Embodiment
Elaborate below in conjunction with accompanying drawing.It is pointed out that equipment on the various trailer shown in the drawings only as an embodiment, its concrete layout is not limited only to accompanying drawing.
The emergency treatment device of sudden water pollution accident provided by the invention mainly partly is made up of water intaking part, water treatment portion and logistics support.(consult Fig. 2-Fig. 4) and material trailer 45 (Figure 12-shown in Figure 13) forms wherein water intaking part by water pump trailer 8.(consult Fig. 5-Fig. 6), water treating equipment support trailer 24 (consults Fig. 7-Fig. 8), monitor trailer 26 and (consults Fig. 9-Figure 11) and regenerating unit trailer 38 (consulting Fig. 1) water treatment portion by water treating equipment trailer 22.Logistics support part (is consulted Figure 15-Figure 16), sleeping berth trailer 57 and (is consulted Figure 17-Figure 18) form by tank-trailer 42 (consulting Figure 14) and food and drink trailer 48.
Water pump trailer 8 is box semi-trailer, and sump pump 9, electrical control cabinet 10, negative-pressure cup 11, water-in 12, water outlet 13 are installed in the trailer; Sidewall is equipped with door 63, window 64; The bottom of trailer platform is equipped with power supply input cabinet 16, distributive pipe 17, and a plurality of rapid-acting couplings 18 are arranged on the distributive pipe 17; The door 63 of trailer all is equipped with staircase 19.
Goods and materials trailer 45 is box semi-trailer, is divided into two portions by partition wall 29 in the trailer, and door 63 is arranged on the partition wall 29.Wherein latter half ofly be used for depositing metal wire casing 1, water-bed valve 2, floating drum 3, anchor and anchor chain 4, rubber wire water pipe 5, ball float 6, gemini 7, distributive pipe 17, staircase 19, rotary hose 20, water shoot 21, header 34, fire extinguishing appliance 55; The trailer front portion is equipped with life water pot 46, working shaft 47, power supply input cabinet 16, and door 63 is installed on the rear side of trailer and the left and right sides wall, and door 63 is furnished with staircase 19.
Water treatment portion of the present invention, be water treating equipment 23 to be installed on the trailer 22 form water treating equipment trailer 22 and (see also Fig. 5-Fig. 6), this water treating equipment trailer 22 is semi-trailer, and water treating equipment 23 are installed on the trailer, and water treating equipment 23 are provided with water-in 12, water outlet 13.On this water-in 12, the water outlet 13 rapid-acting coupling 18 is installed.(the patent No.: ZL200620087631.2) or/and " a kind of activated coke adsorption tanks " (patent No.: ZL200620022883.7) that water treating equipment 23 can adopt known " a kind of water treatment device ".Comparatively ideal equipment is " a kind of water treatment device " that adopts the patent No. to provide for ZL200620087631.2.Be loaded with water treating equipment support 25 on the water treating equipment support trailer 24 and (see also Fig. 7-Fig. 8).
Monitor trailer 26 (sees also Fig. 9-Figure 11), is divided into two portions by partition wall 29 in the trailer, door 63 is arranged on the partition wall 29 for box semi-trailer.Latter half of oil electric engine 27, power supply output counter 28, fire extinguishing appliance 55, door 63, window 64, the automatic pump 30 of being equipped with wherein, set lights 14, vent window 15 are arranged at the top; Forebody is equipped with operator's console 31, water treatment monitoring cabinet 32, water quality detection instrument 33, door 63, window 64; The bottom of trailer platform is equipped with water tank 35, foul water tank 36, fuel tank 40; Front, compartment outer wall is equipped with conditioning unit 37.Door 63 is furnished with staircase 19.
Regenerating unit trailer 38 is semi-trailer (seeing also Fig. 1), and regenerating unit 39, fuel tank 40, device housing 41, power supply input cabinet 16, fire extinguishing appliance 55 are installed on the car.
The present invention does not have strict restriction to adopting which kind of regenerating unit, as long as can satisfy activated coke regeneration.Why this device is done a summary here, be to wish to help those skilled in the art further to understand method of the present invention, thereby implement.
