CN101486327B - Design method of non-highway dump truck - Google Patents

Design method of non-highway dump truck Download PDF

Info

Publication number
CN101486327B
CN101486327B CN2008102325055A CN200810232505A CN101486327B CN 101486327 B CN101486327 B CN 101486327B CN 2008102325055 A CN2008102325055 A CN 2008102325055A CN 200810232505 A CN200810232505 A CN 200810232505A CN 101486327 B CN101486327 B CN 101486327B
Authority
CN
China
Prior art keywords
support
thrust rod
bolt
upper thrust
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008102325055A
Other languages
Chinese (zh)
Other versions
CN101486327A (en
Inventor
牟均发
薛晓强
范翠玲
张帆
林鹰
周万智
彭满平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Tonly Heavy Industries Co ltd
Original Assignee
Shaanxi Tonly Heavy Industries Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Tonly Heavy Industries Co ltd filed Critical Shaanxi Tonly Heavy Industries Co ltd
Priority to CN2008102325055A priority Critical patent/CN101486327B/en
Publication of CN101486327A publication Critical patent/CN101486327A/en
Application granted granted Critical
Publication of CN101486327B publication Critical patent/CN101486327B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Vehicle Body Suspensions (AREA)

Abstract

The invention relates to a design method of a dumper used under an off-highway working condition, which is characterized by comprising the following steps of: its driving system (1) is connected on main frame (8), steering system (2) is connected in the left place ahead outside of main frame (8), suspension system (3) is connected in main frame (8) below, braking system (4) are connected in the inside and the outside of main frame (8), the hydraulic cylinder of lifting system (5) passes through the hydro-cylinder connecting seat and connects on sub vehicle frame (9) front end and the front bezel of packing box (6), packing box (6) are connected on sub vehicle frame (9), sub vehicle frame (9) pass through support and connecting plate and connect on main frame (8), driver's cabin (7) are unilateral and arrange in main frame (8) left place ahead. The method defines the market of the off-highway vehicles, determines the technical indexes of the off-highway vehicles according to the determined market demand, completes the design of the overall layout according to the technical index requirement, and solves the vehicle ground system in the off-highway state.

Description

非公路用自卸车的设计方法 Design method of non-highway dump truck

技术领域technical field

本发明涉及一种非公路工况使用的自卸车,尤其是一种能在非公路工况情况下,在各种露天矿物料短途转场运输中发挥高运输效能的非公路用自卸车的设计方法。The invention relates to a dump truck used in off-highway working conditions, in particular to the design of a dump truck for off-highway that can exert high transportation efficiency in short-distance transfer transportation of various open-air mineral materials under off-highway working conditions method.

背景技术Background technique

目前,对于国内水利电力建设工地、大型露天矿等类似场所散装物料运输这一特定市场而言,施工现场相对封闭,工期较长,运输物料相对稳定、车辆使用强度大,更新快。工程范畴的矿用车比较适宜,但因其购置成本及营运成本高,工程承包单位为招标需要而购置少量用于资质认定,实际使用很少;汽车范畴的工程车,因公路法规及车辆标准限制,难以很好满足工程工况对车辆的特殊要求。它的不足点主要表现如下:At present, for the specific market of bulk material transportation in domestic water conservancy and electric power construction sites, large-scale open-pit mines and other similar places, the construction site is relatively closed, the construction period is long, the transport materials are relatively stable, and the vehicles are heavily used and updated quickly. Mining vehicles in the engineering category are more suitable, but because of their high purchase and operating costs, project contractors purchase a small amount for qualification certification for bidding needs, and they are rarely used in practice; engineering vehicles in the automotive category are subject to road regulations and vehicle standards It is difficult to meet the special requirements of engineering conditions for vehicles. Its shortcomings are mainly manifested as follows:

1、传统使用的非公路用车,还是基本按标准的工程用车设计有的只是局部进行了改进,没有根据工程实际的需要进行整体设计布局。1. Traditionally used off-highway vehicles are still basically designed according to the standard engineering vehicles, some of which are only partially improved, and the overall design layout is not carried out according to the actual needs of the project.

2、传统的工程用车后悬架中,使用骑马螺栓将多片钢板弹簧安装在平衡轴壳槽中,两端安装在桥上的板簧滑板座上,载重通过货箱将力传到副车架、车架、板簧到桥及轮胎,最终到地面。钢板弹簧在悬架结构中是主要的承载件和减震件,容易造成板簧易损。同时在工程车辆使用中,由于受国内热处理整体水平限制,要提高车辆的承载能力,多片钢板弹簧如果加厚太多,会出现热处理裂纹,同时会减少弹性,这样工程车行驶在不平路面使用,造成车辆颠簸严重,钢板弹簧易断,司机劳动强度增加。2. In the rear suspension of the traditional engineering vehicle, the saddle bolts are used to install multiple leaf springs in the balance shaft shell groove, and the two ends are installed on the leaf spring skateboard seat on the bridge. The load transmits the force to the auxiliary through the cargo box. Frame, frame, leaf springs to axles and tires, and finally to the ground. The leaf spring is the main bearing and shock absorber in the suspension structure, which is easy to cause the leaf spring to be vulnerable. At the same time, in the use of engineering vehicles, due to the overall level of heat treatment in China, it is necessary to improve the load-carrying capacity of the vehicle. If the multi-leaf springs are thickened too much, heat treatment cracks will appear and the elasticity will be reduced, so that engineering vehicles can be used on uneven roads. , resulting in serious vehicle bumps, leaf springs are easily broken, and the driver's labor intensity increases.

3、传统的工程用车后平衡悬架推力杆采用上推力杆为单杆纵向分布,下推力杆为双杆八字形分布。这种车辆在工地上使用时,由于工地路况差,车辆行驶路面松软硬实度差,表面道路阻力系数大,作业强度高超载严重,经常出现上推力杆断裂现象,长期造成驱动桥走位、中后桥传动轴损坏现象,这种悬架推力杆分布方式不能满足工地使用。3. The thrust rods of the rear balance suspension of traditional engineering vehicles adopt the vertical distribution of the upper thrust rod as a single rod, and the distribution of the lower thrust rod as a double rod in a figure-eight shape. When this kind of vehicle is used on the construction site, due to the poor road conditions on the construction site, the softness and hardness of the road surface on which the vehicle is driving, the large resistance coefficient of the surface road, the high working intensity and severe overloading, the upper thrust rod often breaks, which causes long-term drive axles to move, mid The drive shaft of the rear axle is damaged, and the distribution of the suspension thrust rods cannot meet the requirements of the construction site.

4、传统的平衡悬架都是单板簧结构的,即将板簧中间固定在一个平衡轴上。两端支撑在前后两个车桥上,再通过车桥上的轮胎将力传递到地面上。这种平衡悬架是能很好的将前后两个车轮上的力平均分配,因而被广泛的应用。但随着汽车载重量的不断加大,这种传统的单板簧平衡悬架不能很好的解决车辆空载和满载两种工作情况下的矛盾。即空载情况下,车辆的总质量比较小,板簧的刚度显得太大,驾驶员难以驾驶;而重载情况下车辆的总质量比较大,板簧的刚度显得太小。4. Traditional balance suspensions are all single-leaf spring structures, that is, the middle of the leaf spring is fixed on a balance shaft. The two ends are supported on the front and rear axles, and the force is transmitted to the ground through the tires on the axles. This kind of balanced suspension can well distribute the forces on the front and rear wheels evenly, so it is widely used. But along with the continuous increase of the load capacity of the vehicle, this traditional single-leaf spring balanced suspension cannot well solve the contradiction between the vehicle's no-load and full-load conditions. That is, under the condition of no load, the total mass of the vehicle is relatively small, and the stiffness of the leaf spring is too large, making it difficult for the driver to drive; while under the condition of heavy load, the total mass of the vehicle is relatively large, and the stiffness of the leaf spring is too small.

5、传统的工程用车后悬架中,驱动形式为6X4的工程车辆,后悬架多为钢板弹簧平衡悬架,板簧与车架之间用整体平衡轴连接来实现。存在的问题是噪音大,重量重,车辆的经济性能不好。5. In the rear suspension of traditional engineering vehicles, the driving form of engineering vehicles is 6X4. The rear suspension is mostly a leaf spring balanced suspension, and the connection between the leaf spring and the frame is realized by an integral balance shaft. There are problems in that the noise is large, the weight is heavy, and the economic performance of the vehicle is not good.

