CN101572955B - Method and device for deleting load - Google Patents

Method and device for deleting load Download PDF

Info

Publication number
CN101572955B
CN101572955B CN2008101054446A CN200810105444A CN101572955B CN 101572955 B CN101572955 B CN 101572955B CN 2008101054446 A CN2008101054446 A CN 2008101054446A CN 200810105444 A CN200810105444 A CN 200810105444A CN 101572955 B CN101572955 B CN 101572955B
Authority
CN
China
Prior art keywords
deleting bearing
management entity
user mobile
mobile control
control management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008101054446A
Other languages
Chinese (zh)
Other versions
CN101572955A (en
Inventor
熊春山
沈宇希
艾明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Telecommunications Technology CATT
Datang Mobile Communications Equipment Co Ltd
Original Assignee
China Academy of Telecommunications Technology CATT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Telecommunications Technology CATT filed Critical China Academy of Telecommunications Technology CATT
Priority to CN2008101054446A priority Critical patent/CN101572955B/en
Priority to KR1020107026776A priority patent/KR101175219B1/en
Priority to PCT/CN2009/071544 priority patent/WO2009132582A1/en
Publication of CN101572955A publication Critical patent/CN101572955A/en
Application granted granted Critical
Publication of CN101572955B publication Critical patent/CN101572955B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/30Connection release

Abstract

The invention provides a method and a device for deleting a load. The method comprises the steps: a service gateway is triggered to initiate a load-deleting process; the service gateway selects a usermobile control management entity for the load-deleting process and sends a load-deleting request message to the user mobile control management entity; and the selected user mobile control management entity performs corresponding load-deleting process according to the load-deleting request massage. The method and the device for deleting a load are not only suitable for the condition that user equipment (UE) does not activate an idle state signaling optimization (ISR) function or the ISR function of the UE can be activated or the UE is in a connection state after the ISR function of the UE is activated, but also suitable for the condition that the UE is in an idle state after the ISR function of the UE is activated.

Description

A kind of method and apparatus of deleting bearing
Technical field
The present invention relates to mobile communication technology, particularly relate to a kind of method and apparatus of deleting bearing.
Background technology
In the evolved packet system (EPS) of third generation collaborative project, adopted new core network architecture, the user mobility control and management entity that the enhancing data transfer rate Radio Access Network (UTRAN/GERAN) of universal terrestrial access network/global system for mobile communications in this core network architecture/global system for mobile communications evolution and two kinds of connecting systems of evolved universal terrestrial radio access network (E-UTRAN) are corresponding respectively is that service universal packet wireless business affair service node SGSN and Mobility Management Entity MME are common the existence.In order to be adapted to the user mobility management under the new core network architecture, a kind of idle state signaling optimization (ISR) technology has been proposed in the evolved packet system.The signaling amount of mobility management process when the user terminal (UE) that this technology can reduce idle condition resides at the borderline region of UTRAN/GERAN and two kinds of connecting systems of E-TURAN, described idle condition are meant between UE and the pairing user mobile control management entity in current resident district does not have the signaling of Non-Access Stratum to be connected.When the ISR of UE function is activated, UE will be registered on the corresponding respectively user mobile control management entity of two kinds of connecting systems of UTRAN/GERAN and E-TURAN simultaneously, be SGSN and MME, at this moment, the gateway of UE (Serving GW) also will keep GTP control plane (the GTP Control of S3 interface and S11 interface simultaneously with described SGSN and MME, GTP-C) connect, promptly the GTP-C of two interfaces connects.After activating the ISR function, the UE that is in idle condition distributes between the route district of UE and a plurality of tracking areas that MME distributes to UE when mobile at SGSN, need not to do general Routing Area Update or general tracing section updating operation, can avoid UE issuable frequent route district or tracing section updating operation when mobile between the zone of MME and SGSN management thus, reduce space interface signaling.
After the ISR of UE function is activated, if Serving GW and grouped data network gateway (Packet Data Network GateWay, PDN GW) uses the general packet radio service gprs tunnel protocol between, then UE EPS is carried on MME, all preserve corresponding EPS bearer context on Serving GW and the PDN GW, simultaneously on SGSN, also preserve this EPS and carry pairing packet data protocol (PDP) context, and after this need MME and SGSN on EPS bearer context and PDP Context, to keep synchronous.For example, when UE has activated a new EPS carrying in the E-UTRAN connecting system after, when getting back to the UTRAN/GERAN connecting system afterwards, SGSN will set up corresponding PDP Context by the synchronous mode of context; Carry when UE has deleted an EPS in the E-UTRAN connecting system, when getting back to UTRAN/GERAN afterwards, SGSN will delete corresponding PDP Context by the synchronous mode of context; The QoS of a PDP Context that inserts at UTRAN/GERAN as UE has been modified, and when UE gets back to E-UTRAN afterwards, MME will revise the QoS of the EPS bearer context of correspondence by the synchronous mode of context.In addition, when UE during in connection status its ISR function by deexcitation after, the ISR function that the active user's mobile management controlled entity MME of UE or SGSN will notify this UE of Serving GW is by deexcitation, and Serving GW will delete pairing evolution session management of another user mobility management control entity (ESM) or session management (SM) context that self preserves.For example, when UE was in connection status, the ISR function of this UE of its active user's mobile management controlled entity MME notice Serving GW was during by deexcitation, and Serving GW will delete the pairing SM context of SGSN of its preservation.
Existing EPS system has provided the method for the deletion EPS carrying of being initiated by PDN GW.In the method, PDN GW is by sending the deleting bearing request to Serving GW, and Serving GW will move the control and management entity and finish corresponding deleting bearing processing according to the active user of deleting bearing request triggering UE.But the ISR function that this method is only applicable to UE inactive I SR function or UE is by the ISR function of deexcitation or the UE situation of back UE when being in connection status that be activated.Because, when the ISR function of UE inactive I SR function or UE during by deexcitation, only there is a user mobility management control entity to serve this UE, corresponding, also have only a GTP-C to be connected between the user mobility management control entity of this UE and the Serving GW of this UE.When after the ISR of UE function is activated, being in connection status, this UE is that active user's mobile management controlled entity keeps the signaling of Non-Access Stratum to be connected with its current resident area relative user mobility management control entity only, and GTP-U connection that this moment, Serving GW can be by judging the S1U interface and the notice of SGSN know that active user's mobile management controlled entity that this UE is in connection status and this UE is MME or SGSN.Therefore, in these cases, adopt the method for existing deletion EPS carrying, Serving GW can determine that the active user's mobility control and management entity to UE sends the deleting bearing request message and triggers it and finish corresponding deleting bearing and handle.But, when after the ISR of UE function is activated, being in idle condition, because UE is connected with the signaling that MME does not all set up Non-Access Stratum with SGSN, the Serving GW of UE has all kept GTP-C to be connected with SGSN and MME, therefore Serving GW can't determine to trigger the processing which user mobility control and management entity is deleted the EPS carrying, and after guaranteeing to delete the EPS carrying, it is synchronous that MME and SGSN keep on EPS bearer context and PDP Context.If Serving GW just sends deleting bearing request message or deletion PDP Context request message to SGSN, and do not send the deleting bearing request message to MME, after SGSN receives message, find that UE is in idle condition, will be not can paging UE, and the EPS bearer context of deletion UE in its SM context just; Though realized between SGSN and the Serving GW like this on the EPS loaded state synchronously, but MME and Serving GW and SGSN do not realize on the EPS loaded state synchronously, be that ESM context on the MME does not obtain upgrading, if UE is positioned at E-UTRAN at this moment, even and realized the synchronous of EPS carrying by the tracing section updating process between UE and the MME, but because of the ESM context of MME does not obtain upgrading, MME does not know that described EPS carrying is deleted, so UE can not realize synchronous in the EPS carrying of UE and network by the tracing section updating process.Therefore, the method for existing deleting bearing of being initiated by PDN GW is not suitable for the ISR function back UE that is activated and is in the situation of idle condition.