Regenerating unit has heating chamber 73, the division wall of making for high-temperature refractory in the middle of the heating chamber 73 74, and with heating chamber 73 separated into two parts, wherein the heating chamber 73 of stove tail 65 1 ends is the high-temperature zone, the heating chamber 73 of burner 83 1 ends is cold zone;
On high-temperature zone one sidewall of heating chamber 73 3 temperature sensors 78 are installed, 3~6 gas-fired equipments 79 and oil fuel burner 80 respectively are installed on the two side, high-temperature zone.During the regenerating unit operation, 3 temperature sensors, 78 monitorings by the high-temperature zone, and by adjusting the heat supplied of each gas-fired equipment 79 and oil fuel burner 80, temperature in the control high-temperature zone in the different zones, wherein, the zone of high-temperature zone and close stove tail 65 1 ends, temperature is 700~850 ℃, regional temperature in the middle of the high-temperature zone is 600~700 ℃, the zone of high-temperature zone and close division wall 74 1 ends, and temperature is 500~600 ℃;
On cold zone one sidewall of heating chamber 73 3 temperature sensors 78 are installed, on cold zone and the close division wall 74 1 end two sides 1~2 combustion equipment 79 and oil fuel burner 80 are installed respectively.During the regenerating unit operation, by 3 temperature sensors, 78 monitorings of cold zone, and by adjusting the heat supplied of each gas-fired equipment 79 and oil fuel burner 80, temperature in the control cold zone in the different zones, wherein, the zone of cold zone and close division wall 74 1 ends, temperature is 300~400 ℃; Cold zone region intermediate temperature is 200~300 ℃, the zone of cold zone and close burner 20 1 ends, and temperature is 100~200 ℃;
Double-deck weight turnover panel unloading valve is installed on the discharge port 67 of stove tail 65 bottoms, during regenerating unit 39 operations, activated coke is discharged by double-deck weight turnover panel unloading valve under the effect of its weight, and double-deck weight turnover panel unloading valve can prevent in the air admission stove tail 65 simultaneously;
1-2 parichnos 75 is arranged in the heating chamber 73 and bottom of division wall 74, and during the regenerating unit operation, the gas in the high-temperature zone enters cold zone through parichnos 75, and cold zone is heated.Exhanst gas outlet 82 is arranged at the top of heating chamber 73 and cold zone, close burner 83 1 ends, and the waste gas in the heating chamber 73 are discharged by exhanst gas outlet 82;
Steam outlet 85 is arranged at the top of burner 83, and variable valve 86 is arranged at steam outlet 85 tops, and variable valve 86 tops are water vapor delivery pipe 87;
Inflammable gas outlet 66 is arranged at the top of stove tail 65, on stove tail 65 sidewalls detection of negative pressure equipment 68 is arranged.In regenerating unit when operation,, combustible gas discharge fan 81 will be positioned at inflammable gas that the cylinder 70 of high-temperature zone produces by inflammable gas outlet 66 extractions, then by combustible gas discharge fan 81, be transported to gas-fired equipment 79.It is mobile to the cylinder 70 that is positioned at the high-temperature zone to be positioned at the water vapor that the cylinder 70 of cold zone produces simultaneously, required steam when becoming high-temperature zone activated coke regeneration activating.During the regenerating unit operation, detect and 81 runnings of control combustible gas discharge fan by detection of negative pressure equipment 68.
Burner 83, stove tail 65 have tightness system 77 with cylinder 70 connecting portions and cylinder 70 with heating chamber 73 connecting portions.
Gas-fired equipment 79 provides when burning required air by burner blower 69.
The worm conveyor 84 that activated coke is installed through burner 83 delivers into cylinder 70, under the effect of activated coke material rotating plate 71 in cylinder 70, to stove tail 65 directions rolling, mobile.The recovery time of activated coke in cylinder 70 is 50~80 minutes;
Cylinder 70 adopts the high temperature resistant stainless steel material to make, and two ends are seated on the carrying roller 72, and cylinder 70 1 ends have gear ring 88, and drive unit 76 is by 70 rotations of gear ring 88 head rolls.The rotating speed setting range of cylinder 70 is 2~5 rev/mins, and the length-to-diameter ratio of cylinder 70 is 10~15: 1, and cylinder 70 inclination angles are 1~2 °.The activated coke packing factor is 0.2~0.3 in the cylinder 70.
In the activated coke input cylinder 70 with needs regeneration, through the drying of cold zone, a large amount of water vapors of generation are discharged by steam outlet 85 earlier, and then enter the high-temperature zone and regenerate; Produce a large amount of inflammable gass in the high-temperature zone because combustible gas discharge fan 81 is delivered to gas-fired equipment 79 and is used; Owing to the effect of combustible gas discharge fan 81, the water vapor that is positioned at the cold zone part in the cylinder 70 enters cylinder 70 and is positioned at the high-temperature zone part as the required water vapor of activated coke activation simultaneously.
In the described regenerating unit, low-temperature zone and high temperature section are separated, reduce the thermosteresis that the equipment fume emission causes, the heat that fuel combustion is produced is fully used; With the activated coke regenerative process, drying stage produces the inflammable gas separate treatment that a large amount of water vapors and destructive distillation, activation stage produce, and a part of water vapor that drying stage is produced is as the required steam of activation stage, remaining water vapor discharging; The inflammable gas that destructive distillation, activation stage produce is recycled; Reduce the investment of activated coke reclaim equiment, floor space and energy consumption, thereby reduce the regeneration cost of activated coke.
Logistics support part (is consulted Figure 15-Figure 16), sleeping berth trailer 57 and (is consulted Figure 17-Figure 18) form by tank-trailer 42 (consulting Figure 14) and food and drink trailer 48.
Tank-trailer 42 is equipped with oil tank 43, oil pump 44, fire extinguishing appliance 55.
Food and drink trailer 48 is box semi-trailer.Be divided into two portions by partition wall 29 in the trailer, door 63 is arranged on the partition wall 29, wherein latter half of is kitchen 49, and refrigerator 50, water-heater 56, smoke exhaust ventilator 51, kitchen tools 52, set lights 14, fire extinguishing appliance 55 are installed in the kitchen 49; The trailer first half is dining room 53, and inside is equipped with tables and chairs 54, set lights 14; The trailer platform bottom is equipped with water tank 35, automatic pump 30, foul water tank 36, power supply input cabinet 16; Trailer side walls is equipped with door 63, window 64, conditioning unit 37; Door 63 is equipped with staircase 19.
Sleeping berth trailer 57 is box semi-trailer.Be divided into three parts by partition wall 29 in the trailer, door 63 is arranged on the partition wall 29, wherein latter half of is shower cabinet 58 and toilet 59; The trailer middle portion is corridor 60.The trailer forebody is bedroom 61, and double bunk 62, tables and chairs 54 are installed in the bedroom; The trailer top is equipped with set lights 14 and vent window 15; Trailer side walls be equipped with the door 63, window 64,, conditioning unit 37; Water tank 35, automatic pump 30, water-heater 56, power supply input cabinet 16, foul water tank 36 are installed under the trailer platform; Trailer door 63 is equipped with staircase 19.
When sudden water pollution accident takes place, at first water pump trailer 8, water treating equipment trailer 22, monitor trailer 26, tank-trailer 42, goods and materials trailer 45 are hauled the scene of burst water pollution accident by truck.Water treating equipment support trailer 24, regenerating unit trailer 38, food and drink trailer 48, sleeping berth trailer 57 are hauled near the burst water pollution accident scene by truck subsequently.
After reaching the spot with gemini 7, metal wire casing 1, water-bed valve 2, floating drum 3, anchor and anchor chain 4, rubber wire water pipe 5, ball float 6, distributive pipe 17, staircase 19, rotary hose 20, water shoot 21, header 34 by unloading down on the goods and materials trailer 45.Water-bed valve 2 is connected to rubber wire water pipe 5 one ends, according to the distance between water pump trailer 8 and the dry point, how root rubber steel wire water pipe 5 is cascaded, the rapid-acting coupling 18 on the water-in 12 of the other end of rubber wire water pipe 5 and water pump trailer 8 is connected.The water-bed valve 2 that will be connected with rubber wire water pipe 5 is put into metal wire casing 1, and is fixed on the floating drum 3 with metal wire casing 1, and the certain distance in rubber wire water pipe 5 intervals that needs stretch in the water is fastened ball float 6.Take advantage of gemini 7 to move rubber wire water pipe 5, water-bed valve 2 and metal wire casing 1 and floating drum 3 to dry point, with anchor and anchor chain 4 floating drum 3 is stabilized in the waters of water intaking then.
To fill water in the negative-pressure cup 11, the rapid-acting coupling 18 on the distributive pipe 17 of an end of rotary hose 20 and water pump trailer 8 is connected, the other end of rotary hose 20 is connected with rapid-acting coupling 18 on water treating equipment 23 water-ins 12.According to handling the water pollution accident required water yield to be processed every day, the processing water yield of every 23 every days of water treating equipment, many water treating equipment 23 are in parallel with the distributive pipe 17 of water pump trailer 8.
Rotary hose 20 1 ends are connected with rapid-acting coupling 18 on water treating equipment 23 water outlets 13, rapid-acting coupling 18 on the water-in 12 of the other end of rotary hose 20 and header 34 is connected, rapid-acting coupling 18 on header 34 water outlets 13 is connected with water shoot 21, according to the distance between the drainage position of header 34 and appointment, many water shoots 21 are connected in series.Cable one end is connected with the power supply input cabinet 16 of water pump trailer 8, and the cable the other end is connected with the power supply output counter 28 of monitor trailer 26.
Start the oil pump 44 in the tank-trailer 42, fill it up with diesel oil in the fuel tank 40 with monitor trailer 26.After water-bed valve 2, rubber wire water pipe 5, distributive pipe 17, rotary hose 20, water treating equipment 23, header 34, water shoot 21 all connect, fix, start the oil electric engine 27 on the monitor trailer 26, start sump pump 9 to water treating equipment 23 inner water-supplies.Sewage enters sump pump 9 via metal wire casing 1, water-bed valve 2, rubber wire water pipe 5, negative-pressure cup 11; Enter water treating equipment 23 by sump pump 9, distributive pipe 17, rotary hose 20 again; After sewage is handled through water treating equipment 23, pollutent in the water is by the activated coke Filtration Adsorption in the water treating equipment 23, removed the pollutent in the water, through water quality detection instrument 33 checks of installing on the monitor trailer 26, the water quality after the processing reaches desired standard.Water after the processing is transported to the place of appointment by water treating equipment 23 water outlets, rotary hose 20, header 34, water shoot 21.In sewage treatment process, the water quality of the water treatment monitoring cabinet 32 in the monitor trailer 26,33 pairs of polluted waterss of water quality detection instrument, water treating equipment 23 operations, the processing water yield, effluent quality are monitored.
Regenerating unit trailer 38 is parked, an end of cable is connected to the power supply input cabinet 16 of regenerating unit 39, the cable the other end is connected to the power supply output counter 28 of monitor trailer 26.The oil pump 44 that starts tank-trailer 42 is filled it up with diesel oil with the fuel tank 40 of regenerating unit 39.
After water treating equipment 23 were disposed of sewage the operation regular hour, the activated coke in the water treating equipment 23 was saturated.With water treating equipment support 25 by unloading down on the water treating equipment support trailer 24, the water treating equipment 23 of needs being changed activated coke hang onto on the water treating equipment support 25, fetch boiling water discharge opening below the treatment facility 23, being transported to regenerating unit 39 after activated coke drawn off regenerates, activated coke after the regeneration is joined in the water treating equipment 23 again, water treating equipment 23 are laid reposition restart.
One end of cable is connected to the power supply input cabinet 16 of food and drink trailer 48, the cable the other end is connected to the power supply output counter 28 of monitor trailer 26.Start the working shaft 47 in the goods and materials trailer 45, the water of life water pot 46 is transported in the water tank 35 of food and drink trailer 48.
Food and drink trailer 48, sleeping berth trailer 57 make the staff keep good working order for the staff at scene provides basic living guarantee, make emergency processing work can be continuously, stably carry out.
One end of cable is connected to the power supply input cabinet 16 of sleeping berth trailer 57, the cable the other end is connected to the power supply output counter 28 of monitor trailer 26.Start the working shaft 47 in the goods and materials trailer 45, the water of life water pot 46 is transported in the water tank 35 of sleeping berth trailer 57.
Embodiment 1
The sudden water pollution accident that present embodiment is handled is that river water area polluted near a chemical plant pollutent leaked the factory that causes, and makes chemical oxygen demand (COD) in the river (CODCr), total mercury, total cadmium, chromium (sexavalence), total lead, total cyanide, volatile phenol index severe overweight.Adopt the present invention that polluted waters is carried out emergency processing, the method of emergency processing and device partly are made up of water intaking part, water treatment portion and logistics support, comprising: two water pump trailers 8,25 water treating equipment trailers 22, two water treating equipment support trailers 24, a monitor trailer 26, a regenerating unit trailer 38, a tank-trailer 42, a goods and materials trailer 45, a food and drink trailer 48, two sleeping berth trailers 57.
The water intaking part is made up of metal wire casing 1, water-bed valve 2, floating drum 3, anchor and anchor chain 4, rubber wire water pipe 5, ball float 6, gemini 7, water pump trailer 8.
Water pump trailer 8 is box semi-trailer, and sump pump 9, electrical control cabinet 10, negative-pressure cup 11, water-in 12, water outlet 13 are installed in the trailer; Car body top is equipped with set lights 14, vent window 15; Sidewall is equipped with door 63, window 64; The bottom of trailer platform is equipped with power supply input cabinet 16, distributive pipe 17, and a plurality of rapid-acting couplings 18 are arranged on the distributive pipe 17; The door 63 of trailer all is equipped with staircase 19.
Water treatment portion is made up of water treating equipment trailer 22, water treating equipment support trailer 24, monitor trailer 26 and regenerating unit trailer 38.
Water treating equipment trailer 22 is semi-trailer, and water treating equipment 23 are installed on the trailer, and water treating equipment 23 are provided with water-in 12, water outlet 13, on water-in 12, the water outlet 13 rapid-acting coupling 18 is installed.Water treating equipment 23 adopt known " a kind of water treatment device " (patent No.: ZL200620087631.2).Be loaded with water treating equipment support 25 on the water treating equipment support trailer 24.
Monitor trailer 26 is box semi-trailer, is divided into two portions by partition wall 29 in the trailer, and door 63 is arranged on the partition wall 29.Latter half of oil electric engine 27, power supply output counter 28, fire extinguishing appliance 66, door 63, window 64, the automatic pump 30 of being equipped with wherein, set lights 14, vent window 15 are arranged at the top; Forebody is equipped with operator's console 31, water treatment monitoring cabinet 32, water quality detection instrument 33, door 63, window 64; The bottom of trailer platform is equipped with water tank 35, foul water tank 36, fuel tank 40; Front, compartment outer wall is equipped with conditioning unit 37.Door 63 is furnished with staircase 19.
Regenerating unit trailer 38 is semi-trailer, and regenerating unit, fuel tank, device housing, power supply input cabinet, fire extinguishing appliance are installed on the car.
The logistics support part is made up of tank-trailer 42, goods and materials trailer 45, food and drink trailer 48, sleeping berth trailer 57.
Tank-trailer 42 is equipped with oil tank 43, oil pump 44, fire extinguishing appliance 55.
Goods and materials trailer 45 is box semi-trailer, is divided into two portions by partition wall 29 in the trailer, and door 63 is arranged on the partition wall 29.Wherein latter half ofly be used for depositing metal wire casing 1, water-bed valve 2, floating drum 3, anchor and anchor chain 4, rubber wire water pipe 5, ball float 6, gemini 7, distributive pipe 17, staircase 19, rotary hose 20, water shoot 21, header 34, fire extinguishing appliance 55; The trailer front portion is equipped with life water pot 46, working shaft 47, and door 63 is installed on the rear side of trailer and the left and right sides wall, and door 63 is furnished with staircase 19.