6、传统的工程用车油缸连接方式是将油缸两端的支架直接连接在货箱前板上,这样的连接方式有三个的缺点:一、是在货箱前板上钻12个φ16.5的孔,由于货箱前板重量较重,面积很大,加工起来很不方便,二、是由于货箱前板在货箱装载货物时容易变形,这样就直接导致油缸安装位置发生变化,使得油缸受到额外的附加力,减小油缸使用寿命;三、是由于螺栓直接与货箱前板相连,使得螺栓头外露在货箱里边,受货物冲击影响后变形或锈蚀后很难拆卸,不便于油缸维修更换。6. The traditional connection method of the oil cylinder for engineering vehicles is to directly connect the brackets at both ends of the oil cylinder to the front plate of the cargo box. This connection method has three disadvantages: 1. Drill 12 φ16.5 holes on the front plate of the cargo box. Holes, due to the heavy weight and large area of the front plate of the cargo box, it is very inconvenient to process. Second, because the front plate of the cargo box is easily deformed when the cargo box is loaded, this will directly lead to changes in the installation position of the oil cylinder, making the oil cylinder The service life of the oil cylinder is reduced due to the additional force; third, because the bolts are directly connected to the front plate of the cargo box, the bolt heads are exposed inside the cargo box, and it is difficult to disassemble after being deformed or corroded by the impact of the cargo, which is not convenient for the oil cylinder Repair and replace.

7、大量的工况调查显示,对于露天煤矿的剥离或金属矿的开采等工地,货箱装载的物料一次多达50多吨,货箱在举升卸料过程中,对货箱翻转铰座装置冲击力较大,如果强度不够或结构不合理,易造成翻转铰座开裂有或间隙增大,引起货箱左右窜动,因此会损坏举升油缸或引起翻车事故。7. A large number of working condition surveys show that for the stripping of open-pit coal mines or the mining of metal ores, the materials loaded in the container can reach more than 50 tons at a time. During the lifting and unloading process of the container, the hinge seat is turned over The impact force of the device is large. If the strength is not enough or the structure is unreasonable, it is easy to cause cracks in the turning hinge seat or the gap increases, causing the container to move left and right, thus damaging the lifting cylinder or causing a rollover accident.

8、大量的工况调查显示:对于露天煤矿的剥离或金属矿的开采等工地,装载物的密度大于1.8吨/方,物粒直径大于500毫米,装载设备为大斗容挖机、装载机或电铲,这种工况对于货箱的冲击力大且磨损严重,货箱容易开裂、变形,特别是底板容易变形、开裂,修复起来成本高且修复周期长,或无法修复而报废。8. A large number of working condition surveys show that: for open-pit coal mine stripping or metal ore mining and other construction sites, the density of the load is greater than 1.8 tons/square, and the particle diameter is greater than 500 mm. The loading equipment is a large bucket excavator and loader. Or electric shovel, this kind of working condition has a large impact on the cargo box and serious wear and tear, the cargo box is easy to crack and deform, especially the bottom plate is easy to deform and crack, the repair cost is high and the repair period is long, or it cannot be repaired and scrapped.

9、原有车辆在运行中,因为路面的坑凹不平引起车辆的震动、颠簸,如果货箱内装的货物较多,堆装的物料跳过货箱侧板掉到车辆行驶的路面上,如工程上用的碎石散落在路面,会对车辆轮胎造成破坏,减少了轮胎的使用寿命。9. When the original vehicle is in operation, the unevenness of the road surface causes the vehicle to vibrate and bump. If there are many goods in the container, the stacked materials will jump over the side plate of the container and fall onto the road on which the vehicle is driving. The gravel used in engineering is scattered on the road surface, which will cause damage to vehicle tires and reduce the service life of tires.

10、传统的工程用车后悬架中,板簧滑板座有两种方式,一种为框架式结构,可以在平衡悬架中、后桥跳动时自限位,但上平面为平面,同时下圆弧面没有油槽;另一种为镰刀式结构,上平面为平面,在中后桥跳动时不能自限位。由于在非公路工况,车辆行驶路面为工程便道,路况差,路面坑凹不平度大,车桥跳动量大而且频繁,这样传统的板簧滑板座两种结构使用在非公路工况时会出现板簧座上平面在车桥下跳自限位时与板簧线接触并受冲击,板簧受压力增大,同时下平面没有油槽,这样造成板簧最长的3片,下面与板簧滑板座磨损,上面受冲击,最长片在工地使用很容易断裂。10. In the rear suspension of traditional engineering vehicles, there are two types of leaf spring skateboard seats. One is a frame structure, which can be self-limiting in the balanced suspension and when the rear axle jumps, but the upper plane is a plane, and at the same time There is no oil groove on the lower arc surface; the other is a sickle structure, and the upper plane is a plane, which cannot be self-limiting when the middle and rear axles jump. Due to the off-highway working conditions, the road surface of the vehicle is an engineering sidewalk, the road condition is poor, the road surface is uneven, and the axle jumps are large and frequent, so the traditional two structures of the leaf spring skateboard seat are used in off-highway working conditions. When the upper plane of the leaf spring seat comes into contact with the leaf spring wire and is impacted when the axle jumps down to the self-limiting position, the pressure on the leaf spring increases, and there is no oil groove on the lower plane. The spring slide seat is worn, and the top is impacted, and the longest piece is easy to break when used on the construction site.

发明内容Contents of the invention

本发明的目的之一是:提供一种非公路用自卸车的设计方法,它定义了非公路用车的市场,依据确定的市场需求确定了非公路用车的技术指标,同时按技术指标要求完成了总体布局的设计,核心解决了非公路状态下的车辆地面系统。它针对以上各种不足,将各个部位不合理的结构进行了改进使它具有整体组合优势。One of the purposes of the present invention is to provide a design method for off-highway dump trucks, which defines the market for off-highway vehicles, determines the technical indicators of off-highway vehicles according to the determined market demand, and simultaneously presses the requirements of the technical indicators. The design of the overall layout is completed, and the core solution is the vehicle ground system in the off-highway state. It aims at the above various deficiencies, and improves the unreasonable structure of each part so that it has an overall combination advantage.

本发明的目的之二是:提供非公路用自卸车上的一种新的均衡梁悬架结构,它能提高承载能力,还能够充分缓和、拟制由于路面不平引起的振动和冲击。The second object of the present invention is to provide a new equalizer beam suspension structure on the non-highway dump truck, which can improve the bearing capacity, and can fully alleviate and suppress the vibration and impact caused by uneven road surface.

本发明的目的之三是:提供非公路用自卸车上的一种新悬架的结构,它不仅能够防止推力杆断裂、桥走位、传动轴损坏的现象,而且能提高非公路用车的横向稳定性及可靠性,提高整车的实用可靠性。The third object of the present invention is to provide a new suspension structure on off-highway dump trucks, which can not only prevent thrust rods from breaking, bridge displacement, and drive shaft damage, but also improve the performance of off-highway vehicles. Lateral stability and reliability improve the practical reliability of the vehicle.

本发明的目的之四是:提供非公路用自卸车上的一种平衡悬架装置,它空载时悬架刚度小,驾驶舒适性好;满载时悬架刚度大,承载能力强。从而满足了空满载两种不同工作情况。The fourth object of the present invention is to provide a balanced suspension device on an off-highway dump truck, which has low suspension stiffness when unloaded and good driving comfort; when fully loaded, the suspension stiffness is large and the bearing capacity is strong. Thereby satisfying two different working conditions of empty and full load.

本发明的目的之五是:提供非公路用自卸车上的一种橡胶后悬架,它减轻了悬架本身的重量,结实耐用,最大限度的减轻震动,减小噪音,提高通过性及平顺性。The fifth object of the present invention is to provide a rubber rear suspension on a non-highway dump truck, which reduces the weight of the suspension itself, is durable, reduces vibration to the greatest extent, reduces noise, and improves passability and smoothness. sex.

本发明的目的之六是:提供非公路用自卸车上的一种液压油缸连接座,它安装拆卸方便,使用寿命较长,便于维修。The sixth object of the present invention is to provide a hydraulic oil cylinder connecting seat on a non-highway dump truck, which is easy to install and disassemble, has a long service life and is easy to maintain.

