CN101534530B - 对用户设备进行小区重配的方法、系统和控制设备 - Google Patents

对用户设备进行小区重配的方法、系统和控制设备 Download PDF

Info

Publication number
CN101534530B
CN101534530B CN2008101018990A CN200810101899A CN101534530B CN 101534530 B CN101534530 B CN 101534530B CN 2008101018990 A CN2008101018990 A CN 2008101018990A CN 200810101899 A CN200810101899 A CN 200810101899A CN 101534530 B CN101534530 B CN 101534530B
Authority
CN
China
Prior art keywords
cell
district
sub
message
deleted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008101018990A
Other languages
English (en)
Other versions
CN101534530A (zh
Inventor
王飞宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Potevio Information Technology Co Ltd
Original Assignee
Potevio Institute of Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Potevio Institute of Technology Co Ltd filed Critical Potevio Institute of Technology Co Ltd
Priority to CN2008101018990A priority Critical patent/CN101534530B/zh
Publication of CN101534530A publication Critical patent/CN101534530A/zh
Application granted granted Critical
Publication of CN101534530B publication Critical patent/CN101534530B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

本发明公开了一种对用户设备(UE)进行小区重配的方法,该方法包括:判定小区被删除时,释放被删除小区内的在线UE在基站(Node B)侧的资源;被释放的UE检测到链路失效,请求小区更新;为请求小区更新的UE重配小区。本发明还公开了一种对UE进行小区重配的系统,以及该系统中的控制设备。使用本发明能够简化小区重配流程,降低网络侧负荷。

