CN101566003A - Scaffold fastener - Google Patents

Scaffold fastener Download PDF

Info

Publication number
CN101566003A
CN101566003A CNA2009100746162A CN200910074616A CN101566003A CN 101566003 A CN101566003 A CN 101566003A CN A2009100746162 A CNA2009100746162 A CN A2009100746162A CN 200910074616 A CN200910074616 A CN 200910074616A CN 101566003 A CN101566003 A CN 101566003A
Authority
CN
China
Prior art keywords
grab
arc
shaped
grab body
clamping hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100746162A
Other languages
Chinese (zh)
Other versions
CN101566003B (en
Inventor
魏志光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009100746162A priority Critical patent/CN101566003B/en
Publication of CN101566003A publication Critical patent/CN101566003A/en
Application granted granted Critical
Publication of CN101566003B publication Critical patent/CN101566003B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

A scaffold fastener is provided with a U-shaped grab body; the front part of the grab body is set to a pair of parallel arc-shaped grabs; slideway grooves are correspondingly arranged at the inner sides of two grab arms of the grab body; an arc-shaped clamping board with a concave surface facing the grab is arranged in the grab body; a lug body which is matched with the slideway groove is arranged on the arc-shaped clamping board; a connecting plate with a threaded hold in the center is arranged at the rear part of the slideway groove between the two grab arms; an adjusting screw with a handle at the rear end is installed to be matched with the threaded hole in the connecting plate; the front end of the adjusting screw is rotatablely connected with the arc-shaped clamping board; and a grab body tail-cuff is arranged at the rear part of the U-shaped grab body. The fastener has no use for a tool when in installation and dismantling, is convenient for operation, saves time and labor, and can effectively enhance the erection and dismantling construction efficiency of a steel pipe scaffold; simultaneously, the fastener has the characteristics of compact structure, stable performance and good processing technology performance, long service life and low production cost.