In addition, when using proxy-mobile IP (PMIP) agreement between Serving GW and the PDN GW, strategy also can trigger gateway (Serving GW) with charging rule functions (PCRF) and initiate the deleting bearing process.Same reason, the method for existing deleting bearing of being initiated by PCRF are not suitable for the ISR function back UE that is activated and are in the situation of idle condition.
In sum, the method for existing deleting bearing of being initiated by PDN GW or PCRF is not suitable for the ISR function back UE that is activated and is in the situation of idle condition.
Summary of the invention
In view of this, main purpose of the present invention is to provide a kind of method and apparatus of deleting bearing, the ISR function that the present invention is not only applicable to UE inactive I SR function or UE is by the ISR function of deexcitation or the UE situation of back UE when being in connection status that be activated, and the ISR function that also the is applicable to UE back UE that is activated is in the situation of idle condition.
In order to achieve the above object, the technical scheme of the present invention's proposition is:
A kind of method of deleting bearing, this method comprises:
A, PDN GW or PCRF trigger gateway and initiate the deleting bearing process;
B, gateway select to carry out the user mobile control management entity that deleting bearing is handled, and send the deleting bearing request message to it;
C, selected user mobile control management entity are carried out corresponding deleting bearing according to described deleting bearing request message and are handled.
In the aforesaid method, the described selection among the described step b is carried out according to the state of activation and the current wireless access type of UE of the ISR function of the connection status of UE, UE.
In the aforesaid method, the method for the user mobile control management entity that gateway selection carrying out deleting bearing is handled among the described step b comprises:
B11, judge whether the ISR function of UE is activated,, otherwise change step b12 over to if then change step b13 over to;
B12, the current wireless access type of judgement UE, if UTRAN/GERAN, then select SGSN to carry out the user mobile control management entity that deleting bearing is handled, if E-UTRAN then selects MME to carry out the user mobile control management entity that deleting bearing is handled; Withdraw from described selection and carry out the process of the user mobile control management entity of deleting bearing processing;
B13, judge whether UE is in idle condition, if then select SGSN and MME jointly for carrying out the user mobile control management entity that deleting bearing is handled, to move the control and management entity be the user mobile control management entity of carrying out the deleting bearing processing otherwise select to have set up active user that signaling is connected with described UE.
In the aforesaid method, the method for the user mobile control management entity that gateway selection carrying out deleting bearing is handled among the described step b comprises:
B21, judge whether the ISR function of UE is activated,, otherwise change step b22 over to if then change step b23 over to;
B22, the current wireless access type of judgement UE, if UTRAN/GERAN, then select SGSN to carry out the user mobile control management entity that deleting bearing is handled, if E-UTRAN, then select MME to carry out the user mobile control management entity that deleting bearing is handled, withdraw from the process that the user mobile control management entity of deleting bearing processing is carried out in described selection;
B23, judge whether UE is in idle condition, if then change step b24 over to, to move the control and management entity be the user mobile control management entity of carrying out the deleting bearing processing otherwise select to have set up active user that signaling is connected with described UE, withdraws from the process that the user mobile control management entity of deleting bearing processing is carried out in described selection;
B24, judge in the associated SM context of SGSN whether comprise described carrying, if then select SGSN to carry out the user mobile control management entity that deleting bearing is handled; Judge in the associated ESM context of MME whether comprise described deleted carrying, if then select MME to carry out the user mobile control management entity that deleting bearing is handled.
In the aforesaid method, described step c comprises:
If SGSN is selected user mobile control management entity, after then SGSN receives described deleting bearing request message, judge whether UE is in idle condition, if then delete himself preserve with the corresponding PDP Context of described carrying, and upgrade its session management context, otherwise initiate PDP context deactivation process and RAB (RAB) delete procedure to UE, delete then himself preserve carry corresponding PDP Context with described, and upgrade its session management context;
If MME is selected user mobile control management entity, after then MME receives described deleting bearing request message, judge whether UE is in idle condition, if then delete himself preserve with the corresponding EPS bearer context of described carrying, and upgrade its evolved packet system session management context, otherwise initiate the delete procedure of EPS load bearing deactivation process and radio bearer (RB) to UE, delete then himself preserve with the corresponding EPS bearer context of described carrying, and upgrade its evolved packet system session management context.
In the aforesaid method, described step c further comprises:
If SGSN is selected user mobile control management entity, then SGSN carries out sending the deleting bearing response message to gateway after corresponding deleting bearing is handled;
If MME is selected user mobile control management entity, then MME carries out sending the deleting bearing response message to gateway after corresponding deleting bearing is handled;
Further comprise after the described step c:
Initiate the deleting bearing process if trigger gateway by PDN GW among the described step a, then after gateway was received the deleting bearing response message of selected user mobile control management entity transmission, gateway sent the deleting bearing response message to PDN GW;
Initiate the deleting bearing process if trigger gateway by PCRF among the described step a, then after gateway was received the deleting bearing response message of selected user mobile control management entity transmission, gateway was sent completely message to PCRF.
