installed side by side again, the door back side are installed the constant voltage well is installed, couple together these elements with three-way connection, straight coupling, angle coupling and Teflon pipe.
Said cabinet front is equipped with industrial computer, analyser etc., by crossbeam 18 it is provided support, and both sides increase installing plate; Be used for installing electrical equipment, thereby make the rack structure compact more, make that to open the dodge gate installation and maintenance simpler; And because fume treatment unit and electric processing unit are arranged in same rack; The circuit that need not to remove between the two when therefore transporting is connected with pipeline, and is easier for installation, can effectively reach the purpose of the inner components and parts of protection.
More than a kind of two in one machine cabinet of fume continuous monitoring system provided by the present invention has been carried out detailed introduction; Used concrete example among this paper principle of the present invention and embodiment are set forth, the explanation of above embodiment just is used for helping to understand method of the present invention and core concept thereof; Simultaneously, for one of ordinary skill in the art, according to thought of the present invention, the part that on embodiment and range of application, all can change, in sum, this description should not be construed as limitation of the present invention.
Claims (4)
1. two in one machine cabinet of fume continuous monitoring system; Mainly constitute by base (7), top cover (3), Qianmen (1), back door (8), offside door (11), offside door (5) and installation column (10), back installing plate (9) and U-shaped post (14); Said base (7), top cover (3), back door (8), offside door (11) and offside door (5) constitute rack; Electric processing unit is installed in this rack; It is characterized in that: said back installing plate (9) is installed on the U-shaped post (14) through hinge, and door is installed in the formation activity, and this activity is installed on the door flue gas pretreatment unit is installed; Said flue gas pretreatment unit comprises electronic refrigerator, device for drying and filtering, moisture separator, peristaltic pump, oxides of nitrogen converter, sampling pump, constant voltage well; Be provided with recessed position in the middle of the said movable installation door, in this recessed position electronic refrigerator be installed.
2. two in one machine cabinet of fume continuous monitoring system according to claim 1 is characterized in that: said electric processing unit comprises industrial computer and analyser.
3. two in one machine cabinet of fume continuous monitoring system according to claim 1 is characterized in that: said top cover (3) medial surface is equipped with fan box (12) and daylight lamp (13).
4. two in one machine cabinet of fume continuous monitoring system according to claim 1 is characterized in that: said top cover (3) is provided with suspension ring (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100676108A CN101592669B (en) | 2008-05-28 | 2008-05-28 | Two-in-one cabinet of continuous flue gas monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100676108A CN101592669B (en) | 2008-05-28 | 2008-05-28 | Two-in-one cabinet of continuous flue gas monitoring system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101592669A CN101592669A (en) | 2009-12-02 |
CN101592669B true CN101592669B (en) | 2012-11-14 |
Family
ID=41407436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008100676108A Active CN101592669B (en) | 2008-05-28 | 2008-05-28 | Two-in-one cabinet of continuous flue gas monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101592669B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104534275B (en) * | 2015-01-19 | 2016-04-20 | 西南交通大学 | A kind of special machine cabinet of helium recovery recycling device |
CN109725114A (en) * | 2019-02-20 | 2019-05-07 | 湖南创阳环保科技有限公司 | A kind of air-quality monitoring system |
CN116359441B (en) * | 2023-04-03 | 2024-04-30 | 南京华彭科技有限公司 | Drawer type cabinet for flue gas online monitoring system and application thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5386373A (en) * | 1993-08-05 | 1995-01-31 | Pavilion Technologies, Inc. | Virtual continuous emission monitoring system with sensor validation |
US5970426A (en) * | 1995-09-22 | 1999-10-19 | Rosemount Analytical Inc. | Emission monitoring system |
CN1866027A (en) * | 2006-05-18 | 2006-11-22 | 南京卓成自动化设备有限公司 | Integrated gas online detector |
CN200972474Y (en) * | 2006-11-22 | 2007-11-07 | 王健 | Continuosu monitoring system for smoke discharge |
CN101140205A (en) * | 2007-10-08 | 2008-03-12 | 西安电子科技大学 | Fume emission on-line continuous detecting system sampling apparatus |
CN201043975Y (en) * | 2007-01-29 | 2008-04-02 | 王健 | Continuous monitoring system for fume emission |
-
2008
- 2008-05-28 CN CN2008100676108A patent/CN101592669B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5386373A (en) * | 1993-08-05 | 1995-01-31 | Pavilion Technologies, Inc. | Virtual continuous emission monitoring system with sensor validation |
US5970426A (en) * | 1995-09-22 | 1999-10-19 | Rosemount Analytical Inc. | Emission monitoring system |
CN1866027A (en) * | 2006-05-18 | 2006-11-22 | 南京卓成自动化设备有限公司 | Integrated gas online detector |
CN200972474Y (en) * | 2006-11-22 | 2007-11-07 | 王健 | Continuosu monitoring system for smoke discharge |
CN201043975Y (en) * | 2007-01-29 | 2008-04-02 | 王健 | Continuous monitoring system for fume emission |
CN101140205A (en) * | 2007-10-08 | 2008-03-12 | 西安电子科技大学 | Fume emission on-line continuous detecting system sampling apparatus |
Also Published As
Publication number | Publication date |
---|---|
CN101592669A (en) | 2009-12-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102340975B (en) | Manage the system and method for the heat produced by the electronic equipment in electronic equipment casing | |
CN101592669B (en) | Two-in-one cabinet of continuous flue gas monitoring system | |
CN204115520U (en) | For heat exchanger and the dynamical system of dynamical system | |
CN201233400Y (en) | Two-in-one cabinet for flue gas continuous monitoring system | |
ATE267986T1 (en) | EXTRACTOR HOOD SYSTEM | |
CN219495831U (en) | Gas sampling device in narrow space | |
CN109340860A (en) | Integrated kitchen range | |
CN205231503U (en) | Distribution cabinet | |
CN200972474Y (en) | Continuosu monitoring system for smoke discharge | |
CN209399449U (en) | Integrated kitchen range | |
CN209762906U (en) | Solar mobile lighting trailer | |
CN209861296U (en) | Electromechanical device's operation platform | |
KR102208404B1 (en) | distributing board | |
CN210343651U (en) | Vacuum pump gas-liquid separator of vacuum pressure swing adsorption oxygen production equipment | |
CN218954891U (en) | Combustion system of exhaust gas aftertreatment machine | |
CN206163987U (en) | Fixed switchgear | |
CN221693093U (en) | Flue gas analyzer capable of carrying out pretreatment | |
CN216929357U (en) | Block terminal of interior modularization installation | |
CN207200088U (en) | Switch cubicle with dust control by ventilation function | |
CN109154540B (en) | Switch cabinet for waste gas measuring equipment | |
CN207691229U (en) | A kind of contact anti-aging power distribution cabinet | |
CN220491410U (en) | Toxic gas alarm with anti-theft function | |
CN213020123U (en) | Assembled ventilation module | |
CN219421348U (en) | PLC control cabinet | |
CN213278782U (en) | Electric power cabinet with dampproofing function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220513 Address after: 528000 No.8, Huishang Road, Jiangcun village, Leliu street, Shunde District, Foshan City, Guangdong Province Patentee after: Guangdong Yingfeng Technology Co.,Ltd. Address before: 518000 No. 301, block B, R & D building, Tsinghua hi tech Industrial Park, Nanshan District, Guangdong, Shenzhen Patentee before: UNIVERSTAR SCIENCE & TECHNOLOGY (SHENZHEN) Co.,Ltd. |