Description

对用户设备进行小区重配的方法、系统和控制设备
技术领域
本发明涉及时分双工-同步码分多址(TD-SCDMA)通信技术,具体涉及对TD-SCDMA用户设备(UE,User Equipment)进行小区重配的方法、系统和控制设备。
背景技术
在TD-SCDMA系统实际运行中,存在删除小区的场景,例如人为通过网管系统删除频点或小区,或基站(Node B)在异常时主动向无线网络控制器(RNC,Radio Network Controller)上报异常事件,请求删除异常Node B所在频点或小区。对于异频组网来说,一个频点对应一个小区,那么删除频点,就是删除该频点上的唯一小区,因此删除频点和删除小区的效果是相同的;但是对于同频组网来说,一个频点上可能有多个小区,那么删除一个频点,就是删除该频点上的所有小区,而删除一个小区,被删除小区所在频点上的其它小区并没有被删除。
当有小区被删除时,为了保证被删除小区内的在线UE能够继续正常通信,需要对被删除小区内的所有在线UE进行小区重配。目前,对UE进行小区重配的通常作法是:RNC把被删除小区内的所有在线UE在线迁移到其他频点,迁移成功后再对被迁移的UE执行小区重配。
图1为现有技术中对被删除小区内的UE进行小区重配的方法流程图。如图1所示,该方法包括以下步骤:
步骤101:当RNC判定有小区被删除时,为被删除小区内的所有在线UE分配新的UE资源,且在分配新资源时,Node B保留被删除小区内所有在线UE原占用的UE资源不释放。
其中,RNC和Node B根据UE最近一次上报的可驻留小区列表,为被删除小区内的所有在线UE分配新的UE资源,包括无线链路资源和地面传输资源。该分配新UE资源的步骤即是为UE分配新小区。
步骤102~105:RNC逐一向所有被删除小区内的在线UE 1到UE n,发送物理信道重配请求(Physical Channel Reconfiguration Request)消息,并接收物理信道重配成功的UE返回的物理信道重配完成(Physical ChannelReconfiguration Complete)消息。在RNC收齐所有在线UE的物理信道重配完成消息后,才能执行步骤106。其中,n为大于1的整数。
从图1的流程可以看出,RNC分别向被删除小区内的所有在线UE 1~UE n发送物理信道重配请求消息,该物理信道重配请求消息中携带有新小区信息,该新小区信息包括新的无线链路资源和地面传输资源,用于指示重配物理信道。接收到物理信道重配请求消息的UE根据消息中的新小区信息进行物理信道重配,以完成UE的在线信道切换,重配成功后向RNC返回物理信道重配完成消息。物理信道重配不成功的UE向RNC返回物理信道重配失败消息,接收到该失败消息的RNC确定本次小区重配失败。此时,RNC释放自身中被删除小区内的所有在线UE资源,包括已经重配成功的。
步骤106:RNC向Node B发送小区重配请求(Cell ReconfigurationRequest)消息。该小区重配请求消息包括被删除小区信息。实际上,在步骤102~105中UE已经迁移到新的频点,此时RNC发送小区重配请求消息的作用是通知Node B释放在步骤101中保留的Node B侧资源。
步骤107:Node B释放在步骤101中保留的Node B侧资源。
步骤108:Node B向RNC返回小区重配响应(Cell ReconfigurationResponse)消息。
至此,本流程结束。
可见,目前在小区删除情况下对UE进行的小区重配过程具有如下缺点:
1)在将UE从被删除小区迁移出来的时候,由于是在线迁移,待迁移UE当前使用的资源在Node B中仍然被占用,因此Node B需要为待迁移的UE额外的准备一套UE资源。当在线迁移UE数量较多时,Node B需要准备大量的UE资源,导致Node B资源负担加重。Node B和RNC是地面无线接入网(UTRAN,Universal Terrestrial Radio Access Network)中的重要组成单元,因此Node B资源负担的加重,必然导致UTRAN整体负荷增加。
2)现有UE小区重配方案,RNC需要依次向每个UE发送物理信道重配请求,并接收各个UE返回的物理信道重配完成消息,并且在收齐所有物理信道重配完成消息后,才能通知Node B释放原小区所占用的UE资源,可见现有小区重配流程比较复杂,每一步都需要RNC的参与,RNC与UE和Node B之间的信令交互都比较多,从而增加了RNC的功能复杂程度。而且,在RNC与UE交互的过程中,RNC需要进行状态监控和流程控制,记录所有UE在迁移过程中的每一个状态,例如哪个UE返回了无线信道重配完成消息,哪个UE还未返回。当需要小区重配的UE数量较多时,用于状态监控和流程控制的RNC设备执行资源消耗较多。RNC负荷的加重,导致UTRAN侧整体负荷进一步加重。
3)如果RNC和Node B中的UE资源不够,不能保证所有在线UE信道迁移成功时,则RNC向UE发送物理信道重配请求后可能会收到UE的物理信道重配失败消息,此时网络侧会释放掉被删除小区内的所有UE资源,包括已经迁移成功的,并确定小区重配失败。那么,只要有一个UE没有迁移成功,所有的UE包括迁移成功的UE都被释放掉,导致被删除小区内的所有UE重配失败,不能继续当前通话。例如,如图1所示,如果RNC在接收到UE 1到UE(n-1)返回的(n-1)个物理信道重配完成消息后,接收到UE n返回的物理信道重配失败消息,则判定小区重配失败,将UE 1到UE n这n个UE的UE资源都释放掉,那么UE 1到UE n均不能继续当前通话。可见,现有的小区重配方法,小区重配成功率低。
发明内容
有鉴于此,本发明提供了一种对用户设备进行小区重配方法,能够简化小区重配流程,降低网络侧负荷。
该方法包括:
RNC判定小区被删除时,不释放自身中被删除小区内的所有在线UE资源,向Node B发送小区重配请求消息;
Node B根据所接收的小区重配请求,释放自身中被删除小区内的所有在线UE资源,向所述RNC返回小区重配响应消息;
被释放的UE检测到链路失效,请求小区更新;
RNC和NodeB为请求小区更新的UE重配小区。
其中,所述判定小区被删除为:如果判定有频点被删除,则判定被删除频点上的所有小区都被删除。
其中,被释放的UE检测到链路失效,请求小区更新为:
位于专用信道的被释放UE检测到无线链路失败时,发起小区更新过程;
位于公共信道的被释放UE检测到在服务区外时,发起小区更新过程。
其中,所述为请求小区更新的UE重配小区为:
网络侧为请求小区更新的UE重新分配新小区,向请求小区更新的UE返回携带新小区信息的小区更新确认消息;
位于专用信道的UE驻留在所述新小区中,并返回物理信道重配完成消息作为响应消息;位于公共信道的UE驻留在所述新小区中,并返回通用地面无线接入网修改信息确认消息作为响应消息。
本发明还提供了一种对用户设备进行小区重配系统,能够简化小区重配流程,降低网络侧负荷。
该系统包括网络侧和至少一个UE;所述网络侧包括RNC和Node B;
所述RNC,用于在判定小区被删除时,不释放自身中被删除小区的所有在线UE资源,向Node B发送小区重配请求消息;所述Node B,用于根据所接收的小区重配请求消息,释放自身中被删除小区的所有在线UE资源,向所述RNC返回小区重配响应消息;RNC和NodeB还用于为请求小区更新的UE重配小区;
所述UE,用于检测到自身链路失效时,向网络侧请求小区更新。
当所述UE位于专用信道,该UE包括检测单元和处理单元;
所述检测单元,用于在检测到无线链路失败时,通知所述处理单元;
所述处理单元,用于接收到所述通知时,确定可驻留小区,向所述网络侧发送携带可驻留小区的小区更新消息。
当所述UE位于公共信道,该UE包括检测单元和处理单元;
所述检测单元,用于在检测到在服务区外时,通知所述处理单元;
所述处理单元,用于接收到所述通知时,确定可驻留小区,向所述网络侧发送携带可驻留小区的小区更新消息。
根据以上技术方案可见,应用本发明能够简化小区重配流程,降低UTRAN整体资源负荷。具体来说,具有如下有益效果:
1)本发明先将被删除小区内所有UE在Node B侧的UE资源释放掉,使得这些被释放的UE资源能够在小区重配时被重新利用,Node B不必为待重配UE额外准备一套UE资源,降低了Node B侧的资源负荷,从而降低了UTRAN侧的负荷。
2)当UE在Node B侧的UE资源释放掉后,本发明利用UE发现链路失效后可以主动发起小区更新流程的能力,实现对UE的小区重配。整个重配过程,无需RNC逐一向被迁移UE发送物理信道重配请求,简化了小区重配流程。而且,RNC只需要针对请求小区更新的UE进行处理,无需在与UE交互的过程中,监控每个UE状态并进行流程控制,因此,降低了RNC设备的执行资源消耗,从而进一步降低了UTRAN侧的负荷。
3)在资源重配前释放UE在Node B侧的资源,使得Node B侧资源足够,能够保证所有UE的成功迁移,避免出现因资源不足而导致的重配失败的情况。同时,网络侧针对请求小区更新的UE进行小区重配,对每个UE的重配操作都是相互独立的。即使对个别UE重配失败,也不会影响到其它UE的小区重配,因此,提高了小区重配成功率。
附图说明
图1为现有技术中对被删除小区内的UE进行小区重配的方法流程图。
图2为本发明实施例中对UE进行小区重配的方法流程图。
图3为本发明实施例中对UE进行小区重配的系统结构示意图。
具体实施方式
下面结合附图并举实施例,对本发明进行详细描述。
本发明提供了一种对UE进行小区重配的方案,该方案的基本思想是:在判定小区被删除时,释放被删除小区内所有在线UE在Node B侧的资源,被释放的UE一段时间后会检测到链路失效并请求小区更新,此时,网络侧对请求小区更新的UE进行小区重配。
可见,本发明先将被删除小区内所有UE在Node B侧的UE资源释放掉,使得这些被释放的UE资源能够在小区重配时被重新利用,Node B不必为待重配UE额外准备一套UE资源,降低了Node B侧的资源负荷,从而降低了UTRAN侧的负荷。
其次,当UE在Node B侧的UE资源释放掉后,本发明利用UE发现链路失效后可以主动发起小区更新流程的能力,实现对UE的小区重配。整个重配过程,无需RNC逐一向被迁移UE发送物理信道重配请求,简化了小区重配流程。而且,RNC只需要针对请求小区更新的UE进行处理,无需在与UE交互的过程中,监控每个UE状态并进行流程控制,因此,降低了RNC设备的执行资源消耗,从而进一步降低了UTRAN侧的负荷。
此外,在资源重配前释放UE在Node B侧的资源,使得Node B侧资源足够,能够保证所有UE的成功迁移,避免出现因资源不足而导致的重配失败的情况。同时,网络侧针对请求小区更新的UE进行小区重配,对每个UE的重配操作都是相互独立的。即使对个别UE重配失败,也不会影响到其它UE的小区重配,因此,提高了小区重配成功率。
图2示出了本发明实施例中UE小区重配方法的流程图。为了描述方便,图2只示出了一个UE。如图2所示,该方法包括以下步骤:
步骤200~201:当判定小区被删除时,RNC保留自身中被删除小区的所有在线UE资源不释放,向Node B发送小区重配请求消息。
该小区重配请求消息中携带有被删除小区的信息。
需要说明的是,在异频组网环境下,如果判定有频点被删除,则该频点上的唯一小区被删除;在同频组网环境下,如果判定有频点被删除,则判定被删除频点上的所有小区都被删除。
步骤202:Node B收到小区重配请求消息后,释放自身中被删除小区内的所有在线UE资源。
本步骤中Node B接收到小区更新请求后的响应操作与现有的响应操作相同。
步骤203:Node B向RNC返回小区重配响应消息。
步骤204:被释放的UE检测到自身链路失效,确定可驻留小区。
本步骤中,所谓链路失效是指UE发现自身与网络侧之间的链路断开了。对于处于CELL_DCH和CELL_FACH状态的UE来说,其检测方式有所区别。
对于处于CELL_DCH状态的UE来说,该UE位于专用信道,其正处于通话状态,该状态下的UE在被释放即掉线后的一段时间通常是十几秒内,收到连续的“越出服务区(out of sync)”指示,此时UE启动无线链路失败定时器即定时器T313,当T313超时,确定检测到无线链路失败,即判定链路失效。此时,UE通过对邻小区的信号质量进行测试,确定信号质量较好小区为的可驻留小区,然后执行后续步骤205,从而进行小区更新。
对于处于CELL_FACH状态的UE来说,该UE位于公共信道,其可能正处于下载状态,该状态下的UE确定“在服务区外”时,判定链路失效。此时,UE执行3GPP TS 25.304协议文件中规定的小区选择进程,以确定可驻留的小区,然后执行后续步骤205,从而进行小区更新。
本步骤中UE所确定的可驻留小区可以为一个也可以为多个,并将所确定的可驻留小区记录在可驻留小区列表中,等待发送给RNC。
步骤205:判定链路失效的UE,向RNC发送携带可驻留小区列表的小区更新(Cell Update)消息。小区更新消息用于通知RNC自身需要从所在源小区切换到其它可驻留小区。
步骤206:RNC与Node B为发送小区更新消息的UE分配新的无线链路和地面传输资源。分配的依据是UE上报的小区更新消息中携带的可驻留小区列表。
步骤207:分配完成,RNC向UE返回小区更新确认(Cell UpdateConfirm)消息。其中,该小区更新确认消息中携带有分配的新小区信息,包括无线链路和地面传输资源。
此时,UE根据当前状态,择一执行以下步骤208或209:当UE处于CELL_DCH状态时,执行以下步骤208;当UE处于CELL_FACH状态时,执行以下步骤209。
步骤208:CELL_DCH状态下的UE收到小区更新确认消息后,选择RNC分配的新小区驻留,并返回物理信道重配完成消息。本流程结束。
步骤209:CELL_FACH状态下的UE收到小区更新确认消息后,选择RNC分配的新小区驻留,返回UTRAN修改信息确认(Utran MobilityInformation Confirm)消息。本流程结束。
根据以上所述可见,本发明实施例只需对RNC判定有小区被删除后的操作修改为向Node B发起小区重配请求,无需对Node B和UE进行修改即可实现本发明,因此本发明的小区重配方案具有很强的可实施性。
为了实现本发明实施例中的小区重配方法,本发明还提供了一种小区重配系统。图3为本发明实施例中对UE进行小区重配的系统结构示意图。如图3所示,该系统包括网络侧和至少一个UE。在TD-SCDMA系统中,网络侧为UTRAN。
其中,网络侧,用于在判定小区被删除时,释放被删除小区上在线UE的Node B侧资源;在接收到小区更新请求时,为请求小区更新的UE重配小区。
UE,用于在检测到自身链路失效时,向网络侧发送小区更新消息以发起小区更新过程。
以下对网络侧和UE的结构进行详细描述。
首先,图3中的网络侧具体包括RNC和Node B,RNC用于在判定小区被删除时,不释放自身中被删除小区的所有在线UE资源,向Node B发送携带被删除小区信息的小区重配请求消息。该RNC包括判断单元、执行单元和更新单元;其中,
判断单元,用于在判定小区被删除时,将被删除的小区通知给执行单元;
更新单元,用于在接收到来自UE的小区更新消息时,通知执行单元执行现有的小区更新流程。
执行单元,用于在接收到来自判定单元的通知时,不释放自身中被删除小区的所有在线UE资源,向Node B发送小区重配请求消息,并接收NodeB返回的小区重配响应消息。该执行单元还在接收到更新单元的通知后,执行现有的小区更新流程,包括:与Node B一起为UE分配新的无线链路资源和地面传输资源,向UE返回小区更新确认消息,待UE完成物理信道重配后,接收UE返回的物理信道重配的响应消息。
网络侧的Node B,在接收到来自RNC收到的小区重配请求消息时,释放自身中被删除小区的所有在线UE资源,向RNC返回小区重配响应消息。
图3中的UE具体包括检测单元和处理单元。
其中,检测单元,用于在检测到链路失败时,通知处理单元。处理单元,用于在接收到来自检测单元的通知时,通过向网络侧发送小区更新消息,以发起小区更新过程。该小区更新消息中包括处理单元确定的可驻留小区列表。
当UE处于CELL_DCH状态时,该UE中的检测单元在检测到无线链路失败时,通知处理单元;此时,处理单元对所在UE的邻小区信号质量进行测试,确定信号质量较好的小区作为可驻留小区,将所确定的可驻留小区以列表形式携带在小区更新消息中发送给RNC。该处理单元还接收来自RNC的小区更新确认消息,根据该消息中携带的新小区信息的进行物理信道配置,并返回物理信道配置完成消息作为物理信道重配的响应消息。
当UE处于CELL_FACH状态时,该UE中的检测单元在检测到在服务区外时,通知处理单元;此时,处理单元执行3GPP TS 25.304协议文件中规定的小区选择进程,以确定可驻留小区,将所确定的可驻留小区以列表形式携带在小区更新消息中发送给RNC。该处理单元还接收来自RNC的小区更新确认消息,根据该消息中携带的新小区信息的进行物理信道配置,并返回UTRAN修改信息确认消息作为物理信道重配的响应消息。
由以上所述可以看出,本发明所提供的小区重配方案能够简化小区重配流程,降低UTRAN整体资源负荷。
综上所述,以上仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (7)

1.一种对用户设备UE进行小区重配的方法,其特征在于,该方法包括:
RNC判定小区被删除时,不释放自身中被删除小区内的所有在线UE资源,向Node B发送小区重配请求消息;
Node B根据所接收的小区重配请求,释放自身中被删除小区内的所有在线UE资源,向所述RNC返回小区重配响应消息;
被释放的UE检测到链路失效,请求小区更新;
RNC和NodeB为请求小区更新的UE重配小区。
2.如权利要求1所述的方法,其特征在于,所述判定小区被删除为:如果判定有频点被删除,则判定被删除频点上的所有小区都被删除。
3.如权利要求1所述的方法,其特征在于,被释放的UE检测到链路失效,请求小区更新为:
位于专用信道的被释放UE检测到无线链路失败时,发起小区更新过程;
位于公共信道的被释放UE检测到在服务区外时,发起小区更新过程。
4.如权利要求1所述的方法,其特征在于,所述为请求小区更新的UE重配小区为:
网络侧为请求小区更新的UE重新分配新小区,向请求小区更新的UE返回携带新小区信息的小区更新确认消息;
位于专用信道的UE驻留在所述新小区中,并返回物理信道重配完成消息作为响应消息;位于公共信道的UE驻留在所述新小区中,并返回通用地面无线接入网修改信息确认消息作为响应消息。
5.一种对UE进行小区重配的系统,其特征在于,该系统包括网络侧和至少一个UE;所述网络侧包括RNC和Node B;
所述RNC,用于在判定小区被删除时,不释放自身中被删除小区的所有在线UE资源,向Node B发送小区重配请求消息;所述Node B,用于根据所接收的小区重配请求消息,释放自身中被删除小区的所有在线UE资源,向所述RNC返回小区重配响应消息;RNC和NodeB还用于为请求小区更新的UE重配小区;
所述UE,用于检测到自身链路失效时,向网络侧请求小区更新。
6.如权利要求5所述的系统,其特征在于,所述UE位于专用信道,该UE包括检测单元和处理单元;
所述检测单元,用于在检测到无线链路失败时,通知所述处理单元;
所述处理单元,用于接收到所述通知时,确定可驻留小区,向所述网络侧发送携带可驻留小区的小区更新消息。
7.如权利要求5所述的系统,其特征在于,所述UE位于公共信道,该UE包括检测单元和处理单元;
所述检测单元,用于在检测到在服务区外时,通知所述处理单元;
所述处理单元,用于接收到所述通知时,确定可驻留小区,向所述网络侧发送携带可驻留小区的小区更新消息。
CN2008101018990A 2008-03-13 2008-03-13 对用户设备进行小区重配的方法、系统和控制设备 Expired - Fee Related CN101534530B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101018990A CN101534530B (zh) 2008-03-13 2008-03-13 对用户设备进行小区重配的方法、系统和控制设备

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101018990A CN101534530B (zh) 2008-03-13 2008-03-13 对用户设备进行小区重配的方法、系统和控制设备

Publications (2)

Publication Number Publication Date
CN101534530A CN101534530A (zh) 2009-09-16
CN101534530B true CN101534530B (zh) 2011-07-27

Family

ID=41104863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101018990A Expired - Fee Related CN101534530B (zh) 2008-03-13 2008-03-13 对用户设备进行小区重配的方法、系统和控制设备

Country Status (1)

Country Link
CN (1) CN101534530B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8892101B2 (en) 2009-11-23 2014-11-18 Nokia Corporation Radio problem detection assisted rescue handover
CN104540160B (zh) * 2014-12-09 2018-12-25 上海华为技术有限公司 一种承载处理方法以及相关设备

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1722895A (zh) * 2004-07-12 2006-01-18 中兴通讯股份有限公司 一种多载波小区中的主载频重配置方法
WO2006083131A1 (en) * 2005-02-07 2006-08-10 Lg Electronics Inc. Enhanced radio link control error handling
CN101141668A (zh) * 2006-09-05 2008-03-12 大唐移动通信设备有限公司 一种业务承载的释放方法及系统

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1722895A (zh) * 2004-07-12 2006-01-18 中兴通讯股份有限公司 一种多载波小区中的主载频重配置方法
WO2006083131A1 (en) * 2005-02-07 2006-08-10 Lg Electronics Inc. Enhanced radio link control error handling
CN101141668A (zh) * 2006-09-05 2008-03-12 大唐移动通信设备有限公司 一种业务承载的释放方法及系统

Also Published As

Publication number Publication date
CN101534530A (zh) 2009-09-16

Similar Documents

Publication Publication Date Title
EP2138003B1 (en) Processing mobile station history information in a wireless communication system
JP5327479B2 (ja) 通信システム
RU2470491C1 (ru) Способ и устройство оповещения об информации для указания отказа переключения
KR101249424B1 (ko) 디지털 셀룰러 통신 네트워크에서 셀 당 비정상적인 호 해제 이벤트의 카운팅을 분산시키는 방법
EP0849967B1 (en) Dynamic learning of neighboring wireless cells
CN110493830A (zh) 切换方法及装置
CN107113681A (zh) 一种信令优化方法和设备
JP5563524B2 (ja) 無線通信システム及び無線通信システム用構成装置の収容替え方法
JP5328984B2 (ja) 端末切り替え方法及び基地局
CN102300248B (zh) 一种MDT Log信息的反馈方法和设备
CN101572919A (zh) 一种lte系统中为用户设备ue进行切换策略选择的方法
CN110636567B (zh) 一种切换评估、报告方法、装置及基站
CN104540159A (zh) 汇报方法、汇报系统、资源配置方法和系统
CN102098721A (zh) 一种MDT Log信息的反馈方法和设备
CN110089154A (zh) 用于在无线通信系统中管理移动性的方法和设备
CN103260176A (zh) 最小化路测方法、网元及系统
CN115868197A (zh) 一种对无线接入网可见的双连接的体验质量测量方法
CN101534530B (zh) 对用户设备进行小区重配的方法、系统和控制设备
CN103369603A (zh) 自组织网络的互操作方法与装置
CN108156609B (zh) 小区合并、拆分方法、装置及基站
US8767679B2 (en) Physical channel establishment
WO2012083701A1 (zh) 一种邻小区关系测量结果的上报方法和装置
US20040111236A1 (en) Method of gathering statistics of channel resource occupancy in mobile communication systems
CN104507120B (zh) 一种小区间负载均衡方法及装置
CN114554551B (zh) 基于prb利用率的基站负载均衡方法、装置及设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA POTEVIO CO., LTD.

Free format text: FORMER OWNER: PUTIAN IT TECH INST CO., LTD.

Effective date: 20130304

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130304

Address after: 100080, No. two, 2 street, Zhongguancun science and Technology Park, Beijing, Haidian District

Patentee after: CHINA POTEVIO CO.,LTD.

Address before: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee before: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

ASS Succession or assignment of patent right

Owner name: PUTIAN IT TECH INST CO., LTD.

Free format text: FORMER OWNER: CHINA POTEVIO CO., LTD.

Effective date: 20130313

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130313

Address after: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee after: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

Address before: 100080, No. two, 2 street, Zhongguancun science and Technology Park, Beijing, Haidian District

Patentee before: CHINA POTEVIO CO.,LTD.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method, system and control device for cell re-configuration of user equipment

Effective date of registration: 20131210

Granted publication date: 20110727

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

Registration number: 2013990000954

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
C56 Change in the name or address of the patentee

Owner name: POTEVIO INFORMATION TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: PUTIAN IT TECH INST CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee after: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Address before: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee before: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20151102

Granted publication date: 20110727

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2013990000954

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PM01 Change of the registration of the contract for pledge of patent right

Change date: 20151102

Registration number: 2013990000954

Pledgor after: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Pledgor before: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method, system and control device for cell re-configuration of user equipment

Effective date of registration: 20151105

Granted publication date: 20110727

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2015990000948

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20161008

Granted publication date: 20110727

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2015990000948

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method, system and control device for cell re-configuration of user equipment

Effective date of registration: 20161011

Granted publication date: 20110727

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2016990000859

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20170802

Granted publication date: 20110727

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2016990000859

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method, system and control device for cell re-configuration of user equipment

Effective date of registration: 20171012

Granted publication date: 20110727

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2017990000948

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20180112

Granted publication date: 20110727

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2017990000948

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method, system and control device for cell re-configuration of user equipment

Effective date of registration: 20180117

Granted publication date: 20110727

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2018990000033

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20181017

Granted publication date: 20110727

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2018990000033

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110727

CF01 Termination of patent right due to non-payment of annual fee