CN101525948A - Construction method of prefabricating clear water concrete stand plate - Google Patents
Construction method of prefabricating clear water concrete stand plate Download PDFInfo
- Publication number
- CN101525948A CN101525948A CN200910020646A CN200910020646A CN101525948A CN 101525948 A CN101525948 A CN 101525948A CN 200910020646 A CN200910020646 A CN 200910020646A CN 200910020646 A CN200910020646 A CN 200910020646A CN 101525948 A CN101525948 A CN 101525948A
- Authority
- CN
- China
- Prior art keywords
- prefabricating
- plate
- clear water
- platen
- water concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention relates to a construction method of prefabricating a clear water concrete stand plate, which aims at providing a construction method with stable connection and mounting. The construction method is characterized by comprising the following steps: a, at least one beam mounting hole matched with a transverse plate of the stand plate is arranged on a support beam of a stand, and the support beam is used for supporting two ends of the stand plate; b, the clear water concrete stand plate is prefabricated, and at least one plate mounting hole matched with the transverse plate of the stand plate is arranged at each end of a vertical plate of the stand plate; c, at least two embedded parts matched with the mounting hole are embedded at each end of the transverse plate of the stand plate; d, a connecting part is connected with the embedded parts, shrinking-free grouting materials are injected into the mounting hole, the prefabricating stand plate is hoisted on the support beam of the stand, and the connecting part is respectively inserted into the beam mounting hole and the plate mounting hole. The invention has the advantages that the stand plate is firmly arranged on the support beam, the connection between the stand plates is stable, and the pressures between the stand plate and the support beam as well as between the stand plates are greatly buffered.
Description
Technical field
The present invention relates to a kind of job practices of concrete member, specifically be a kind of job practices of prefabricating clear water concrete stand plate.
Background technology
Clear-water concrete can adopt cast-in-place or prefabricated two kinds of schemes.As adopt cast-in-situ clear-water concrete to see platen, complex process, and input is bigger, long in time limit, so should not adopt cast-in-place.Prefabricated fair-faced concrete sees that the platen surfacing is smooth, and physical dimension is regular, and color and luster is even, can realize batch production production, can directly use after the lifting.But present prefabricating clear water concrete stand plate construction, because of the precast stand slab model various, the construction profile complexity, installation difficulty is big, and construction quality is not easy to ensure, the subject matter that exists is exactly: after seeing that platen is installed on the brace summer, because of non-one cast, the time one is of a specified duration, sees between platen and the brace summer easily loosening insecure, influence grandstand and use, and dangerous.On the other hand, upper and lower adjacent very difficult solution of connectivity problem of seeing between the platen.According to former design, see that platen connects the employing pre-embedded steel slab, and when mounted adjacent two pre-embedded steel slabs of seeing platen welded that finish the connection of seeing platen, the easy off normal of this kind connected mode steel plate causes structure to connect defective.After analyzing former design after deliberation, we will be welded to connect makes the bolt connection into, sees the platen purpose of connecting thereby reach.
Summary of the invention
The object of the invention is to provide a kind of energy will see that platen firmly is installed on the brace summer, sees the firm job practices of connection between the platen.
The objective of the invention is to adopt following technical proposals to realize: the job practices of prefabricating clear water concrete stand plate may further comprise the steps:
A, see in the support of grandstand be provided with on the brace summer at platen two ends at least 1 with the beam installing hole of seeing that the platen transverse slat is adaptive;
B, prefabricating clear water concrete stand plate are being seen platen riser two ends, at least 1 of every end setting and the plate installing hole of seeing that the platen transverse slat is adaptive;
C, seeing platen transverse slat two ends, pre-buried at least 2 built-in fittings adaptive of every end with installing hole;
D, connector is connected with built-in fitting, perfusion in the installing hole is not had the slurry of contraction, precast stand slab is lifted on the grandstand brace summer, connector inserts beam, plate installing hole respectively.
Beam buffering bearing also is set on brace summer among the step a.
Upper and lower seeing plate buffering bearing is set between the platen joint face.
Described buffering bearing is a neoprene bearing.
Described built-in fitting is an embedded nut.
Described connector is a bolt.
The nothing of perfusion contraction slurry is that C60 does not have the contraction slurry in the described installing hole of step c.
The invention has the beneficial effects as follows: because the setting of bolt, and bolt inserts perfusion and do not have the installing hole that shrinks slurry, will see that platen firmly is installed on the brace summer, overcome prior art and seen that platen installs unsteady problem; See to connect between the platen and reach firm effect equally.The setting of buffering bearing has cushioned greatly and has seen when platen uses the pressure of brace summer and see pressure between the platen, makes and sees platen and the more durable use of brace summer, and be convenient to see that platen firmly installs.
Description of drawings
Fig. 1 sees the platen scheme of installation for the present invention;
Wherein, 1, see platen, 2, brace summer, 3, built-in fitting, 4, connector, 5, the beam installing hole, 6, the plate installing hole, 7, beam buffering bearing, 8, plate buffering bearing.
The specific embodiment
As shown in the figure, the job practices of prefabricating clear water concrete stand plate may further comprise the steps:
A, see in the support of grandstand be provided with on the brace summer 2 at platen 1 two ends 1 with the beam installing hole 5 of seeing that platen 1 transverse slat is adaptive; Beam buffering bearing 7 also is set above the brace summer 2, and beam buffering bearing 7 is a neoprene bearing.
B, prefabricating clear water concrete stand plate are being seen platen 1 riser two ends, every end be provided with 1 with the plate installing hole 6 of seeing that the platen transverse slat is adaptive;
C, seeing platen 1 transverse slat two ends, every end pre-buried 2 with beam installing hole 5, the adaptive respectively built-in fitting 3 of plate installing hole 6, built-in fitting 3 is an embedded nut.;
D, connector 4 is connected with built-in fitting 3, connector 4 is a bolt, and bolt screws in nut can conveniently finish the two connection; Perfusion C60 in the installing hole is not had the contraction slurry, guarantee that promptly smooth and easy the assurance again of bolt hand-hole is connected firmly; Precast stand slab 1 is lifted on the grandstand brace summer 2, and connector 4 inserts beam installing hole 5, plate installing hole 6 respectively.Simultaneously, upper and lower seeing plate buffering bearing 8 is set between the platen joint face, plate buffering bearing 8 is a neoprene bearing.。
After slurry solidifies, see that platen and brace summer finish solid and reliable connection, adjacent seeing realized between the platen firm the connection.
This improvement has been compared following advantage with former design:
1, reduce difficulty of construction Optimizing construction technology:
The dimensional discrepancy that causes when adopting this kind method of attachment effectively to avoid pre-embedded steel slab is with multiple pre-Bury size and become two kinds of pre-buried sizes, optimized construction technology.
2, simple to operate, save the construction period:
The unified size for connection of seeing platen had not only facilitated but also had made connection standard to production and construction had been installed, and carried The high speed of application of producing becomes the welding in the design and installation process into bolt and connects and reduced by a procedure Accelerated installation progress, improved the quality of connection of seeing platen and ensured safe construction.
3, improve quality of connection:
With the steel plate in the former design not fixedly embedded part make fixedly embedded part of bolt into, avoided the steel plate embedded part displacement to make What become does not connect, and has avoided snapping the security-hidden trouble that causes yet, and has reached the two rich of quality and safety Receive.
4, reduced construction costs:
Use this improvement, make the higher steel plate of cost into lower-cost reinforcing bar, both reduced working procedure, Reduce largely again construction costs, saved cost.
Claims (7)
1, the job practices of prefabricating clear water concrete stand plate is characterized in that: may further comprise the steps:
A, see in the support of grandstand be provided with on the brace summer at platen two ends at least 1 with the beam installing hole of seeing that the platen transverse slat is adaptive;
B, prefabricating clear water concrete stand plate are being seen platen riser two ends, at least 1 of every end setting and the plate installing hole of seeing that the platen transverse slat is adaptive;
C, seeing platen transverse slat two ends, pre-buried at least 2 built-in fittings adaptive of every end with installing hole;
D, connector is connected with built-in fitting, perfusion in the installing hole is not had the slurry of contraction, precast stand slab is lifted on the grandstand brace summer, connector inserts beam, plate installing hole respectively.
2, the job practices of prefabricating clear water concrete stand plate according to claim 1 is characterized in that, beam buffering bearing also is set on brace summer among the step a.
3, the job practices of prefabricating clear water concrete stand plate according to claim 1 and 2 is characterized in that, upper and lower seeing plate buffering bearing is set between the platen joint face.
4, the job practices of prefabricating clear water concrete stand plate according to claim 3 is characterized in that, described buffering bearing is a neoprene bearing.
5, the job practices of prefabricating clear water concrete stand plate according to claim 1 and 2 is characterized in that, described built-in fitting is an embedded nut.
6, the job practices of prefabricating clear water concrete stand plate according to claim 1 and 2 is characterized in that, described connector is a bolt.
7, the job practices of prefabricating clear water concrete stand plate according to claim 1 and 2 is characterized in that, the nothing of perfusion contraction slurry is that C60 does not have the contraction slurry in the described installing hole of step c.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910020646A CN101525948A (en) | 2009-04-16 | 2009-04-16 | Construction method of prefabricating clear water concrete stand plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910020646A CN101525948A (en) | 2009-04-16 | 2009-04-16 | Construction method of prefabricating clear water concrete stand plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101525948A true CN101525948A (en) | 2009-09-09 |
Family
ID=41094002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910020646A Pending CN101525948A (en) | 2009-04-16 | 2009-04-16 | Construction method of prefabricating clear water concrete stand plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101525948A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102953548A (en) * | 2011-08-25 | 2013-03-06 | 上海宝冶集团有限公司 | Pouring process for fair-faced concrete stand board |
CN109235943A (en) * | 2018-09-30 | 2019-01-18 | 央固工程科技(上海)有限公司 | A kind of reinforced concrete precast assembling movie theatre stand structure |
CN111877814A (en) * | 2020-07-21 | 2020-11-03 | 上海建工二建集团有限公司 | Construction method for prefabricating bare concrete stand plate |
CN113062638A (en) * | 2021-03-05 | 2021-07-02 | 上海建工一建集团有限公司 | Assembly type platform structure and construction method |
-
2009
- 2009-04-16 CN CN200910020646A patent/CN101525948A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102953548A (en) * | 2011-08-25 | 2013-03-06 | 上海宝冶集团有限公司 | Pouring process for fair-faced concrete stand board |
CN109235943A (en) * | 2018-09-30 | 2019-01-18 | 央固工程科技(上海)有限公司 | A kind of reinforced concrete precast assembling movie theatre stand structure |
CN109235943B (en) * | 2018-09-30 | 2024-08-23 | 央固工程科技(上海)有限公司 | Reinforced concrete prefabricated assembly type cinema stand structure |
CN111877814A (en) * | 2020-07-21 | 2020-11-03 | 上海建工二建集团有限公司 | Construction method for prefabricating bare concrete stand plate |
CN113062638A (en) * | 2021-03-05 | 2021-07-02 | 上海建工一建集团有限公司 | Assembly type platform structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201635388U (en) | Cast-in-place concrete arc outer wall body unilateral formwork system | |
CN101839061A (en) | Cast-in-place concrete arc outer wall single-side formwork system and construction method thereof | |
CN103452126B (en) | Light combined hanging box with recyclable baseplate steels and construction technology thereof | |
CN102900024B (en) | Using method for overturning die plate for large-scale concrete structure and | |
CN101906754A (en) | Rigid connection method for steel beam and concrete pier | |
CN101525948A (en) | Construction method of prefabricating clear water concrete stand plate | |
CN103437493B (en) | Connecting node of prefabricated reinforced concrete beam and construction method of connecting node | |
CN204282685U (en) | A kind of assembling stair | |
CN109895239B (en) | Fabricated concrete stair slow platform beam slab and construction method thereof | |
CN104481166A (en) | Additionally assembled type balcony structure for old community and construction method of additionally assembled type balcony structure | |
CN113482007B (en) | Waist beam supporting structure and construction method thereof | |
CN102677909A (en) | Tool type support for mounting composite slabs | |
CN102535830B (en) | Machine position adhesion device for monolithic climbing scaffold for constructing prefabricated building | |
CN212689005U (en) | Overhanging type formwork supporting structure for pouring retaining wall | |
CN202672709U (en) | Spliced bamboo plywood hyperboloid pattern plate and bracing system thereof | |
CN106049760A (en) | Prefabricated concrete column base used for rapid restoration after earthquakes, and construction method and maintenance method thereof | |
CN107100322B (en) | Post stretching vertical prestressing cast-in-place concrete rod structure and construction method | |
CN204940825U (en) | A kind of foundation structure of builder's jack | |
CN201474296U (en) | Floor slab back casting hole moulding board support structure | |
CN217812334U (en) | Prestressed steel pipe truss floor support plate | |
CN102926537A (en) | Method and device for fixing root of external wall formwork | |
CN209903497U (en) | Steel mould of prefabricated basic cushion cap | |
CN210032102U (en) | Support for mounting external hanging piece of building | |
CN215670050U (en) | Assembled balcony prefabricated part | |
CN111173300A (en) | Prefabricated assembled structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20090909 |