CN101581148A - Signal generating structure for troweling machine linear adjusting device - Google Patents
Signal generating structure for troweling machine linear adjusting device Download PDFInfo
- Publication number
- CN101581148A CN101581148A CNA2008103055640A CN200810305564A CN101581148A CN 101581148 A CN101581148 A CN 101581148A CN A2008103055640 A CNA2008103055640 A CN A2008103055640A CN 200810305564 A CN200810305564 A CN 200810305564A CN 101581148 A CN101581148 A CN 101581148A
- Authority
- CN
- China
- Prior art keywords
- light
- troweling machine
- signal generating
- cord
- adjusting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
A troweling machine with the function of accurately adjusting the movement back and forth in a straight line does not exist in the current market. The invention provides a signal structure capable of accurately adjusting the movement of the troweling machine back and forth in the straight line. The invention adopts the following technical proposal: a signal generating structure for a troweling machine linear adjusting device is that a light beam emitter is arranged on a linear pillar; a photic plate is arranged on a post on one side of a bracket, and is provided a vertical loophole; a light barrier is arranged on a post on the other side of the bracket, and is provided with two vertical light beam site lines; and a plane formed by the light beam site lines and the loophole is parallel to that of a soot door. The signal generating structure has the advantages of adjustment of the straight line for the troweling machine, simple structure, and low cost.
Description
Affiliated field
The present invention relates to plastering machine, be specially signal generating structure for troweling machine linear adjusting device.
Background technology
In the market the troweling machine of Chu Shouing do not seen as yet can accurately adjust troweling machine move before and after straight function.
Summary of the invention
Accurately adjust straight signal structure before and after the invention provides a kind of can moving to troweling machine.
The present invention adopts technology contents:
Signal generating structure for troweling machine linear adjusting device, the signal recurring structure of straightening line apparatus is: on the straight line post light-beam transmitter is installed, on support one heel post light-passing board is installed, vertical loophole is arranged on this light-passing board, the frequency modulated light plate is installed on the opposite side column, the vertical light-beam position line of twice is arranged, light-beam position line and loophole formed plane and ash hole plane parallel on the frequency modulated light plate.
The signal recurring structure that vertical adjustment is directly installed is: a sagging cord of top of the trellis, and the cord bottom connects regulating block, and the regulating block lower horizontal is installed magnet, and the cord bottom is in touches in the circle, touches circle and is connected with frame bottom; Touching circle, regulating block, magnet periphery has airtight shell, and the cord periphery has sleeve pipe.
Advantage of the present invention: can adjust straight line to troweling machine, and simple in structure, cheap.
Description of drawings
Below in conjunction with accompanying drawing the present invention is described in further details:
Fig. 1 troweling machine schematic diagram Fig. 2 ash hopper and air bag schematic diagram
Fig. 3 straightening line signal recurring structure schematic diagram
1 column, 2 crossbeams, 3 bottom girders, 4 ash holes, 5 plastering plates, 6 truckles 7 promote rope 8 cords 9 sleeve pipes 10 shells 11 and touch circle 12 regulating blocks 13 spacing collars 14 magnet 15 grey hopper 16 air bags 17 light-passing boards 18 frequency modulated light plate (reflector) 19 straight line posts, 20 light-beam transmitters, 21 reflectors (frequency modulated light plate) 22 light-beam position lines 23 light beams
The specific embodiment
Among Fig. 1, rib is higher than and is positioned at that crossbeam 2 (also can be transverse slat) bottom promotes rope 7 or/and the distance of the apparatus of plastering of truckle 6 belows (compositions apparatus of plastering such as plastering plate, ash hole, grey hopper, glider) top (this position can be depression, and the depression position is for promoting rope and the pairing position of truckle) promotes rope or/and the distance of pushing up (i.e. top ceiling point) to support at the bottom of the truckle more than or equal to the crossbeam bottom on the ash hole 4.Because of the support top ceiling point that has with crossbeam 2 bottoms lifting rope or/and the distance between the truckle do not fix, in last more than or equal to greater than being good.If the crossbeam of troweling machine bottom does not have the rope of lifting and truckle, then the position of crossbeam bottom promptly quite with the position of this lifting rope and truckle.
Among Fig. 1, the straight structure of vertical adjustment is: a sagging cord 8 of top of the trellis, and regulating block 12 is arranged at the cord bottom, and there is horizontal magnet 14 the regulating block below, and circle 11 is touched in the regulating block top, and the center of touching circle is cord (when support was vertical, cord was positioned at and touches the circle central point).Also adjustable block is a magnet, and horizontal iron plate is installed in the below.The regulating block periphery has spacing collar 13, restriction regulating block hunting range.Touch circle or/and on the connector fine tuning structure is arranged between spacing collar and the support.Spacing collar, touch circle and can be installed on the same fine tuning structure.Spacing collar is or/and touch between circle and the support connector is arranged, and this connector is fixedlyed connected with support or with lockly is rotatably connected surely.
The sleeve pipe 9 of cord overcoat is divided into 2 ~ 3 sections, and the thin hypomere of epimere is thick.The preceding paragraph is connected with a top of the trellis, and next section is connected with frame bottom.Between interlude (if having) and the last hypomere stuck point or collar are arranged, adjacent segment is blocked do not separated, can easily stretch again.Regulating block, spacing collar, touch overcoat shell 10 such as circle, shell 10 is connected with frame bottom (adopting removable), and knock-down lid is arranged on the shell, and the convenient support of observing is when vertical, and whether cord is touching the circle central point.
Among Fig. 2, air bag 16 is in grey hopper, and connection is pasted mutually with the grey hopper back side in the back side.After inflating fully, air bag can take the whole spaces of grey hopper.Air bag four faces up and down pastes adaptive with grey hopper response surface and connection mutually.Pasting the connection area mutually up and down is 1/5 ~ 4/5 of grey hopper corresponding the area of the back side between the front, preferred 2/5 ~ 3/5, preferably about 1/2. fully the inflation after, the centre in air bag front (longitudinally) horizontal direction is that projection is (if can not exceed the ash hole plane in the middle of the air bag, then the volume of grey hopper should suitably strengthen), can exceed the ash hole plane slightly, the bottom, top can not contact the ash hole plane, and the rib place can not the ash discharge material up and down in case block ash hole.The plastering plate in ash hole front can block the protuberance in the middle of the air bag.Air bag also can select cumulative volume greater than grey bucket capacity, and then four faces and grey hopper inwall paste and connect area and can reach the ratio of this face area of grey hopper greater than 1/2 air bag mutually up and down.If the positive back side of grey hopper height, width are identical, then grey hopper inwall and air bag veneer mutually amass the aforesaid ratio of using.If the positive back side of grey hopper height, width difference, then grey hopper inwall and the air bag size of veneer mutually are the ratio of calculating with length between the back-to-front, and be suitable with the assurance air bag.
Among Fig. 3, the light-passing board 17 parallel with ash hole installed in the convenient position of observing, support lower, on the light-passing board on the straight line post 19 of the width of vertical loophole and the placement of support side the beam diameter of the light-beam transmitter 20 of installation identical.The light beam that this light-beam transmitter produced is that bright-colored such as reddish yellow is good, and diameter substantially with the variation of irradiation distance do not change (0 ~ 50 meter, preferred 0 ~ 40 meter, in best 0 ~ 35 meter scope so).Adopt between light-beam transmitter and the straight line post and with lockly be rotatably connected surely that (for example pushing down rotatable components with elastic component is that light-beam transmitter is or/and the frequency modulated light plate, push down rotatable components with elastic component again after pulling elastic component, rotation rotatable components), rotatable 90 degree are or/and 270 degree (with 180 degree).Light beam passes light-passing board, drops on the frequency modulated light plate 18 of support opposite side installation, and the vertical light-beam position line 22 of twice is arranged on the frequency modulated light plate, and width equals beam diameter between the light-beam position line.This twice light-beam position line dual-side can have the adjacent secondary position line, convenient observation.In the light-beam position line or outer (be outward good with line) be apparent light district, when promptly light beam is a little outside the light-beam position line, be very easy to observe.Also can inside and outside the light-beam position line, adopt the apparent light district of different colours.Show the available various existing and suitable various apparent luminescent material of light beam color in light district.
Among Fig. 3, light barrier 18 can be changed to reflector, and corresponding light-beam position line is arranged on the reflector.Reflector 21 is also installed at the light-beam transmitter back side.Light-beam transmitter is to be good (not necessarily smooth because of ground, light beam itself promptly can be up or down) slightly up or down.Each reflector is good (as corrosion resistant plate or other reflectorized materials) with the reflector that light beam does not have refraction.
Among Fig. 3, light-beam transmitter 20 can (parallel with ash hole) be installed on the support (a heel post), on the straight line post reflector is installed, frequency modulated light plate or reflector (on this frequency modulated light plate or the reflector light-beam position line being arranged) are installed in the light-beam transmitter back side, the light-passing board of installing on so shouldn't support.
In the various structures, because of light beam can come back reflective, so the reflector height should so can improve accuracy greatly.
Among each figure, frequency modulated light plate, light-passing board, reflector are good to be positioned at cradle back.
Claims (2)
1. signal generating structure for troweling machine linear adjusting device (), the signal recurring structure that it is characterized in that the straightening line apparatus is: on the straight line post light-beam transmitter is installed, on support one heel post light-passing board is installed, vertical loophole is arranged on this light-passing board, the frequency modulated light plate is installed on the opposite side column, the vertical light-beam position line of twice is arranged, light-beam position line and loophole formed plane and ash hole plane parallel on the frequency modulated light plate.
2. according to the described signal generating structure for troweling machine linear adjusting device of claim 1 (), it is characterized in that the signal recurring structure that vertical adjustment is directly installed is: a sagging cord of top of the trellis, the cord bottom connects regulating block, the regulating block lower horizontal is installed magnet, the cord bottom is in touches in the circle, touches circle and is connected with frame bottom; Touching circle, regulating block, magnet periphery has airtight shell, and the cord periphery has sleeve pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008103055640A CN101581148A (en) | 2007-11-14 | 2008-11-14 | Signal generating structure for troweling machine linear adjusting device |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200720193045 | 2007-11-14 | ||
CN200720193045.0 | 2007-11-14 | ||
CNA2008103055640A CN101581148A (en) | 2007-11-14 | 2008-11-14 | Signal generating structure for troweling machine linear adjusting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101581148A true CN101581148A (en) | 2009-11-18 |
Family
ID=41363453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2008103055640A Pending CN101581148A (en) | 2007-11-14 | 2008-11-14 | Signal generating structure for troweling machine linear adjusting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101581148A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116641565A (en) * | 2023-07-26 | 2023-08-25 | 成都建工装饰装修有限公司 | Installation clamping device suitable for assembled decoration and heat preservation integrated wallboard |
-
2008
- 2008-11-14 CN CNA2008103055640A patent/CN101581148A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116641565A (en) * | 2023-07-26 | 2023-08-25 | 成都建工装饰装修有限公司 | Installation clamping device suitable for assembled decoration and heat preservation integrated wallboard |
CN116641565B (en) * | 2023-07-26 | 2023-09-22 | 成都建工装饰装修有限公司 | Installation clamping device suitable for assembled decoration and heat preservation integrated wallboard |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201261639Y (en) | Elevation type H rack | |
CN205530121U (en) | Can dismantle flood control wall | |
CN101581148A (en) | Signal generating structure for troweling machine linear adjusting device | |
CN201372557Y (en) | Plastering machine | |
CN204486153U (en) | A kind of glue laminating apparatus of capacitive touch screen | |
US11854429B2 (en) | Portable simulated flood discharge culvert for surveying and mapping | |
CN209534658U (en) | A kind of tire of anti-pinch stone | |
CN106448454A (en) | Municipal street nameplate | |
CN209670378U (en) | A kind of architectural engineering unwrapping wire auxiliary alignment device | |
CN207456453U (en) | A kind of target plummet stability tripod used for geological prospecting | |
CN207143710U (en) | A kind of floating on water shelter bridge subtracts unrestrained Anti-side-turning device | |
CN205008424U (en) | Alignment detection mechanism is taken to saw | |
CN205249405U (en) | Telescopic appearance bracket of checking meter | |
CN206421586U (en) | Urban transportation indicates system | |
CN210570625U (en) | Underground space roof sinking displacement monitoring device | |
CN207633330U (en) | Filling pile cage of reinforcement absolute altitude and verticality control device under a kind of concrete water | |
CN209025015U (en) | A kind of median of ecological, environmental protective | |
CN211289422U (en) | Adjustable support for surveying and mapping engineering | |
CN205712052U (en) | A kind of constructing device for earth work | |
CN108487017B (en) | High-control method in road construction | |
CN209011300U (en) | Detachable activity builder's temporary shed | |
CN206892131U (en) | A kind of erecting device for making ADCP enter water along ramp type riverbank | |
CN204475587U (en) | Circular arc-shaped corner upright post base structure | |
CN201574567U (en) | Signal generating structure of linearity adjusting device of plastering machine | |
CN219284269U (en) | Foundation settlement observation device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20091118 |