CN101588059B - 防雷-接地集成保护系统 - Google Patents
防雷-接地集成保护系统 Download PDFInfo
- Publication number
- CN101588059B CN101588059B CN2009100112595A CN200910011259A CN101588059B CN 101588059 B CN101588059 B CN 101588059B CN 2009100112595 A CN2009100112595 A CN 2009100112595A CN 200910011259 A CN200910011259 A CN 200910011259A CN 101588059 B CN101588059 B CN 101588059B
- Authority
- CN
- China
- Prior art keywords
- cable
- earth rod
- cabin
- shell
- tower tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
本发明涉及一种用在风力发电机组上的防雷-接地保护系统。防雷-接地集成保护系统,在叶片尖部设有防雷接闪器,防雷接闪器通过叶片内部电缆连接到轮毂再连到主轴上,主轴承室通过电缆连接到机舱壳内的接地棒上,齿轮箱通过电缆连接到机舱壳内的接地棒上,塔筒顶部单元的转换器通过电缆连接到机舱壳内的接地棒上,机舱壳内的接地棒通过电缆与塔筒顶部单元的接地棒相连,塔筒顶部单元的接地棒通过电缆与设在塔筒下部的控制柜内部的接地棒连接,设在机舱壳内的发电机通过电缆连接到塔筒下部控制柜内部的接地棒上,控制柜内部的接地棒通过电缆连接到塔筒底部的接地棒上,塔筒底部的接地棒与塔筒基础中的接地线和基础金属框架相连。
Description
技术领域
本发明涉及一种保护系统,尤其涉及一种用在风力发电机组上的防雷-接地保护系统。
背景技术
各个国际风力发电机组厂家实际设计所依据标准和参数包括地网电阻有很大差别。所以,形成的风力发电机组在防雷系统制造上留下薄弱环节,使得制造厂家对机舱壳内部的电气设备接地的分支线,未与接地干线连接,实行串联连接或通过支架、其它槽钢过渡,使得防雷系统和机组的接地系统复杂并且成本过高。甚至由此导致部分风力发电机组遭受雷击,特别是叶片和发电机贵重部件遭受雷击,除了损失修复期间应该发电所得之外,还要负担受损部件的拆装和更新的巨大费用。
发明内容
为解决上述技术问题本发明提供一种防雷-接地集成保护系统,目的是防止风力发电机组受到雷击。
为达上述目的防雷-接地集成保护系统,在叶片尖部设有防雷接闪器,防雷接闪器通过叶片内部电缆连接到轮毂再连到主轴上,主轴与主轴承室外壳通过电缆连接,主轴承室外壳通过电缆连接到机舱壳内的接地棒上,齿轮箱外壳通过电缆连接到机舱壳内的接地棒上,塔筒顶部单元的转换器通过电缆连接到机舱壳内的接地棒上,机舱壳内的接地棒通过电缆与塔筒顶部单元的接地棒相连,塔筒顶部单元的接地棒通过电缆与设在塔筒下部的控制柜内部的接地棒连接,设在机舱壳内的发电机外壳通过电缆连接到塔筒下部控制柜内部的接地棒上,控制柜内部的接地棒通过电缆连接到塔筒底部的接地棒上,塔筒底部的接地棒与塔筒基础中的接地线和基础金属框架相连。
所述的机舱壳内的接地棒与机舱壳外的避雷针连接。
本发明的优点效果:本发明使机组所有部件保持电位平衡,并提供便捷的接地通道以释放雷电,避免高能雷电的积累。从叶片到机舱,是通过电缆直接连接到接地棒上。雷击时,连接主轴与轴承座的换向器可将瞬态电流不经过轴承而安全地转移到机舱底座进入接地网。风力发电机组为一般的电气设备,防雷接地与保护接地如果分开的话,那样对地网制作来说难度会加大,同时要求接地电阻小于1欧姆。如果不分的话只要接地电阻小于4欧姆就可以,简化集成了保护接地、零点接地和防雷保护的保护系统,使其保护系统更加安全容易,同时也大大的降低了做地网的难度,从而使得整个集成保护系系统的装配制造成本。
附图说明
图1是本发明的结构示意图。
图中:1、避雷针;2、叶片;3、机舱壳内的接地棒;4、轮毂;5、主轴承室;6、齿轮箱;7、发电机;8、塔筒顶部单元的转换器;9、塔筒顶部单元的接地棒;10、控制柜内部的接地棒;11、塔筒底部的接地棒;12、塔筒基础;13、防雷接闪器;14、机舱壳;15、控制柜。
具体实施方式
下面结合附图对本发明作进一步说明。
如图所示本发明防雷-接地集成保护系统,叶片2尖部设有防雷接闪器13,防雷接闪器13通过叶片2内部电缆连接到轮毂4再连到主轴上,主轴与主轴承室5外壳通过电缆连接,主轴承室5外壳通过电缆连接到机舱壳内的接地棒3上,齿轮箱6外壳通过电缆连接到机舱壳内的接地棒3上,塔筒顶部单元的转换器8通过电缆连接到机舱壳内的接地棒3上,机舱壳内的接地棒3通过电缆与塔筒顶部单元的接地棒9相连,塔筒顶部单元的接地棒9通过电缆与设在塔筒下部的控制柜内部的接地棒10连接,设在机舱壳内的发电机7的外壳通过电缆连接到塔筒下部控制柜内部的接地棒10上,控制柜内部的接地棒10通过电缆连接到塔筒底部的接地棒11上,塔筒底部的接地棒11与塔筒基础12中的接地线和基础金属框架相连,机舱壳内的接地棒3与机舱壳外的避雷针1连接,风向仪风速仪与避雷针为一体。
同时主轴承室5外壳、齿轮箱6外壳、机舱壳内的接地棒3、塔筒顶部单元的接地棒9、机舱壳14、发电机7外壳、控制柜内部的接地棒10、控制柜15外壳和塔筒底部的接地棒11各自接地,形成互为备用的接地保护回路。
Claims (2)
1.防雷-接地集成保护系统,其特征在于在叶片尖部设有防雷接闪器,防雷接闪器通过叶片内部电缆连接到轮毂再连到主轴上,主轴与主轴承室外壳通过电缆连接,主轴承室外壳通过电缆连接到机舱壳内的接地棒上,齿轮箱外壳通过电缆连接到机舱壳内的接地棒上,塔筒顶部单元的转换器通过电缆连接到机舱壳内的接地棒上,机舱壳内的接地棒通过电缆与塔筒顶部单元的接地棒相连,塔筒顶部单元的接地棒通过电缆与设在塔筒下部的控制柜内部的接地棒连接,设在机舱壳内的发电机外壳通过电缆连接到塔筒下部控制柜内部的接地棒上,控制柜内部的接地棒通过电缆连接到塔筒底部的接地棒上,塔筒底部的接地棒与塔筒基础中的接地线和基础金属框架相连;同时主轴承室外壳、齿轮箱外壳、机舱壳内的接地棒、塔筒顶部单元的接地棒、机舱壳、发电机外壳、控制柜内部的接地棒、控制柜外壳和塔筒底部的接地棒各自接地,形成互为备用的接地保护回路。
2.根据权利要求1所述的防雷-接地集成保护系统,其特征在于所述的机舱壳内的接地棒与机舱壳外的避雷针连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100112595A CN101588059B (zh) | 2009-04-23 | 2009-04-23 | 防雷-接地集成保护系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100112595A CN101588059B (zh) | 2009-04-23 | 2009-04-23 | 防雷-接地集成保护系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101588059A CN101588059A (zh) | 2009-11-25 |
CN101588059B true CN101588059B (zh) | 2011-03-23 |
Family
ID=41372177
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100112595A Expired - Fee Related CN101588059B (zh) | 2009-04-23 | 2009-04-23 | 防雷-接地集成保护系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101588059B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102010025546A1 (de) | 2010-06-29 | 2011-12-29 | Suzlon Energy Gmbh | Maschinenhausverkleidung |
ITVI20110013U1 (it) * | 2011-02-23 | 2012-08-24 | Itaco S R L | Generatore elettrico |
CN111293446B (zh) * | 2020-02-17 | 2021-05-11 | 中国人民解放军海军工程大学 | 一种多功能的船舶电气设备接地设备及其用途 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7377750B1 (en) * | 2004-03-19 | 2008-05-27 | Northern Power Systems, Inc. | Lightning protection system for a wind turbine |
CN101207270A (zh) * | 2007-12-13 | 2008-06-25 | 苏州市南极风能源设备有限公司 | 风力发电防雷系统 |
CN201125843Y (zh) * | 2007-12-21 | 2008-10-01 | 广东明阳风电技术有限公司 | 风力发电机组防雷保护系统 |
CN201378728Y (zh) * | 2009-04-23 | 2010-01-06 | 沈阳瑞祥风能设备有限公司 | 防雷-接地集成保护系统 |
-
2009
- 2009-04-23 CN CN2009100112595A patent/CN101588059B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7377750B1 (en) * | 2004-03-19 | 2008-05-27 | Northern Power Systems, Inc. | Lightning protection system for a wind turbine |
CN101207270A (zh) * | 2007-12-13 | 2008-06-25 | 苏州市南极风能源设备有限公司 | 风力发电防雷系统 |
CN201125843Y (zh) * | 2007-12-21 | 2008-10-01 | 广东明阳风电技术有限公司 | 风力发电机组防雷保护系统 |
