CN101526580A - 气体绝缘金属封闭开关设备现场冲击试验方法 - Google Patents

气体绝缘金属封闭开关设备现场冲击试验方法 Download PDF

Info

Publication number
CN101526580A
CN101526580A CN200910060561A CN200910060561A CN101526580A CN 101526580 A CN101526580 A CN 101526580A CN 200910060561 A CN200910060561 A CN 200910060561A CN 200910060561 A CN200910060561 A CN 200910060561A CN 101526580 A CN101526580 A CN 101526580A
Authority
CN
China
Prior art keywords
testing
impact
voltage generator
insulated switchgear
gas insulated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910060561A
Other languages
English (en)
Inventor
陈勇
万启发
胡伟
霍锋
曹晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Electric Power Research Institute
Original Assignee
State Grid Electric Power Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Electric Power Research Institute filed Critical State Grid Electric Power Research Institute
Priority to CN200910060561A priority Critical patent/CN101526580A/zh
Publication of CN101526580A publication Critical patent/CN101526580A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明提供了一种气体绝缘金属封闭开关设备现场冲击试验方法,采用振荡雷电冲击试验方法,即在冲击电压发生器本体和负载间串入振荡电感;然后根据负载电容的大小,调整冲击电压发生器波头电阻,直到冲击电压发生器输出电压波形的波前时间小于15μs,以满足试验标准的要求。本发明可以使冲击电压发生器输出电压波形发生振荡,且试验波形的幅值、波前时间均满足试验标准的要求,并且使冲击电压发生器的电压输出效率大大提高。对保证GIS开关站设备的安全可靠运行具有重要意义。本发明可以在今后GIS现场交接试验中推广应用。

Description

气体绝缘金属封闭开关设备现场冲击试验方法
技术领域
本发明涉及一种气体绝缘金属封闭开关设备现场冲击试验方法,属于交流输变电工程高压试验领域。
背景技术
根据中华人民共和国电力行业标准《DL/T618-1997气体绝缘金属封闭开关设备现场交接试验规程》,对气体绝缘金属封闭开关设备(GIS)需进行主回路绝缘试验。绝缘试验包括雷电冲击试验,且规定雷电冲击波的波前时间不大于15μs。普通的高电压输变电设备的电容为几百pF至几千pF,而GIS开关站试验回路负载较大,在GIS开关站现场冲击试验中,其负载电容较普通的高电压输变电设备的电容量要大很多(例如:三峡GIS开关站单相最大负荷约为23nF),如果采用普通的冲击试验方法(即不在主回路中串电感L),则冲击电压发生器输出电压的波前时间将会大于15μs,不能满足试验标准的要求;并且冲击发生器电压输出效率较低,输出电压难以满足试验标准的要求。
发明内容
本发明的目的在于提供一种气体绝缘金属封闭开关设备现场冲击试验方法,它采用振荡雷电冲击试验方法,可以使冲击电压发生器产生振荡的波形,使试验电压的波前时间小于15μs,并且使冲击电压发生器的电压输出效率大大提高。
本发明的技术方案是:气体绝缘金属封闭开关设备现场冲击试验方法,其特征在于:采用振荡雷电冲击试验方法,即在冲击电压发生器本体和负载间串入电感。
如上所述的气体绝缘金属封闭开关设备现场冲击试验方法,其特征在于:然后根据负载电容的大小,调整冲击电压发生器波头电阻,直到冲击电压发生器输出电压波形的波前时间小于15μs。
本发明的有益效果是:(1)本发明采用振荡雷电冲击试验方法,根据GIS试验回路负载的大小,合理的调节波头电阻,使试验波形的幅值、波前时间均满足标准的要求,对保证GIS开关站设备的安全可靠运行具有重要意义。(2)通过试验可以检查GIS开关站总体安装后的绝缘性能是否完好,验证是否存在各种隐患(如安装错误,包装、运输、储存和安装调试中的损坏,存在异物等)导致内部故障。
附图说明
图1为本发明实施例试验回路示意图。
图2为本发明实施例现场冲击试验振荡雷电波波形图。
具体实施方式
以下结合附图和实施例对本发明气体绝缘金属封闭开关设备现场冲击试验方法做进一步的说明。
图1中标记的说明:1-冲击电压发生器,2-电感,3-冲击分压器,4-控制台,5-冲击电压测量仪表(峰值电压表、暂态记录仪),6-接地线及地,7-高压引线,8-负载电容(负载)。
本发明实施例采用的振荡雷电冲击试验方法说明如下:在冲击电压发生器1本体和负载8间串入振荡电感2(简称为L),如图1所示。由于放电回路中存在储能元件L,而L的电压可突变,UL与回路充电电流变化率成正比,表示为:UL=L(diL/dt),式中,UL为衰减正弦振荡波,电压极性交替变换,由此可见UL可产生波头振荡的作用,因而在试验中产生振荡雷电波。试验过程中物理变化过程说明如下:(1)放电瞬间UL突变,电感2开始储能;在充电电流首个峰值时,电感2能量开始释放,相当于冲击电压发生器1主电容和电感2串联对负载电容8继续充电,产生冲击峰值过冲,因而冲击电压发生器1的输出效率大大提高(采用振荡雷电冲击试验方法可以使冲击电压发生器1电压输出效率大于1)。(2)冲击波形振荡衰减的过程,是电感2吸收能量和释放能量的交替过程,所以采用振荡冲击试验方法施加到负载8上的电压波形也会随着电感2能量的吸收和释放而发生振荡,因而输出电压波形的波前时间较普通的冲击试验方法产生的波形波前时间大大减小,从而使输出电压的波形满足标准的要求;(3)峰值过冲最大值出现在首次充电结束后;(4)负载电容8作为电容性储能元件,电容量的变化对波头振荡有影响。
本发明实施例具体步骤如下:按照图1所示的试验回路布置,
第一步:根据负载电容8的大小,调整冲击电压发生器1波头电阻,直到输出电压波形的波前时间小于15μs,以满足试验的要求。
第二步:根据冲击电压发生器1的电压输出效率和试验要求的幅值,调节冲击电压发生器1充电电压,直到输出电压的幅值满足试验的要求。
由图2可以看到,通过本发明实施例振荡雷电冲击试验方法,可以使冲击电压发生器1输出电压波形发生振荡,且波形波前时间约为11.7μs,满足了试验波形波前时间小于15μs的要求。

Claims (2)

1、气体绝缘金属封闭开关设备现场冲击试验方法,其特征在于:采用振荡雷电冲击试验方法,即在冲击电压发生器本体和负载间串入电感。
2、根据权利要求1所述的气体绝缘金属封闭开关设备现场冲击试验方法,其特征在于:然后根据负载电容的大小,调整冲击电压发生器波头电阻,直到冲击电压发生器输出电压波形的波前时间小于15μs。
CN200910060561A 2009-01-16 2009-01-16 气体绝缘金属封闭开关设备现场冲击试验方法 Pending CN101526580A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910060561A CN101526580A (zh) 2009-01-16 2009-01-16 气体绝缘金属封闭开关设备现场冲击试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910060561A CN101526580A (zh) 2009-01-16 2009-01-16 气体绝缘金属封闭开关设备现场冲击试验方法

Publications (1)

Publication Number Publication Date
CN101526580A true CN101526580A (zh) 2009-09-09

Family

ID=41094548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910060561A Pending CN101526580A (zh) 2009-01-16 2009-01-16 气体绝缘金属封闭开关设备现场冲击试验方法

Country Status (1)

Country Link
CN (1) CN101526580A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102073003A (zh) * 2011-02-16 2011-05-25 上海思源高压开关有限公司 用于气体绝缘金属封闭开关设备的绝缘试验工装
CN102721911A (zh) * 2012-07-16 2012-10-10 西安交通大学 一种用于变压器的冲击耐压试验方法及其系统
CN103323754A (zh) * 2013-06-09 2013-09-25 辽宁省电力有限公司大连供电公司 变电站gis类设备冲击耐压试验装置
CN104699150A (zh) * 2015-03-09 2015-06-10 国家电网公司 封闭式紧凑型冲击电压发生器波形调节装置
CN104730430A (zh) * 2014-07-23 2015-06-24 施周平 一种绝缘电器冲击试验检测装置
CN105911440A (zh) * 2016-04-20 2016-08-31 浙江舟山海洋输电研究院有限公司 大电容直流电缆雷电冲击电压试验波形调节方法
CN109085483A (zh) * 2018-06-22 2018-12-25 国网四川省电力公司电力科学研究院 一种高频衰减振荡冲击电压发生装置
CN113933659A (zh) * 2021-08-30 2022-01-14 中国电力科学研究院有限公司 气体绝缘全封闭组合开关考核试验系统及其试验方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102073003A (zh) * 2011-02-16 2011-05-25 上海思源高压开关有限公司 用于气体绝缘金属封闭开关设备的绝缘试验工装
CN102073003B (zh) * 2011-02-16 2012-08-08 上海思源高压开关有限公司 用于气体绝缘金属封闭开关设备的绝缘试验工装
CN102721911A (zh) * 2012-07-16 2012-10-10 西安交通大学 一种用于变压器的冲击耐压试验方法及其系统
CN102721911B (zh) * 2012-07-16 2014-11-26 西安交通大学 一种用于变压器的冲击耐压试验方法及其系统
CN103323754A (zh) * 2013-06-09 2013-09-25 辽宁省电力有限公司大连供电公司 变电站gis类设备冲击耐压试验装置
CN104730430A (zh) * 2014-07-23 2015-06-24 施周平 一种绝缘电器冲击试验检测装置
CN104699150A (zh) * 2015-03-09 2015-06-10 国家电网公司 封闭式紧凑型冲击电压发生器波形调节装置
CN105911440A (zh) * 2016-04-20 2016-08-31 浙江舟山海洋输电研究院有限公司 大电容直流电缆雷电冲击电压试验波形调节方法
CN105911440B (zh) * 2016-04-20 2019-12-06 浙江舟山海洋输电研究院有限公司 大电容直流电缆雷电冲击电压试验波形调节方法
CN109085483A (zh) * 2018-06-22 2018-12-25 国网四川省电力公司电力科学研究院 一种高频衰减振荡冲击电压发生装置
CN113933659A (zh) * 2021-08-30 2022-01-14 中国电力科学研究院有限公司 气体绝缘全封闭组合开关考核试验系统及其试验方法

Similar Documents

Publication Publication Date Title
CN101526580A (zh) 气体绝缘金属封闭开关设备现场冲击试验方法
CN102901917B (zh) 一种陡前沿脉冲的现场生成装置
CN105676161A (zh) 交直流暂稳态一体化检测装置
CN101598757A (zh) 一种可控金属氧化物避雷器残压试验回路和方法
CN201222073Y (zh) 基于真空触发开关管的10/350μs雷电流波形激励装置
CN102680861A (zh) 变压器或电抗器的短路承受能力试验系统及其方法
CN103472393A (zh) 一种风电机组高电压穿越测试系统
CN100392417C (zh) 过电流试验装置中晶闸管触发方法
CN201514437U (zh) 一种配网电容电流测试仪
CN109342910A (zh) 一种全电型局部放电检测装置及检测方法
CN106707127A (zh) 用于测试晶闸管级反向恢复特性的工频冲击合成试验回路
CN201229390Y (zh) 交流电电缆耐压试验装置
CN108680777A (zh) 一种冲击电压发生装置
CN203287500U (zh) 一种基于变流器并联和电抗器分压的低电压穿越测试平台
CN105606951A (zh) 一种自激法测量电容式电压互感器极性的方法及装置
CN102879713A (zh) 一种接地保护选线的方法
CN102486511B (zh) 一种直流换流阀冲击电压试验方法
CN203164242U (zh) 电流波形发生装置
CN202854283U (zh) 一种陡前沿脉冲的现场生成装置
King et al. Switching transients in offshore wind farms–impact on the offshore and onshore networks
CN102445634B (zh) 输电线路故障检测装置
Shen et al. Modeling of high-frequency electromagnetic oscillation for DC fault in MMC-HVDC systems
Li et al. The impact of the lightning surge on SiC-based medium-voltage three-phase four-wire grid-connected converters
CN104820172A (zh) 一种三相变压器冲击耐压试验方法
CN213749946U (zh) 快速消除套管试验后残余静电荷的回路结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090909