Food and drink trailer 48 is box semi-trailer.Be divided into two portions by partition wall 29 in the trailer, door 63 is arranged on the partition wall 29, wherein latter half of is kitchen 49, and refrigerator 50, water-heater 56, smoke exhaust ventilator 51, kitchen tools 52, set lights 14, fire extinguishing appliance 55 are installed in the kitchen 49; The trailer first half is dining room 53, and inside is equipped with tables and chairs 54, set lights 14; The trailer platform bottom is equipped with water tank 35, automatic pump 30, foul water tank 36, power supply input cabinet 16; Trailer side walls is equipped with door 63, window 64, conditioning unit 37; Door 63 is equipped with staircase 19.
Sleeping berth trailer 57 is box semi-trailer.Be divided into three parts by partition wall 29 in the trailer, door 63 is arranged on the partition wall 29, wherein latter half of is shower cabinet 58 and toilet 59; The trailer middle portion is corridor 60.The trailer forebody is bedroom 61, and double bunk 62, tables and chairs 54 are installed in the bedroom; The trailer top is equipped with set lights 14 and vent window 15; Trailer side walls be equipped with the door 63, window 64,, conditioning unit 37; Water tank 35, automatic pump 30, water-heater 56, power supply input cabinet 16, foul water tank 36 are installed under the trailer platform; Trailer door 63 is equipped with staircase 19.
When sudden water pollution accident takes place, at first as soon as possible water pump trailer 8, water treating equipment trailer 22, monitor trailer 26, tank-trailer 42, goods and materials trailer 45 are hauled the scene of burst water pollution accident by truck.Water treating equipment support trailer 24, regenerating unit trailer 38, food and drink trailer 48, sleeping berth trailer 57 are hauled near the burst water pollution accident scene by truck subsequently.
After reaching the spot with gemini 7, metal wire casing 1, water-bed valve 2, floating drum 3, anchor and anchor chain 4, rubber wire water pipe 5, ball float 6, distributive pipe 17, staircase 19, rotary hose 20, water shoot 21, header 34 by unloading down on the goods and materials trailer 45.Water-bed valve 2 is connected to rubber wire water pipe 5 one ends, according to the distance between water pump trailer 8 and the dry point, how root rubber steel wire water pipe 5 is cascaded, the rapid-acting coupling 18 on the water-in 12 of the other end of rubber wire water pipe 5 and water pump trailer 8 is connected.The water-bed valve 2 that will be connected with rubber wire water pipe 5 is put into metal wire casing 1, and is fixed on the floating drum 3 with metal wire casing 1, and the certain distance in rubber wire water pipe 5 intervals that needs stretch in the water is fastened ball float 6.Take advantage of gemini 7 to move rubber wire water pipe 5, water-bed valve 2 and metal wire casing 1 and floating drum 3 to dry point, with anchor and anchor chain 4 floating drum 3 is stabilized in the waters of water intaking then.
To fill water in the negative-pressure cup 11, the rapid-acting coupling 18 on the distributive pipe 17 of an end of rotary hose 20 and water pump trailer 8 is connected, the other end of rotary hose 20 is connected with rapid-acting coupling 18 on water treating equipment 23 water-ins 12.
Be 10,000 tons according to calculating the water yield that every day, needs were handled, the processing water yield of every 23 every days of water treating equipment is 400 tons, and 25 water treating equipment 23 are in parallel with the distributive pipe 17 of two water pump trailers 8 respectively.Rotary hose 20 1 ends are connected with rapid-acting coupling 18 on water treating equipment 23 water outlets 13, rapid-acting coupling 18 on the water-in 12 of the other end of rotary hose 20 and header 34 is connected, rapid-acting coupling 18 on header 34 water outlets 13 is connected with water shoot 21, according to the distance between the drainage position of header 34 and appointment, many water shoots 21 are connected in series.Cable one end is connected with the power supply input cabinet 16 of water pump trailer 8, and the cable the other end is connected with the power supply output counter 28 of monitor trailer 26.
Start the oil pump 44 in the tank-trailer 42, fill it up with diesel oil in the fuel tank 40 with monitor trailer 26.After water-bed valve 2, rubber wire water pipe 5, distributive pipe 17, rotary hose 20, water treating equipment 23, header 34, water shoot 21 all connect, fix, start the oil electric engine 27 on the monitor trailer 26, start sump pump 9 to water treating equipment 23 inner water-supplies.Sewage enters sump pump 9 via metal wire casing 1, water-bed valve 2, rubber wire water pipe 5, negative-pressure cup 11; Enter water treating equipment 23 by sump pump 9, distributive pipe 17, rotary hose 20 again; After sewage was handled through water treating equipment 23, the pollutent in the water had been removed the pollutent in the water by the activated coke Filtration Adsorption in the water treating equipment 23.Through water quality detection instrument 33 checks of installing on the monitor trailer 26, the water quality after the processing reaches desired standard.Water after the processing is transported to the place of appointment by water treating equipment 23 water outlets, rotary hose 20, header 34, water shoot 21.In sewage treatment process, the water quality of the water treatment monitoring cabinet 32 in the monitor trailer 26,33 pairs of polluted waterss of water quality detection instrument, water treating equipment 23 operations, the processing water yield, effluent quality are monitored.