CN201378728Y (zh) * | 2009-04-23 | 2010-01-06 | 沈阳瑞祥风能设备有限公司 | 防雷-接地集成保护系统 |
Non-Patent Citations (6)
Title |
---|
JP特开2004-225660A 2004.08.12 |
元建学等.大型风力机的防雷保护.《延安大学学报(自然科学版)》.2008,第27卷(第4期),51-54. * |
康春华等.风电机组的防雷问题.《山西电力》.2006,(第6期),62-64. * |
林志远等.风力发电机组的防雷问题.《广东电力》.2001,第14卷(第5期),15-18,81. * |
王丽广.风电机组的防雷保护.《变流技术与电力牵引》.2008,37-39. * |
邢作霞等.大型并网风力发电机的防雷保护.《可再生能源》.2004,(第115期),55-56. * |
Also Published As
Publication number | Publication date |
---|---|
CN101588059A (zh) | 2009-11-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102767487B (zh) | 用于风力涡轮机的防雷保护系统及其防雷方法 | |
CA2780558C (en) | Lightning protection for a nacelle of a wind turbine | |
CN101463802B (zh) | 风力发电机组防雷保护系统 | |
Rodrigues et al. | Protection of wind energy systems against the indirect effects of lightning | |
US9638172B2 (en) | Arrangement of a switchgear of a wind turbine | |
Rona et al. | Power system integration of wind farms and analysis of grid code requirements | |
CN201125843Y (zh) | 风力发电机组防雷保护系统 | |
CN101588059B (zh) | 防雷-接地集成保护系统 | |
Olsen et al. | Low frequency AC transmission on large scale offshore wind power plants | |
KR101321090B1 (ko) | 핵심보호체 보호를 위한 낙뢰 방지기 | |
CN105443324A (zh) | 一种风力发电机组机舱罩防雷系统设计方法及防雷系统 | |
CN201378728Y (zh) | 防雷-接地集成保护系统 | |
CN201994656U (zh) | 大型海上风力发电机组防雷系统 | |
Rodrigues et al. | Electromagnetic transients due to lightning strikes on wind turbines: A case study | |
Rodrigues et al. | Direct lightning surge analysis in wind turbines using electromagnetic transients computer program | |
CN202249077U (zh) | 外设橡胶保护层的风电电杆 | |
CN201747535U (zh) | 一种风力发电机组的塔筒 | |
CN211287980U (zh) | 一种风力发电机组机舱罩防雷系统 | |
Rodrigues et al. | Indirect effects of lightning on wind turbines using EMTP-RV | |
Rodrigues et al. | EMTP-RV Analysis of Lightning Surges on Wind Turbines | |
Rodrigues et al. | Electromagnetic transients study due to lightning strikes on two interconnected wind turbines | |
CN201705568U (zh) | 竖轴直驱永磁低碳风力发电机组 | |
CN219034909U (zh) | 一种风力发电机组的接地保护安装组件 | |
CN215719260U (zh) | 一种防闪电风机 | |
Vahidi et al. | Lightning overvoltage analysis in wind farm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110323 Termination date: 20150423 |
|
EXPY | Termination of patent right or utility model |