CN101532668A - Turbulent and boiling combined-circulation fluidized bed refuse incinerator - Google Patents

Turbulent and boiling combined-circulation fluidized bed refuse incinerator Download PDF

Info

Publication number
CN101532668A
CN101532668A CN200910097419A CN200910097419A CN101532668A CN 101532668 A CN101532668 A CN 101532668A CN 200910097419 A CN200910097419 A CN 200910097419A CN 200910097419 A CN200910097419 A CN 200910097419A CN 101532668 A CN101532668 A CN 101532668A
Authority
CN
China
Prior art keywords
boiling
turbulent
fluidized bed
chamber
circulation fluidized
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910097419A
Other languages
Chinese (zh)
Other versions
CN101532668B (en
Inventor
陈旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Nengda Huawei Equipment Co Ltd
Original Assignee
Hangzhou Nengda Huawei Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Nengda Huawei Equipment Co Ltd filed Critical Hangzhou Nengda Huawei Equipment Co Ltd
Priority to CN2009100974192A priority Critical patent/CN101532668B/en
Publication of CN101532668A publication Critical patent/CN101532668A/en
Application granted granted Critical
Publication of CN101532668B publication Critical patent/CN101532668B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fluidized-Bed Combustion And Resonant Combustion (AREA)

Abstract

The invention provides a turbulent and boiling combined-circulation fluidized bed refuse incinerator, belonging to the garbage disposer field. The present circulation fluidized bed refuse incinerator has unstable bed temperature, inadequate burning and high energy consumption. The turbulent and boiling combined-circulation fluidized bed refuse incinerator comprises a hearth and a cyclone separator, a boiling chamber is arranged at the lower part of the hearth, a refuse inlet is opened in the middle of the hearth, the upper part of the hearth is communicated with the cyclone separator, the lower part of the cyclone separator is communicated with the hearth by a feedback device, the turbulent and boiling combined-circulation fluidized bed refuse incinerator is characterized in that a turbulent chamber capable of slantly moving and transferring the refuse is arranged under the refuse inlet. The turbulent and boiling combined-circulation fluidized bed refuse incinerator provided by the invention solves the problems of inadequate burning and high coal doping, saves the energy and improves the treating capacity of single refuse incinerator per day.