A kind of device of realizing the gateway deleting bearing, this device comprises:
The information receiving and transmitting module is used to receive triggering gateway that PDN GW or PCRF send and initiates the message of deleting bearing process and trigger processing module and carry out; The user mobile control management entity of selecting to processing module sends the deleting bearing request message;
Processing module is used to select to carry out the user mobile control management entity that deleting bearing is handled, and triggers the information receiving and transmitting module to selected user mobile control management entity transmission deleting bearing request message.
In the aforesaid device, described processing module comprises:
Activate judging unit, be used to judge whether the ISR function of UE is activated, if, then trigger the idle determination unit and carry out, carry out otherwise trigger the wireless access type judging unit;
The wireless access type judging unit, be used to the wireless access type of judging that UE is current, if UTRAN/GERAN, then select SGSN to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to SGSN, if E-UTRAN then selects MME to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to MME;
The idle determination unit, judge whether UE is in idle condition, if then select SGSN and MME jointly for carrying out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message, carry out otherwise trigger current management entity judging unit to SGSN and MME;
Current management entity judging unit, be used to judge that having set up the active user that signaling is connected with described UE moves the control and management entity, if SGSN then selects SGSN to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to SGSN, if MME then selects MME to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to MME.
In the aforesaid device, described processing module comprises:
Activate judging unit, be used to judge whether the ISR function of UE is activated, carry out, carry out otherwise trigger the wireless access type judging unit if then trigger the idle determination unit;
The wireless access type judging unit, be used to the wireless access type of judging that UE is current, if UTRAN/GERAN, then select SGSN to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to SGSN, if E-UTRAN then selects MME to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to MME;
The idle determination unit judges whether UE is in idle condition, carries out if then trigger the context determination unit, carries out otherwise trigger current management entity judging unit;
The context determination unit, be used for judging whether the associated SM contextual information of SGSN comprises described deleted carrying, if then select SGSN to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to SGSN; Judge in the associated ESM contextual information of MME whether comprise described deleted carrying,, trigger the information receiving and transmitting module and send the deleting bearing request message to MME if then select MME to carry out the user mobile control management entity that deleting bearing is handled;
Current management entity judging unit, be used to judge that setting up the active user that signaling is connected with described UE moves the control and management entity, if SGSN then selects SGSN to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to SGSN; If MME then selects MME to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to MME.
In the aforesaid device, described processing module, further comprise: response unit, during the deleting bearing response message that is used for sending, trigger the information receiving and transmitting module and send the deleting bearing response message or be sent completely message to PCRF to PDN GW when the user mobile control management entity of receiving all selections;
Described information receiving and transmitting module is further used for receiving the deleting bearing response message that user mobile control management entity that described processing module selects sends and is forwarded to processing module; Send the deleting bearing response message or be sent completely message to PDN GW to PCRF.
In sum, the method and apparatus of the deleting bearing that the present invention proposes, receive the deleting bearing request message of PDNGW transmission at Serving GW after, state of activation and the current wireless access type of UE according to the ISR function of the connection status of UE, UE select to carry out under the different situations user mobile control management entity that deleting bearing is handled, and trigger it and carry out corresponding deleting bearing and handle by sending the deleting bearing request message.In such scheme, the ISR function of judging UE as Serving GW has been activated and UE when being in idle condition, Serving GW can determine and carry out the user mobile control management entity that deleting bearing is handled, trigger selected user mobile control management entity and carry out corresponding deleting bearing processing, thereby make ISR function that the present invention is not only applicable to UE inactive I SR function or UE by the ISR function of deexcitation or the UE situation of back UE when being in connection status that be activated, the ISR function that also the is applicable to UE back UE that is activated is in the situation of idle condition.
Description of drawings
Fig. 1 is the schematic flow sheet of the inventive method.
Fig. 2 is the schematic flow sheet of the inventive method embodiment one.
Fig. 3 is the structural representation of the embodiment one of apparatus of the present invention.
Fig. 4 is a kind of structural representation of processing module in apparatus of the present invention.
Embodiment
For making the purpose, technical solutions and advantages of the present invention clearer, the present invention is described in further detail below in conjunction with the accompanying drawings and the specific embodiments.
Basic thought of the present invention is: when Serving GW is triggered the process of initiating deleting bearing by PDN GW or PCRF, state of activation and the current wireless access type of UE according to the ISR function of the connection status of UE, UE select to carry out under the different situations user mobile control management entity that deleting bearing is handled, and trigger selected user mobile control management entity and carry out corresponding deleting bearing and handle by sending the deleting bearing request message.
Fig. 1 is the flow chart of the inventive method, and the method for deleting bearing of the present invention comprises as shown in Figure 1:
Step 101, triggering gateway are initiated the deleting bearing process;
Here, in actual applications, the initiation of described deleting bearing process is to send the message that triggers gateway initiation deleting bearing process by PDN GW or PCRF to gateway to realize, all carryings that described message can indicate carrying of deletion also can indicate deletion to be connected with all PDN, the concrete method that triggers gateway initiation deleting bearing process is a prior art, repeats no more herein.
Step 102, gateway select to carry out the user mobile control management entity that deleting bearing is handled, and send described deleting bearing request message to selected user mobile control management entity of carrying out the deleting bearing processing;
Here, gateway is according to the state of activation and the UE of the ISR function of the connection status of UE, UE
Current wireless access type is selected, and concrete system of selection will be elaborated by preferred embodiment of the present invention.
Step 103, selected user mobile control management entity are carried out corresponding deleting bearing according to described deleting bearing request message and are handled.
Here, in actual applications, when selected user mobile control management entity has been finished corresponding deleting bearing processing according to described deleting bearing request message after, can send the deleting bearing response message or be sent completely message to PDN GW, make the initiator of deleting bearing process know that designated bearing is deleted to PCRF.
For the better method of sending out explanation deleting bearing of the present invention, be described in detail with preferred embodiment below.
In the embodiments of the invention one, trigger Serving GW by PDN GW and initiate the deleting bearing process.
Fig. 2 is the schematic flow sheet of the embodiment one of the inventive method.As shown in Figure 2, embodiment one may further comprise the steps:
Step 201, PDN GW send the deleting bearing request message to Serving GW;
Here, PDN GW triggers Serving GW initiation deleting bearing process by sending the deleting bearing request message.
Step 202, Serving GW judge that whether the ISR function of UE is activated, if then change step 204 over to, otherwise changes step 203 over to after receiving described deleting bearing request message;
Here, whether Serving GW is activated according to the ISR function of the context determination UE of the described UE of its preservation.
Step 203, Serving GW judge the current wireless access type of UE, if UTRAN/GERAN, then select SGSN to carry out the user mobile control management entity that deleting bearing is handled, if E-UTRAN then selects MME to carry out the user mobile control management entity that deleting bearing is handled; Change step 205 over to;
Step 204, Serving GW judge whether UE is in idle condition, if then select SGSN and MME jointly for carrying out the user mobile control management entity that deleting bearing is handled, to move the control and management entity be the user mobile control management entity of carrying out the deleting bearing processing otherwise select to have set up active user that signaling is connected with described UE;
This step is the operation of carrying out when the ISR of UE function has activated, active user when at this moment, Serving GW can judge UE and whether is in connection status and is in connection status according to the GTP-U tunnel that Serving GW is set up moves the control and management entity.If Serving GW has set up the GTP-U tunnel of the S1U interface of at least one, then UE is in connection status, and its active user to move the control and management entity be MME; If Serving has set up the GTP-U tunnel of at least one S4 interface, perhaps, the GTP-U tunnel of at least one S12 interface, then UE is in connection status, and its active user's mobile management controlled entity is SGSN.
Here need to prove, in actual applications, may fail on ESM context or SM context, to realize synchronously owing to the UE after the activation ISR function with network, do not exist in the SM context that causes occurring existing in the ESM context that an EPS is carried among gateway and the MME to be preserved and in gateway and SGSN, preserved, perhaps, do not exist in the ESM context that EPS is carried among gateway and the MME to be preserved and situation about existing in the SM context in gateway and SGSN, preserved.At above-mentioned situation, in step 204, when judging that UE is in idle condition, ServingGW can also determine whether to select SGSN or MME to carry out the user mobile control management entity that deleting bearing is handled according to SGSN associated session management context and the associated evolution system session management context of MME, and concrete grammar is:
Judge in the associated session management context of SGSN whether comprise described deleted carrying, if then select SGSN to carry out the user mobile control management entity that deleting bearing is handled; Judge in the associated evolution system session management context of MME whether comprise described deleted carrying, if then select MME to carry out the user mobile control management entity that deleting bearing is handled.
Step 205, gateway send described deleting bearing request message to selected user mobile control management entity;
Step 206, selected user mobile control management entity are carried out corresponding deleting bearing processing according to described deleting bearing request message, and send the deleting bearing response message in the described back of finishing dealing with to gateway;
In this step, if SGSN is selected user mobile control management entity, then the SGSN processing of carrying out deleting bearing comprises:
After SGSN receives described deleting bearing request message, judge whether UE is in idle condition, if then delete himself preserve with the corresponding PDP Context of described carrying, and upgrade its session management context, otherwise to UE initiation packet data protocol PDP context deactivation process and RAB RAB delete procedure, delete then himself preserve with the corresponding PDP Context of described carrying, and upgrade its session management context;
If MME is selected user mobile control management entity, then the MME processing of carrying out deleting bearing comprises:
After MME receives described deleting bearing request message, judge whether UE is in idle condition, if then delete himself preserve with the corresponding EPS bearer context of described carrying, and upgrade its evolved packet system session management context, otherwise initiate the delete procedure of EPS load bearing deactivation process and radio bearer RB to UE, delete then himself preserve with the corresponding EPS bearer context of described carrying, and upgrade its evolved packet system session management context.
Here, initiate PDP context deactivation process and RAB delete procedure to UE, and to UE initiation EPS load bearing deactivation process and RB delete procedure respectively in TS23.060 He among the TS23.401, defining, repeat no more herein.
Step 207, gateway send the deleting bearing response message to PDN GW after receiving the deleting bearing response message of selected user mobile control management entity transmission.
