Embodiment
For making purpose of the present invention, technical scheme and advantage clearer, below with reference to the accompanying drawing embodiment that develops simultaneously, the present invention is described in more detail.
The embodiment of the invention provides a kind of method that improves up-link service quality, flow process as shown in Figure 1, comprising:
Step 101:RNC disposes the delay parameter of UE Different Logic channel to NodeB.
At RAB (Radio Access Bearer, RAB) configuring request and RB (Radio Bearer, radio bearer) in the process such as foundation, UE and core net (Core Network, CN) consult to determine service quality (Quality of Service, QoS) parameter, and RNC and UE are given in configuration respectively.RNC is by NBAP (NodeB Application Part in the prior art, base station application part) agreement is only given NodeB with the parameter configuration such as priority of each logic channel, and the embodiment of the invention further adds the time delay demand of the every business that is carried on the Different Logic channel in the NBAP agreement, a kind of feasible method is to strengthen transmission channel (Enhanced Dedicated Transport Channel, E-DCH) delay parameter that adds the Different Logic channel in the logic channel message, the value of this parameter is set by high level in advance according to the scope of loaded service type and time delay permission separately.
Step 102: according to the SI that UE reports for the first time, NodeB calculates lapse of time of highest priority logical channel among each UE, and described lapse of time utilizes this logic channel to dispatch described data institute elapsed time for there being data will send to NodeB from buffer memory.
There are mapping relations between the time delay demand that in the NBAP agreement, is provided with in the delay parameter T_threshold of described each logic channel and the step 101 (Discard Timer), can be expressed as: T_threshold=f (Discard Timer), for example a kind of possible mapping relations are: T_threshold=Discard Timer-C, wherein C is a constant that sets in advance, and 0≤C≤Discard Timer.
Because different business has different time delay demands, the embodiment of the invention is for the priority of comprehensive each logic channel and the time delay demand of different business, calculating has data to send from the UE that carries out uplink, receive these data and begin scheduling to NodeB, the T_lapse of lapse of time of process, the concrete grammar that calculates described lapse of time is as follows:
When the initial SI reporting of UE, corresponding lapse of time is the T_lapse of the highest priority logical channel when carrying out uplink scheduling transmission first:
At first, when NodeB dispatches first, SI is by inserting ascending control channel (E-DCH Random Access Uplink Control Channel at random, E-RUCCH) initially report, because reporting of SI may be repeatedly to send just success, therefore there are data to send from UE this moment, receive the elapsed time T_sourceT_source=T_RUCCH * N_ref of SI institute that reports to NodeB, wherein T_RUCCH is a timer in the SI message, N_ref is the required average time of successful access E-RUCCH that obtains according to system emulation, the value of this N_ref can be decimal, described T_RUCCH and N_ref can obtain their value according to method of the prior art, so no longer describe in detail.
Secondly, calculate NodeB and receive that the SI that reports is T_st to the dispatching office elapsed time that NodeB carries out uplink.At this moment, each self-corresponding T_lapse=T_source+T_st of lapse of time of each logic channel.
Step 103: calculate the dispatching priority of highest priority logical channel among each UE respectively according to described lapse of time and schedule information, the UE under the highest logic channel of dispatching priority is dispatched.
The method of the dispatching priority of highest priority logical channel comprises among each UE of described calculating:
According to the T_lapse of lapse of time that obtains, calculate the normalization delay parameter Td=T_lapse/T_threshold of highest priority logical channel among each UE;
Determine the factor of the dispatching priority of a logic channel to have a lot,, adopt formula F (t)=p for the influence of comprehensive various factors
1f
1+ p
2f
2+ p
3f
3+ p
4f
4+ ...+p
N-1f
N-1+ p
nTd, wherein f
iBe the value of list parameter in the described schedule information, for example priority of logical channels, cache size, highest priority data account for the ratio of total buffer memory and guarantee bit rate etc., and p
i(i=1,2 ... n) be the weights of each parameter, p
i∈ [0,1], concrete value preestablishes.Utilize above-mentioned formula to calculate the dispatching priority of each logic channel, and the UE under the highest logic channel of dispatching priority is dispatched.
Step 104: the schedule information that receives the renewal of the highest user terminal transmission of described dispatching priority, upgrade lapse of time of the highest logic channel of dispatching priority, return step 103 then and continue to carry out the calculating of described dispatching priority and carry out described scheduling, up to the uplink data scheduling transmission of each user terminal is finished.
The highest logic channel of described dispatching priority upgrades lapse of time according to following formula,
Lapse of time after wherein T_lapse (t) expression is upgraded, lapse of time before T_lapse (t-1) expression is upgraded, correctly then get 0 if judge the CRC check result, decision error then gets 1, and T_fa is the time interval of last scheduling and this scheduling, Tp is minimum scheduling interval, such as getting 5ms, may not dispatch timely by network side at the Tp time point of setting, so the value of T_fa is the Tp of integral multiple, Buffer is the cache size of this logic channel, L
iFor NodeB MAC-e PDU (Protocol Data Unit, protocol Data Unit) is resolved after the MAC-e PDU size of this logical channel data.The value of described each parameter can obtain according to concrete application scenarios, repeats no more herein.
When carrying out transmitting uplink data, described UE also simultaneously the schedule information of upgrading is sent to NodeB, according to the value of each list parameter in the schedule information of upgrading and the lapse of time after the renewal, return step 103 and continue to carry out the calculating of described dispatching priority and carry out described scheduling.
By as seen above-mentioned, said method can be taken into account the time delay demand of institute's loaded service on the priority of logic channel and the logic channel simultaneously when carrying out uplink scheduling, but the scope that described method selects logic channel to dispatch when each scheduling only limits to the highest logic channel of each UE medium priority, in order further to take into account the time delay demand of institute's bearer service on the non-highest priority logical channel, also further comprise in the method for the raising up-link service quality that provides in the embodiment of the invention:
NodeB sets in advance cycle regular hour or scheduling times, every through behind certain hour or the scheduling times, dispatch the highest UE of described dispatching priority according to total cache size, make network side can obtain the list parameter in each logic channel of non-limit priority among this UE, guarantee upgrading in time these list parameters.
NodeB receives the upstream data of described UE transmission and therefrom parses data description indication information (Data Description Index, DDI), there is corresponding relation in each logic channel among described DDI and this UE, described logic channel had both comprised highest priority logical channel, also comprised each channel except that highest priority logical channel.
Usually there are a plurality of logic channels among the UE, as NodeB during according to total cache size scheduling resource, can be according to the DDI that parses the data that send from UE and the corresponding relation of each logic channel, obtain the value of the various list parameters such as priority, cache size of described non-highest priority logical channel, and lapse of time of described each logic channel is calculated as T_fa, described T_fa is last scheduling and the time interval of this scheduling;
At this moment, calculate respectively after the step of the dispatching priority of highest priority logical channel in each user terminal according to described lapse of time and schedule information in the step 103, further comprise before the step that the user terminal under the highest logic channel of dispatching priority is dispatched:
According to the value of described list parameter and lapse of time calculate the dispatching priority of each logic channel except that highest priority logical channel in described each user terminal.
Below by a concrete example, further specify among the present invention the implementation of the method that improves up-link service quality, flow process as shown in Figure 2, comprising:
Step 201: high level is provided with the time delay demand and the informing base station of each logic channel of each UE, and the base station obtains delay parameter T_threshold after described time delay demand is shone upon.
Step 202: the base station receives the SI information that UE reports for the first time by E-RUCCH.
Step 203: obtain each list parameter in its corresponding logic channel according to the HLID in the SI information, described list parameter comprises priority, cache size and assurance bit rate etc.
Step 204: the T_lapse=T_source+T_st of lapse of time of the highest priority logical channel when calculating uplink scheduling transmission first.
Step 205: the various list parameters of each logic channel of base station maintenance different UEs, upgrade once the data in described logic channel according to the every TTI of frame structure and be scheduled.
Step 206: according to the value of described list parameter and lapse of time calculate the dispatching priority of each UE highest priority logical channel, the UE under the highest logic channel of selection scheduling priority carries out uplink scheduling.
Step 207: whether judge this scheduling according to total cache size scheduling, if, execution in step 208; Otherwise, execution in step 209.
Judge that wherein the method whether this scheduling is carried out according to total cache size is: set in advance cycle regular hour or scheduling times, every time or scheduling times that reaches this appointment is promptly according to total cache size scheduling UE.
Step 208: described UE is dispatched according to total cache size in the base station, continues execution in step 210.
Step 209: execution in step 212 is continued according to dispatching for the resource of the logical channel assignment of high dispatching priority in the base station.
Step 210: receive the upstream data of described UE transmission and therefrom parse DDI, corresponding relation according to each logic channel among described DDI and the UE, obtain the value of the list parameter of each logic channel except that highest priority logical channel, and lapse of time of described each logic channel is calculated as T_fa, described T_fa is last scheduling and the time interval of this scheduling.
Step 211: according to the value of described list parameter and lapse of time calculate the dispatching priority of each logic channel except that highest priority logical channel in described each user terminal, return step 205.
Step 212: the base station is upgraded T_lapse and is also returned step 205 according to the SI of the renewal that together sends with upstream data, continues to carry out described flow process up to finishing scheduling.
By as seen above-mentioned, obtain time delay demand and informing base station by delay parameter mapping with different business, the time delay demand of this Channel Transmission business except the priority of considering each logic channel, is also considered simultaneously in the base station when carrying out service dispatching, thereby improves the QoS demand of uplink service.
The embodiment of the invention also provides a kind of system that improves up-link service quality simultaneously, and it forms structure as shown in Figure 3, comprising: base station controller 310, user terminal 320 and base station 330;
Described base station controller 310, the delay parameter of configuration Different Logic channel also sends to base station 330.
Described user terminal 320 carries out reporting of schedule information, and carries out transmission of uplink data according to the resource that base station 330 is distributed.
Described base station 330, the schedule information that reports for the first time according to the delay parameter that receives and user terminal 320, calculate lapse of time of highest priority logical channel in each user terminal 320 respectively, described lapse of time for from buffer memory, have data to send to base station 330 utilize this logic channel dispatch described data institute elapsed time obtain comprise highest priority logical channel the T_lapse of lapse of time at interior various list parameters, and the initial value of the various list parameters of non-highest priority logical channel is set, described lapse of time is represented: have data will send to base station 330 from user terminal 320 and receive these data and utilize this logic channel to carry out the dispatching office elapsed time; Calculate the dispatching priority of highest priority logical channel in each user terminal 320 respectively according to described lapse of time and schedule information, the user terminal 320 under the highest logic channel of dispatching priority is dispatched; Receive the schedule information of the renewal of the highest user terminal of described dispatching priority 320 transmissions, upgrade lapse of time of the highest logic channel of dispatching priority, continue then to carry out the calculating of described dispatching priority and carry out described scheduling, up to the uplink data scheduling transmission of each user terminal 320 is finished.
Described base station controller 310 comprises that delay parameter is provided with module 311, be used to be provided with the time delay demand of each logic channel, described time delay demand be configured to the delay parameter T_threshold and the informing base station 330 of base station 330 according to default mapping relations by the NBAP agreement.
Described base station 330 comprises lapse of time computing module 331, dispatching priority computing module 332, lapse of time update module 333, periodic scheduling module 334 and list parameter update module 335;
Wherein, the described computing module of lapse of time 331, utilize formula T_lapse=T_source+T_st to calculate lapse of time, and T_source=T_RUCCH * N_ref, wherein T_source receives the schedule information elapsed time for having data will send to base station 330 from described logic channel, T_st is for 330 receiving that the schedule information that reports 330 begins to dispatch described data institute elapsed time to the base station from the base station, and setting pre-determines the value of described T_RUCCH and N_ref according to system.
Described dispatching priority computing module 332 according to lapse of time that lapse of time computing module 331 obtains, adopts formula Td=T_lapse/T_threshold to calculate the normalization delay parameter; According to the value of each list parameter in normalization delay parameter and the schedule information, utilize formula F (t)=p again
1f
1+ p
2f
2+ p
3f
3+ p
4f
4+ ...+p
N-1f
N-1+ p
nTd calculates the dispatching priority of described each logic channel, wherein f
iBe the value of list parameter in the described schedule information, p
iBe the weight of described each parameter, and value is preestablished 0≤p by system
i≤ 1, i=1,2 ... n, i and n are natural number, and list parameter comprises in the described schedule information: total cache size, highest priority data account for ratio, assurance bit rate and each priority of logical channels of total buffer memory.
The described update module of lapse of time 333 is upgraded lapse of time according to the decode cyclic redundancy check (CRC) result that obtains of the upstream data that user terminal 320 is sent, and utilizes formula
Lapse of time after wherein T_lapse (t) expression is upgraded, lapse of time before T_lapse (t-1) expression is upgraded, correctly then get 0 if judge the CRC check result, decision error then gets 1, T_fa is the time interval of last scheduling and this scheduling, and Tp is minimum scheduling interval, and the value of T_fa is the Tp of integral multiple, Buffer is the cache size of this logic channel, L
iMAC-e PDU size for this logical channel data after the 330 pairs of MAC-e PDU parsings in base station.
Described periodic scheduling module 334 sets in advance cycle regular hour or scheduling times, and is every through behind certain hour or the scheduling times, dispatches the highest user terminal of described dispatching priority 320 and notify list parameter update module 335 according to total cache size;
Described list parameter update module 335, the notice of receiving cycle scheduler module 334, from the upstream data that the described user terminal 320 that receives sends, parse the data description indication information, there is corresponding relation in each logic channel in described data description indication information and this user terminal 320, obtain the value of the list parameter of each logic channel except that highest priority logical channel according to described corresponding relation, lapse of time of described each logic channel is calculated as T_fa and notifies dispatching priority computing module 332, and described T_fa is the time interval of last scheduling and this scheduling;
Described dispatching priority computing module 332, further calculate the normalization delay parameter of described logic channel according to lapse of time of each logic channel except that highest priority logical channel, the value of the list parameter that is obtained by described normalization delay parameter and list parameter update module 335 is utilized formula F (t)=p again
1f
1+ p
2f
2+ p
3f
3+ p
4f
4+ ...+p
N-1f
N-1+ p
nTd calculates the dispatching priority of described each logic channel, wherein f
iBe the value of described each list parameter, p
iBe the weight of described each parameter, and value is preestablished 0≤p by system
i≤ 1, i=1,2 ... n, i and n are natural number, and described each list parameter comprises: total cache size, highest priority data account for ratio, assurance bit rate and each priority of logical channels of total buffer memory.
By as seen above-mentioned, obtain time delay demand and informing base station by delay parameter mapping with different business, the time delay demand of this Channel Transmission business except the priority of considering each logic channel, is also considered simultaneously in the base station when carrying out service dispatching, thereby improves the QoS demand of uplink service.
Therefore; understand easily, the above is preferred embodiment of the present invention only, is not to be used to limit spirit of the present invention and protection range; equivalent variations that any those of ordinary skill in the art made or replacement all should be considered as being encompassed within protection scope of the present invention.