Description

Scaffold clasp
Technical field
The present invention relates to the building operations assembly for scaffold, be specifically related to a kind of steel tube scaffold clasp.
Background technology
At present, the steel tube scaffold clasp that building operations is used generally adopts two make-up circular arc fasteners of right-angled intersection to constitute by the bolt connection.This kind fastener needs just can finish with the spanner rotating bolt the fixing and dismounting of scaffolding steel pipe connected node in use, and troublesome poeration is wasted time and energy, and efficiency of construction is low.The applicant's application number provides a kind of steel pipe scaffold PUSH NUT FASTENERS for a patent application formerly of " 200820227722.0 ", it adopts the locking leading screw that is equipped with handle to control the moving of pair card body that a front end is provided with the arc clamp, and the connection and the dismounting of the horizontal, vertical steel pipe node of scaffold finished in the cooperation that is provided with the main card body of parallel grab by pair card body and front portion.This kind scaffold clasp is owing to need tool using to finish to install and dismantling operation, has easy to use, operation time and labour saving, can effectively improve the advantage that operating efficiency was built and removed to steel pipe scaffold.But this steel pipe scaffold PUSH NUT FASTENERS is aspect functional performance, processing characteristics and product cost reduction, still requires further improvement and perfect.
Summary of the invention
The objective of the invention is at the problems referred to above, the scaffold clasp that a kind of functional performance and process industrial art performance are better, be more convenient for reducing the production cost is provided.
The technical scheme that realizes above-mentioned purpose is: a kind of scaffold clasp, it has a U-shaped grab body, the arc grab of pair of parallel is arranged in the front portion of this grab body, the inboard corresponding slideway groove that is respectively arranged with at U-shaped grab body two clamping hook arms, in U-shaped grab body, become mutual plumbness to be provided with the arc clamp of a concave surface towards grab with the arc grab, the both sides at this arc clamp middle part are respectively arranged with the lug body that matches with the slideway groove, the rear that is positioned at the slideway groove between two clamping hook arms becomes mutual plumbness to be fixed with a plate with clamping hook arm, the center of this junction plate plate face is provided with screwed hole, pass the through hole of U-shaped grab body rear end and match and be provided with an adjustment leading screw parallel with clamping hook arm with screwed hole on the junction plate, the front end of this adjustment leading screw becomes to be rotatably connected with the arc clamp, is connected with handle in the rear end of adjusting leading screw.
Technical scheme of the present invention also comprises: be equipped with a grab body tail cover at the rear portion of U-shaped grab body; The anterior arc grab that is provided with of described U-shaped grab body is the circular arc grab, and the arc clamp is the circular arc clamp.
The present invention has following advantage:
Do not need tool using when 1, mounting and dismounting, easy to operate, saving of work and time can effectively improve the efficient that work was built and removed to steel pipe scaffold.
2, the Stability Analysis of Structures performance is good, reliable lock, long service life.
3, compact conformation, process industrial art performance is good, helps reducing the production cost.
Description of drawings
Fig. 1 is that this scaffold clasp master looks schematic diagram;
Fig. 2 is the vertical view of Fig. 1.
The specific embodiment
In conjunction with the accompanying drawings the specific embodiment of the present invention is described.
As accompanying drawing, this scaffold clasp has the grab body 1 of a U-shaped, the arc grab of pair of parallel is arranged in the front portion of this grab body 1, the inboard corresponding slideway groove 2 that is respectively arranged with at 1 liang of clamping hook arm of U-shaped grab body, in U-shaped grab body 1, become mutual plumbness to be provided with the arc clamp 3 of a concave surface towards grab with the arc grab, the both sides at these arc clamp 3 middle parts are respectively arranged with the lug body 4 that matches with the slideway groove, the rear that is positioned at the slideway groove between two clamping hook arms becomes mutual plumbness to be fixed with a plate 5 with clamping hook arm, center at junction plate 5 plate faces is provided with screwed hole, pass the through hole of U-shaped grab body 1 rear end and match and be provided with an adjustment leading screw 6 parallel with clamping hook arm with screwed hole on the junction plate 5, the front end of this adjustment leading screw 6 is rotatably connected for 3 one-tenth with the arc clamp, be connected with handle 7 in the rear end of adjusting leading screw 6, be equipped with grab body tail cover 8 at the rear portion of U-shaped grab body 1.
Slideway groove 2 on the clamping hook arm of the present invention is arranged to rectangular recess, is fit to adopt the Sheet Metal Forming Technology moulding.Lug body 4 on the arc clamp 3 is arranged to the rectangle cross section lug body with the slideway groove fit.Junction plate 5 adopts welding procedure with being connected of U-shaped grab body 1 clamping hook arm.Adjusting leading screw 6 and arc clamp 3 adopts by the connecting axle of leading screw 6 front ends and becomes rotating riveting ways of connecting realization to be connected with connecting hole on the arc clamp 3.Handle 7 adopts the in-line handle, is fixed by welding in the rear end of leading screw 6.Grab body tail cover 8 is the box body structure of open-front, and its rear end is provided with the centre bore that supplies leading screw to pass, and assembling back front end and clamping hook arm are weldingly connected, and realizes the mount of grab body tail cover 8 and U-shaped grab body 1.
The arc grab of U-shaped grab body 1 of the present invention and arc clamp 3 are fit to adopt circular arc grab and the circular arc clamp that matches with the scaffolding steel pipe diameter.

Claims (3)

1, a kind of scaffold clasp, it has a U-shaped grab body (1), the arc grab of pair of parallel is arranged in the front portion of this grab body (1), it is characterized in that: at the inboard corresponding slideway groove (2) that is respectively arranged with of U-shaped grab body (1) two clamping hook arm, in U-shaped grab body (1), become mutual plumbness to be provided with the arc clamp (3) of a concave surface towards grab with the arc grab, the both sides at this arc clamp middle part are respectively arranged with the lug body (4) that matches with the slideway groove, the rear that is positioned at the slideway groove between two clamping hook arms becomes mutual plumbness to be fixed with a plate (5) with clamping hook arm, the center of this junction plate plate face is provided with screwed hole, pass the through hole of U-shaped grab body (1) rear end and match and be provided with an adjustment leading screw (6) parallel with clamping hook arm with screwed hole on the junction plate (5), the front end of this adjustment leading screw (6) becomes to be rotatably connected with arc clamp (3), is connected with handle (7) in the rear end of adjusting leading screw (6).
2, scaffold clasp according to claim 1 is characterized in that: be equipped with a grab body tail cover (8) at the rear portion of U-shaped grab body (1).
3, scaffold clasp according to claim 1 is characterized in that: the anterior arc grab that is provided with of U-shaped grab body (1) is the circular arc grab, and arc clamp (3) is the circular arc clamp.
CN2009100746162A 2009-05-27 2009-05-27 Scaffold fastener Expired - Fee Related CN101566003B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100746162A CN101566003B (en) 2009-05-27 2009-05-27 Scaffold fastener

