CN101590984A - Mast unbalance stress eliminating hoisting method - Google Patents

Mast unbalance stress eliminating hoisting method Download PDF

Info

Publication number
CN101590984A
CN101590984A CNA2009101116343A CN200910111634A CN101590984A CN 101590984 A CN101590984 A CN 101590984A CN A2009101116343 A CNA2009101116343 A CN A2009101116343A CN 200910111634 A CN200910111634 A CN 200910111634A CN 101590984 A CN101590984 A CN 101590984A
Authority
CN
China
Prior art keywords
lift
weight
mast
suspension centre
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CNA2009101116343A
Other languages
Chinese (zh)
Inventor
林汉丁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2009101116343A priority Critical patent/CN101590984A/en
Publication of CN101590984A publication Critical patent/CN101590984A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Testing Of Balance (AREA)

Abstract

The invention provides a kind of mast unbalance stress eliminating hoisting method, comprise that existing mast lifts the method for weight by being arranged at suspension centre on the weight, is characterized in that three suspension centres and the weight center of gravity that are provided with are in the same plane.With this lift-on/lift-off system lifting, can eliminate because of promoting asynchronously, and the weight dimensional orientation changes the variation that the suspension centre that produces lifts power.This lift-on/lift-off system is applicable to that three masts lift or take the lift heavy thing by force.And two masts do not wait lift heavy to lift or take the lift heavy thing by force.

Description

Mast unbalance stress eliminating hoisting method
Technical field
Mast unbalance stress eliminating hoisting method (this lift-on/lift-off system, down together) belongs to the method for mast lifting weight, and exactly, it is a kind of method that mast lifted or took by force the lift heavy thing.
Background technology
A kind of method of using when the existing method of lifting is mast lifting weight, its practice is suspension centre to be set carry out lifting of weight more than the weight center of gravity, owing to promote asynchronous between mast, and the change of weight dimensional orientation, suspension centre lifts power and changes immediately, thereby when calculating lifts power,, set up the unbalance stress coefficient in order to leave necessary deposit allowance.When lifting, also to adopt an effective measure.。。
Summary of the invention
In order to eliminate that mast lifts or when taking weight by force,, specially formulate this lift-on/lift-off system because of promoting asynchronous and the weight orientation changes and produces the suspension centre power that lifts and change.The analysis mode that between reflection lifting power three elements, concerns (referring to: the math modeling [J] of the stressed control of Lin Handing hoisting and hanging, Nanjing College of Architectural Engineering's journal, 1996 (4): 72~76) as can be known, from analysis mode, stressed clear and definite mast suspension centre lifts power, equal to lift power, multiply by by hoisting rope and depart from the hoisting rope coefficient that plumb bob vertical produces by the suspension centre that the hoisting crane lifting is calculated.And the hoisting crane suspension centre lifts power, equals to lift that suspension centre lifts power when initial, and promotes asynchronous and the weight dimensional orientation changes, and produces the algebraic sum of the power that the lifts variable quantities of these those long changes that disappear between suspension centre.When 4 points (three suspension centres, weight center of gravity) when coplane is provided with, the latter is zero, so the suspension centre power of lifting is constantly equal to the power that lifts when initial that lifts.So the mast that 4 points (three suspension centres, weight center of gravity) coplane is provided with lifting, its suspension centre lifts power, also just equal by hoisting crane calculate be constantly equal to lifting when initial suspension centre lift power, multiply by the hoisting rope coefficient again.Be in the stressed clear and definite mast lifting,, then eliminated that the suspension centre of generation lifts power to be changed because of promoting asynchronous and the change of weight dimensional orientation if lifted weight thing center of gravity is positioned on the definite plane of three suspension centres (3 points).
When adopting two masts to lift weight, two suspension centres connect the back by mast lifting, and surplus next suspension centre is by another mast lifting; When adopting three masts lifting weight, the corresponding mast of each suspension centre.
This lift-on/lift-off system is applicable to that three masts lift or take the lift heavy thing by force.And two masts do not wait lift heavy to lift or take the lift heavy thing by force.
The specific embodiment
Now introduce a kind of mode:
1. on the earlier predetermined weight center of gravity with center of gravity under the suspension centre power that lifts distribute or lift the force rate value, because three suspension centres are divided into upper and lower two sides of center of gravity, then must there be a side that a suspension centre only is set, follow suspension centre of table body place's preliminary election at this side's weight, and on the extended line of this suspension centre and weight center of gravity line, lift the ratio of power by above-mentioned predetermined center of gravity upper and lower suspension centre, that determines two suspension centres of the opposing party always lifts origin of force;
2. always lift origin of force by two suspension centres and make a straight line, intersect the two-end-point place, a suspension centre (two suspension centres lift power according to it to the spacing that always lifts origin of force distribution that is inversely proportional to) respectively is set at the table body of itself and lifted weight thing;
3. definite as stated above three suspension centres (3 points), promptly in the same plane with lifted weight thing center of gravity, this be because the straight line two ends by the weight center of gravity (end is the suspension centre of preliminary election, the other end be two suspension centres of other party always lift origin of force) all on the definite plane of three suspension centres (3 points).
The suspension centre setting will be by calculating, analyzing, whether each suspension centre lifts power suitable, whether the lifted weight thing is stressed meets the requirements, that whether the present position helps lifting lifted weight thing center of gravity in the triangle that with three suspension centres is the summit is stable, and whether this table body place of weight allow to be provided with factors such as suspension centre, determines through comparative optimization.All the other are analyzed slightly.

Claims (2)

1, mast unbalance stress eliminating hoisting method comprises that existing mast is arranged at the method that the suspension centre on the weight lifted or took by force the lift heavy thing, it is characterized in that three suspension centres that are provided with, and is in the same plane with the weight center of gravity.
2, according to right 1 described mast unbalance stress eliminating hoisting method, the center of gravity of weight is positioned among the triangle that three suspension centres are the summit.
CNA2009101116343A 2009-05-05 2009-05-05 Mast unbalance stress eliminating hoisting method Withdrawn CN101590984A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2009101116343A CN101590984A (en) 2009-05-05 2009-05-05 Mast unbalance stress eliminating hoisting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2009101116343A CN101590984A (en) 2009-05-05 2009-05-05 Mast unbalance stress eliminating hoisting method

Publications (1)

Publication Number Publication Date
CN101590984A true CN101590984A (en) 2009-12-02

Family

ID=41405899

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2009101116343A Withdrawn CN101590984A (en) 2009-05-05 2009-05-05 Mast unbalance stress eliminating hoisting method

Country Status (1)

Country Link
CN (1) CN101590984A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103588081A (en) * 2012-08-13 2014-02-19 中国石油天然气集团公司 Hoisting method for equipment inapplicable to conventional hoisting process
CN103871093A (en) * 2012-12-07 2014-06-18 江苏省电力公司 Method for performing three-dimensional virtual simulation transmission line tower group tower leg hoisting process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103588081A (en) * 2012-08-13 2014-02-19 中国石油天然气集团公司 Hoisting method for equipment inapplicable to conventional hoisting process
CN103871093A (en) * 2012-12-07 2014-06-18 江苏省电力公司 Method for performing three-dimensional virtual simulation transmission line tower group tower leg hoisting process
CN103871093B (en) * 2012-12-07 2016-12-07 江苏省电力公司 The method of three-dimensional emulation electric power line pole tower group tower leg hoisting process

Similar Documents

Publication Publication Date Title
CN201439475U (en) Multifunctional balance hanging beam
CN203845712U (en) Heavy-duty equipment hoisting device
CN103010954A (en) Multi-point hoisting method for heterogeneous prefabricated part
CN101590984A (en) Mast unbalance stress eliminating hoisting method
CN202508756U (en) Steel truss bridging bar piece space adjustable load lifting device
CN204823664U (en) Adjustable combination hoist
CN203754224U (en) Lifting appliance for lifting bridge cable
CN102983517A (en) Integral installation device for transformer test bench
CN103738852B (en) Hoisting crane test mass device
CN206188233U (en) Hydraulic pressure balance hanger
CN101357737B (en) Constant hoisting force conveying method for crane with multi-hoisting points
CN205442379U (en) Balanced sling
CN202358822U (en) Hoisting structure for oil field skid block
CN104899444B (en) A kind of bow plate limiter of moment structural parameter determining method matched with tower crane
CN101353133A (en) Crane constant hoisting force delivery hoisting method
CN102502392A (en) Oilfield skid block hoisting structure
CN103264953B (en) Butt-joint adjusting device of steel bar cage
CN203639016U (en) Balance beam for hoisting reinforcing steel bars by tower crane
CN101590979A (en) The hoisting crane constant-rear lifting and hoisting force short-delivery hoisting method
CN202936088U (en) T-shaped beam steel lifting bracket
CN204454251U (en) A kind of multipurpose hanger being applicable to the stiffening girder lifting of suspension bridge steel purlin
CN101353134A (en) Crane multiple hoisting point delivery hoisting method
CN101723235A (en) Crane short-delivery leveling mode constant-rear hoisting force delivery method
CN202164029U (en) Lifting appliance for crane
CN204297905U (en) A kind of lifting device of precast concrete

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C04 Withdrawal of patent application after publication (patent law 2001)
WW01 Invention patent application withdrawn after publication

Open date: 20091202