Regenerating unit trailer 38 is parked, an end of cable is connected to the power supply input cabinet 16 of regenerating unit 39, the cable the other end is connected to the power supply output counter 28 of monitor trailer 26.The oil pump 44 that starts tank-trailer 42 is filled it up with diesel oil with the fuel tank 40 of regenerating unit 39.
After water treating equipment 23 were disposed of sewage the operation regular hour, the activated coke in the water treating equipment 23 was saturated.With water treating equipment support 25 by unloading down on the water treating equipment support trailer 24, the water treating equipment 23 of needs being changed activated coke hang onto on the water treating equipment support 25, fetch boiling water discharge opening below the treatment facility 23, being transported to regenerating unit 39 after activated coke drawn off regenerates, activated coke after the regeneration is joined in the water treating equipment 23 again, water treating equipment 23 are laid reposition restart.
One end of cable is connected to the power supply input cabinet 16 of food and drink trailer 48, the cable the other end is connected to the power supply output counter 28 of monitor trailer 26.Start the working shaft 47 in the goods and materials trailer 45, the water of life water pot 46 is transported in the water tank 35 of food and drink trailer 48.
One end of cable is connected to the power supply input cabinet 16 of sleeping berth trailer 57, the cable the other end is connected to the power supply output counter 28 of monitor trailer 26.Start the working shaft 47 in the goods and materials trailer 45, the water of life water pot 46 is transported in the water tank 35 of sleeping berth trailer 57.
Food and drink trailer 48, sleeping berth trailer 57 make the staff keep good working order for the staff at scene provides basic living guarantee, make emergency processing work can be continuously, stably carry out.
Through water quality detection instrument 33 checks of installing on the monitor trailer 26; after water treating equipment 23 processing; the water quality of river reaches in China's " face of land (face) quality standard of water environment (GB 3838-2002) "; the III class standard of " water environment quality standard elementary item standard value ", water quality are applicable to centralized Drinking Water waterhead area second class protection district, general fish protection district and Swimming area.
The forward and backward main water-quality guideline comparable situation of river emergency processing in the present embodiment:
Sequence number |
Project |
Surface water III class standard value |
The river that pollutes |
Handle back water quality |
1 |
Chemical oxygen demand (COD) (CODCr) |
≤20mg/L |
120mg/L |
17mg/L |
2 |
Total mercury |
≤0.0001mg/L |
0.03mg/L |
0.00007mg/L |
3 |
Total cadmium |
≤0.005mg/L |
0.02mg/L |
0.004mg/L |
4 |
Chromium (sexavalence) |
≤0.05mg/L |
6mg/L |
0.046mg/L |
5 |
Total plumbous |
≤0.05mg/L |
1.1mg/L |
0.03mg/L |
6 |
Total cyanide |
≤0.005mg/L |
0.6mg/L |
0.0042mg/L |
7 |
Volatile phenol |
≤0.002mg/L |
1mg/L |
0.001mg/L |
8 |
Sulfide |
≤0.2mg/L |
10mg/L |
0.13mg/L |
Embodiment 2
The sudden water pollution accident that present embodiment is handled is that the somewhere is as the lake eutrophication water body at water source, cities and towns, monitoring data shows, nitrogen in the water body, phosphorus, chlorophyll a content severe overweight, be subjected to weather effect lake water temperature above 20 degrees centigrade, be higher than the normal time, and water level is lower than the normal time, higher water temperature and lower water level cause water quality further to worsen, water temperature and water quality all are conducive to algae and grow fast, at any time all may large-scale outbreak blue-green algae, serious threat town dweller's water supply security.Adopt the present invention that the algae near the waters this waterhead area is carried out emergency processing, the method of emergency processing and device partly are made up of water intaking part, water treatment portion and logistics support, comprising: three water pump trailers 8,38 water treating equipment trailers 22, two water treating equipment support trailers 24, a monitor trailer 26, a regenerating unit trailer 38, a tank-trailer 42, two goods and materials trailers 45, two food and drink trailers 48, three sleeping berth trailers 57.
The water intaking part is made up of metal wire casing 1, water-bed valve 2, floating drum 3, anchor and anchor chain 4, rubber wire water pipe 5, ball float 6, gemini 7, water pump trailer 8.
Water pump trailer 8 is box semi-trailer, and sump pump 9, electrical control cabinet 10, negative-pressure cup 11, water-in 12, water outlet 13 are installed in the trailer; Car body top is equipped with set lights 14, vent window 15; Sidewall is equipped with door 63, window 64; The bottom of trailer platform is equipped with power supply input cabinet 16, distributive pipe 17, and a plurality of rapid-acting couplings 18 are arranged on the distributive pipe 17; The door 63 of trailer all is equipped with staircase 19.
Water treatment portion is made up of water treating equipment trailer 22, water treating equipment support trailer 24, monitor trailer 26 and regenerating unit trailer 38.
