CN101553019B - Method and system for deleting personnel in multi-tunnel routeset - Google Patents

Method and system for deleting personnel in multi-tunnel routeset Download PDF

Info

Publication number
CN101553019B
CN101553019B CN2008100875455A CN200810087545A CN101553019B CN 101553019 B CN101553019 B CN 101553019B CN 2008100875455 A CN2008100875455 A CN 2008100875455A CN 200810087545 A CN200810087545 A CN 200810087545A CN 101553019 B CN101553019 B CN 101553019B
Authority
CN
China
Prior art keywords
base station
evolution base
routes
tunnel
accesses terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008100875455A
Other languages
Chinese (zh)
Other versions
CN101553019A (en
Inventor
赵孝武
徐子华
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN2008100875455A priority Critical patent/CN101553019B/en
Priority to PCT/CN2008/073023 priority patent/WO2009121232A1/en
Publication of CN101553019A publication Critical patent/CN101553019A/en
Application granted granted Critical
Publication of CN101553019B publication Critical patent/CN101553019B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/20Manipulation of established connections
    • H04W76/22Manipulation of transport tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides a method for deleting personnel in a multi-tunnel routeset and a super movable broadband system. In the method for deleting, evolution base stations eBS1, eBS2 and SRNC are personnel in a routeset of an accessed terminal, wherein the eBS1 and the accessed terminal are in a connected state, and the eBS1is used for sending forward chain data to the accessed terminal and transmitting a data packet of the accessed terminal to the eBS2. The method includes the following steps: the personnel eBS2 is deleted from the routeset of the accessed terminal; the eBS2 judges whether a basic agent IP tunnel exists between the eBS2 and an accessed gateway; and if the basic agent IP tunnel exists between the eBS2 and the accessed gateway, then the basic agent IP tunnel is remained. The invention perfects the functions of a route management set.

Description

The delet method of personnel in multi-tunnel routeset and system
Technical field
The present invention relates to the communications field, in particular to a kind of delet method and system of personnel in multi-tunnel routeset.
Background technology
UMB (Ultra Mobile Broadband, Ultra-Mobile Broadband) then is the new technology of cdma2000 access technology evolution.Many technology of UMB air interface can promote the performance of cdma2000 inserting technology networks greatly, have established nature basis for the user provides the radio multimedium business of more requirements at the higher level.
Route (route) and Access Network route instance concepts have been introduced in the UMB air interface technologies; Route is meant the protocol stack (InUse protocol stack) that accesses terminal and using with an Access Network, and an Access Network route instance refers to and access terminal one open the logicality function of route.In realization, a route instance can be an evolution base station (eBS, evolved Base Station), also can be session reference network control (SRNC, Session Reference Network Control) entity.Set of routes then is meant the set of all the route instances that had of accessing terminal.
The use of set of routes allows to have between the quick eBS that can seamlessly move and simplify widely the low expense of eBS interface support between the adjacent eBS of different abilities switches, access terminal through route manage with set of routes in relevant processing and the operation of each eBS.The management of set of routes comprises increases the set of routes member, deletion set of routes member.
In the UMB network technology, (AGW is through setting up proxy-mobile IP tunnel (being referred to as PMIP Tunnel or Proxy Mobile IP Tunnel) contact with transmitting grouped data between AccessGateway) for evolution base station and IAD.Can there be the proxy-mobile IP tunnel in an IAD with a plurality of evolution base stations, and this is referred to as many tunnels.The evolution base station that receives the forward link user data from IAD is referred to as data binding point (DAP, Data Attachment Point), and DAP can be in set of routes, also can be not in set of routes.
In addition; Feedforward network evolution base station (FLSE; Forward Link Serving eBS) is meant with AT and keeps being connected, and send the evolution base station of forward link data, oppositely network evolution base station (RLSE to AT; Reserve Link Serving eBS) is meant that maintenance is connected with AT, sends the evolution base station of AT packet to DAP.Under normal conditions, AGW sends to DAP with data through basic PMIP tunnel, and DAP sends to forward direction service evolution base station to forward data again.
In current set of routes member deletion technology; For a plurality of PMIP tunnel flow process as shown in Figure 1 or mode of operation are arranged: suppose that evolution base station eBS1, eBS2 and SRNC are in set of routes; And eBS1 and eBS2 have data tunnel with AGW respectively, just the PMIP tunnel.
Step is following:
A. access terminal AT current with set of routes in eBS1 have and be connected, eBS2 and SRNC are other members of set of routes;
There are basic PMIP tunnel (representing with cylindricality in the drawings) in b.eBS1 and AGW, and in this example, eBS1 also bears the function of DAP simultaneously.User data transmits in AT and eBS1/DAP and AGW;
Only there are reverse tunnel (representing with cylindricality in the drawings) in c.eBS2 and AGW;
D. the route instance (eBS2) or the transmission route close message (RouteClose) that accesses terminal are with removing members eBS2 from set of routes.
E. accessing terminal keeps and the connected state of eBS1, and SRNC continues to be retained in the set of routes;
F. in the deletion route that accesses terminal, AT sends route and shines upon (Route Map) message to all members in the set of routes, to upgrade all the route instances in the set of routes.Shine upon message according to this route, eBS1 and SRNC stop all communications with eBS2;
G. after completion and all communications, eBS2 sends the PMIP-login request message with the PMIP tunnel between deletion and the AGW.Carrying life cycle in this message is 0;
H. receive after this message, the data tunnel between AGW deletion and the eBS2, and send PMIP-registration reply message and give eBS2;
I.eBS1 continues and AGW keeps basic tunnel;
J. after eBS2 receives the route close message; Perhaps it connects after maintenance lifetime (the Connection Keep Alive Period) timer expiry; If at eBS2 any airlink record of creating for AT is arranged, eBS2 sends charging request message and gives AGW;
K. receive after the charging request message that AGW sends charge response message and gives eBS2.When charging report obtains the affirmation of AGW, eBS2 cancels to AT and distributes all resources.
In above-mentioned flow process, obviously eBS1 is a forward direction service evolution base station, and the function of serving as DAP, because there is basic PMIP tunnel in it with AGW.
In realizing process of the present invention, the inventor finds to exist at least in the prior art following problem: in the actual operation, forward direction service evolution base station and DAP possibly not be evolution base stations.As the member of DAP as the Route collection, it also can be deleted from set of routes, because along with the distance of forward direction service evolution base station and DAP more and more far is moved out of set of routes.But DAP is bearing and is keeping the function in basic PMIP tunnel with AGW and can not discharge immediately.Therefore on, above-mentioned flow process be actually can't solve when DAP as Route collection member and the situation of being deleted.
Summary of the invention
The present invention aims to provide a kind of delet method and system of personnel in multi-tunnel routeset, with solve when DAP as Route collection member and the problem of the situation of being deleted.
In an embodiment of the present invention; A kind of delet method of personnel in multi-tunnel routeset is provided, and evolution base station eBS1, eBS2 and SRNC are the members in the set of routes that accesses terminal, wherein; EBS1 is in connection status with accessing terminal; EBS1 is used for to the transmission forward link data that accesses terminal, and transmits the packet that accesses terminal to eBS2, comprises the steps: that removing members eBS2 is to obtain upgrading set of routes from the set of routes that accesses terminal; EBS2 judges between own and the IAD whether have basic Agent IP tunnel; If then keep basic Agent IP tunnel.
Preferably, removing members eBS2 specifically comprises to obtain upgrading set of routes from the set of routes that accesses terminal: access terminal and send the route close message of request deletion eBS2 from set of routes to eBS2; Access terminal removing members eBS2 from set of routes to obtain upgrading set of routes; The transmission route that accesses terminal is shone upon message to the route member who upgrades in the set of routes.
Preferably, accessing terminal to eBS2 feedback route close message is to send the route close message by eBS2 to accessing terminal to trigger.
Preferably, also comprise after obtaining upgrading set of routes at removing members eBS2 from the set of routes that accesses terminal: the connection status of access terminal maintenance and eBS1, SRNC is retained in the set of routes that accesses terminal.
Preferably, after obtaining upgrading set of routes, also comprise: after connecting maintenance lifetime timer expiry, discharge the route resource that relates to eBS2 at removing members eBS2 from the set of routes that accesses terminal.
Preferably, also comprise: if judge between eBS2 and the IAD do not have basic Agent IP tunnel, eBS2 sends Agent IP-login request message to IAD; IAD sends Agent IP-registration reply message and gives eBS2; And the data tunnel between IAD deletion and the eBS2.
Preferably, also comprise after obtaining upgrading set of routes at removing members eBS2 from the set of routes that accesses terminal: if eBS2 exists for the airlink record that accesses terminal and create, then eBS2 sends charging request message and gives IAD; IAD sends charge response message and gives eBS2; EBS2 receives charge response message, and then the resource that accesses terminal and distribute is given in cancellation.
Preferably, also comprise after obtaining upgrading set of routes at removing members eBS2 from the set of routes that accesses terminal: eBS1 and IAD keep oppositely only having the Agent IP tunnel.
In an embodiment of the present invention; A kind of Ultra-Mobile Broadband system also is provided, has comprised: access terminal, eBS1, eBS2 and SRNC, it is the member in the set of routes that accesses terminal; EBS2 is the data binding point, and there are data tunnel in eBS1 and eBS2 with IAD respectively; Wherein, eBS1 is in connection status with accessing terminal, and eBS1 is used for to the transmission forward link data that accesses terminal, and transmits the packet that accesses terminal to eBS2; Access terminal and eBS2 also is used for from the set of routes removing members eBS2 that accesses terminal to obtain upgrading set of routes; EBS2 also is used for judging between own and the IAD whether have basic Agent IP tunnel, if then keep basic Agent IP tunnel.
Above embodiment is to relating under many tunnels situation in the set of routes management; Proposed to work as flow process and the solution that DAP removes from the Route collection as Route collection member; Filled up the blank that UMB network route management collection current techniques can not contain, the perfect function of routing management collection.
Description of drawings
Accompanying drawing described herein is used to provide further understanding of the present invention, constitutes the application's a part, and illustrative examples of the present invention and explanation thereof are used to explain the present invention, do not constitute improper qualification of the present invention.In the accompanying drawings:
Fig. 1 shows the deletion set of routes member's in a plurality of PMIP tunnel in the prior art flow chart;
Fig. 2 shows the flow chart according to the delet method of the personnel in multi-tunnel routeset of the embodiment of the invention;
Fig. 3 shows the sketch map of the delet method of personnel in multi-tunnel routeset according to the preferred embodiment of the invention.
Embodiment
Below with reference to accompanying drawing and combine embodiment, specify the present invention.
Fig. 2 shows the flow chart according to the delet method of the personnel in multi-tunnel routeset of the embodiment of the invention; Evolution base station eBS1 (first evolution base station), eBS2 (second evolution base station) and SRNC are the members in the set of routes that accesses terminal; Wherein, eBS1 is in connection status with accessing terminal, and eBS1 is used for to the transmission forward link data that accesses terminal; Transmit the packet that accesses terminal to eBS2, comprise the steps:
Step S10, removing members eBS2 is to obtain upgrading set of routes from the set of routes that accesses terminal;
Step S20, eBS2 judges between own and the IAD whether have basic Agent IP tunnel;
Step S30 is if then keep basic Agent IP tunnel.
This embodiment is to relating under many tunnels situation in the set of routes management; Proposed to collect flow process and the solution that the member removes from the Route collection as Route (route) as DAP; Filled up the blank that UMB network route management collection current techniques can not contain, the perfect function of routing management collection.
Preferably, removing members eBS2 specifically comprises to obtain upgrading set of routes from the set of routes that accesses terminal: access terminal and send the route close message of request deletion eBS2 from set of routes to eBS2; Access terminal removing members eBS2 from set of routes to obtain upgrading set of routes; The transmission route that accesses terminal is shone upon message to the route member who upgrades in the set of routes.
Preferably, accessing terminal to eBS2 feedback route close message is to send the route close message by eBS2 to accessing terminal to trigger.
Preferably, also comprise after obtaining upgrading set of routes at removing members eBS2 from the set of routes that accesses terminal: the connection status of access terminal maintenance and eBS1, SRNC is retained in the set of routes that accesses terminal.
Preferably, after obtaining upgrading set of routes, also comprise: after connecting maintenance lifetime timer expiry, discharge the route resource that relates to eBS2 at removing members eBS2 from the set of routes that accesses terminal.
Preferably, also comprise: if judge between eBS2 and the IAD do not have basic Agent IP tunnel, eBS2 sends Agent IP-login request message to IAD; IAD sends Agent IP-registration reply message and gives eBS2; And the data tunnel between IAD deletion and the eBS2.
Preferably, also comprise after obtaining upgrading set of routes at removing members eBS2 from the set of routes that accesses terminal: if eBS2 exists for the airlink record that accesses terminal and create, then eBS2 sends charging request message and gives IAD; IAD sends charge response message and gives eBS2; EBS2 receives charge response message, and then the resource that accesses terminal and distribute is given in cancellation.
Preferably, also comprise after obtaining upgrading set of routes at removing members eBS2 from the set of routes that accesses terminal: eBS1 and IAD keep oppositely only having the Agent IP tunnel.
In an embodiment of the present invention; A kind of Ultra-Mobile Broadband system also is provided, has comprised: access terminal, eBS1, eBS2 and SRNC, it is the member in the set of routes that accesses terminal; EBS2 is the data binding point, and there are data tunnel in eBS1 and eBS2 with IAD respectively; Wherein, eBS1 is in connection status with accessing terminal, and eBS1 is used for to the transmission forward link data that accesses terminal, and transmits the packet that accesses terminal to eBS2; Access terminal and eBS2 also is used for from the set of routes removing members eBS2 that accesses terminal to obtain upgrading set of routes; EBS2 also is used for judging between own and the IAD whether have basic Agent IP tunnel, if then keep basic Agent IP tunnel.
This embodiment is to relating under many tunnels situation in the set of routes management; Proposed to work as flow process and the solution that DAP removes from the Route collection as Route collection member; Filled up the blank that UMB network route management collection current techniques can not contain, the perfect function of routing management collection.
Fig. 3 shows the sketch map of set of routes member's delet method according to the preferred embodiment of the invention; Suppose that forward direction service evolution base station and reverse evolution base station all are eBS1, there is reverse PMIP tunnel in it with AGW, and eBS2 is DAP; Only there is basic PMIP tunnel in it with AGW, comprises the steps:
A. access terminal AT current with set of routes in eBS1 have and be connected, eBS1 is a forward direction service evolution base station (FLSE), also is oppositely to serve evolution base station (RLSE), eBS2 and SRNC are other members of set of routes of AT, this is a prerequisite;
Only there are basic Agent IP tunnel in b.eBS2 and AGW, and this is a prerequisite;
Only there are the reverse proxy IP tunnel in c.eBS1//FLSE/RLSE and AGW, and this is a prerequisite;
D. the route instance (eBS2) or the transmission route close message (RouteClose) that accesses terminal are with removing members eBS2 from set of routes; If this information drop-out; Potential recipient's connection keeps after lifetime (the Connection Keep Alive Period) timer expiry; The recipient will cancel the resource that this route is distributed
E. access terminal and continue the connected state of maintenance and eBS1, SRNC continues to be retained in the set of routes of AT,
F. access terminal after the deletion route member, AT sends route and shines upon (RouteMap) message to all the reservation members in the set of routes, to upgrade all the route instances in the set of routes;
Although g. eBS2 no longer is the member of AT set of routes, eBS2 continues and AGW keeps basic PMIP tunnel;
H.eBS1/FLSE/RLSE then continues to keep reverse PMIP tunnel with AGW;
I. after eBS2 receives the route close message, perhaps it connects and keeps after lifetime (ConnectionKeepAlivePeriod) timer expiry, if at eBS2 any airlink record of creating for AT is arranged, eBS2 sends charging request message and gives AGW;
J. receive after the charging request message that AGW sends charge response message and gives eBS2, when charging report obtains the affirmation of AGW, eBS2 cancels to AT and distributes all resources.
This embodiment is to relating under many tunnels situation in the set of routes management; Proposed to work as flow process and the solution that DAP removes from the Route collection as Route collection member; Filled up the blank that UMB network route management collection current techniques can not contain, the perfect function of routing management collection.
Obviously, it is apparent to those skilled in the art that above-mentioned each module of the present invention or each step can realize with the general calculation device; They can concentrate on the single calculation element; Perhaps be distributed on the network that a plurality of calculation element forms, alternatively, they can be realized with the executable program code of calculation element; Thereby; Can they be stored in the storage device and carry out, perhaps they are made into each integrated circuit modules respectively, perhaps a plurality of modules in them or step are made into the single integrated circuit module and realize by calculation element.Like this, the present invention is not restricted to any specific hardware and software combination.
The above is merely the preferred embodiments of the present invention, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.All within spirit of the present invention and principle, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (9)

1. the delet method of a personnel in multi-tunnel routeset; It is characterized in that first evolution base station, second evolution base station and session reference network controlled entity are the members in the set of routes that accesses terminal, wherein; Said first evolution base station and said accessing terminal are in connection status; Said first evolution base station is used for to the said transmission forward link data that accesses terminal, and transmits the said packet that accesses terminal to said second evolution base station, comprises the steps:
Removing members second evolution base station is to obtain upgrading set of routes from the set of routes that accesses terminal;
Said second evolution base station judges between own and the IAD whether have basic Agent IP tunnel;
If then keep said basic Agent IP tunnel.
2. delet method according to claim 1 is characterized in that, removing members second evolution base station specifically comprises to obtain upgrading set of routes from the set of routes that accesses terminal:
Said accessing terminal sent the route close message of request said second evolution base station of deletion from said set of routes to said second evolution base station;
Said removing members second evolution base station that accesses terminal from said set of routes is to obtain said renewal set of routes;
The said transmission route that accesses terminal is shone upon message to the route member in the said renewal set of routes.
3. delet method according to claim 2 is characterized in that, saidly accesses terminal that to feed back said route close message to said second evolution base station be to be sent said route close message and trigger to said accessing terminal by said second evolution base station.
4. delet method according to claim 1 is characterized in that, also comprises after obtaining upgrading set of routes at removing members second evolution base station from the set of routes that accesses terminal:
The connection status of said access terminal maintenance and said first evolution base station, said session reference network controlled entity is retained in the said set of routes that accesses terminal.
5. delet method according to claim 1 is characterized in that, also comprises after obtaining upgrading set of routes at removing members second evolution base station from the set of routes that accesses terminal:
After connecting maintenance lifetime timer expiry, discharge the route resource that relates to said second evolution base station.
6. delet method according to claim 1 is characterized in that, also comprises:
If judge do not have basic Agent IP tunnel between said second evolution base station and the said IAD, said second evolution base station sends Agent IP-login request message to said IAD;
Said IAD sends Agent IP-registration reply message and gives said second evolution base station; And
Data tunnel between said IAD deletion and said second evolution base station.
7. delet method according to claim 1 is characterized in that, also comprises after obtaining upgrading set of routes at removing members second evolution base station from the set of routes that accesses terminal:
The airlink record of creating if said second evolution base station exists for said accessing terminal, then said second evolution base station sends charging request message and gives said IAD;
Said IAD sends charge response message and gives said second evolution base station;
Said second evolution base station is received said charge response message, and then the said resource that accesses terminal and distribute is given in cancellation.
8. delet method according to claim 1 is characterized in that, also comprises after obtaining upgrading set of routes at removing members second evolution base station from the set of routes that accesses terminal:
Said first evolution base station and IAD keep oppositely only having the Agent IP tunnel.
9. a Ultra-Mobile Broadband system is characterized in that, comprising:
Access terminal, first evolution base station, second evolution base station and session reference network controlled entity; Said first evolution base station, said second evolution base station and said session reference network controlled entity are the members in the said set of routes that accesses terminal; Said second evolution base station is the data binding point, and there are data tunnel in said first evolution base station and second evolution base station with IAD respectively;
Wherein, said first evolution base station and said accessing terminal are in connection status, and said first evolution base station is used for to the said transmission forward link data that accesses terminal, and transmit the said packet that accesses terminal to said second evolution base station;
Said accessing terminal also is used for from said set of routes removing members second evolution base station that accesses terminal to obtain upgrading set of routes with said second evolution base station;
Said second evolution base station also is used for judging between own and the IAD whether have basic Agent IP tunnel, if then keep said basic Agent IP tunnel.
CN2008100875455A 2008-04-02 2008-04-02 Method and system for deleting personnel in multi-tunnel routeset Expired - Fee Related CN101553019B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2008100875455A CN101553019B (en) 2008-04-02 2008-04-02 Method and system for deleting personnel in multi-tunnel routeset
PCT/CN2008/073023 WO2009121232A1 (en) 2008-04-02 2008-11-12 Deletion method and system for multi-tunnel route set members