Description

Turbulent and boiling combined-circulation fluidized bed refuse incinerator
[technical field]
The present invention is a kind of turbulent and boiling combined-circulation fluidized bed refuse incinerator, belongs to the refuse treatment plant field.
[background technology]
Now low, the complicated component of China's rubbish ubiquity refuse classification degree, water content is big, calorific value is low etc. is unfavorable for aptitude to burn.Rubbish is sent into burner hearth by charging gear in traditional circulating fluid bed garbage furnace.Because traditional burner hearth all is upright burner hearth, rubbish under the gravity effect directly to the whereabouts, cause rubbish enter behind the incinerator various complicated ingredients can not be in very short time after-flame, and its moisture height, after going into stove, need to absorb a large amount of heats and be used for evaporating wherein moisture, this makes that combustion stability can not get ensureing, it is excessive the operational factor fluctuation usually to occur, be in operation to mix and burn a large amount of auxiliary fuels such as coal, and in moisture bigger season, mix the burning auxiliary fuel and also be difficult to guarantee smooth combustion, need to reduce the operation of burning amount.Simultaneously, because the particularity of fuel, the incinerator combustion product complicated component that is in operation produces a lot of different chemical reactions under the different temperatures environment, is in operation to be prone to high temperature slagging scorification, dust stratification etc. and to be unfavorable for the incident moved.In addition, incinerator is in operation owing to the flue gas flow rate height, and particle concentration is big, and its back-end surfaces wearing and tearing are bigger.
[summary of the invention]
Be prone to temperature instability in the incinerator in the prior art in order to overcome, it is abundant inadequately to burn, mix coal ratio height, the big deficiency that waits of power consumption the invention provides a kind of novel turbulent and boiling combined-circulation fluidized bed refuse incinerator, by increasing turbulence chamber, make rubbish just drying and pyrolysis fully before entering boiling-house, thereby make incineration firing abundant, that has reduced coal effectively mixes burning ratio, effective wearing and tearing and the etching problem that alleviates high temperature slagging scorification and back-end surfaces.For this reason, the present invention is by the following technical solutions:
Turbulent and boiling combined-circulation fluidized bed refuse incinerator, comprise burner hearth and cyclone separator, the bottom of described burner hearth is provided with boiling-house, be provided with ebullated bed in the boiling-house, have the rubbish feeding mouth at the middle part of burner hearth, the top and the cyclone separator of described burner hearth are connected, the bottom of cyclone separator is connected with boiling-house by material returning device, the outlet on cyclone separator top links to each other with the flue that is furnished with heating surface, it is characterized in that: be provided with the turbulence chamber that can make rubbish tilt to transfer between described rubbish feeding mouth and the boiling-house, described turbulence chamber comprises air distribution plate, is furnished with the blast cap of arranging and be communicated with extraneous and turbulence chamber at a certain distance on the air distribution plate.The setting of turbulence chamber can make the time of staying of rubbish in burner hearth increase, what is more important, and the high temperature wind energy of introducing from blast cap makes the rubbish dispersion at turbulence chamber's regional movement, dry, pyrolysis, and the rubbish of process pyrolysis enters boiling-house with the two-forty fired state.The heat energy that carries in the heat energy and the circulating ash of boiling-house burning generation acts on turbulence chamber's rubbish with reverse strong convection form, promotes the physical change and the chemical reaction of waste component.The setting of turbulence chamber makes boiling-house can set up balanced, stable temperature field, aerodynamic field, realizes fully burning under the air-breathing of certain excess quantity.
Turbulent and boiling combined-circulation fluidized bed refuse incinerator, it is characterized in that: the outlet on cyclone separator top links to each other with the upper end of flue gas sedimentation dual firing chamber, described flue gas sedimentation dual firing chamber is an exhaust gases passes that is surrounded by fin panel casing, the lower end of flue gas sedimentation dual firing chamber links to each other with the bottom of rising chamber, the rising chamber is the exhaust gases passes that is furnished with heating surface, and the top of rising chamber links to each other with flue.High-temperature flue gas carries fine particle and enters flue gas sedimentation dual firing chamber by cyclone separator.Uncombusted particle burning after-flame in flue gas sedimentation dual firing chamber.Flue-gas temperature owing to the heat exchange decrease to some degree, has been avoided high temperature slagging scorification district and high temperature corrosion district in flue gas decline process.The rising chamber is the exhaust gases passes that is furnished with heating surface, flue gas is risen be connected with the back flue, and can make flue gas cooling and cooling.
Turbulent and boiling combined-circulation fluidized bed refuse incinerator is characterized in that: flue gas sedimentation dual firing chamber lower end links to each other with an end of the impacting type separator that the pipe of having loose bowels forms, and the other end of impacting type separator links to each other with the bottom of rising chamber.Lower end, rising chamber is provided with particle and reclaims bucket.Flue gas is behind process impacting type separator, and flow velocity reduces, the wearing and tearing that effectively alleviated back-end surfaces; Bulky grain is separated, and the particle that separates reclaims bucket by particle and collects, discharging regularly.
Turbulent and boiling combined-circulation fluidized bed refuse incinerator is characterized in that: blast cap is the segment type structure.The segment type blast cap can solve the long-pending and problem such as not smooth that flows of the extension of rubbish in motion process.
Turbulent and boiling combined-circulation fluidized bed refuse incinerator is characterized in that: the turbulence chamber bottom is provided with air compartment.Air compartment can make the intersection high temperature wind of friction speed enter turbulence chamber with stable speed.
Turbulent and boiling combined-circulation fluidized bed refuse incinerator is characterized in that: the turbulence chamber bottom is provided with three air compartments of equidistant arrangement.A plurality of air compartments are set, can make high temperature wind enter turbulence chamber with more stable speed.
Turbulent and boiling combined-circulation fluidized bed refuse incinerator provided by the invention, design by architecture advances, further reinforcement is fully burnt and has been solved and mixes coal than high shortcoming, saved the energy, alleviated the high temperature slagging scorification of heating surface, alleviate the wearing and tearing of back-end surfaces, improved incinerator separate unit day output.
[description of drawings]
Fig. 1 is a structural representation of the present invention.
Fig. 2 is the structural representation of air distribution plate in the turbulence chamber among Fig. 1.
Among the figure: 1. boiling-house, 2. air compartment, 3. turbulence chamber, 4. blast cap, 5. material returning device, 6. rubbish feeding mouth, 7. upper furnace, 8. cyclone separator, 9. flue gas sedimentation dual firing chamber, 10. impacting type separator, 11. particles reclaim bucket, rising chambers 12., 13. burner hearths, 14. flues.
[specific embodiment]
Below in conjunction with specification drawings and specific embodiments substantive distinguishing features of the present invention is further described.
Turbulent and boiling combined-circulation fluidized bed refuse incinerator as depicted in figs. 1 and 2, comprise burner hearth 13 and cyclone separator 8, the bottom of burner hearth 13 is provided with boiling-house 1, be provided with ebullated bed in the boiling-house 1, have rubbish feeding mouth 6 at the middle part of burner hearth 13, be provided with the turbulence chamber 3 that can make rubbish tilt to transfer between rubbish feeding mouth 6 and the boiling-house 1, turbulence chamber 3 comprises air distribution plate, is furnished with arrangement at a certain distance on the air distribution plate and is communicated with segment type blast cap extraneous and turbulence chamber.Turbulence chamber 3 bottoms are provided with three air compartments 2 of equidistant arrangement.
The top of burner hearth 13 and cyclone separator 8 are connected, the bottom of cyclone separator 8 is connected with boiling-house 1 by U type material returning device 5, the outlet on cyclone separator 8 tops links to each other with the upper end of flue gas sedimentation dual firing chamber 9, flue gas sedimentation dual firing chamber 9 is an exhaust gases passes that is surrounded by fin panel casing, flue gas sedimentation dual firing chamber 9 lower ends link to each other with an end of the impacting type separator 10 that the pipe of having loose bowels forms, the other end of impacting type separator 10 links to each other with the bottom of rising chamber 12, rising chamber 12 is for being furnished with the exhaust gases passes of heating surface, and the top of rising chamber 12 links to each other with the flue 14 that is furnished with heating surface.12 lower ends, rising chamber are provided with particle and reclaim bucket 11.
Use principle of the present invention is: rubbish is sent into burner hearth 13 by rubbish feeding mouth 6, in gravity and burner hearth under the interaction force of material and gas, sub-fraction rubbish rises and enters upper furnace 7, and major part enters turbulence chamber 3, and high temperature wind enters turbulence chamber 3 through air compartment 2 by the blast cap on the air distribution plate 4.Inflammable moisture few article such as paper can burn at this in the rubbish, and a part can enter upper furnace 7 in this pyrolysis, evaporation, and other firing-difficult matters and noncombustibles are in this drying, and heating up enters the fluidized bed combustion of 1 li of boiling-house.Gas-solid mixture is after upper furnace 7 burnings, and by being exported to cyclone separator 8, large granular materials returns boiling-house 1 by material returning device 5 after cyclone separator 8 separates, and high-temperature flue gas carries fine particle and enters flue gas sedimentation dual firing chamber 9 by cyclone separator 8.At flue gas sedimentation dual firing chamber 9 uncombusted particle burning after-flames.Flue-gas temperature owing to the heat exchange decrease to some degree, has been avoided high temperature slagging scorification district and high temperature corrosion district in flue gas decline process.Bulky grain is separated after separating through impacting type separator 10, and flue gas flow rate reduces, and has effectively alleviated the heating surface wear of rising chamber 12 and flue 14.The particle that separates reclaims bucket 11 by particle and collects discharging regularly.Flue gas enters purifying column desulfurization, depickling then in the cooling of rising chamber 12 and flue 14 heating surfaces, cooling, and the deduster dedusting is waited to remove wherein pernicious gas (as HCl, SO 2) and particle after air-introduced machine and chimney enter atmosphere.

Claims (7)

1. turbulent and boiling combined-circulation fluidized bed refuse incinerator, comprise burner hearth (13) and cyclone separator (8), the bottom of described burner hearth (13) is provided with boiling-house (1), boiling-house is provided with ebullated bed in (1), have rubbish feeding mouth (6) at the middle part of burner hearth (13), the top (7) and the cyclone separator (8) of described burner hearth (13) are connected, the bottom of cyclone separator (8) is connected with boiling-house (1) by material returning device (5), the outlet on cyclone separator (8) top links to each other with the flue that is furnished with heating surface (14), it is characterized in that: be provided with the turbulence chamber (3) that can make rubbish tilt to transfer between described rubbish feeding mouth (6) and the boiling-house (1), described turbulence chamber (3) comprises air distribution plate, is furnished with the blast cap (4) of arranging and be communicated with extraneous and turbulence chamber (3) at a certain distance on the air distribution plate.
2. turbulent and boiling combined-circulation fluidized bed refuse incinerator according to claim 1, it is characterized in that: the outlet on cyclone separator (8) top links to each other with the upper end of flue gas sedimentation dual firing chamber (9), described flue gas sedimentation dual firing chamber (9) is an exhaust gases passes that is surrounded by fin panel casing, the lower end of flue gas sedimentation dual firing chamber (9) links to each other with the bottom of rising chamber (12), rising chamber (12) is for being furnished with the exhaust gases passes of heating surface, and the top of rising chamber (12) links to each other with flue (14).
3. turbulent and boiling combined-circulation fluidized bed refuse incinerator according to claim 2, it is characterized in that: flue gas sedimentation dual firing chamber (9) lower end links to each other with an end of the impacting type separator (10) that the pipe of having loose bowels forms, and the other end of impacting type separator (10) links to each other with the bottom of rising chamber (12).
4. turbulent and boiling combined-circulation fluidized bed refuse incinerator according to claim 3 is characterized in that: lower end, rising chamber (12) is provided with particle and reclaims bucket (11).
5. turbulent and boiling combined-circulation fluidized bed refuse incinerator according to claim 1 is characterized in that: described blast cap (4) is the segment type structure.
6. according to claim 4 or 5 described turbulent and boiling combined-circulation fluidized bed refuse incinerators, it is characterized in that: turbulence chamber (3) bottom is provided with air compartment (2).
7. turbulent and boiling combined-circulation fluidized bed refuse incinerator according to claim 6 is characterized in that: turbulence chamber (3) bottom is provided with three air compartments (2) of equidistant arrangement.
CN2009100974192A 2009-04-02 2009-04-02 Turbulent and boiling combined-circulation fluidized bed refuse incinerator Expired - Fee Related CN101532668B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100974192A CN101532668B (en) 2009-04-02 2009-04-02 Turbulent and boiling combined-circulation fluidized bed refuse incinerator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100974192A CN101532668B (en) 2009-04-02 2009-04-02 Turbulent and boiling combined-circulation fluidized bed refuse incinerator

Publications (2)

Publication Number Publication Date
CN101532668A true CN101532668A (en) 2009-09-16
CN101532668B CN101532668B (en) 2011-07-06

Family

ID=41103423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100974192A Expired - Fee Related CN101532668B (en) 2009-04-02 2009-04-02 Turbulent and boiling combined-circulation fluidized bed refuse incinerator

Country Status (1)

Country Link
CN (1) CN101532668B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107178785A (en) * 2017-07-28 2017-09-19 贵州富燃环保科技有限公司 A kind of circulating fluid bed garbage furnace
CN107906533A (en) * 2017-12-22 2018-04-13 杭州海陆重工有限公司 Fluidisation charging gear for fluidized-bed combustion boiler
CN108180484A (en) * 2018-01-30 2018-06-19 刘亮 The turbulent and boiling combined-circulation fluidized bed of kitchen garbage is dried in a kind of flue gas recirculation
CN109899796A (en) * 2019-04-02 2019-06-18 上海多灵环保工程设备有限公司 A kind of multi-function incinerator

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107178785A (en) * 2017-07-28 2017-09-19 贵州富燃环保科技有限公司 A kind of circulating fluid bed garbage furnace
CN107906533A (en) * 2017-12-22 2018-04-13 杭州海陆重工有限公司 Fluidisation charging gear for fluidized-bed combustion boiler
CN108180484A (en) * 2018-01-30 2018-06-19 刘亮 The turbulent and boiling combined-circulation fluidized bed of kitchen garbage is dried in a kind of flue gas recirculation
CN109899796A (en) * 2019-04-02 2019-06-18 上海多灵环保工程设备有限公司 A kind of multi-function incinerator

Also Published As

Publication number Publication date
CN101532668B (en) 2011-07-06

Similar Documents

Publication Publication Date Title
CN202229208U (en) Furnace smoke drying and water recycling warehouse-type fan mill hot air powder supplying and making system
CN101975388B (en) Biomass boiler system capable of saving energy and reducing emission
CN201688552U (en) Assembled water tube boiler by burning biomass
CN1844745B (en) Incinerator for urban refuse granular fuel
CN113958935B (en) Flexibility transformation system for low-load operation of coal-fired power plant boiler
CN202204144U (en) Grate boiler burning coal and biomass fuels
CN101532668B (en) Turbulent and boiling combined-circulation fluidized bed refuse incinerator
CN202132964U (en) Fan mill front counter flow type furnace-smoke drying dewatering direct blowing pulverizer system
CN201819190U (en) Energy saving and emission reduction biomass boiler system
CN212408675U (en) Novel sludge drying and incinerating system
CN2837692Y (en) Domestic refuse incinerator
CN201396743Y (en) Angle pipe type circulating fluidized bed boiler
CN207880848U (en) A kind of waste incineration CFB boiler that two-stage gas-solid separating device is successively arranged
CN104501177A (en) Waste incinerating circulating fluidized bed boiler
CN101708940B (en) Sludge drying incineration processing system utilizing gas and solid residual heat
CN204421014U (en) A kind of waste incineration CFBB
CN111981473A (en) Slag burnout system and method of biomass boiler
CN201407665Y (en) Garbage incinerator with turbulent-boiling composite circular fluidized bed
CN111623352A (en) Self-sustaining incineration system and method for low-calorific-value high-ash sludge
CN100441952C (en) Composite circulating fluidized bed system for high performance clean burning of urban domestic garbage
CN2816613Y (en) Device for feeding coal upwards from coal-burning boiler bottom and boiler mounted with same
CN207880844U (en) A kind of waste incineration CFB boiler of cyclone separator and membrane type separation apparatuses in series
CN206514307U (en) It is a kind of to reduce the device and waste incineration processing system of unburned thing discharge capacity
CN101545636A (en) Process and device for reclaiming blown gas made from coal and by oxygen-enriched combustion
CN212746475U (en) Flue gas purification and waste heat utilization system for low-calorific-value garbage incinerator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: Hangzhou City, Zhejiang province 311101 Yuhang Qiaosi Triangle Zone Tong Village Road No. 66

Patentee after: Hangzhou Nengda Huawei Equipment Co., Ltd.

Address before: 310018 No. 10, road 9, Xiasha economic and Technological Development Zone, Hangzhou, Zhejiang

Patentee before: Hangzhou Nengda Huawei Equipment Co., Ltd.

DD01 Delivery of document by public notice

Addressee: Hangzhou Nengda Huawei Equipment Co.,Ltd. The person in charge

Document name: Notice of termination of patent right

DD01 Delivery of document by public notice
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110706

Termination date: 20210402

CF01 Termination of patent right due to non-payment of annual fee