本发明的目的之七是:提供非公路用自卸车上的一种矿用自卸车货箱翻转铰座装置,这种矿用自卸车货箱翻转铰座装置终身免维修,货箱在举升卸料过程中翻转铰座无窜动,货箱在举升卸料过程中安全可靠,提高了工作效率且成本低。Seventh object of the present invention is to provide a mining dump truck cargo box turning hinge seat device on a non-highway dump truck. This mining dump truck cargo box turning hinge seat device is maintenance-free for life, and the cargo box can During the unloading process, there is no movement of the turning hinge seat, and the cargo box is safe and reliable during the lifting and unloading process, which improves the work efficiency and reduces the cost.

本发明的目的之八是:提供非公路用自卸车上的一种双层底货箱,这种双层底货箱修复方便、周期短,提高了工作效率且成本低。The eighth object of the present invention is to provide a double-bottom container on a non-highway dump truck, which is easy to repair, has a short cycle, improves work efficiency and is low in cost.

本发明的目的之九是:提供非公路用自卸车上的一种轮胎保护装置,它可以减少大量物料散落在自卸车正常行驶的路面上,从而减少因为路面散落的碎石对车辆轮胎的破坏,大大提高了轮胎的使用寿命。Ninth object of the present invention is to provide a tire protection device on non-highway dump trucks, which can reduce the amount of material scattered on the road where the dump truck is normally running, thereby reducing the damage to vehicle tires due to the scattered gravel on the road surface , greatly improving the service life of the tire.

本发明的目的之十是:提供非公路用自卸车上的一种新式板簧滑板座,它克服在用工程车辆板簧滑板座结构不合理造成的最长片板簧容易断裂的问题,不紧在非公路工况下能使板簧最长的3片上面减少冲击,减少压力及下面耐磨,从而延长板簧寿命。The tenth purpose of the present invention is: provide a kind of novel leaf spring slide seat on the non-highway dump truck, it overcomes the problem that the longest leaf spring is easy to break caused by the unreasonable structure of the leaf spring slide seat of the engineering vehicle in use, and does not Under off-highway working conditions, it can reduce the impact on the top of the longest 3 pieces of the leaf spring, reduce the pressure and wear resistance of the bottom, thereby prolonging the life of the leaf spring.

本发明的技术方案是:设计一种非公路用自卸车的设计方法,它至少包括车体、车架、动力系统、传动系统、车箱、轮胎、制动系统,其特征是:它的动力系统连接在主车架上,转向系统连接在主车架的左前方外侧,悬架系统连接在主车架下方,制动系统连接在主车架的内及外侧,举升系统的液压油缸通过油缸连接座连接在副车架前端上面及货箱的前板上,货箱连接在副车架上面,副车架通过支架及连接板连接在主车架上面,驾驶室是单边布置在主车架左前方。The technical scheme of the present invention is: design a kind of design method of non-highway dump truck, it at least comprises car body, vehicle frame, power system, transmission system, carriage, tire, braking system, is characterized in that: its power system Connected to the main frame, the steering system is connected to the left front outside of the main frame, the suspension system is connected to the bottom of the main frame, the braking system is connected to the inside and outside of the main frame, and the hydraulic cylinder of the lifting system passes through the cylinder The connecting seat is connected to the front end of the sub-frame and the front plate of the cargo box. The cargo box is connected to the sub-frame. The sub-frame is connected to the main frame through brackets and connecting plates. The cab is arranged on one side of the main vehicle. rack left front.

所述的货箱及副车架宽度选择在2800~3800mm之间;它的驾驶室宽度选择在1000mm~1500mm之间,长度选择在1800mm—2400mm,高度控制在1480mm—50mm之间;它驱动桥总速比应在8~13之间,最大允许输入扭矩应不小于15000Nm,轮距应控制在2000~3000mm;最小离地间隙不小于350mm;主车架采用槽型端面螺栓连接,主车架宽度选择在1000mm—1800mm之间;转向轴轴荷大于8吨,转向阻力矩大于6200Nm。The width of the cargo box and sub-frame is selected between 2800-3800mm; the width of its cab is selected between 1000mm-1500mm, the length is selected between 1800mm-2400mm, and the height is controlled between 1480mm-50mm; it drives the axle The total speed ratio should be between 8 and 13, the maximum allowable input torque should not be less than 15000Nm, the wheelbase should be controlled at 2000-3000mm; the minimum ground clearance should be not less than 350mm; The width is selected between 1000mm-1800mm; the axle load of the steering shaft is greater than 8 tons, and the steering resistance torque is greater than 6200Nm.

所述的悬架系统是一种均衡梁悬架结构,它至少包括主簧、连接件、推力杆、均衡梁、各种支架、后桥、轴、中桥、轴承、车架、四横梁,它的均衡梁呈开口向上的下凹型;它的主簧是橡胶主簧;上推力杆是V字形结构。The suspension system is an equalizing beam suspension structure, which at least includes main springs, connectors, thrust rods, equalizing beams, various supports, rear axles, axles, middle axles, bearings, vehicle frames, four beams, Its equalizing beam is concave with an opening upward; its main spring is a rubber main spring; the upper thrust rod is a V-shaped structure.

所述的悬架系统是一种悬架的结构,它至少包括上推力杆、上推力杆梁端支架、上推力杆桥端支架、下推力杆桥端支架、支架、下推力杆、中桥、四横梁、后桥及连接件,上推力杆和下推力杆,中桥与支架、四横梁通过上推力杆粱端支架及上推力杆支架和下推力杆支架的连接在四横梁的前端与后端形成两个并排的四连杆机构;四根上推力杆通过分别连接上推力杆梁端支架、上推力杆桥端支架、四横梁、主车架上、中桥和后桥上呈八字形分布;四根下推力杆通过分别连接在支架、下推力杆桥端支架,四横梁,中桥和后桥上也呈八字形分布,四根上推力杆的八字分布与四根下推力杆的八字分布的八字形开口方向相反。The suspension system is a suspension structure, which at least includes an upper thrust rod, an upper thrust rod beam end bracket, an upper thrust rod bridge end bracket, a lower thrust rod bridge end bracket, a bracket, a lower thrust rod, a middle bridge , four crossbeams, rear axle and connectors, upper thrust rod and lower thrust rod, middle bridge and support, four crossbeams are connected at the front end of four crossbeams and The rear end forms two side-by-side four-bar linkages; the four upper thrust rods are respectively connected to the beam end bracket of the upper thrust rod, the bridge end bracket of the upper thrust rod, the four beams, the main frame, the middle bridge and the rear bridge in a figure-eight shape. Distribution; the four lower thrust rods are respectively connected to the bracket, the lower thrust rod bridge end bracket, the four beams, the middle bridge and the rear bridge are also distributed in a figure-of-eight shape, and the distribution of the four upper thrust rods is similar to that of the four lower thrust rods. The direction of the distribution of figure-eight openings is opposite.

所述的悬架系统是平衡悬架装置,平衡悬架板簧采用主板簧和副板簧连接构成,以便增加承载能力;平衡轴壳和平衡轴通过轴承联接起来,平衡轴壳是可以转动的;平衡悬架主板簧和平衡悬架副板簧是通过骑马螺栓分别固定在平衡轴壳的上下两个槽内;上板簧滑板座和下板簧滑板座分别固定在前后两个桥管的上面和下面,平衡悬架主板簧两端分别插在两个上板簧滑板座的空腔内;平衡悬架副板簧两端分别插在两个下板簧滑板座的空腔内。The suspension system is a balanced suspension device. The balanced suspension leaf spring is composed of a main plate spring and a secondary leaf spring to increase the load-carrying capacity; the balance shaft shell and the balance shaft are connected by bearings, and the balance shaft shell is rotatable. The main plate spring of the balance suspension and the auxiliary leaf spring of the balance suspension are respectively fixed in the upper and lower grooves of the balance shaft shell through saddle bolts; Above and below, the two ends of the main board spring of the balance suspension are respectively inserted in the cavities of the two upper leaf spring slide seats; the two ends of the balance suspension auxiliary leaf spring are respectively inserted in the cavities of the two lower leaf spring slide seats.

所述的悬架系统是一种橡胶后悬架,它至少包括支架、弹性圆柱销、轴销组件、上推力杆支架、螺栓、中桥上推力杆、上推力杆梁端支架、四横梁、后桥上推力杆、螺栓、后桥、中桥、减震器、限位块支架、主簧及车架,它的弹性元件是主簧和副簧,主簧和副簧是橡胶主簧和橡胶副簧,它的减震器两端分别连接在支架和均衡梁总成上;四件橡胶主簧,左、右各两件斜面上端通过螺栓分别连接在左、右支架上,斜面下端通过螺栓连接在均衡梁总成斜面上端;均衡梁总成其中一件通过左支架、弹性圆柱销、销轴组件连接在中桥和后桥上,同样另一件均衡梁总成通过右支架、弹性圆柱销、销轴组件连接在中桥和后桥上。The suspension system is a rubber rear suspension, which at least includes brackets, elastic cylindrical pins, pivot pin assemblies, upper thrust rod brackets, bolts, upper thrust rods on the middle bridge, upper thrust rod beam end brackets, four beams, Thrust rods, bolts, rear axles, middle axles, shock absorbers, limit block brackets, main springs and vehicle frames on the rear axle. Its elastic elements are main springs and auxiliary springs. The main springs and auxiliary springs are rubber main springs and Rubber auxiliary spring, the two ends of its shock absorber are respectively connected to the bracket and the equalizing beam assembly; four pieces of rubber main spring, the upper ends of the left and right two inclined parts are respectively connected to the left and right brackets by bolts, and the lower ends of the inclined surfaces are connected by bolts. Bolts are connected to the upper slope of the equalizing beam assembly; one of the equalizing beam assemblies is connected to the middle and rear axles through the left bracket, elastic cylindrical pin and pin shaft assembly, and the other equalizing beam assembly is also connected to the right bracket, elastic The cylindrical pin and pin shaft assembly are connected on the middle axle and the rear axle.

所述的举升系统的液压油缸上连接有液压油缸连接座,油缸支架通过螺栓连接在油缸支座上,油缸支架的上端固定有限位块,两端口朝外的U型槽油缸支座固定在由两前板纵梁和两前板横梁连接构成的两对边平行的框架上,框架固定在货箱前板上,油缸支架与油缸连接。The hydraulic cylinder of the lifting system is connected with a hydraulic cylinder connecting seat, the cylinder support is connected to the cylinder support by bolts, the upper end of the cylinder support is fixed with a limit block, and the U-shaped groove cylinder support with two ports facing outward is fixed on the On a frame with two parallel sides formed by connecting two front plate longitudinal beams and two front plate cross beams, the frame is fixed on the front plate of the cargo box, and the oil cylinder bracket is connected with the oil cylinder.

所述的货箱底部连接有自卸车货箱翻转铰座装置,盖板通过螺栓和弹垫固定在铰座上,油杯固定在铰座上;铰轴穿过铰座穿入管子,管子固定在副车架上,销轴穿过管子和铰轴,开口销穿过销轴使销轴固定。The bottom of the cargo box is connected with a tipping truck container turning hinge seat device, the cover plate is fixed on the hinge seat by bolts and spring washers, and the oil cup is fixed on the hinge seat; the hinge shaft passes through the hinge seat and penetrates into the pipe, and the pipe is fixed On the subframe, pins pass through the tubes and hinges, and cotter pins pass through the pins to hold the pins in place.

所述的货箱它包括侧板和底板,货箱底板是双层底板,它由下底板、加强筋和上底板固定连接构成;它的加强筋与连接在货箱两侧板上的横梁位置相对应,以便加强筋通过下底板叠加在横梁上。The cargo box includes side panels and bottom panels, and the cargo box bottom panel is a double-layer bottom panel, which is composed of a lower bottom panel, a reinforcing rib and an upper bottom panel fixedly connected; Correspondingly, so that the ribs are superimposed on the beam through the lower base plate.

所述的货箱后端底部连接有一种轮胎保护装置,导向板座体是一直角两面体,两直角面构成的斜面是通过固紧螺栓连接的导向板;两个导向板座体斜面向外分别固定在货箱侧板外底部两侧的纵梁上。A tire protection device is connected to the bottom of the rear end of the cargo box. The guide plate seat body is a right-angled dihedron, and the inclined plane formed by two right-angled surfaces is a guide plate connected by fastening bolts; the inclined surfaces of the two guide plate seat bodies are outward They are respectively fixed on the longitudinal beams on both sides of the outer bottom of the side plate of the cargo box.

所述的悬架系统主要包括前悬架系统与后悬架系统,后悬架系统有一种板簧滑板座,它的座体是框架式结构,座体上平面的下表面两端是向下凸起的下圆弧面,中间是平面;座体下平面的上表面是向上凸起的上圆弧面;座体下平面的上圆弧面上有通油槽和油道,油道和通油槽连通;座体上平面的下表面与下平面的上表面之间的最大空间距离减去板簧总厚度所留空隙距离是18mm。The suspension system mainly includes a front suspension system and a rear suspension system. The rear suspension system has a leaf spring skateboard seat. Its seat body is a frame structure, and the two ends of the lower surface of the upper plane of the seat body are downward The raised lower arc surface has a plane in the middle; the upper surface of the lower plane of the seat body is an upwardly raised upper arc surface; the upper arc surface of the lower plane of the seat body has oil grooves and oil passages, and the oil passage and passage The oil groove is connected; the maximum space distance between the lower surface of the upper plane of the seat body and the upper surface of the lower plane minus the gap distance left by the total thickness of the leaf spring is 18mm.

本发明的特点如下:Features of the present invention are as follows:

1、这种非公路用自卸车由于它是针对已知技术的各种不足,将各个部位不合理的结构进行了改进,所以它具有整体组合优势及各个部位的优势。它可定义非公路用车的市场,依据确定的市场需求确定了非公路用车的技术指标,同时按技术指标要求完成了总体布局的设计,核心解决了非公路状态下的车辆地面系统。1. This non-highway dump truck has the advantages of the overall combination and the advantages of each part because it aims at various deficiencies of the known technology and improves the unreasonable structure of each part. It can define the market of off-highway vehicles, determine the technical indicators of off-highway vehicles according to the determined market demand, and complete the design of the overall layout according to the requirements of the technical indicators, and solve the core solution of the vehicle ground system in the off-highway state.

2、这种非公路用自卸车它通过均衡梁设计和橡胶主簧连接后的组合使用,同时上推力杆使用单V杆,下推杆采用直杆纵向水平平行布置,形成的均衡梁悬架结构,除能够提高承载能力外,还能够充分缓和、拟制由于路面不平引起的振动和冲击,保证驾驶员乘座舒适和所运货物完好;除传递车辆垂直力以外,还传递其它各方面的力和力矩,并保证车轮和车架之间有确定的运动关系,使整车具有良好的驾驶性能。其发明特点是不使用传统的钢板弹簧作为悬架的承载及减震零部件,悬架中主要承载和减震、传力零部件是均衡梁、橡胶主簧以及推力杆。此悬架系统中主要承载和减震、传力零部件是均衡梁及橡胶主簧。2. This non-highway dump truck is used in combination with the design of the balance beam and the connection of the rubber main spring. At the same time, the upper thrust rod uses a single V rod, and the lower push rod adopts a straight rod vertically and horizontally arranged in parallel to form a balanced beam suspension. The structure, in addition to improving the load-carrying capacity, can also fully alleviate and suppress the vibration and impact caused by uneven road surfaces, ensuring the driver's comfort and the cargo being transported in good condition; in addition to transmitting the vertical force of the vehicle, it also transmits other aspects of the load. Force and moment, and ensure that there is a definite kinematic relationship between the wheel and the frame, so that the vehicle has good driving performance. Its invention is characterized in that traditional leaf springs are not used as the load-bearing and shock-absorbing parts of the suspension. The main load-bearing, shock-absorbing and force-transmitting parts in the suspension are equalizing beams, rubber main springs and thrust rods. The main load-bearing, shock-absorbing, and force-transmitting components in this suspension system are equalizer beams and rubber main springs.