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100875455A CN101553019B (en) 2008-04-02 2008-04-02 Method and system for deleting personnel in multi-tunnel routeset

Publications (2)

Publication Number Publication Date
CN101553019A CN101553019A (en) 2009-10-07
CN101553019B true CN101553019B (en) 2012-05-09

Family

ID=41134807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100875455A Expired - Fee Related CN101553019B (en) 2008-04-02 2008-04-02 Method and system for deleting personnel in multi-tunnel routeset

Country Status (2)

Country Link
CN (1) CN101553019B (en)
WO (1) WO2009121232A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102056136B (en) * 2009-10-28 2014-04-09 中兴通讯股份有限公司 Tunnel updating method and system in communication system supporting local IP access

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1571396A (en) * 2003-07-18 2005-01-26 华为技术有限公司 An implementing method for switching ZONET in IPv6 network
CN1662091A (en) * 2004-02-26 2005-08-31 大唐移动通信设备有限公司 Method for switching users between different subzones implemented within same station
CN1889761A (en) * 2005-06-27 2007-01-03 华为技术有限公司 Control method for activating set updating in soft switching process

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001145161A (en) * 1999-11-12 2001-05-25 Tokyo Gas Co Ltd Communication system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1571396A (en) * 2003-07-18 2005-01-26 华为技术有限公司 An implementing method for switching ZONET in IPv6 network
CN1662091A (en) * 2004-02-26 2005-08-31 大唐移动通信设备有限公司 Method for switching users between different subzones implemented within same station
CN1889761A (en) * 2005-06-27 2007-01-03 华为技术有限公司 Control method for activating set updating in soft switching process

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开2001-145161A 2001.05.25

Also Published As

Publication number Publication date
WO2009121232A1 (en) 2009-10-08
CN101553019A (en) 2009-10-07

Similar Documents

Publication Publication Date Title
CN101473678B (en) Changing LTE specific anchor with simple tunnel switching
CN101150838B (en) A method and system for inter-system switching
US20030117983A1 (en) Method and gateway GPRS support node (GGSN) for user (payload) plane redundancy
JP3821662B2 (en) Communication device
CN105282803A (en) Communication interface and information transfer method and system based on the same
CN100446622C (en) Moving exchanging center switching method of location updating and user imputing
CN101330751A (en) Method for releasing source network resource, gateway entity and network appliance
CN101540719B (en) Method and equipment for re-locating serving gateway
CN101483848A (en) Method, apparatus and system for switching network under roaming state
CN102695293A (en) Method and system for deleting loads and serving gateway
CN101919301A (en) Providing mobility management using emulation
CN101553019B (en) Method and system for deleting personnel in multi-tunnel routeset
CN101594652A (en) The method, system and device of starting update load bearing configuration in a kind of handoff procedure
CN101765152B (en) Method for base stations under same routing area to share tunnel resources
CN112398589B (en) Method and device for data transmission in relay network
CN101128012B (en) A method for quick switching of mobile terminal
KR101007408B1 (en) Data sharing based data transfer method and system
CN103379474A (en) Method for achieving reverse activation and method and system for maintaining terminal state by means of ILR
CN103548413A (en) System and method for preventing deadlock in direct tunnel release
CN101394290B (en) Fee counting method for ultra-mobile wideband access network
CN102404697A (en) Multi-media message service system, method and device
CN103069917B (en) For setting up the method for data path, equipment and communication system
CN101400029A (en) Message transmission method, system and gateway supporting node
CN100466768C (en) The system and method for monitoring the in and out SMS of the mobile office call of the group
KR100628748B1 (en) A method for managing billing session of ggsn with preservation state control in gprs

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120509

Termination date: 20200402