In the technique scheme, described step 201 has realized step 101, step 202,203,204 and 205 has realized step 102, step 206 has realized step 103, in addition, in preferred embodiment of the present invention, also send the deleting bearing response message to PDN GW by step 207, make PDN GW know that described carrying successfully deletes.
At said method, the invention allows for a kind of device of deleting bearing, in actual applications, this device is equipped with the part assembly on PDN GW, PCRF, gateway, SGSN, MME and UE, for simplicity, here, only the part of being located in the gateway is elaborated, Fig. 3 is the structural representation of the embodiment one of apparatus of the present invention.As shown in Figure 3, it mainly comprises:
Information receiving and transmitting module 301 is used to receive triggering gateway that PDN GW or PCRF send and initiates the message of deleting bearing process and trigger processing module 302 and carry out; The user mobile control management entity of selecting to processing module 302 sends the deleting bearing request message;
Processing module 302 is used to select to carry out the user mobile control management entity that deleting bearing is handled, and triggers information receiving and transmitting module 301 to selected user mobile control management entity transmission deleting bearing request message; It comprises:
Activate judging unit 3021, be used to judge whether the ISR function of UE is activated, carry out, carry out otherwise trigger wireless access type judging unit 3022 if trigger idle determination unit 3023;
Wireless access type judging unit 3022, be used to the wireless access type of judging that UE is current, if UTRAN/GERAN, then select SGSN to carry out the user mobile control management entity that deleting bearing is handled, trigger information receiving and transmitting module 301 and send the deleting bearing request message to SGSN, if E-UTRAN then selects MME to carry out the user mobile control management entity that deleting bearing is handled, trigger information receiving and transmitting module 301 and send the deleting bearing request message to MME;
Idle determination unit 3023, judge whether UE is in idle condition, if then select SGSN and MME jointly for carrying out the user mobile control management entity that deleting bearing is handled, trigger information receiving and transmitting module 301 and send the deleting bearing request message, carry out otherwise trigger current management entity judging unit 3024 to SGSN and MME;
Current management entity judging unit 3024, be used to judge that having set up the active user that signaling is connected with described UE moves the control and management entity, if SGSN then selects SGSN to carry out the user mobile control management entity that deleting bearing is handled, trigger information receiving and transmitting module 301 and send the deleting bearing request message to SGSN, if MME then selects MME to carry out the user mobile control management entity that deleting bearing is handled, trigger information receiving and transmitting module 301 and send the deleting bearing request message to MME.
Need to prove, in actual applications, described processing module 302 can also have another kind of implementation structure, as shown in Figure 4, it comprises: activate judging unit 3021, wireless access type judging unit 3022, idle determination unit 3027, current management entity judging unit 3024 and context determination unit 3025.Wherein, described activation judging unit 3021, wireless access type judging unit 3022 and current management entity judging unit 3024 respectively with Fig. 3 in activation judging unit 3021, wireless access type judging unit 3022 identical with current management entity judging unit 3024, repeat no more herein, be with structure difference among Fig. 3:
Described idle determination unit 3027 is used to judge whether UE is in idle condition, carries out if then trigger context determination unit 3025, carries out otherwise trigger current management entity judging unit 3024;
Described context determination unit 3025, be used for judging whether the associated SM contextual information of SGSN comprises described deleted carrying, if then select SGSN to carry out the user mobile control management entity that deleting bearing is handled, trigger information receiving and transmitting module 301 and send the deleting bearing request message to SGSN; Judge in the associated ESM contextual information of MME whether comprise described deleted carrying,, trigger information receiving and transmitting module 301 and send the deleting bearing request message to MME if then select MME to carry out the user mobile control management entity that deleting bearing is handled.
In actual applications, in order to make PDN GW or PCRF know that described carrying successfully deletes, described information receiving and transmitting module 301 is further used for receiving the deleting bearing response message that user mobile control management entity that described processing module 302 selects sends and is forwarded to processing module 302; Send the deleting bearing response message or be sent completely message to PDN GW to PCRF; Accordingly, as shown in Figure 3 and Figure 4, described processing module 302 further comprises:
Response unit 3026 during the deleting bearing response message that is used for sending when the user mobile control management entity of receiving all selections, triggers information receiving and transmitting module 301 and sends the deleting bearing response message or be sent completely message to PCRF to PDN GW.
Here, in actual applications, when described deleting bearing process is initiated by PDN GW, then trigger information receiving and transmitting module 301 and send the deleting bearing response message to PDN GW, when described deleting bearing process is initiated by PCRF, then trigger information receiving and transmitting module 301 and send the deleting bearing response message to PCRF.
From technique scheme as can be seen, after the present invention receives the deleting bearing request message of PDN GW transmission at Serving GW, connection status according to UE, the current wireless access type of the state of activation of the ISR function of UE and UE selects to carry out under the different situations user mobile control management entity that deleting bearing is handled, and trigger it by transmission deleting bearing request message and carry out corresponding deleting bearing processing, thereby the method and apparatus that makes deleting bearing of the present invention is not only applicable to ISR function that subscriber equipment (UE) un-activation idle state signaling optimizes (ISR) function or UE by the ISR function of deexcitation or the UE situation of back UE when being in connection status that be activated, and the ISR function that also the is applicable to UE back UE that is activated is in the situation of idle condition.
In sum, more than be preferred embodiment of the present invention only, be not to be used to limit protection scope of the present invention.Within the spirit and principles in the present invention all, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (5)

1. the method for a deleting bearing is characterized in that, this method comprises:
A, grouped data network gateway PDN GW or strategy and charging rule functions PCRF trigger gateway Serving GW and initiate the deleting bearing process;
B, gateway select to carry out the user mobile control management entity that deleting bearing is handled, and send the deleting bearing request message to it;
C, selected user mobile control management entity are carried out corresponding deleting bearing according to described deleting bearing request message and are handled;
Wherein, the method for the user mobile control management entity that gateway selection carrying out deleting bearing is handled among the described step b comprises:
Whether b11, the idle state signaling of judging user equipment (UE) are optimized the ISR function and are activated, if then change step b13 over to, otherwise change step b12 over to;
B12, the current wireless access type of judgement UE, if the enhancing data transfer rate Radio Access Network UTRAN/GERAN of universal terrestrial access network/global system for mobile communications/global system for mobile communications evolution, then select service universal grouping wireless access service service node SGSN to carry out the user mobile control management entity that deleting bearing is handled, if evolved universal terrestrial radio access network E-UTRAN then selects Mobility Management Entity MME to carry out the user mobile control management entity that deleting bearing is handled; Withdraw from described selection and carry out the process of the user mobile control management entity of deleting bearing processing;
B13, judge whether UE is in idle condition, if then select SGSN and MME jointly for carrying out the user mobile control management entity that deleting bearing is handled, to move the control and management entity be the user mobile control management entity of carrying out the deleting bearing processing otherwise select to have set up active user that signaling is connected with described UE;
Perhaps, the method for the user mobile control management entity that gateway selection carrying out deleting bearing is handled among the described step b comprises:
B21, judge whether the ISR function of UE is activated,, otherwise change step b22 over to if then change step b23 over to;
B22, the current wireless access type of judgement UE, if UTRAN/GERAN, then select SGSN to carry out the user mobile control management entity that deleting bearing is handled, if E-UTRAN, then select MME to carry out the user mobile control management entity that deleting bearing is handled, withdraw from the process that the user mobile control management entity of deleting bearing processing is carried out in described selection;
B23, judge whether UE is in idle condition, if then change step b24 over to, to move the control and management entity be the user mobile control management entity of carrying out the deleting bearing processing otherwise select to have set up active user that signaling is connected with described UE, withdraws from the process that the user mobile control management entity of deleting bearing processing is carried out in described selection;
B24, judge in the associated session management SM context of SGSN whether comprise described carrying, if then select SGSN to carry out the user mobile control management entity that deleting bearing is handled; Judge in the associated evolution system session management ESM context of MME whether comprise described deleted carrying, if then select MME to carry out the user mobile control management entity that deleting bearing is handled.
2. method according to claim 1 is characterized in that, described step c comprises:
If SGSN is selected user mobile control management entity, after then SGSN receives described deleting bearing request message, judge whether UE is in idle condition, if then delete himself preserve with the corresponding packet data protocol PDP Context of described carrying, and upgrade its session management context, otherwise initiate PDP context deactivation process and RAB RAB delete procedure to UE, delete then himself preserve with the corresponding PDP Context of described carrying, and upgrade its session management context;
If MME is selected user mobile control management entity, after then MME receives described deleting bearing request message, judge whether UE is in idle condition, if then delete himself preserve with the corresponding EPS bearer context of described carrying, and upgrade its evolved packet system session management context, otherwise initiate the delete procedure of EPS load bearing deactivation process and radio bearer RB to UE, delete then himself preserve with the corresponding EPS bearer context of described carrying, and upgrade its evolved packet system session management context.
3. method according to claim 2 is characterized in that, described step c further comprises:
If SGSN is selected user mobile control management entity, then SGSN carries out sending the deleting bearing response message to gateway after corresponding deleting bearing is handled;
If MME is selected user mobile control management entity, then MME carries out sending the deleting bearing response message to gateway after corresponding deleting bearing is handled;
Further comprise after the described step c:
Initiate the deleting bearing process if trigger gateway by PDN GW among the described step a, then after gateway was received the deleting bearing response message of selected user mobile control management entity transmission, gateway sent the deleting bearing response message to PDN GW;
Initiate the deleting bearing process if trigger gateway by PCRF among the described step a, then after gateway was received the deleting bearing response message of selected user mobile control management entity transmission, gateway was sent completely message to PCRF.
4. a device of realizing the gateway deleting bearing is characterized in that, this device comprises:
The information receiving and transmitting module is used to receive triggering gateway that PDN GW or PCRF send and initiates the message of deleting bearing process and trigger processing module and carry out; The user mobile control management entity of selecting to processing module sends the deleting bearing request message;
Processing module is used to select to carry out the user mobile control management entity that deleting bearing is handled, and triggers the information receiving and transmitting module to selected user mobile control management entity transmission deleting bearing request message;
Wherein, described processing module comprises:
Activate judging unit, be used to judge whether the ISR function of UE is activated, if, then trigger the idle determination unit and carry out, carry out otherwise trigger the wireless access type judging unit;
The wireless access type judging unit, be used to the wireless access type of judging that UE is current, if UTRAN/GERAN, then select SGSN to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to SGSN, if E-UTRAN then selects MM to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to MME;
The idle determination unit, judge whether UE is in idle condition, if then select SGSN and MME jointly for carrying out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message, carry out otherwise trigger current management entity judging unit to SGSN and MME;
Current management entity judging unit, be used to judge that having set up the active user that signaling is connected with described UE moves the control and management entity, if SGSN then selects SGSN to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to SGSN, if MME then selects MME to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to MME;
Perhaps, described processing module comprises:
Activate judging unit, be used to judge whether the ISR function of UE is activated, carry out, carry out otherwise trigger the wireless access type judging unit if then trigger the idle determination unit;
The wireless access type judging unit, be used to the wireless access type of judging that UE is current, if UTRAN/GERAN, then select SGSN to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to SGSN, if E-UTRAN then selects MME to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to MME;
The idle determination unit judges whether UE is in idle condition, carries out if then trigger the context determination unit, carries out otherwise trigger current management entity judging unit;
The context determination unit, be used for judging whether the associated session management SM contextual information of SGSN comprises described deleted carrying, if then select SGSN to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to SGSN; Judge in the associated ESM contextual information of MME whether comprise described deleted carrying,, trigger the information receiving and transmitting module and send the deleting bearing request message to MME if then select MME to carry out the user mobile control management entity that deleting bearing is handled;
Current management entity judging unit, be used to judge that setting up the active user that signaling is connected with described UE moves the control and management entity, if SGSN then selects SGSN to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to SGSN; If MME then selects MME to carry out the user mobile control management entity that deleting bearing is handled, trigger the information receiving and transmitting module and send the deleting bearing request message to MME.
5. device according to claim 4, it is characterized in that, described processing module, further comprise: response unit, during the deleting bearing response message that is used for sending, trigger the information receiving and transmitting module and send the deleting bearing response message or be sent completely message to PCRF to PDN GW when the user mobile control management entity of receiving all selections;
Described information receiving and transmitting module is further used for receiving the deleting bearing response message that user mobile control management entity that described processing module selects sends and is forwarded to processing module; Send the deleting bearing response message or be sent completely message to PDN GW to PCRF.
CN2008101054446A 2008-04-29 2008-04-29 Method and device for deleting load Active CN101572955B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN2008101054446A CN101572955B (en) 2008-04-29 2008-04-29 Method and device for deleting load
KR1020107026776A KR101175219B1 (en) 2008-04-29 2009-04-29 Method and device for deleting bearer
PCT/CN2009/071544 WO2009132582A1 (en) 2008-04-29 2009-04-29 Method and device for deleting bearer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101054446A CN101572955B (en) 2008-04-29 2008-04-29 Method and device for deleting load

