CN101561364B - High-temperature air valve service life test bed - Google Patents
High-temperature air valve service life test bed Download PDFInfo
- Publication number
- CN101561364B CN101561364B CN2009101471167A CN200910147116A CN101561364B CN 101561364 B CN101561364 B CN 101561364B CN 2009101471167 A CN2009101471167 A CN 2009101471167A CN 200910147116 A CN200910147116 A CN 200910147116A CN 101561364 B CN101561364 B CN 101561364B
- Authority
- CN
- China
- Prior art keywords
- electric heater
- heat exchanger
- temperature
- temperature air
- air valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)
Abstract
The invention pertains to the technical field of tests, and relates to a high-temperature air valve service life test bed used in a high-temperature air valve test. The test bed comprises an air source, a flow adjusting device, an electric heater unit, a support for a high-temperature air valve to be tested, a pressure adjusting device and a temperature adjusting device; a heat exchanger is additionally arranged between the flow adjusting device and the electric heater unit; after flowing through the flow adjusting device, an air flow firstly enters the cold side inlet of the heat exchanger and then enters into the hot side inlet ofthe electric heater unit; after flowing through the high-temperature air valve to be tested, hot air flow of the outlet of the electric heater unit arrives at the hot side inlet of the heat exchanger and then arrives at the pressure adjusting device from the hot side outlet of the heat exchanger. The test bed eliminates a water-cool heat exchanger of the original system, utilizes the high-temperature airflow of the outlet of the valve to be tested to preheat the normal-temperature air flow entering the electric heater unit and after being preheated, the normal-temperature air flow entering the electric heater unit enters the electric heater unit, thereby reducing electric heating energy consumption by 30 percent to 80 percent.
Description
Technical field
The invention belongs to the experimental technique field, relate to a kind of the high-temperature air valve service life test bed of high-temperature air valve test that be used for.
Background technology
At present, the air register life test rack generally all adopts electrical heating pressurized air simulation high-temperature air valve working pressure, state of temperature, air-flow is cooled to discharge below the pressure governor valve safe working temperature through wanting first water behind the overtesting valve again, so promptly waste water, wasted the heat of discharging air-flow again.
Summary of the invention
The objective of the invention is to propose a kind of not water, do not waste again and discharge the high-temperature air valve service life test bed of air-flow heat.
Technical solution of the present invention is, comprise source of the gas, flow regulator, the electric heater group, tested high-temperature air valve platform position, pressure adjustment assembly and temperature control equipment, between flow regulator and electric heater group, install air heat exchanger additional, air-flow is behind flow regulator, be introduced into the cold limit of air heat exchanger inlet, cold limit outlet from air heat exchanger enters the inlet of electric heater group again, the thermal current of the outlet of electric heater group is after being installed in the tested high-temperature air valve on the tested high-temperature air valve platform position, arrive the hot limit of air heat exchanger inlet, arrive pressure adjustment assembly again from air heat exchanger hot limit outlet.Advantage that the present invention has and beneficial effect, the present invention has cancelled the water-cooled exchanging air of discharging the thermal current cooling in the former high-temperature air valve testing table, the high temperature gas flow that utilizes the test valve to export enters the normal temperature air-flow of electric heater by the heat interchanger preheating, carry out the electric heater group again after the normal temperature air-flow that enters electric heater is preheating to uniform temperature, thereby reduced the power consumption that the electric heater group is heated to the normal temperature air of certain flow uniform temperature, reach energy-conservation effect, the high temperature gas flow of testing the valve outlet simultaneously reduces the reliably working that also helps the pressure governor valve by heat interchanger cooling back temperature.Appropriate design or type selecting by heat interchanger can guarantee that delivery temperature is reduced in the pressure governor valve normal working temperature scope, and the electrical heating power consumption reduces by 30%~80%.
Description of drawings
Fig. 1 is a principle of the invention synoptic diagram.
Embodiment
As shown in the figure, system comprises source of the gas 1, flow regulator 2, electric heater group 4, tested high-temperature air valve platform position 5, pressure adjustment assembly 6 and temperature control equipment 7, between flow regulator 2 and electric heater group 4, install heat interchanger 3 additional, air-flow is behind flow regulator 2, be introduced into heat interchanger 3 cold limit inlets, cold limit outlet from heat interchanger 3 enters the inlet of electric heater group 4 again, the thermal current of the outlet of electric heater group 4 is after being installed in the tested high-temperature air valve on the tested high-temperature air valve platform position 5, arrive heat interchanger 3 hot limit inlets, arrive pressure adjustment assembly 6 again from heat interchanger 3 hot limit outlets.Heat interchanger 3 is taken all factors into consideration, is designed according to the installation site of pressure, temperature, flow and the heat interchanger of air-flow, overall dimensions, efficient requirement etc., to reach feasible, practicality and purpose of energy saving.
Embodiment one
High Temperature High Pressure low discharge aviation air register life test rack in certain flow 100kg/h~400kg/h, pressure 0.4Mpa~2.5Mpa, temperature normal temperature~600 ℃, system design the shell-tube type air-to-air heat exchanger of one cover diameter 150mm, long 1.5m, by heat interchanger exhaust pre-heating intaking, when 200kg/h, 2.5Mpa, 600 ℃ of states, energy-conservation near 80%, and owing to cancelled cooling water system, system is simplified, and cost reduces.