3、这种非公路用自卸车为了克服在用非公路车辆平衡悬架的推力杆分布不适合工地使用,造成推力杆断裂后桥走位、传动轴断裂的现象,在传统的平衡悬架基础上,在四横梁的前端和后端各增加一个上推力杆,使得四横梁前端有两个推力杆形成八字形分布,后端有两个推力杆,形成八字形分布,四横梁端为八字形开口方向,通过左右车架的两个梁端支架,桥上的两个支架将上推力杆固定,下推力杆四个也是八字形分布,但八字形开口方向与上推力杆分布的八字形开口方向相反,下推力杆经过两个平衡轴支架及四个桥端支架固定,这样的分布方式可以增加整车的横向稳定性和行驶可靠性。同时增加了车辆推力杆承受的纵向力及横向力,加强横向导向性。3. In order to overcome the problem that the distribution of the thrust rods of the balance suspension of non-highway vehicles is not suitable for use on construction sites, resulting in the phenomenon that the thrust rod breaks and the rear axle moves and the drive shaft breaks, this non-highway dump truck is based on the traditional balance suspension. Above, add an upper thrust rod to the front end and the rear end of the four-beam, so that there are two thrust rods at the front end of the four-beam to form a figure-eight distribution, and two thrust rods at the rear end to form a figure-eight distribution, and the end of the four-beam is a figure-eight distribution In the opening direction, the upper thrust rod is fixed by the two beam end brackets on the left and right frame, and the two brackets on the bridge. In the opposite direction, the lower thrust rod is fixed through two balance shaft brackets and four bridge end brackets. This distribution method can increase the lateral stability and driving reliability of the vehicle. At the same time, the longitudinal force and lateral force borne by the thrust rod of the vehicle are increased, and the lateral guidance is strengthened.

4、这种非公路用自卸车将传统平衡悬架的单板簧结构改为双板簧结构,在车辆空载情况下,只有主板簧起作用;在车辆满载情况下主板簧和副板簧同时起用。这样既解决了空载板簧刚度太大的问题,又解决了满载情况下板簧刚度太小的问题。这种平衡悬架装置,它空载时悬架刚度小,驾驶舒适性好;满载时悬架刚度大,承载能力强。从而满足了空满载两种不同工作情况。4. This non-highway dump truck changes the single leaf spring structure of the traditional balanced suspension into a double leaf spring structure. When the vehicle is unloaded, only the main plate spring works; when the vehicle is fully loaded, the main plate spring and the secondary leaf spring Use at the same time. This not only solves the problem of too much stiffness of the no-load leaf spring, but also solves the problem of too small stiffness of the leaf spring under full load. This kind of balanced suspension device has small suspension rigidity when it is unloaded, and good driving comfort; when it is fully loaded, the suspension rigidity is large and the bearing capacity is strong. Thereby satisfying two different working conditions of empty and full load.

5、这种非公路用自卸车它取消了传统平衡悬架中的平衡轴,弹性元件不采用钢板弹簧,采用四件结实耐用的橡胶主簧,既橡胶中硫化有钢板,用于提高刚度,它分别倾斜安装在两个均衡梁马鞍型的两侧,使得橡胶主簧既承受垂直力,又承受横向力,两个橡胶副簧在空载时与均衡梁马鞍型下端平面不接触,满载时接触参与承载,这样实现了空载、满载时加速度值比较接近,车辆行驶在非公路工况时,空载与满载频率接近,更为平顺。5. This non-highway dump truck cancels the balance shaft in the traditional balance suspension. The elastic element does not use leaf springs, but four durable rubber main springs. There are steel plates vulcanized in the rubber to improve rigidity. They are installed obliquely on both sides of the two balance beam saddles, so that the rubber main spring bears both vertical force and lateral force. The contact participates in the bearing, so that the acceleration values at no-load and full-load are relatively close, and when the vehicle is driving in off-road conditions, the frequency of no-load and full-load is close to each other, making it smoother.

6、这种非公路用自卸车安装了油缸连接座,所以它具有如下特点:a、由于在油缸支座体积小、重量轻,在其上钻孔比在货箱前板上钻孔加工工艺性要好;b、由于两端口朝外的U型槽油缸支座6固定在由两前板纵梁4和两前板横梁5连接构成的两对边平行的框架上,框架固定在货箱前板3上,即油缸支座上下有两道横筋,这两道横筋与货箱前板上的两道纵筋相连,形成了一种框架结构,油缸连接处不会因货箱前板的变型而受影响;c.油缸支座的形状设计成一种两端口朝外的U型,很方便连接螺栓的安装和拆卸;d.油缸支架上的两块限位块,用来承受油缸举升及下降时主要的剪切力,减轻连接螺栓所受的剪力。E.由于连接螺栓在货箱前板的外边,不易受力变型和生锈,便于拆卸。6. This non-highway dump truck is equipped with an oil cylinder connecting seat, so it has the following characteristics: a. Due to the small size and light weight of the oil cylinder support, the drilling process on it is better than the drilling process on the front plate of the cargo box b. Since the U-shaped groove oil cylinder support 6 with two ports facing outwards is fixed on the two opposite sides parallel frame formed by the connection of two front plate longitudinal beams 4 and two front plate cross beams 5, the frame is fixed in front of the cargo box There are two horizontal ribs on plate 3, that is, the upper and lower sides of the oil cylinder support. These two horizontal ribs are connected with the two longitudinal ribs on the front plate of the cargo box to form a frame structure. The connection of the oil cylinder will not be affected by the deformation of the front plate of the cargo box. c. The shape of the oil cylinder support is designed as a U shape with two ports facing outward, which is very convenient for the installation and removal of the connecting bolts; d. The two limit blocks on the oil cylinder bracket are used to withstand the lifting of the oil cylinder and The main shear force during the descent reduces the shear force on the connecting bolts. E. Since the connecting bolts are outside the front plate of the cargo box, it is not easy to be deformed and rusted by force, and it is easy to disassemble.

7、这种非公路用自卸车由于货箱翻转铰轴穿过货箱翻转铰座,穿入副车架管中,并用开口销穿过销轴使销轴7固定。它结构简单,利于加工、利于组装和焊接以便实现免维护。7. This off-highway dump truck passes through the hinge seat of the cargo box turnover because the cargo box overturn hinge shaft passes through the subframe pipe, and passes the pin shaft with the cotter pin to fix the pin shaft 7. It has a simple structure, which is convenient for processing, assembly and welding so as to realize maintenance-free.

8、这种非公路用自卸车由于在货箱主底板上的横向加强筋和纵梁的位置拼焊副底板的横向加强筋和纵梁,再在其上铺焊一定厚度的钢板,所以它承载量大,结实耐用,结构简单,利于加工、利于拼装和焊接。8. This kind of non-highway dump truck is welded with the lateral reinforcement ribs and longitudinal beams of the sub-floor at the positions of the transverse reinforcement ribs and longitudinal beams on the main floor of the container, and then laying and welding steel plates of a certain thickness on them, so it Large load capacity, strong and durable, simple structure, easy to process, easy to assemble and weld.

9、这种非公路用自卸车由于在车厢上增加了轮胎保护装置,它可以减少大量物料散落在自卸车正常行的驶路面上,从而减少因为路面散落的碎石对车辆轮胎的破坏,大大提高了轮胎的使用寿命。9. This non-highway dump truck is equipped with a tire protection device on the compartment, which can reduce a large amount of materials scattered on the normal driving road of the dump truck, thereby reducing the damage to the vehicle tires caused by the scattered gravel on the road surface, greatly Increased tire life.

10、这种非公路用自卸车它的板簧滑板座体为框架式结构,座体上平面的下表面两端是向下凸起的弧形面,中间是平面;座体下平面的上表面是向上凸起的圆弧面9。座体下平面的上圆弧面上有通油道2和油槽3,通油道2和油槽3连通,以便将润滑脂注入通油道2导入到油槽3中对板簧8进行润滑,减少磨损,提高板簧8寿命。板簧滑板座上平面加两段圆弧面后,在非公路工况车桥跳动时,板簧最长的3片上面受压力减小,冲击力减小,延长板簧寿命两倍以上。10. The leaf spring skateboard seat body of this non-highway dump truck is a frame structure. The two ends of the lower surface of the upper plane of the seat body are arc-shaped surfaces that protrude downward, and the middle is a plane; the upper plane of the lower plane of the seat body The surface is an upwardly convex arc surface 9 . There are oil channel 2 and oil groove 3 on the upper circular arc surface of the lower plane of the seat body, and the oil channel 2 and oil groove 3 are connected so that grease can be injected into the oil channel 2 and introduced into the oil groove 3 to lubricate the leaf spring 8, reducing Wear and tear, improve leaf spring 8 life-spans. After adding two sections of arc surface to the upper plane of the leaf spring skateboard seat, when the axle jumps in off-highway conditions, the pressure on the three longest pieces of the leaf spring is reduced, the impact force is reduced, and the life of the leaf spring is extended by more than two times.

附图说明Description of drawings

下面结合实施例附图对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings of the embodiments.

图1是实施例整体结构示意图;Fig. 1 is the overall structural representation of embodiment;

图2是实施例后视图;Fig. 2 is the rear view of embodiment;

图2-1是实施例2的均衡梁悬架结构主视图;Fig. 2-1 is the front view of the equalizing beam suspension structure of embodiment 2;

图2-2是实施例2的均衡梁悬架结构俯视图;Fig. 2-2 is the plan view of the equalizing beam suspension structure of embodiment 2;

图2-3是实施例2的均衡梁外形示意图;Fig. 2-3 is the outline schematic diagram of the equalizing beam of embodiment 2;

图3-1是实施例3的悬架推力杆分布方式主视图;Figure 3-1 is a front view of the distribution mode of the suspension thrust rods in Embodiment 3;

图3-2是实施例3的悬架推力杆分布方式俯视图;Fig. 3-2 is a top view of the distribution mode of the suspension thrust rods in Embodiment 3;

图4-1是实施例4的双板簧结构在空载情况下的结构和工作示意图;Fig. 4-1 is the structure and working schematic diagram of the double leaf spring structure of embodiment 4 under no-load condition;

图4-2是实施例4的双板簧结构在重载情况下的结构和工作示意图;Fig. 4-2 is the structure and working schematic diagram of the double leaf spring structure of embodiment 4 under the heavy load situation;

图5-1是实施例5的橡胶悬架主视图;Fig. 5-1 is the front view of the rubber suspension of embodiment 5;

图5-2是实施例5的橡胶悬架俯视图;Fig. 5-2 is the top view of the rubber suspension of embodiment 5;

图5-3是实施例5的橡胶悬架左视图;Fig. 5-3 is the left side view of the rubber suspension of embodiment 5;

图6-1是实施例6的液压油缸连接座结构示意图;Fig. 6-1 is a schematic diagram of the structure of the hydraulic cylinder connecting seat in embodiment 6;

图6-2是图6-1取掉油缸和油缸支座后的B向视图;Figure 6-2 is the B-direction view of Figure 6-1 after removing the oil cylinder and oil cylinder support;

图6-3是图6-2中的A-A剖视图;Figure 6-3 is a sectional view of A-A in Figure 6-2;

图7-1是实施例7的铰座结构示意图;Fig. 7-1 is the schematic diagram of the hinge seat structure of embodiment 7;

图7-2是图7-1的A-A剖视图;Figure 7-2 is a sectional view of A-A of Figure 7-1;

图8-1是实施例8的货箱结构的俯视图;Fig. 8-1 is the top view of the container structure of embodiment 8;

图8-2是图8-1A-A剖视图;Figure 8-2 is a sectional view of Figure 8-1A-A;

图8-3是图8-1B-B剖视图;Figure 8-3 is a sectional view of Figure 8-1B-B;

图8-4是图8-1C-C剖视图;Figure 8-4 is a sectional view of Figure 8-1C-C;

图9-1实施例9的轮胎保护装置结构示意图;Figure 9-1 is a schematic structural view of the tire protection device of Embodiment 9;

图9-2是图9-1的K部放大图;Figure 9-2 is an enlarged view of part K of Figure 9-1;

图10-1是实施例10的板簧滑板座结构主视图;Fig. 10-1 is a front view of the structure of the leaf spring slider seat of Embodiment 10;

图10-2是实施例10的板簧滑板座结构左视结构图;Fig. 10-2 is a left view structure diagram of the leaf spring slider seat structure in Embodiment 10;

图10-3是图10-1的A-A剖视图;Figure 10-3 is a sectional view of A-A of Figure 10-1;

图10-4是实施例10的板簧滑板座在车桥上跳时的位置图;Fig. 10-4 is the position diagram when the leaf spring skateboard seat of embodiment 10 jumps on the axle;

图10-5是实施例10的板簧滑板座在车桥下跳时的位置图。Fig. 10-5 is the position diagram when the leaf spring skateboard seat of embodiment 10 jumps under the axle.

图中:1、动力系统;2、转向系统;3、悬架系统;4、制动系统;5、举升系统;6、货箱;7、驾驶室;8、主车架;9、副车架;In the figure: 1. Power system; 2. Steering system; 3. Suspension system; 4. Braking system; 5. Lifting system; 6. Cargo box; 7. Cab; 8. Main frame; frame;

2-1、橡胶主簧;2-2、螺栓;2-3、V形上推力杆;2-4、均衡梁;2-5、上推力杆梁端支架;2-6、螺栓;2-7、螺栓;2-8、上推力杆桥端支架;2-9、螺栓;2-10、后桥;2-11、螺栓;2-12、下推力杆支架;2-13、下推力杆;2-14、平衡轴支架;2-15、螺栓;2-16、平衡轴;2-17、销子;2-18、中桥;2-19、橡胶轴承;2-20、橡胶轴承盖;2-21、螺栓;2-22、螺栓;2-23、车架;2-24、四横梁;2-1, rubber main spring; 2-2, bolts; 2-3, V-shaped upper thrust rod; 2-4, equalizing beam; 2-5, upper thrust rod beam end bracket; 2-6, bolts; 2- 7, bolt; 2-8, upper thrust rod bridge end bracket; 2-9, bolt; 2-10, rear axle; 2-11, bolt; 2-12, lower thrust rod bracket; 2-13, lower thrust rod ;2-14, balance shaft bracket; 2-15, bolt; 2-16, balance shaft; 2-17, pin; 2-18, middle bridge; 2-19, rubber bearing; 2-20, rubber bearing cover ; 2-21, bolts; 2-22, bolts; 2-23, frame; 2-24, four beams;

3-1、上推力杆;3-2、上推力杆梁端支架;3-3、螺栓;3-4、上推力杆桥端支架;3-5、螺栓;3-6、销子;3-7、螺栓;3-8、销子;3-9、下推力杆桥端支架;3-10、螺栓;3-11、支架;3-12、螺栓;3-13、下推力杆;3-14、中桥;3-15、四横梁;3-16、后桥;3-17、螺栓;3-1, upper thrust rod; 3-2, upper thrust rod beam end bracket; 3-3, bolt; 3-4, upper thrust rod bridge end bracket; 3-5, bolt; 3-6, pin; 3 -7, bolt; 3-8, pin; 3-9, lower thrust rod bridge end bracket; 3-10, bolt; 3-11, bracket; 3-12, bolt; 3-13, lower thrust rod; 3 -14, middle bridge; 3-15, four beams; 3-16, rear bridge; 3-17, bolts;

4-1、平衡悬架主板簧;4-2、平衡悬架副板簧;4-3、平衡轴;4-4、平衡轴壳;4-5、骑马螺栓;4-6、上板簧滑板座;4-7、下板簧滑板座;4-1. Balance suspension main plate spring; 4-2. Balance suspension auxiliary leaf spring; 4-3. Balance shaft; 4-4. Balance shaft shell; 4-5. Riding bolt; 4-6. Upper leaf spring Skateboard seat; 4-7, lower plate spring skateboard seat;

5-1、左支架;5-2、弹性圆柱销;5-3、轴销组件;5-4、上推力杆支架;5-5、螺栓;5-6、中桥上推力杆;5-7、右支架;5-8、上推力杆梁端支架;5-9、四横梁;5-10、后桥上推力杆;5-11、螺栓;5-12、后桥;5-13、中桥;5-14、均衡梁总成;5-15、减震器;5-16、螺栓;5-17、橡胶限位块;5-18、螺栓;5-19、限位块支架;5-20、螺栓;5-21、螺栓;5-22、橡胶主簧;5-23、橡胶副簧;5-24、螺栓;5-25、螺栓;5-26、支架;5-27、车架;5-1. Left bracket; 5-2. Elastic cylindrical pin; 5-3. Shaft pin assembly; 5-4. Upper thrust rod bracket; 5-5. Bolt; 5-6. Upper thrust rod of the middle bridge; 5- 7, right bracket; 5-8, beam end bracket of upper thrust rod; 5-9, four beams; 5-10, upper thrust rod of rear axle; 5-11, bolt; 5-12, rear axle; 5-13, Intermediate bridge; 5-14, equalizing beam assembly; 5-15, shock absorber; 5-16, bolt; 5-17, rubber limit block; 5-18, bolt; 5-19, limit block bracket; 5-20, bolt; 5-21, bolt; 5-22, rubber main spring; 5-23, rubber secondary spring; 5-24, bolt; 5-25, bolt; 5-26, bracket; 5-27, frame;

6-1、油缸;6-2、油缸支架;6-3、货箱前板;6-4、前板纵梁;6-5、前板横梁;6-6、油缸支座;6-7、限位块;6-1. Oil cylinder; 6-2. Oil cylinder support; 6-3. Front panel of cargo box; 6-4. Front panel longitudinal beam; 6-5. Front panel beam; 6-6. Oil cylinder support; 6-7 , limit block;

7-1:盖板;7-2:螺栓;7-3:弹垫;7-4:油杯;7-5:铰座;7-6:管子;7-7:销轴;7-8:开口销;7-9:铰轴;7-1: cover plate; 7-2: bolt; 7-3: spring washer; 7-4: oil cup; 7-5: hinge seat; 7-6: pipe; 7-7: pin shaft; 7-8 : cotter pin; 7-9: hinge shaft;

8-1、加强筋;8-2、上底板;8-3、下底板;8-4、横梁;8-5、纵梁;8-1, stiffener; 8-2, upper floor; 8-3, lower floor; 8-4, beam; 8-5, longitudinal beam;

9-1、货箱;9-2、货箱侧板上沿;9-3、物料;9-4、货箱侧板外侧下纵梁;9-5、导向板;9-6、导向板座体;9-7、固紧螺栓;9-8、轮胎;9-9、行驶路面;9-1, cargo box; 9-2, edge of cargo box side panel; 9-3, material; 9-4, outer lower longitudinal beam of cargo box side panel; 9-5, guide plate; 9-6, guide plate Seat body; 9-7, fastening bolt; 9-8, tire; 9-9, driving road surface;

10-1、下圆弧面;10-2、通油槽;10-3、油道;10-4、车桥上跳时板簧上平面接触处;10-5、车桥上跳时板簧下平面接触处;10-6、车桥下跳时板簧下平面接触处;10-7、车桥下跳时板簧上平面接触处;10-8、板簧;10-9、上圆弧面。10-1, the lower arc surface; 10-2, the oil groove; 10-3, the oil channel; 10-4, the flat contact point of the leaf spring on the axle; 10-5, the leaf spring on the axle 10-6, the lower plane contact of the leaf spring when the axle jumps down; 10-7, the upper plane contact of the leaf spring when the axle jumps down; 10-8, the leaf spring; 10-9, the upper circle curved surface.

具体实施方式Detailed ways

实施例1如图1和图2所示,这种非公路用自卸车,它包括车体、车架、动力系统、传动系统、车箱、轮胎、制动系统,它的动力系统1连接在主车架8上,转向系统2连接在主车架8的左前方外侧,悬架系统3连接在主车架8下方,制动系统4连接在主车架8的内及外侧,举升系统5的液压油缸通过油缸连接座连接在副车架9前端上面及货箱6的前板上,货箱6连接在副车架9上面,副车架9通过支架及连接板连接在主车架8上面,驾驶室7通过支架连接在主车架的左前方。Embodiment 1 As shown in Figure 1 and Figure 2, this non-highway dump truck includes a car body, a vehicle frame, a power system, a transmission system, a carriage, tires, and a braking system, and its power system 1 is connected to the main On the vehicle frame 8, the steering system 2 is connected to the left front outside of the main frame 8, the suspension system 3 is connected below the main frame 8, the braking system 4 is connected to the inside and outside of the main frame 8, and the lifting system 5 The hydraulic cylinder is connected to the front end of the subframe 9 and the front plate of the cargo box 6 through the oil cylinder connecting seat, the cargo box 6 is connected to the subframe 9, and the subframe 9 is connected to the main frame 8 through a bracket and a connecting plate. Above, the cab 7 is connected to the left front of the main frame through brackets.

它针对施工工地特殊工况,它的动力系统匹配设计采用16吨级的加强性宽体工程驱动桥;14.00—20的宽大工程轮胎,使得该车具有了超强的承载能力。由于整车总质量确定为40吨,从轮胎负荷及通过性技术指标的考虑,选择了14.00—20工程花纹轮胎,7档变速箱。选择了潍柴动力股份有限公司生产的WD615.50工程版发动机来实现动力要求。考虑非公路工况对车辆爬坡度要求和常用车速要求,将一档最大动力因数,直接档最大动力因数作为必保指标。选择了7DS100变速箱;驱动桥总速比应在8~13之间,最大允许输入扭矩应不小于15000Nm。按照整车稳定性要求,轮距应控制在2000~3000mm,选用工程桥。保证车辆最小离地间隙不小于350mm.It is aimed at the special working conditions of the construction site. Its power system matching design adopts a 16-ton reinforced wide-body engineering drive axle; 14.00-20 wide engineering tires make the vehicle have a super carrying capacity. Since the total mass of the vehicle is determined to be 40 tons, 14.00-20 engineering pattern tires and a 7-speed gearbox are selected from the consideration of tire load and passability technical indicators. The WD615.50 engineering version engine produced by Weichai Power Co., Ltd. was selected to meet the power requirements. Considering the requirements of off-highway working conditions on vehicle gradeability and common vehicle speed, the maximum power factor of the first gear and the maximum power factor of the direct gear are taken as the guaranteed indicators. The 7DS100 gearbox is selected; the total speed ratio of the drive axle should be between 8 and 13, and the maximum allowable input torque should not be less than 15000Nm. According to the stability requirements of the whole vehicle, the wheelbase should be controlled at 2000-3000mm, and the engineering bridge should be selected. Ensure that the minimum ground clearance of the vehicle is not less than 350mm.

为了实现承载,它的车架采用槽型端面高强度螺栓连接,设计宽度控制在1000mm—1800mm之间。In order to realize the bearing, its frame is connected by high-strength bolts on the grooved end face, and the design width is controlled between 1000mm-1800mm.

它的转向系统设计对于非公路车而言,由于整车设计总质量为40吨,而且使用环节超载普遍,转向轴轴荷大于8吨,转向阻力矩大于6200Nm,所以选择专利号为:ZL200720031805.8的一种转向液压外助力装置。Its steering system design is for off-highway vehicles, because the total design mass of the vehicle is 40 tons, and the overload of the use link is common, the axle load of the steering shaft is greater than 8 tons, and the steering resistance torque is greater than 6200Nm, so the selected patent number is: ZL200720031805. 8, a steering hydraulic external power assist device.

它的悬架系统设计采用非独立悬架结构形式,板簧为15mm厚,共13片均表明设计能够满足总重量40吨使用要求。Its suspension system is designed in the form of a non-independent suspension structure. The leaf spring is 15mm thick, and a total of 13 pieces show that the design can meet the requirements of a total weight of 40 tons.

后桥采用平衡悬架,这种结构型式在汽车上得到普遍应用。但非公路工况对中后桥动行程的要求及14.00-20轮胎总成对轮距的要求又为悬挂设计带来新的课题。就更具备着挑战,超强的六根推力杆,有效的协调着中后桥在恶劣路面的承载。钢板弹簧采用22mm厚,13片,逐片端部去应力,梯形截面设计减少了整架簧的内应力,使每片板簧浑然组成一弹性整体,减少了片与片之间的摩擦,从而使悬架系统工作柔和,同时具备超载能力。The rear axle adopts balanced suspension, which is widely used in automobiles. However, the requirements of the off-highway working conditions on the dynamic stroke of the middle and rear axles and the requirements of the 14.00-20 tire assembly on the track have brought new issues to the suspension design. It is even more challenging. The super strong six thrust rods effectively coordinate the load of the middle and rear axles on bad roads. The leaf spring is 22mm thick, 13 pieces, and the stress is relieved one by one. The trapezoidal cross-section design reduces the internal stress of the whole spring, so that each leaf spring forms an elastic whole, reducing the friction between the pieces, so that The suspension system works softly and is capable of over-boosting at the same time.