Water treating equipment trailer 22 is semi-trailer, and water treating equipment 23 are installed on the trailer, and water treating equipment 23 are provided with water-in 12, water outlet 13, on water-in 12, the water outlet 13 rapid-acting coupling 18 is installed.Water treating equipment 23 adopt known " a kind of water treatment device " (patent No.: ZL 200620087631.2).Be loaded with water treating equipment support 25 on the water treating equipment support trailer 24.
Monitor trailer 26 is box semi-trailer, is divided into two portions by partition wall 29 in the trailer, and door 63 is arranged on the partition wall 29.Latter half of oil electric engine 27, power supply output counter 28, fire extinguishing appliance 66, door 63, window 64, the automatic pump 30 of being equipped with wherein, set lights 14, vent window 15 are arranged at the top; Forebody is equipped with operator's console 31, water treatment monitoring cabinet 32, water quality detection instrument 33, door 63, window 64; The bottom of trailer platform is equipped with water tank 35, foul water tank 36, fuel tank 40; Front, compartment outer wall is equipped with conditioning unit 37.Door 63 is furnished with staircase 19.
Regenerating unit trailer 38 is semi-trailer, and regenerating unit, fuel tank, device housing, power supply input cabinet, fire extinguishing appliance are installed on the car.Regenerating unit adopts number of patent application that 200820078699.3 " a kind of activated coke regenerating units " that provide are provided.
The logistics support part is made up of tank-trailer 42, goods and materials trailer 45, food and drink trailer 48, sleeping berth trailer 57.
Tank-trailer 42 is equipped with oil tank 43, oil pump 44, fire extinguishing appliance 55.
Goods and materials trailer 45 is box semi-trailer, is divided into two portions by partition wall 29 in the trailer, and door 63 is arranged on the partition wall 29.Wherein latter half ofly be used for depositing metal wire casing 1, water-bed valve 2, floating drum 3, anchor and anchor chain 4, rubber wire water pipe 5, ball float 6, gemini 7, distributive pipe 17, staircase 19, rotary hose 20, water shoot 21, header 34, fire extinguishing appliance 55; The trailer front portion is equipped with life water pot 46, working shaft 47, and door 63 is installed on the rear side of trailer and the left and right sides wall, and door 63 is furnished with staircase 19.
Food and drink trailer 48 is box semi-trailer.Be divided into two portions by partition wall 29 in the trailer, door 63 is arranged on the partition wall 29, wherein latter half of is kitchen 49, and refrigerator 50, water-heater 56, smoke exhaust ventilator 51, kitchen tools 52, set lights 14, fire extinguishing appliance 55 are installed in the kitchen 49; The trailer first half is dining room 53, and inside is equipped with tables and chairs 54, set lights 14; The trailer platform bottom is equipped with water tank 35, automatic pump 30, foul water tank 36, power supply input cabinet 16; Trailer side walls is equipped with door 63, window 64, conditioning unit 37; Door 63 is equipped with staircase 19.
Sleeping berth trailer 57 is box semi-trailer.Be divided into three parts by partition wall 29 in the trailer, door 63 is arranged on the partition wall 29, wherein latter half of is shower cabinet 58 and toilet 59; The trailer middle portion is corridor 60.The trailer forebody is bedroom 61, and double bunk 62, tables and chairs 54 are installed in the bedroom; The trailer top is equipped with set lights 14 and vent window 15; Trailer side walls be equipped with the door 63, window 64,, conditioning unit 37; Water tank 35, automatic pump 30, water-heater 56, power supply input cabinet 16, foul water tank 36 are installed under the trailer platform; Trailer door 63 is equipped with staircase 19.
When sudden water pollution accident takes place, at first in the shortest time, water pump trailer 8, water treating equipment trailer 22, monitor trailer 26, tank-trailer 42, goods and materials trailer 45 are hauled the scene of burst water pollution accident by truck.Water treating equipment support trailer 24, regenerating unit trailer 38, food and drink trailer 48, sleeping berth trailer 57 are hauled near the burst water pollution accident scene by truck subsequently.
After reaching the spot with gemini 7, metal wire casing 1, water-bed valve 2, floating drum 3, anchor and anchor chain 4, rubber wire water pipe 5, ball float 6, distributive pipe 17, staircase 19, rotary hose 20, water shoot 21, header 34 by unloading down on the goods and materials trailer 45.Water-bed valve 2 is connected to rubber wire water pipe 5 one ends, according to the distance between water pump trailer 8 and the dry point, how root rubber steel wire water pipe 5 is cascaded, the rapid-acting coupling 18 on the water-in 12 of the other end of rubber wire water pipe 5 and water pump trailer 8 is connected.The water-bed valve 2 that will be connected with rubber wire water pipe 5 is put into metal wire casing 1, and is fixed on the floating drum 3 with metal wire casing 1, and the certain distance in rubber wire water pipe 5 intervals that needs stretch in the water is fastened ball float 6.Take advantage of gemini 7 to move rubber wire water pipe 5, water-bed valve 2 and metal wire casing 1 and floating drum 3 to dry point, with anchor and anchor chain 4 floating drum 3 is stabilized in the waters of water intaking then.
To fill water in the negative-pressure cup 11, the rapid-acting coupling 18 on the distributive pipe 17 of an end of rotary hose 20 and water pump trailer 8 is connected, the other end of rotary hose 20 is connected with rapid-acting coupling 18 on water treating equipment 23 water-ins 12.
Be 15,000 tons according to calculating the water yield that every day, needs were handled, the processing water yield of every 23 every days of water treating equipment is 400 tons, and 38 water treating equipment 23 are in parallel with the distributive pipe 17 of three water pump trailers 8 respectively.Rotary hose 20 1 ends are connected with rapid-acting coupling 18 on water treating equipment 23 water outlets 13, rapid-acting coupling 18 on the water-in 12 of the other end of rotary hose 20 and header 34 is connected, rapid-acting coupling 18 on header 34 water outlets 13 is connected with water shoot 21, according to the distance between the drainage position of header 34 and appointment, many water shoots 21 are connected in series.Cable one end is connected with the power supply input cabinet 16 of water pump trailer 8, and the cable the other end is connected with the power supply output counter 28 of monitor trailer 26.
Start the oil pump 44 in the tank-trailer 42, fill it up with diesel oil in the fuel tank 40 with monitor trailer 26.After water-bed valve 2, rubber wire water pipe 5, distributive pipe 17, rotary hose 20, water treating equipment 23, header 34, water shoot 21 all connect, fix, start the oil electric engine 27 on the monitor trailer 26, start sump pump 9 to water treating equipment 23 inner water-supplies.Sewage enters sump pump 9 via metal wire casing 1, water-bed valve 2, rubber wire water pipe 5, negative-pressure cup 11; Enter water treating equipment 23 by sump pump 9, distributive pipe 17, rotary hose 20 again; After sewage is handled through water treating equipment 23, pollutent in the water is by the activated coke Filtration Adsorption in the water treating equipment 23, removed the pollutent in the water, through water quality detection instrument 33 checks of installing on the monitor trailer 26, the water quality after the processing reaches desired standard.Water after the processing is transported to the place of appointment by water treating equipment 23 water outlets, rotary hose 20, header 34, water shoot 21.In sewage treatment process, the water quality of the water treatment monitoring cabinet 32 in the monitor trailer 26,33 pairs of polluted waterss of water quality detection instrument, water treating equipment 23 operations, the processing water yield, effluent quality are monitored.
Regenerating unit trailer 38 is parked, an end of cable is connected to the power supply input cabinet 16 of regenerating unit 39, the cable the other end is connected to the power supply output counter 28 of monitor trailer 26.The oil pump 44 that starts tank-trailer 42 is filled it up with diesel oil with the fuel tank 40 of regenerating unit 39.
After water treating equipment 23 were disposed of sewage the operation regular hour, the activated coke in the water treating equipment 23 was saturated.With water treating equipment support 25 by unloading down on the water treating equipment support trailer 24, the water treating equipment 23 of needs being changed activated coke hang onto on the water treating equipment support 25, fetch boiling water discharge opening below the treatment facility 23, being transported to regenerating unit 39 after activated coke drawn off regenerates, activated coke after the regeneration is joined in the water treating equipment 23 again, water treating equipment 23 are laid reposition restart.
One end of cable is connected to the power supply input cabinet 16 of food and drink trailer 48, the cable the other end is connected to the power supply output counter 28 of monitor trailer 26.Start the working shaft 47 in the goods and materials trailer 45, the water of life water pot 46 is transported in the water tank 35 of food and drink trailer 48.
One end of cable is connected to the power supply input cabinet 16 of sleeping berth trailer 57, the cable the other end is connected to the power supply output counter 28 of monitor trailer 26.Start the working shaft 47 in the goods and materials trailer 45, the water of life water pot 46 is transported in the water tank 35 of sleeping berth trailer 57.
Food and drink trailer 48, sleeping berth trailer 57 make the staff keep good working order for the staff at scene provides basic living guarantee, make emergency processing work can be continuously, stably carry out.
After the algae in the lake is carried out emergency processing, improved the water quality in the lake, suppressed blue algae bloom in the lake.Water quality in the lake reaches in China's " face of land (face) quality standard of water environment (GB3838-2002) "; III class standard in III class standard in " table 1 water environment quality standard elementary item standard value " and " the table 2 lake and reservoir specific project standard value ", water quality are applicable to centralized Drinking Water waterhead area second class protection district, general fish protection district and Swimming area.
The main water-quality guideline comparable situation that lake water emergency processing in the present embodiment is forward and backward:
Sequence number |
Project |
Surface water III class standard |
Pollute lake water |
Handle back water quality |
1 |
Chemical oxygen demand (COD) (CODCr) |
≤20mg/L |
120mg/L |
10mg/L |
2 |
Total phosphorus (in P) |
≤0.025mg/L |
0.26mg/L |
0.02mg/L |
3 |
Total nitrogen |
≤0.3mg/L |
1.5mg/L |
0.2mg/L |
4 |
Chlorophyll a |
≤0.01mg/L |
0.09mg/L |
0.006mg/L |
5 |
Transparency |
≥2.5m |
0.3m |
3m |
6 |
Flavor |
Do not have |
Seriously |
Do not have |