CN101487855A - Method for automatically recording voltage-losing meter-leaking electric energy in three-phase three-wire electric energy measurement - Google Patents

Method for automatically recording voltage-losing meter-leaking electric energy in three-phase three-wire electric energy measurement Download PDF

Info

Publication number
CN101487855A
CN101487855A CNA2009100374390A CN200910037439A CN101487855A CN 101487855 A CN101487855 A CN 101487855A CN A2009100374390 A CNA2009100374390 A CN A2009100374390A CN 200910037439 A CN200910037439 A CN 200910037439A CN 101487855 A CN101487855 A CN 101487855A
Authority
CN
China
Prior art keywords
phase
electric energy
energy
meter
circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2009100374390A
Other languages
Chinese (zh)
Inventor
陈劲游
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2009100374390A priority Critical patent/CN101487855A/en
Publication of CN101487855A publication Critical patent/CN101487855A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a method for automatically recording pressure loss leakage electric energy in three-phase three-wire electrical metering, and is characterized in that: (1) the voltage and current signals of the load circuit are collected; (2) a sample/hold circuit samples the alternating current signals of voltage and current in each period; (3) digital quantity is converted to access a data memory through an A/D converting circuit; (4) a logical operation circuit calculates actually calculated active energy W and actually calculated reactive energy Q; (5) whether three phases have any phase to be disconnected is judged; (6) if the phase is disconnected, the logical operation circuit further records the calculated active energy W and reactive energy Q when disconnection in the step (4); simultaneously, the active energy W' and reactive energy Q' of load consumption are calculated according to principle of shifting; (7) the active energy W'-W and reactive energy Q'-Q of leakage are calculated when disconnection; the invention further discloses an electric energy meter, and is characterized in that the electric energy meter comprises a collection data circuit of the electric energy meter, the sample/hold circuit, the A/D converting, the original data memory and the logical operation circuit that are connected in turn. The invention solves the problem of remedying pressure loss leakage electric energy in three-phase three-wire electrical metering, thereby improving the accuracy of remedying pressure loss leakage electric energy and combining the recorded pressure loss leakage electricity meter with the electric energy meter.

Description

A kind of in the phase three-wire three electric energy metrical the automatically method and the electric energy meter thereof of recording pressure loss leakage meter electric energy
[technical field]
The present invention relates to a kind of in the phase three-wire three electric energy metrical the automatically method and the electric energy meter thereof of recording pressure loss leakage meter electric energy, be generally used for measuring in the electric system method and the device of active energy, reactive energy.
[background technology]
When causing electric energy meter that one phase voltage decompression is arranged because of a variety of causes in the phase three-wire three electric energy metrical, electric energy meter can leak the meter electric energy.Existing various remedy with Louing the mode of meter electric energy exist calculate inaccurate or workload too greatly or the too high shortcoming of expense.
The present invention has carried out useful improvement in order to overcome above shortcoming.
[summary of the invention]
The present invention has overcome the deficiencies in the prior art, and the electric energy of the automatic recording pressure loss hourglass of a kind of energy meter is provided, and can also finish the method and the device of common electric energy table function simultaneously.So be called " electric energy meter of recording pressure loss leakage meter electric energy automatically ".
The present invention be based on the electric power system three-phase voltage substantially symmetry (the three-phase voltage amplitude equates, the phasing degree differs 120 °) design, the impossible absolute symmetry of certain actual three-phase voltage, but, in fact asymmetrical component very little, for example: reactive energy-meter is based on also that the basic symmetric design of three-phase voltage forms, and accuracy is only than the low grade of active electric energy meter of the same type.As 1 grade of active electric energy meter, reactive energy-meter of the same type then is 2 grades.By that analogy, the present invention is based on also that the basic symmetric design of three-phase voltage forms, and the class of accuracy that record leaks the meter electric energy is only than itself the active energy accuracy of measuring low grade.
In order to solve the technical matters of above-mentioned existence, the present invention adopts following technical proposal:
A kind of in the phase three-wire three electric energy metrical the automatic method of recording pressure loss leakage meter electric energy, it is characterized in that:
(1) the electric energy meter data collection circuit is collected voltage, the current signal on the load circuit;
(2) by sample/hold circuit the AC signal of voltage, electric current is being sampled N time in the phase weekly;
(3) then through the A/D change-over circuit, convert digital quantity to and deposit data-carrier store in;
(4) logical operation circuit calculates actual active energy W, reactive energy Q by electric energy meter active energy, reactive energy computing formula; In three-phase three-wire circuit, electric energy meter is measured Uab, Ucb, Ia, Ic deposit in the storer, calculate actual count active energy W = Uab × Ia × cos Φa × Δt + Ucb × Ic × cos Φc × Δt Reactive energy Q = Uab × Ia × sin Φa × Δt + Ucb × Ic × sin Φc × Δt ;
(5) judge whether any phase phase failure decompression is arranged in the three-phase;
(6) if phase failure decompression is arranged, logical operation circuit also write down above-mentioned (4) step when the phase failure actual count active energy W, reactive energy Q; Simultaneously, when the phase failure of A phase, use
Figure A200910037439D00034
Replace in electric energy meter active energy, the reactive energy computing formula
Figure A200910037439D0003093554QIETU
, when the phase failure of B phase, use
Figure A200910037439D00035
Replace in electric energy meter active energy, the reactive energy computing formula
Figure A200910037439D00036
With
Figure A200910037439D00037
Replace in electric energy meter active energy, the reactive energy computing formula
Figure A200910037439D00041
When the phase failure of C phase, use Replace in electric energy meter active energy, the reactive energy computing formula
Figure A200910037439D00043
And calculate active energy W ', the reactive energy Q ' of load consumption;
(7) logical operation circuit (L) calculates phase failure hourglass in respect of merit electric energy=W '-W, leakage meter reactive energy=Q '-Q;
Realize a kind of electric energy meter of said method, it is characterized in that comprising electric energy meter collection data circuit, sample/hold circuit, A/D change-over circuit, raw storage, logical operation circuit; Electric energy meter is collected the input end of the output terminal connection sample/hold circuit of data circuit, the output terminal of sample/hold circuit connects the input end of A/D change-over circuit, the output terminal of A/D change-over circuit connects the input end of data-carrier store, and the output terminal of data-carrier store connects logical operation circuit.
The present invention compared with prior art has following advantage: the present invention will not only solve the difficulty of remedying pressure loss leakage meter electric energy, also improve the accuracy of remedying pressure loss leakage meter electric energy greatly, and recording pressure loss leakage quantity calculation and electric energy meter are integrated.
[description of drawings]
Fig. 1 is block scheme of the present invention (one);
Fig. 2 is block scheme of the present invention (two);
Fig. 3 is electric energy meter data collection circuit figure of the present invention;
Fig. 4 is a concrete block scheme of the present invention;
Fig. 5 is phasor principle analysis figure of the present invention ();
Fig. 6 is phasor principle analysis figure of the present invention (two);
Fig. 7 is phasor principle analysis figure of the present invention (three);
Fig. 8 is A of the present invention, B, C phase phase failure discriminatory analysis figure ();
Fig. 9 is A of the present invention, B, C phase phase failure discriminatory analysis figure (two);
Figure 10 is a circuit distribution plan of the present invention.
[embodiment]
Below in conjunction with accompanying drawing and embodiment the present invention is described in further detail:
A kind of in the phase three-wire three electric energy metrical the automatic method of recording pressure loss leakage meter electric energy, as Fig. 1, Fig. 2, comprise at least:
(1) electric energy meter data collection circuit H collects voltage, the current signal on the load circuit, above-mentioned signal is input to the analog quantity input interface of single-chip microcomputer;
As shown in Figure 3, the voltage of high voltage supply system is that to become low-voltage be secondary voltage to primary voltage through insurance and high pressure measurement voltage transformer (VT) (TV1) with high voltage, electric current becomes secondary current through high pressure measurement current transformer (TA1) with primary current, respectively through showing interior voltage transformer (VT) (TV2), current transformer (TA2), be incorporated into the analog quantity input interface of single-chip microcomputer then;
(2) by sample/hold circuit I with the AC signal of voltage, electric current N time (as N=36) of sampling in phase weekly;
(3) then through A/D change-over circuit J, analog quantity is become digital quantity deposit data-carrier store K in;
(4) logical operation circuit L calculate the reality meter active energy W, actual reactive energy Q;
When phase failure decompression does not take place when, the reality meter active energy, reactive energy reflected the electric energy of user load normal consumption, leak active energy, the reactive energy of meter this moment.At this moment, be equivalent to common electric energy meter function.
But when load circuit generation phase failure decompression, just record leaks the meter electric energy:
(5) judge whether any phase phase failure decompression is arranged in the three-phase;
(6) if decompression is arranged, logical operation circuit also write down above-mentioned (4) step when phase failure decompression actual count active energy W, reactive energy Q; Simultaneously, adopt the phase shift of non-decompression voltage or adopt the mode of non-decompression phase current phase shift to obtain and the decompression voltage and the decompression phase current phase product that equate of virtual voltage mutually according to the characteristic of three-phase voltage symmetry, thereby calculate active energy W ', the reactive energy Q ' of load consumption according to the characteristic of three-phase current symmetry;
(7) logical operation circuit (L) calculates phase failure hourglass in respect of merit electric energy=W '-W, leakage meter reactive energy=Q '-Q.
Embodiments of the invention are that the high pressure measurement mode of using with the phase three-wire three high voltage supply system (Fig. 3) is an example, introduce its principle of work in conjunction with the principle of work block diagram (Fig. 4) of the electric energy meter of the automatic recording pressure loss leakage meter of phase three-wire three electric energy:
In three-phase three-wire circuit, electric energy meter is measured Uab, Ucb, Ia, Ic deposit in the storer.Calculate actual count active energy W = Uab × Ia × cos Φa × Δt + Ucb × Ic × cos Φc × Δt , Reactive energy Q = Uab × Ia × sin Φa × Δt + Ucb × Ic × sin Φc × Δt (Φ a, φ c see Fig. 5, Fig. 6, Fig. 7).Uab represents to survey AB phase line voltage phasor
Figure A200910037439D00053
Effective value, Ia represents phasor
Figure A200910037439D00054
Effective value, φ a represents phasor
Figure A200910037439D00055
With phasor
Figure A200910037439D00056
Angle; Ucb represents to survey CB phase line voltage phasor
Figure A200910037439D00057
Effective value, Ic represents phasor
Figure A200910037439D00058
Effective value, φ c represents phasor With phasor
Figure A200910037439D000510
Angle; The expression sampling interval time.
If existing A phase fuse melting, A phase decompression then,
Figure A200910037439D000512
Voltage can connect the load difference according to secondary circuit, and amplitude can reduce, even reduces to 0, if residual voltage is arranged, its phasing degree also can change.So active energy formula at this moment W = Uab × Ia × cos Φa × Δt + Ucb × Ic × cos Φc × Δt In also calculate the actual active energy W that records when then only reflecting A phase fuse melting with the actual Uab that comes that measures A, and the active energy that not reflected load consumes, this will cause the loss of metering active energy.Active energy W ' for reflected load consumption A, symmetrical substantially according to the electrical network three-phase voltage, can use
Figure A200910037439D000514
Amplitude replace Uab, as shown in Figure 5, will Moving 60 ° backward is
Figure A200910037439D000516
Promptly use (use
Figure A200910037439D000518
Expression) replaces in the active energy formula
Figure A200910037439D000519
(W ' A-W A) being the active energy of A phase decompression hourglass meter, each time sampling period is added up is whole A phase decompression is leaked meter in the time active energy; (Q ' A-Q A) be the reactive energy of A phase decompression hourglass meter.
When the phase failure of B phase, as shown in Figure 7, at this moment
Figure A200910037439D000520
With
Figure A200910037439D000521
Amplitude and phase place all change, but their difference equals
Figure A200910037439D000522
Will
Figure A200910037439D000523
Move forward 60 ° promptly (use Expression) can replace
Figure A200910037439D000526
Will After move 60 ° promptly
Figure A200910037439D000528
(use
Figure A200910037439D000529
Expression) can replace
Figure A200910037439D000530
(W ' B-W B) being the active energy of B phase decompression hourglass meter, each time sampling period is added up is whole B phase decompression is leaked meter in the time active energy (W BThe actual active energy that records during reflection B phase fuse melting, W ' BThe active energy that reflected load consumes); (Q ' B-Q B) be the reactive energy of B phase decompression hourglass meter.
When the phase failure of C phase, can use
Figure A200910037439D000531
Amplitude replace Ucb, as shown in Figure 6, will
Figure A200910037439D000532
Be for 60 ° to reach
Figure A200910037439D000533
Promptly use
Figure A200910037439D000534
(use Expression) replaces in the active energy formula
Figure A200910037439D000536
(W ' C-W C) being the active energy of C phase decompression hourglass meter, each time sampling period is added up is whole C phase decompression is leaked meter in the time active energy (W CThe actual active energy that records during reflection C phase fuse melting, W ' CThe active energy that reflected load consumes); (Q ' C-Q C) be the reactive energy of C phase decompression hourglass meter.
In when, decompression not taking place when, meritorious, reactive energy that the above-mentioned skew principle of unnecessary employing computational load consumes.In order to guarantee only when decompression takes place, just the calculating of utilization skew principle is provided with decompression starting current value and decompression trigger voltage value and return voltage value.Satisfy 2 conditions when simultaneously, A, arbitrary phase current are more than or equal to the decompression starting current value of setting; B, the voltage that records are less than or equal to the decompression trigger voltage value of setting; Just calculate and recording pressure loss leakage meter electric energy.
Be decompression prerequisite be must have a phase current more than or equal to a certain setting value (as ratings 0.5%), believe 1. for control among Fig. 8, start, return comparer by 1. controlling decompression, when Ia, Ic biphase current during all less than starting current, then control signal is forbidden in comparer output, the control of back forbids that full controlled variable is output as 0; When a phase current is arranged in the biphase current more than or equal to starting current, then allow relatively.
Fig. 9, control letter 1. output allow under the situation relatively, determine the end and be which the phase decompression in A, B, the C three-phase, then by corresponding phase line voltage with start the return voltage setting value and relatively determine.First kind of situation: Uab be less than or equal to decompression start setting value (as ratings 78%) through relatively back output " 1 ", Uac is less than or equal to decompression and is started setting value through relatively back output " 1 ", 4. two " 1 " produces through AND gate, and signal is " 1 ", at this moment Uab, Uac are lower than decompression startup setting value, expression is the phase failure of " B " phase, and 4. signal calculates according to the situation of " B " phase phase failure with regard to may command active energy, reactive energy formula.Second kind of situation: Uab is less than or equal to decompression and started setting value through relatively back output " 1 ", Uac is higher than decompression and starts setting value through relatively back output " 0 ", can producing 3. as shown in Figure 9, signal is " 1 ", at this moment expression is the phase failure of " A " phase, and 3. signal calculates according to the situation of " A " phase phase failure with regard to may command active energy, reactive energy formula.The third situation: Uab is higher than decompression and starts setting value through relatively back output " 0 ", Uac is less than or equal to decompression and is started setting value through relatively back output " 1 ", can producing 2. as shown in Figure 9, signal is " 1 ", at this moment expression is the phase failure of " C " phase, and 2. signal calculates according to the situation of " C " phase phase failure with regard to may command active energy, reactive energy formula.
Line voltage is lower than that decompression starts when starting the return voltage setting value, produces control signal 2., 3., 4., allows phase shift and subsequent adds, takes advantage of, subtracts, adds up Lou in respect of merit, reactive energy.Voltage be equal to or higher than return setting value (as ratings 85%) time decompression return, stop phase shift and subsequent add, take advantage of, subtract, add up Lou in respect of merit, reactive energy.
Certainly, we can also adopt method for distinguishing to judge which phase decompression in A, B, the C three-phase.
As seen from the figure, leak the calculating of meter reactive energy and above-mentioned leakage seemingly in respect of the compute classes of merit electric energy, all be with correct voltage, principle according to the basic symmetry of three-phase voltage, with its phase shift, obtain the required correct voltage of respective element, and calculate correct reactive energy, the reactive energy of the real meter of counter element when deducting decompression again, thus the leak reactive energy of meter obtained.
Among the figure fundamental diagram that draws with the voltage phase shift, because the phase differential of voltage and electric current is a relative value; So, adopt the mode of non-decompression phase current phase shift also can draw same result according to the characteristic of three-phase current symmetry.
A kind of in the phase three-wire three electric energy metrical the automatic electric energy meter of recording pressure loss leakage meter electric energy, it is characterized in that comprising that electric energy meter collects data circuit, sample/hold circuit, A/D change-over circuit, raw storage, logical operation circuit; Electric energy meter is collected the input end of the output terminal connection sample/hold circuit of data circuit, the output terminal of sample/hold circuit connects the input end of A/D change-over circuit, the output terminal of A/D change-over circuit connects the input end of data-carrier store, and the output terminal of data-carrier store connects logical operation circuit.

Claims (2)

1, a kind of in the phase three-wire three electric energy metrical the automatic method of recording pressure loss leakage meter electric energy, it is characterized in that:
(1) the electric energy meter data collection circuit is collected voltage, the current signal on the load circuit;
(2) by sample/hold circuit the AC signal of voltage, electric current is being sampled N time in the phase weekly;
(3) then through the A/D change-over circuit, convert digital quantity to and deposit data-carrier store in;
(4) logical operation circuit calculates actual active energy W, reactive energy Q by electric energy meter active energy, reactive energy computing formula; In three-phase three-wire circuit, electric energy meter is measured Uab, Ucb, Ia, Ic deposit in the storer, calculate actual count active energy
Figure A200910037439C0002181148QIETU
Figure A200910037439C0002181155QIETU
, reactive energy
Figure A200910037439C0002181202QIETU
(5) judge whether any phase phase failure decompression is arranged in the three-phase;
(6) if phase failure decompression is arranged, logical operation circuit also write down above-mentioned (4) step when the phase failure actual count active energy W, reactive energy Q; Simultaneously, when the phase failure of A phase, use
Figure A200910037439C0002144732QIETU
Cd-j60 ° replaces in electric energy meter active energy, the reactive energy computing formula
Figure A200910037439C0002144732QIETU
Ab, when the phase failure of B phase, use (
Figure A200910037439C0002144732QIETU
Ab-
Figure A200910037439C0002144732QIETU
Cb) e J60 °Replace in electric energy meter active energy, the reactive energy computing formula
Figure A200910037439C0002144732QIETU
Ab, with (
Figure A200910037439C0002144732QIETU
B-
Figure A200910037439C0002144732QIETU
Ab) e-j60 ° replaces in electric energy meter active energy, the reactive energy computing formula
Figure A200910037439C0002144732QIETU
Cb uses when the phase failure of C phase
Figure A200910037439C0002144732QIETU
Ab e J60 °Replace in electric energy meter active energy, the reactive energy computing formula
Figure A200910037439C0002144732QIETU
Cb, and calculate active energy W ', the reactive energy Q ' of load consumption;
(7) logical operation circuit (L) calculates phase failure hourglass in respect of merit electric energy=W '-W, leakage meter reactive energy=Q '-Q.
2, realize a kind of electric energy meter of claim 1 method, it is characterized in that comprising electric energy meter collection data circuit, sample/hold circuit, A/D change-over circuit, raw storage, logical operation circuit; Electric energy meter is collected the input end of the output terminal connection sample/hold circuit of data circuit, the output terminal of sample/hold circuit connects the input end of A/D change-over circuit, the output terminal of A/D change-over circuit connects the input end of data-carrier store, and the output terminal of data-carrier store connects logical operation circuit.
CNA2009100374390A 2009-02-22 2009-02-22 Method for automatically recording voltage-losing meter-leaking electric energy in three-phase three-wire electric energy measurement Pending CN101487855A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2009100374390A CN101487855A (en) 2009-02-22 2009-02-22 Method for automatically recording voltage-losing meter-leaking electric energy in three-phase three-wire electric energy measurement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2009100374390A CN101487855A (en) 2009-02-22 2009-02-22 Method for automatically recording voltage-losing meter-leaking electric energy in three-phase three-wire electric energy measurement

Publications (1)

Publication Number Publication Date
CN101487855A true CN101487855A (en) 2009-07-22

Family

ID=40890825

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2009100374390A Pending CN101487855A (en) 2009-02-22 2009-02-22 Method for automatically recording voltage-losing meter-leaking electric energy in three-phase three-wire electric energy measurement

Country Status (1)

Country Link
CN (1) CN101487855A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102551881A (en) * 2012-02-27 2012-07-11 安徽英特电子有限公司 Output power monitoring circuit of high frequency electrotome
CN102628892A (en) * 2012-04-12 2012-08-08 广东电网公司中山供电局 Method for calculating voltage-loss unusual electrical energy measurement on line and electric energy meter
CN102692556A (en) * 2011-03-25 2012-09-26 深圳市锐能微科技有限公司 Three-phase electric quantity calculation method and apparatus thereof
CN102768301A (en) * 2012-08-13 2012-11-07 广东电网公司中山供电局 Method and device for on-line determining withdrawal and compensation electric quantity in three-phase four-wire two-phase current loss
CN102778605A (en) * 2012-08-13 2012-11-14 广东电网公司中山供电局 Method and device for carrying out online determination on given and appended electric quantity of three-phase four-wire system in process of one-phase current losing
CN102830280A (en) * 2012-08-13 2012-12-19 广东电网公司中山供电局 Method and device for online determining returned and compensated electric quantity for three-phase three-wire current loss
CN104777395A (en) * 2014-01-15 2015-07-15 浙江万胜电力仪表有限公司 Method for detecting breaking of B-phase voltage circuit of three-phase three-wire power meter
CN109375145A (en) * 2018-09-26 2019-02-22 深圳供电局有限公司 No-voltage fault monitoring method and device based on phase three-wire three meter equipment
CN110988416A (en) * 2019-12-25 2020-04-10 重庆华虹仪表有限公司 Outdoor three-phase high-voltage electric energy meter
CN111766465A (en) * 2020-06-28 2020-10-13 广东电网有限责任公司 Intelligent accounting terminal for electric quantity compensation
CN112485752A (en) * 2020-11-25 2021-03-12 国网北京市电力公司 Intelligent electric energy meter compensation electric quantity calculation method, system, device and storage medium

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102692556A (en) * 2011-03-25 2012-09-26 深圳市锐能微科技有限公司 Three-phase electric quantity calculation method and apparatus thereof
CN102551881B (en) * 2012-02-27 2013-09-11 安徽英特电子有限公司 Output power monitoring circuit of high frequency electrotome
CN102551881A (en) * 2012-02-27 2012-07-11 安徽英特电子有限公司 Output power monitoring circuit of high frequency electrotome
CN102628892A (en) * 2012-04-12 2012-08-08 广东电网公司中山供电局 Method for calculating voltage-loss unusual electrical energy measurement on line and electric energy meter
CN102628892B (en) * 2012-04-12 2014-06-04 广东电网公司中山供电局 Method for calculating voltage-loss unusual electrical energy measurement on line and electric energy meter
CN102768301B (en) * 2012-08-13 2014-06-11 广东电网公司中山供电局 Method and device for on-line determining withdrawal and compensation electric quantity in three-phase four-wire two-phase current loss
CN102830280A (en) * 2012-08-13 2012-12-19 广东电网公司中山供电局 Method and device for online determining returned and compensated electric quantity for three-phase three-wire current loss
CN102778605A (en) * 2012-08-13 2012-11-14 广东电网公司中山供电局 Method and device for carrying out online determination on given and appended electric quantity of three-phase four-wire system in process of one-phase current losing
CN102768301A (en) * 2012-08-13 2012-11-07 广东电网公司中山供电局 Method and device for on-line determining withdrawal and compensation electric quantity in three-phase four-wire two-phase current loss
CN102778605B (en) * 2012-08-13 2014-07-23 广东电网公司中山供电局 Method and device for carrying out online determination on given and appended electric quantity of three-phase four-wire system in process of one-phase current losing
CN102830280B (en) * 2012-08-13 2014-09-10 广东电网公司中山供电局 Method and device for online determining returned and compensated electric quantity for three-phase three-wire current loss
CN104777395A (en) * 2014-01-15 2015-07-15 浙江万胜电力仪表有限公司 Method for detecting breaking of B-phase voltage circuit of three-phase three-wire power meter
CN109375145A (en) * 2018-09-26 2019-02-22 深圳供电局有限公司 No-voltage fault monitoring method and device based on phase three-wire three meter equipment
CN110988416A (en) * 2019-12-25 2020-04-10 重庆华虹仪表有限公司 Outdoor three-phase high-voltage electric energy meter
CN110988416B (en) * 2019-12-25 2022-03-15 重庆华虹仪表有限公司 Outdoor three-phase high-voltage electric energy meter
CN111766465A (en) * 2020-06-28 2020-10-13 广东电网有限责任公司 Intelligent accounting terminal for electric quantity compensation
CN112485752A (en) * 2020-11-25 2021-03-12 国网北京市电力公司 Intelligent electric energy meter compensation electric quantity calculation method, system, device and storage medium

Similar Documents

Publication Publication Date Title
CN101487855A (en) Method for automatically recording voltage-losing meter-leaking electric energy in three-phase three-wire electric energy measurement
CN201352235Y (en) Three-phase multifunctional electric energy meter
CN101860076B (en) Electric energy quality monitoring and analyzing system
CN205844484U (en) A kind of portable high-pressure breaker mechanic property tester
Zhao et al. A review on on-line voltage stability monitoring indices and methods based on local phasor measurement
CN101881790A (en) Intelligent electric power parameter tester
CN102628892A (en) Method for calculating voltage-loss unusual electrical energy measurement on line and electric energy meter
CN103091550B (en) Synchronous isolation sampling direct-current power meter of wide voltage and large current
CN102739085B (en) Inverter phase sequence detection phase locking device and phase locking and phase sequence identifying method
CN105870974A (en) Bidirectional measurement device of electric quantity parameters of distributed photovoltaic grid-connected system
CN102928778B (en) A kind of three-phase motor of nuclear power station starts overall characteristic test system
CN106124909A (en) A kind of electric energy detection metering system
CN203191430U (en) Multifunctional electric power parameter display instrument based on DSP
CN100427956C (en) Automatically voltage-loss missing electric-energy recording method and its multifunctional electric-energy gauge
CN109541520A (en) The split-phase calculating method of electric energy metering device failure wrong electric energy
CN209542825U (en) A kind of on-line monitoring system of CVT measurement error state
CN111721988A (en) Measuring instrument and method for electric quantity compensation of metering device
CN202494722U (en) Remote cost control three-phase intelligent electric energy meter
CN103105525A (en) Precision compensation method of current clamp, detection method and detection system using current clamp
CN102332829A (en) Zero drift digital suppression device for sampling practical value of AC-AC (Alternating-Current-Alternating-Current) frequency converter
CN101957401A (en) Power-distribution electric energy comprehensive measuring apparatus and measuring method thereof
CN101718814A (en) Method for measuring and calculating electrical quantities of safety and stability control device based on FPGA
CN114167168A (en) Time-sharing phase-splitting electric quantity recorder
CN205426981U (en) Nimble multi -functional instrument of external opening mutual -inductor of multiloop that disposes of single three -phase
CN208820757U (en) A kind of electric power signal synchronous sampling system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090722