Embodiment two
High Temperature High Pressure air register life test rack in certain flow 200kg/h~1500kg/h, pressure 0.4Mpa~2.5Mpa, temperature normal temperature~600 ℃, system design the shell-tube type air-to-air heat exchanger of one cover diameter 250mm, long 1.8m, by air heat exchanger exhaust pre-heating intaking, when 1200kg/h, 2.0Mpa, 600 ℃ of states, energy-conservationly reach 50%, and owing to cancelled cooling water system, system is simplified, and cost reduces.
Embodiment three
The big flow aviation of High Temperature High Pressure air register life test rack in certain flow 1000kg/h~15000kg/h, pressure 0.1Mpa~0.8Mpa, temperature normal temperature~150 ℃, system design one cover diameter 600mm, long 1.8m make the box air-air tubular heat exchanger of intermediate medium with silicone oil, by heat interchanger exhaust pre-heating intaking, when 12000kg/h, 0.4Mpa, 120 ℃ of states, energy-conservationly reach 30%, and owing to cancelled cooling water system, system is simplified, and cost reduces.
Claims (1)
- One kind high-temperature air valve service life test bed, comprise source of the gas (1), flow regulator (2), electric heater group (4), tested high-temperature air valve platform position (5), pressure adjustment assembly (6) and temperature control equipment (7), it is characterized in that, between flow regulator (2) and electric heater group (4), install air heat exchanger (3) additional, air-flow is behind flow regulator (2), be introduced into the cold limit of air heat exchanger (3) inlet, enter the inlet of electric heater group (4) again from the cold limit outlet of air heat exchanger (3), the thermal current of the outlet of electric heater group (4) is after being installed in the tested high-temperature air valve on the tested high-temperature air valve platform position (5), arrive the hot limit of air heat exchanger (3) inlet, arrive pressure adjustment assembly (6) again from air heat exchanger (3) hot limit outlet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101471167A CN101561364B (en) | 2009-06-04 | 2009-06-04 | High-temperature air valve service life test bed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101471167A CN101561364B (en) | 2009-06-04 | 2009-06-04 | High-temperature air valve service life test bed |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101561364A CN101561364A (en) | 2009-10-21 |
CN101561364B true CN101561364B (en) | 2011-03-30 |
Family
ID=41220260
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009101471167A Active CN101561364B (en) | 2009-06-04 | 2009-06-04 | High-temperature air valve service life test bed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101561364B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103809048A (en) * | 2012-11-06 | 2014-05-21 | 上海航天设备制造总厂 | Electro-pneumatic valve tester |
CN103954441A (en) * | 2014-04-25 | 2014-07-30 | 武汉工程大学 | Device and method for detecting and testing high-temperature valve based on air heating system |
CN110763500B (en) * | 2019-11-04 | 2021-05-04 | 中国原子能科学研究院 | Test bed and test method for air door performance test |
CN112504641B (en) * | 2020-11-09 | 2023-05-23 | 芜湖天航装备技术有限公司 | Test pipeline for performance of pressure regulator and application method thereof |
-
2009
- 2009-06-04 CN CN2009101471167A patent/CN101561364B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN101561364A (en) | 2009-10-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203177465U (en) | Electric preheating high-temperature high-pressure heat storing air heating device | |
RU2009139756A (en) | AIRCRAFT COOLING AND REGULATING SYSTEM FOR AIRCRAFT POWER UNITS | |
CN102563867B (en) | Solar-heating assisted salt melting system | |
CN109461952B (en) | Marine fuel cell cogeneration system | |
CN105576269A (en) | Thermal control system of fixed mini-type fuel cell cogeneration device | |
CN101561364B (en) | High-temperature air valve service life test bed | |
CN204554957U (en) | Storing energy and supplying hot wind system | |
CN104279077A (en) | Two-stage linkage type automobile tail gas thermoelectric power generation system | |
CN109638312B (en) | Circulating cooling water device of fuel cell system | |
CN207602525U (en) | A kind of temperature control device for power device ageing | |
CN104279078A (en) | Automobile exhaust thermoelectric power generation system | |
CN103670822A (en) | Railway air conditioner dynamo van fuel oil heating system and control method suitable for high and cold environment | |
CN210554237U (en) | Fuel cell system and automobile | |
CN203992395U (en) | Vacuum sintering furnace cooling system | |
CN103697591B (en) | A kind of regenerative pure air heating system | |
CN203081768U (en) | Heat energy recycling and saving system with screw air compressor | |
CN103401478A (en) | Gas combustion heat power generation and supply device | |
EP2674590B1 (en) | Method for operating a power plant with solar energy system | |
CN105508055A (en) | System and method for cooling circulation water in distributed energy station | |
CN210951853U (en) | Solid electric heating energy storage fresh air hot air system heat release device | |
CN203756382U (en) | Fuel heating device | |
CN204140231U (en) | A kind of two-stage linking type vehicle exhaust thermo-electric generation system | |
CN201244507Y (en) | Heated air circulation improved device of vertical mill system | |
RU2561777C2 (en) | Fuel gas heating system with cogeneration unit | |
CN102721075A (en) | Device and method for preheating interior of dust remover |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |