CN101575833A - Method for restoring crosstie made of concrete - Google Patents

Method for restoring crosstie made of concrete Download PDF

Info

Publication number
CN101575833A
CN101575833A CNA2008100371824A CN200810037182A CN101575833A CN 101575833 A CN101575833 A CN 101575833A CN A2008100371824 A CNA2008100371824 A CN A2008100371824A CN 200810037182 A CN200810037182 A CN 200810037182A CN 101575833 A CN101575833 A CN 101575833A
Authority
CN
China
Prior art keywords
concrete
concrete sleeper
screw
crosstie
restoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008100371824A
Other languages
Chinese (zh)
Other versions
CN101575833B (en
Inventor
方啸虎
温简杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ZUANSHENG AND NEW MATERIAL TECHNOLOGY Co Ltd
Original Assignee
SHANGHAI ZUANSHENG AND NEW MATERIAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ZUANSHENG AND NEW MATERIAL TECHNOLOGY Co Ltd filed Critical SHANGHAI ZUANSHENG AND NEW MATERIAL TECHNOLOGY Co Ltd
Priority to CN200810037182A priority Critical patent/CN101575833B/en
Publication of CN101575833A publication Critical patent/CN101575833A/en
Application granted granted Critical
Publication of CN101575833B publication Critical patent/CN101575833B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention discloses a method for restoring a crosstie made of concrete, belonging to the technical filed of restoration and aiming to solve the technical problem of fast restoring the crosstie made of concrete so that the old and useless crosstie made of concrete can be repeatedly used. The method for restoring the crosstie made of concrete comprises the following steps: (1) perforating damaged screw parts of the crosstie made of concrete by a diamond drill and then taking concrete drill cores containing damaged screws out; (2) embedding (new) screws and filling concrete materials, i.e. rapid hardening and quick drying sulphate aluminum cement and adding water glass or adding water glass and water into perforated holes so that the concrete materials can be rapidly hardened; and (3) checking the fastness degree of the embedded screws, determining that the concrete materials are solidified and then adding screw caps to tighten the screws so that the restoration is completed. With the invention, the crosstie made of concrete can be fast restored so that the old and useless crosstie made of concrete can be repeatedly used.

Description

A kind of method of repairing concrete sleeper
Technical field
The present invention relates to recovery technique, particularly relate to the method that a kind of reparation is used for the concrete sleeper of tunnel, mine and railway.
Background technology
According to the preliminary statistics, there are 210,000 big and small mines in the whole nation, and each mine is on average by tunnel, 5 kilometers mines, and will there be the tunnel, mine of nearly gigameter in the whole nation.These tunnel, mine long period of soaking are very easily suffered to damage and must often be repaired in underground water.This be railroad track ten Shes doubly, the repair amount is extraordinary.
In addition, Chinese china railway total length will reach 7.5 ten thousand kilometers to the end of the year 2008, plan 2010, and railway increases by 20,000 kilometers again, and length overall reaches 9.5 ten thousand kilometers.Be only second to the U.S., Russia occupies the third place in the world.But 2006, China railways has been finished the freight volume of world's railway 1/4 with the revenue kilometres that account for world's railway 6%, has created four the first in the world: volume of passenger transportation the first in the world, delivery of goods amount the first in the world, conventional of freight mileage the first in the world, railway transportation density the first in the world.
Along with the high speed of national economy, sustainable development, railway transportation are still being undertaken other at home and are being transported irreplaceable effect.Also along with the high speed of national economy, the mileage of sustainable development railway also can continue to increase.
Creating on the railway transportation much the first, no doubt is meddlesome.Also bring a lot of unfavorable factors for simultaneously the maintenance of railway.As everyone knows, the sleeper of railway originally all is with wooden, changes concrete system afterwards into, is a much progress, has saved timber so greatly.And not resembling wooden crossties, can just can not reinforce concrete sleeper with iron nail, but reinforce with screw.In long-term vibrations friction, screw will become flexible, and maintenance is then often fastening at ordinary times.Then screw damage of longer time before not having the present invention, is cancelled whole concrete sleeper only, has wasted material, also pollutes.
Follow according to data, per two meters tracks just have five sleepers, and every sleeper has four screws, so every meter on average has ten on screw.Screw on railway will be up to 750,000 at present in the whole nation.This maintenance capacity is big has just well imagined.
Summary of the invention
At the defective that exists in the above-mentioned prior art, technical problem to be solved by this invention provides the quick repairing concrete sleeper of a kind of energy, makes the waste and old reusable method of concrete sleeper energy.
In order to solve the problems of the technologies described above, the method of a kind of repairing concrete sleeper provided by the present invention, it is characterized in that the step of method: 1) the part punching of the screw that concrete sleeper has been damaged with diamond bit, take out the concrete core that contains the damaged screws nail; 2) then (new) screw is implanted, and with the fast dried sulphate aluminium cement of rapid hardening add water glass or add water glass and the concrete material filling of water wherein, make its rapid solidification; 3) the firm degree of the inspection screw that buries is confirmed to solidify, and it is fastening to add nut, finishes reparation.
Further, described diamond bit is the special diamond drill bit that is used for repairing concrete sleeper that Shanghai GEMS company produces.
Further, described fast hard (fast doing) sulphate aluminium cement is a label 525 #--1025 #Totally six specifications, quality meets the fast dried sulphate aluminium cement of rapid hardening of Chinese building material JC714-96 standard.
Utilize the method for repairing concrete sleeper provided by the invention, because adopting the diamond bit punching removes, the mode repairing concrete sleeper of the fast dried sulphate aluminium cement filling setscrew of rapid hardening, and this fast hard (fast doing) cement can be cured in the extremely short time, and the longest needs 3h, and the shortest needs 25min, even can also be as required≤25min, so can just be usually used in the reparation of the useless concrete sleeper that decreases, and its cost has only and changes 1/10 of whole concrete sleeper, save very much; Simultaneously waste and old concrete sleeper could also be reused, and does not need whole be discarded in by the railway, has avoided the pollution of waste and old concrete sleeper!
The specific embodiment
Below embodiments of the invention are described in further detail, but present embodiment is not limited to the present invention, every employing similarity method of the present invention and similar variation thereof all should be listed protection scope of the present invention in.
The method of a kind of repairing concrete sleeper that the embodiment of the invention provided, be characterized in, the part of the concrete sleeper screw that the special diamond drill bit will have been damaged earlier, with portable rig with drill bit in the part punching that damages, take out the concrete core that contains the damaged screws nail.Then new screw is implanted, and with the fast dried sulphate aluminium cement of rapid hardening or add water glass or add water glass and the concrete material filling of water wherein, allow its rapid solidification.Because this cement can be cured in the extremely short time, the longest needs 3h, and the shortest needs 25min, even can also be as required≤25min.So can just be usually used in the reparation of the useless concrete sleeper that decreases, and its cost has only and changes 1/10 of whole concrete sleeper, save very much.Simultaneously waste and old concrete sleeper could also be reused, and does not need whole be discarded in by the railway, so that pollute!
Because this kind cement also has freeze proof advantage,, more can be suitable for the use under the cold conditions in western part, the north and winter so not only be fit to the use of general normal weather! Particularly western, geology Disaster evil is very frequent at present, more apparent its importance of this operation!
The diamond bit that the present invention selects for use is that Shanghai GEMS company produces, and the trade mark is: a kind of among the GEMS-Z.Its diameter of phi 25-40mm; The general 120-150mm of length.Bit wall thickness is generally 3-8mm.As GEMS-Z Φ 35mm; Long 100mm; Bit wall thickness is 5mm; Code name can be written as GEMS-Z Φ 35mm.
Also to be equipped with special portable rig with it.
Method of the present invention adopts the fast dried sulphate aluminium cement series of products of rapid hardening, label 525 #--1025 #Totally six specifications, quality meets Chinese building material JC714-96 standard.This product has high strength, low alkalinity, early epistasis, fast, the acid and alkali-resistance of condensing, antiseep, corrosion resistant, microdilatancy, the low contraction.In order to accelerate setting rate, special-purpose No. 3 water glass of available engineering circle, as required fast time of doing adds water in proportion or does not add the water ready-mixed concrete with this product during use.Can accelerate setting time greatly like this, this brings desirable effect to the operation meeting that is in operation.
The concrete technical requirements index of the fast dried sulphate aluminium cement of rapid hardening in the inventive method:
1. technical qualities index
A. specific area: be not less than 350 squares/kg
B. time of setting: initial set is no earlier than 25min, and final set is earlier than 3h.Can provide the rapid hardening fast dried sulphate aluminium cement of initial set by customer requirements less than 25min.
2. predominant use
A. preparation early by force, hard, freeze proof, resisting erosion of sulfate concrete soon;
B. prepare GRC concrete and goods;
C. winter construction, repairing rush construction engineering, particularly the railway engineering repairing is used.
One of specific embodiments of the inventive method:
1) problematic concrete sleeper is checked out in track inspection, and noting marker;
2) adopting GEMS-Z type Φ 30mm, long 120mm, bit wall thickness is 5mm, and its code name is the railway concrete sleeper special diamond drill bit of GEMS-Z Φ 30.Accomplish fluently diameter at problematic concrete sleeper position and be and get the core hole about Φ 31mm, and its concrete core and the screw that damaged are taken out together;
3) imbed prior ready prepd new screw and put into the hole;
4) by the required setting time that designs in advance, allotment rapid hardening fast dried sulphate aluminium cement, this adds water glass is 30% or water 70%.Quick hardening cement is adjusted to the higher pastel of viscosity.The general setting time of present case is about 1h;
5) the concrete material of pastel is filled in and screw is housed puts into the hole, allows its rapid solidification;
6) the firm degree of the inspection screw that buries is confirmed to solidify, and it is fastening to add nut, promptly repairs.
Two of the specific embodiments of the inventive method:
1) problematic concrete sleeper is checked out in track inspection, and noting marker;
2) adopting GEMS-Z type Φ 35mm, long 120mm, bit wall thickness is 8mm, and its code name is the concrete sleeper special diamond drill bit of GEMS-Z Φ 35.Accomplish fluently diameter at problematic concrete sleeper position and be and get the core hole about Φ 36mm, and its concrete core and the screw that damaged are taken out together;
3) imbed prior ready prepd screw, put into the hole;
4) by the required setting time that designs in advance, allotment rapid hardening fast dried sulphate aluminium cement, this adds water glass is 45% or water 55%.Quick hardening cement is adjusted to the higher pastel of viscosity.The general setting time of present case is about 0.5-0.75h;
5) the concrete material of pastel is filled in and screw is housed puts into the hole, allows its rapid solidification;
6) the firm degree of the inspection screw that buries is confirmed to solidify, and it is fastening to add nut, promptly repairs.

Claims (3)

1, a kind of method of repairing concrete sleeper is characterized in that, the step of method:
1) the concrete core that contains the damaged screws nail is taken out in the part punching of the screw that concrete sleeper has been damaged with diamond bit;
2) then new screw is implanted, and with the fast dried sulphate aluminium cement of rapid hardening add water glass or add water glass and the concrete material filling of water wherein, make its rapid solidification;
3) the firm degree of the inspection screw that buries is confirmed to solidify, and it is fastening to add nut, finishes reparation.
2, the method for repairing concrete sleeper according to claim 1 is characterized in that, described diamond bit is the special diamond drill bit that is used for repairing concrete sleeper that Shanghai GEMS company produces.
3, the method for repairing concrete sleeper according to claim 1 is characterized in that, the fast dried sulphate aluminium cement of described rapid hardening is a label 525 #--1025 #Totally six specifications, quality meets the fast dried sulphate aluminium cement of rapid hardening of Chinese building material JC714-96 standard.
CN200810037182A 2008-05-09 2008-05-09 Method for restoring crosstie made of concrete Expired - Fee Related CN101575833B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810037182A CN101575833B (en) 2008-05-09 2008-05-09 Method for restoring crosstie made of concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810037182A CN101575833B (en) 2008-05-09 2008-05-09 Method for restoring crosstie made of concrete

Publications (2)

Publication Number Publication Date
CN101575833A true CN101575833A (en) 2009-11-11
CN101575833B CN101575833B (en) 2012-10-17

Family

ID=41270887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810037182A Expired - Fee Related CN101575833B (en) 2008-05-09 2008-05-09 Method for restoring crosstie made of concrete

Country Status (1)

Country Link
CN (1) CN101575833B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306171A (en) * 2013-06-26 2013-09-18 西南交通大学 Groove cutting machine, groove cutting machine for repairing sleeper, and railroad sleeper repairing method
CN103866662A (en) * 2012-12-14 2014-06-18 昆明中铁大型养路机械集团有限公司 Small milling device for high-speed ballastless track

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10330878B3 (en) * 2003-07-09 2005-02-03 Pfleiderer Infrastrukturtechnik Gmbh & Co. Kg Method for the subsequent insertion of push-through connections in concrete sleepers
CN2668682Y (en) * 2003-11-01 2005-01-05 徐怀志 Plastic casing-tube drilling device for speed-up railroad switch rail-pillow plate and preburying device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866662A (en) * 2012-12-14 2014-06-18 昆明中铁大型养路机械集团有限公司 Small milling device for high-speed ballastless track
CN103866662B (en) * 2012-12-14 2015-09-16 昆明中铁大型养路机械集团有限公司 The small-sized milling device of a kind of high speed non-fragment orbit
CN103306171A (en) * 2013-06-26 2013-09-18 西南交通大学 Groove cutting machine, groove cutting machine for repairing sleeper, and railroad sleeper repairing method
CN103306171B (en) * 2013-06-26 2015-08-26 西南交通大学 Groove cutting machine, sleeper reparation groove cutting machine and railroad sleeper restorative procedure

Also Published As

Publication number Publication date
CN101575833B (en) 2012-10-17

Similar Documents

Publication Publication Date Title
CN103498683B (en) Tunnel early-strength quick strengthening method based on quick-set composite mortar and fiber woven mesh
CN103952952A (en) Method for repairing open joint of track slab of CRTS II type slab ballastless track on high-speed rail
CN104404844A (en) Method for repairing and reinforcing open joint of filling layer of slab ballastless track
CN102888791A (en) Maintenance structure and maintenance method for plate-type ballastless track
CN101579892B (en) Efficient diamond drill for repairing concrete sleeper and fabricating method thereof
CN110952996B (en) Method and material for reinforcing electric power tunnel by fiber grid reinforced polymer mortar
CN106436492A (en) Maintaining method of base plates of CRTS II-shaped plate type ballastless tracks
CN101575833B (en) Method for restoring crosstie made of concrete
Huang et al. Behavior and Control of the Ballastless Track‐Subgrade Vibration Induced by High‐Speed Trains Moving on the Subgrade Bed with Mud Pumping
CN113089394A (en) Mechanical lifting and grouting reinforcement rapid repairing method for supporting layer of double-block ballastless track
CN209508841U (en) Utilize the old Hollow Slab Beam Bridge reinforcing construction of screw-thread steel and polymer-modified concrete
CN202830664U (en) Plate-type ballastless track maintenance structure
CN108130825B (en) Subgrade of metro concrete replacement technique in special limiting condition
CN201254693Y (en) Guarding system for railway steel bridge deck
CN105568795A (en) Method for repairing polymer composite for embedded track
CN203783600U (en) Bonding steel reinforcement device for highway tunnel lining surface
CN105089077A (en) Compound well cover of ultra-high performance concrete honeycomb structure and method for manufacturing compound well cover
CN201485755U (en) Concrete sleeper of pre-embedded combined casing
CN106626024A (en) Cast-in-place concrete sleeper construction technology
CN202194137U (en) Hollow grouting fastener for soil fixation
CN209586387U (en) A kind of reparation structure of Tunnel Second Lining concrete dew muscle
Bonatto et al. Maintenance and recovery of bridges and tunnels in a freight traffic railway line
Baoqun et al. Key innovative technology of CRTS III type pre-tensioning ballastless track slab by unit serial method
Silva et al. Recovery of Cracks in Concrete Railroad Sleepers: Procedure and Case Study
Chen The Application of Structural Adhesives in the Bridge Reinforcement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121017

Termination date: 20150509

EXPY Termination of patent right or utility model