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100746162A CN101566003B (en) 2009-05-27 2009-05-27 Scaffold fastener

Publications (2)

Publication Number Publication Date
CN101566003A true CN101566003A (en) 2009-10-28
CN101566003B CN101566003B (en) 2011-03-16

Family

ID=41282350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100746162A Expired - Fee Related CN101566003B (en) 2009-05-27 2009-05-27 Scaffold fastener

Country Status (1)

Country Link
CN (1) CN101566003B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060818A (en) * 2014-06-18 2014-09-24 安徽虎博机电科技有限公司 Buckle element used for fast installation and connection at two ends of steel pipe
CN107762151A (en) * 2017-11-02 2018-03-06 中煤第七十二工程有限公司 Truss frame for connecting and the fastener even enclosed in a kind of slip form platform
CN115059280A (en) * 2022-08-04 2022-09-16 中国能源建设集团山西电力建设有限公司 Construction method of clamping type scaffold platform supporting structure on universal H-shaped steel stand column

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2217378B (en) * 1988-04-11 1992-03-25 Pandrol Ltd A device for securing elongate members together
CN2409264Y (en) * 2000-01-06 2000-12-06 庞明方 Convenient fastener for building scaffold
JP2004238872A (en) * 2003-02-05 2004-08-26 Mitsuhiko Kotai Single pipe clamp
CN2604486Y (en) * 2003-03-27 2004-02-25 朴祥培 Clamps for connecting scaffold
CN2804266Y (en) * 2005-05-10 2006-08-09 白虹 Fastening for fast detaching steel pipe scaffold
CN201180371Y (en) * 2008-02-22 2009-01-14 杜中合 Steel pipe fast chucking buckle
CN201460194U (en) * 2009-05-27 2010-05-12 魏志光 Scaffold fastener

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060818A (en) * 2014-06-18 2014-09-24 安徽虎博机电科技有限公司 Buckle element used for fast installation and connection at two ends of steel pipe
CN107762151A (en) * 2017-11-02 2018-03-06 中煤第七十二工程有限公司 Truss frame for connecting and the fastener even enclosed in a kind of slip form platform
CN115059280A (en) * 2022-08-04 2022-09-16 中国能源建设集团山西电力建设有限公司 Construction method of clamping type scaffold platform supporting structure on universal H-shaped steel stand column

Also Published As

Publication number Publication date
CN101566003B (en) 2011-03-16

Similar Documents

Publication Publication Date Title
CN202787849U (en) Keel for mounting wall panel of building
CN102126145B (en) Power takeoff shift fork fixture
CN101566003B (en) Scaffold fastener
CN201460194U (en) Scaffold fastener
CN201310188Y (en) Steel tube scaffold fast fastener
CN210177781U (en) Adjustable light gauge steel connection structure
CN210788683U (en) H-shaped steel straightening roller convenient to replace roller sleeve
CN210949415U (en) Splicing structure of aluminum profiles
CN211639709U (en) Disassembling tool for shock absorber and steering knuckle
CN201321719Y (en) Scaffold fastener for buildings
CN210476752U (en) Screw disassembling tool
CN210732304U (en) Auxiliary supporting device for hydraulic wrench
CN217280482U (en) Adjustable electrical switch support
CN210194567U (en) Multistage hydraulic hoist
CN219451524U (en) A die sinking ware for aluminium mould installation
CN218176660U (en) A supplementary angle steel spare of installation that is arranged in aluminium mould pulling-on piece system to hang mould
CN216447655U (en) Novel double-clamping-pressing type four-way pipe fitting
CN202787841U (en) Adjustable locating component
CN213331949U (en) Stud capable of being fastened quickly and mounting tool
CN217924943U (en) Jig frame structure for mounting large-span steel structure
CN216657807U (en) Simple multifunctional disassembling tool
CN202021585U (en) Special device for mounting large-scale fastening piece
CN209976318U (en) Adjustable fixed connection spare in location and special regulation spanner are used in installation of passive window
CN216634025U (en) Special spanner for valve maintenance
CN218176629U (en) Screw aluminum alloy template convenient to installation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110316

Termination date: 20200527