Publications (2)

Publication Number Publication Date
CN101572955A CN101572955A (en) 2009-11-04
CN101572955B true CN101572955B (en) 2011-10-05

Family

ID=41232152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101054446A Active CN101572955B (en) 2008-04-29 2008-04-29 Method and device for deleting load

Country Status (3)

Country Link
KR (1) KR101175219B1 (en)
CN (1) CN101572955B (en)
WO (1) WO2009132582A1 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102055746B (en) * 2009-11-06 2013-12-18 中兴通讯股份有限公司南京分公司 Method and system for realizing final call under idle signalling reduction (ISR) condition
CN102098655B (en) * 2009-12-11 2013-12-04 中兴通讯股份有限公司 Method and system for controlling activation of ISR (Idle mode Signaling Reduction) and UE (user equipment)
CN102281519B (en) * 2010-06-12 2016-06-15 中兴通讯股份有限公司 A kind of bearing modification method and system
CN102076114B (en) * 2011-01-14 2013-05-22 大唐移动通信设备有限公司 Method and device for deleting load bearing
KR101641791B1 (en) * 2014-12-10 2016-07-22 주식회사 엘지유플러스 Communication system, control method thereof, recording medium for recording program for executing the control method, application saved in the recording medium for executing the control method being combined with hardware
CN107548167A (en) * 2016-06-29 2018-01-05 中兴通讯股份有限公司 Control method, apparatus and system and the gateway of user equipment
CN113784418B (en) * 2017-01-09 2022-11-18 华为技术有限公司 Session management method and device
CN110351103B (en) * 2018-04-02 2020-11-17 维沃移动通信有限公司 Configuration method and equipment of service data adaptation protocol SDAP entity

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101087454B (en) * 2006-11-06 2010-12-08 中兴通讯股份有限公司 A deletion method of wireless access carrier of selective service
CN101087441A (en) * 2006-11-07 2007-12-12 中兴通讯股份有限公司 A deletion method of wireless access carrier of selective service
CN101355792B (en) * 2007-07-25 2011-11-23 华为技术有限公司 Control method for deleting load-bearing and adscription user server as well as relevant equipment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
.《3GPP TS 23.401 V8.1.0》.2008,第82,83页. *
3rd Generation Partnership Project.Technical Specification Group Services and System Aspects *

Also Published As

Publication number Publication date
KR101175219B1 (en) 2012-08-21
WO2009132582A1 (en) 2009-11-05
KR20110003384A (en) 2011-01-11
CN101572955A (en) 2009-11-04

Similar Documents

Publication Publication Date Title
RU2764259C1 (en) Method for activating or deactivating user plane connection in each session
CN101572955B (en) Method and device for deleting load
JP5132815B2 (en) Method and system for determining activation of signaling saving function in idle mode
CN101925042B (en) Method and system for controlling tunnel identifier allocation and devices
KR20190034572A (en) Method and apparatus for operating a wireless communication system in which mobility management and session management are separated
CN101677470B (en) Processing method, device and system of service request
CN101282511B (en) Bearing processing method
US8582503B2 (en) Method for indicating the bearer management of a serving gateway
CN101222765A (en) Control method, system and device for circuit field fall-back
CN102131251A (en) Method for data forwarding
CN101572862B (en) Method and equipment for supporting intercommunication between 3G system and LTE system
CN101534495B (en) Method for establishing the service bearing of user equipment and device thereof
CN101547521A (en) Method for releasing UE resources
CN104604269A (en) Joint position updating processing method, device and system
CN101505474B (en) Network side processing method in subscriber handover process, network element equipment and network system
CN101600192B (en) Method, equipment and system for synchronizing user context
CN101553011A (en) Method for confirming default bearing and mobile management entity
CN107926064A (en) A kind of control method and local chain of command equipment
CN101657025B (en) Method and device for processing circuit switch domain services under ISR scene
CN100486381C (en) Method for GGSN in packet domain to obtain information of starting up single tunnel by SGSN
CN101605364B (en) Bearing parameter transmitting method, strategy and charging rule functional device and service gateway
WO2018001301A1 (en) User equipment control method, apparatus, and system, and network gateway
CN101621786A (en) Method, device and system for bearer update
CN101296479A (en) Downstream data processing method and communication system
WO2015054850A1 (en) Communication method, communication device, and communication system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: INST OF TELECOMMUNICATION SCIENCE AND TECHNOLGOY

Free format text: FORMER OWNER: DATANG MOBILE COMMUNICATION EQUIPMENT CO., LTD.

Effective date: 20110622

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100083 NO. 29, XUEYUAN ROAD, HAIDIAN DISTRICT, BEIJING TO: 100191 NO. 40, XUEYUAN ROAD, HAIDIAN DISTRICT, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20110622

Address after: 100191 Haidian District, Xueyuan Road, No. 40,

Applicant after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100083 Haidian District, Xueyuan Road, No. 29,

Applicant before: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210603

Address after: 100085 1st floor, building 1, yard 5, Shangdi East Road, Haidian District, Beijing

Patentee after: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY