CN101527454A - 一种电网年度运行方式报告自动生成方法 - Google Patents
一种电网年度运行方式报告自动生成方法 Download PDFInfo
- Publication number
- CN101527454A CN101527454A CN200910031108A CN200910031108A CN101527454A CN 101527454 A CN101527454 A CN 101527454A CN 200910031108 A CN200910031108 A CN 200910031108A CN 200910031108 A CN200910031108 A CN 200910031108A CN 101527454 A CN101527454 A CN 101527454A
- Authority
- CN
- China
- Prior art keywords
- calculation
- report
- automatically
- power grid
- running mode
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100311086A CN101527454B (zh) | 2009-04-27 | 2009-04-27 | 一种电网年度运行方式报告自动生成方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100311086A CN101527454B (zh) | 2009-04-27 | 2009-04-27 | 一种电网年度运行方式报告自动生成方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101527454A true CN101527454A (zh) | 2009-09-09 |
CN101527454B CN101527454B (zh) | 2012-07-18 |
Family
ID=41095195
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100311086A Expired - Fee Related CN101527454B (zh) | 2009-04-27 | 2009-04-27 | 一种电网年度运行方式报告自动生成方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101527454B (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102929854A (zh) * | 2012-09-20 | 2013-02-13 | 国家电网华中电力调控分中心 | 基于wams动态数据的自动报告生成系统 |
CN104809543A (zh) * | 2015-01-28 | 2015-07-29 | 国电南瑞科技股份有限公司 | 基于月度输变电设备检修计划的电网运行方式生成方法 |
CN104881726A (zh) * | 2014-12-31 | 2015-09-02 | 国家电网公司 | 一种实现调控操作票与在线联合计算一体化的方法 |
CN105069516A (zh) * | 2015-06-19 | 2015-11-18 | 国家电网公司 | 基于综合风险的输变电设备月度检修计划协调方法 |
CN105139114A (zh) * | 2015-08-14 | 2015-12-09 | 国家电网公司 | 一种用于地县电网年度运行方式的自动化编制方法 |
CN110008457A (zh) * | 2019-04-08 | 2019-07-12 | 中钢集团马鞍山矿山研究院有限公司 | 一种安全评价报告自动编制系统 |
CN110807002A (zh) * | 2019-11-05 | 2020-02-18 | 杭州安恒信息技术股份有限公司 | 一种基于工作流的报表生成方法、系统及设备和存储介质 |
CN113821530A (zh) * | 2021-09-26 | 2021-12-21 | 北京慧博科技有限公司 | 一种利用sql自动化分析客户留存率的方法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4516862B2 (ja) * | 2005-03-11 | 2010-08-04 | 大阪瓦斯株式会社 | エネルギ供給システム |
CN100481666C (zh) * | 2006-12-19 | 2009-04-22 | 北京四方继保自动化股份有限公司 | 基于线路故障状态和控制断面有功功率的复故障判别方法 |
CN101179195B (zh) * | 2007-11-15 | 2011-04-06 | 上海交通大学 | 配电网规划方案辅助决策系统 |
-
2009
- 2009-04-27 CN CN2009100311086A patent/CN101527454B/zh not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102929854A (zh) * | 2012-09-20 | 2013-02-13 | 国家电网华中电力调控分中心 | 基于wams动态数据的自动报告生成系统 |
CN104881726A (zh) * | 2014-12-31 | 2015-09-02 | 国家电网公司 | 一种实现调控操作票与在线联合计算一体化的方法 |
CN104809543A (zh) * | 2015-01-28 | 2015-07-29 | 国电南瑞科技股份有限公司 | 基于月度输变电设备检修计划的电网运行方式生成方法 |
CN105069516A (zh) * | 2015-06-19 | 2015-11-18 | 国家电网公司 | 基于综合风险的输变电设备月度检修计划协调方法 |
CN105069516B (zh) * | 2015-06-19 | 2018-09-14 | 国家电网公司 | 基于综合风险的输变电设备月度检修计划协调方法 |
CN105139114A (zh) * | 2015-08-14 | 2015-12-09 | 国家电网公司 | 一种用于地县电网年度运行方式的自动化编制方法 |
CN110008457A (zh) * | 2019-04-08 | 2019-07-12 | 中钢集团马鞍山矿山研究院有限公司 | 一种安全评价报告自动编制系统 |
CN110807002A (zh) * | 2019-11-05 | 2020-02-18 | 杭州安恒信息技术股份有限公司 | 一种基于工作流的报表生成方法、系统及设备和存储介质 |
CN110807002B (zh) * | 2019-11-05 | 2022-08-02 | 杭州安恒信息技术股份有限公司 | 一种基于工作流的报表生成方法、系统及设备和存储介质 |
CN113821530A (zh) * | 2021-09-26 | 2021-12-21 | 北京慧博科技有限公司 | 一种利用sql自动化分析客户留存率的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101527454B (zh) | 2012-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101527454B (zh) | 一种电网年度运行方式报告自动生成方法 | |
CN103150600B (zh) | 一种电网安全分析系统 | |
Papavasiliou et al. | Reserve requirements for wind power integration: A scenario-based stochastic programming framework | |
CN102074954A (zh) | 一种城乡配电网综合节能评估与决策方法 | |
CN109617099B (zh) | 一种虚拟储能协调控制系统及其方法 | |
Lei et al. | Short-term load forecasting with clustering–regression model in distributed cluster | |
CN112260331A (zh) | 特高压交直流电网仿真平台及构建方法 | |
CN111046519A (zh) | 一种人工智能技术在电能表误差诊断中的应用分析方法 | |
Araujo et al. | Optimal power flow with renewable generation: a modified NSGA-II-based probabilistic solution approach | |
CN103886419A (zh) | 一种电网运行方式规划校核分析系统 | |
CN102035210B (zh) | 电力系统放松约束的无功设备优化方法 | |
CN116776543A (zh) | 一种面向智能电网的电力大数据应用方法 | |
CN116455078A (zh) | 一种配电网智能化运维管控平台 | |
Zhang et al. | Research and Implementation of the State Grid Transmission Planning Simulation Platform | |
Zhao et al. | A learning-to-rank-based investment portfolio optimization framework for smart grid planning | |
CN107565579B (zh) | 一种提高无功电压控制水平的多源协同管控系统及方法 | |
He et al. | Research on model and method of maturity evaluation of smart grid industry | |
Guo et al. | A periodic requests dispatcher for energy optimization of hybrid powered data centers | |
Ao | Integrated service system for multi-power business scenarios based on micro-service architecture | |
Gehbauer | Framework for multi layer control in python (fmlc) v1. 0 | |
Strasser et al. | Improving the portability and exchangeability of model data for smart grids focusing on real-time simulations—definition of a common reference model | |
Vaz et al. | The BFS Method in a Cloud Environment for Analyzing Distributed Energy Resource Management Systems | |
Song et al. | Research on the performance evaluation system of digital government capacity building based on power data | |
Liu | Comprehensive Intelligent Training Simulation System for Power Communication Transmission Network | |
Zhao et al. | Research on the construction of data pool and the management model of data pool integrating block chain concept for ubiquitous electric power Internet of Things |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: NARI TECHNOLOGY DEVELOPMENT CO., LTD. Free format text: FORMER OWNER: STATE GRID ELECTRIC POWER RESEARCH INSITITUTE Effective date: 20140213 |
|
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 210003 NANJING, JIANGSU PROVINCE TO: 210061 NANJING, JIANGSU PROVINCE |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20140213 Address after: 210061 D10, Nanjing high tech Industrial Development Zone, Jiangsu, China Patentee after: NARI Technology Development Co., Ltd. Patentee after: Henan Electric Power Dispatching & Communication Center Address before: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003 Patentee before: State Grid Electric Power Research Insititute Patentee before: Nanjing Nari Co., Ltd. Patentee before: Henan Electric Power Dispatching & Communication Center |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120718 Termination date: 20200427 |