它的制动系统设计选用专利号为ZL200720031807.7的工程路面车辆制动装置,它有四套制动装置:(1)行车制动装置,即脚制动;(2)应急制动装置:一旦主回路失效,用手操纵阀实施弹簧贮能制动;(3)驻车制动装置:弹簧贮能制动,与应急制动为同一装置;(4)辅助制动装置:发动机WEVB闭气门制动、电控气动。Its braking system design uses the engineering road vehicle braking device with the patent number ZL200720031807.7. It has four sets of braking devices: (1) service braking device, that is, foot brake; (2) emergency braking device: Once the main circuit fails, use the manual valve to implement spring energy storage braking; (3) Parking brake device: spring energy storage braking, which is the same device as emergency braking; (4) Auxiliary braking device: engine WEVB closed Valve brake, electro-pneumatic.

它的举升系统设计对于非公路车,其运距很短,举升系统工作频繁,举升系统工作的可靠性,影响非公路用车的使用效果。所以举升系统采用了国际上目前大量采用的单顶多级油缸的设计方案。最低启动压力0.64Mpa。最大举升时间不超过30"。Its lifting system is designed for off-highway vehicles, the transportation distance is very short, the lifting system works frequently, and the reliability of the lifting system affects the use effect of off-highway vehicles. Therefore, the lifting system adopts the design scheme of single-top multi-stage oil cylinder widely used in the world. The minimum starting pressure is 0.64Mpa. The maximum lifting time does not exceed 30".

它的货箱系列设计,由于货箱是非公路用车主要的作业装置,为了保证该车的动力性、转向轻便性、行驶稳定性、制动可靠性必须严格控制整车重量,合理布置重心位置,使其具有良好使用效果。在底盘的主要部件选型和布置方案确定后,其重量和重心的变化余地相对较小,影响整车重量和重心的主要因素是系列货箱的形态设计及货箱重量及装满货物时的重心布置方式。如果满载时重心前移,使得前悬承载力变的太大,这时转向阻力矩增大,影响转向轻便性及操纵稳定性;如果满载时重心后移使得中后桥承载变大,在车辆卸货时易于翘头,易于翻车,影响整车稳定性。货箱及副车架设计宽度控制在2800~3800mm之间。Its cargo box series design, because the cargo box is the main operating device of off-highway vehicles, in order to ensure the vehicle's power, steering portability, driving stability, and braking reliability, the weight of the vehicle must be strictly controlled and the center of gravity should be reasonably arranged. , so that it has a good use effect. After the selection and layout of the main components of the chassis are determined, there is relatively little room for change in its weight and center of gravity. The main factors affecting the weight and center of gravity of the vehicle are the shape design of the series of containers, the weight of the containers and the time when they are full of goods. Center of gravity arrangement. If the center of gravity moves forward when fully loaded, the load capacity of the front suspension becomes too large, and the steering resistance torque increases at this time, which affects the portability of steering and handling stability; It is easy to tilt the head when unloading, and it is easy to roll over, which affects the stability of the whole vehicle. The design width of the cargo box and sub-frame is controlled between 2800 and 3800mm.

实施例1还可以增加加热装置。如专利号:ZL 2007 2 0031806.2的一种货箱加热装置。本实施例1中其它结构与工程车完全相同,属公知技术这里不在叙述。它的装配与调试在《非公路用自卸车整车装配、调整、验收技术条件》指导下进行。Embodiment 1 can also increase the heating device. For example, the patent number: ZL 2007 2 0031806.2 is a container heating device. Other structures in the present embodiment 1 are identical with engineering vehicle, belong to known technology and do not narrate here. Its assembly and debugging are carried out under the guidance of "Technical Conditions for Assembly, Adjustment and Acceptance of Non-highway Dump Trucks".

它的主要技术指标如下表:Its main technical indicators are as follows:

  项目 主要技术指标 试验结果 符合判定 整车整备质量Kg 13500 13300 符合 前桥负荷/中后桥负荷Kg 8000/32000 7980/31980 符合 最大装载质量Kg 26435 26500 符合 最大总质量Kg 40000 39870 符合 project Main Specifications test results Meet the judgment Vehicle curb weight Kg 13500 13300 conform to Front axle load/middle and rear axle load Kg 8000/32000 7980/31980 conform to Maximum loading weight Kg 26435 26500 conform to Maximum total mass Kg 40000 39870 conform to

  最高车速Km/h 52 51.3 符合 直接档最低稳定车速Km/h 12 12.3 符合 最大爬坡度% 38 40.2 符合 最小转弯直径mm 18450 18450 符合 最大制动距离(V=30Km/h) 10m 9.6m 符合 接近角/离去角 31°/52° 31.2°/52° 符合 最小离地间隙(前轴) 350mm 346mm 符合 货箱容积(m3) 18 17.6 符合 货箱举升角度: 51° 52 符合 Maximum speed Km/h 52 51.3 conform to Minimum stable speed of direct gear Km/h 12 12.3 conform to Maximum grade% 38 40.2 conform to Minimum turning diameter mm 18450 18450 conform to Maximum braking distance (V=30Km/h) 10m 9.6m conform to Approach / departure angle 31°/52° 31.2°/52° conform to Minimum ground clearance (front axle) 350mm 346mm conform to Container volume (m3) 18 17.6 conform to Cargo box lifting angle: 51° 52 conform to

它的驾驶室采用单边驾驶室布置在车架左前方。驾驶室宽度控制在1000mm~1500mm之间,长度控制在1800mm—2400mm,高度控制在1480mm—1550mm之间。Its cab is arranged on the left front of the frame with a unilateral cab. The width of the cab is controlled between 1000mm and 1500mm, the length is controlled between 1800mm and 2400mm, and the height is controlled between 1480mm and 1550mm.

实施例2与实施例1基本相同,所不同的是它的悬架是衡梁悬架如图2-1所示,橡胶主簧2-1共四件,两件上面通过螺栓2-2连接在车架2-23左侧均衡梁2-4的两端,另外两件上面通过螺栓2-2连接在车架2-23右侧均衡梁2-4的两端,四件橡胶主簧2-1下面通过螺栓2-11分别连接在中桥2-18和后桥2-10的桥壳加工面上;均衡梁2-4中间部位用橡胶轴承2-19、橡胶轴承盖2-20、螺栓2-21连接在平衡轴2-16两端,平衡轴2-16被固定在平衡轴支架2-14中,两个平衡轴支架2-14通过螺栓2-22分别连接在车架2-23上,同时下端孔通过螺栓2-15连接四根下推力杆2-13,四根推力杆2-13另一端通过销子2-17、下推力杆支架2-12、螺栓2-11纵向水平平行布置在中桥2-18和后桥2-10中,两根V形上推力杆2-3一端分别通过上推力杆桥端支架2-8、螺栓2-9、螺栓2-7及销子2-17连接在中桥2-18及后桥2-10中间部位桥包位置的加工面上,两根V形上推力杆2-3另一端通过上推力杆梁端支架2-5及螺栓2-6连接在四横梁2-24和车架2-23上,如图2-2所示,通过以上安装连接,六根推力杆控制着桥的正确位置,同时传递驱动力、制动力。重载力依次通过车架2-23、四横梁2-24、平衡轴支架2-14、平衡轴2-16、橡胶轴承2-19、均衡梁2-4、橡胶主簧2-1传到桥上,由桥通过轮胎传到地面。它的均衡梁2-4呈开口向上的弓形如图2-3所示。本实施例2的均衡梁悬架结构,通过以上连接安装,实现了车架与车桥的联系,同时保证了车轮与车架之间的正确运动关系,实现了承载与导向及减震的功能,保证了驾驶员乘座舒适和所运货物完好,使整车具有良好的驾驶性能。Embodiment 2 is basically the same as Embodiment 1, except that its suspension is a balance beam suspension, as shown in Figure 2-1. There are four rubber main springs 2-1, and the two parts are connected by bolts 2-2. At the two ends of the equalizing beam 2-4 on the left side of the vehicle frame 2-23, the other two parts are connected to the two ends of the equalizing beam 2-4 on the right side of the vehicle frame 2-23 by bolts 2-2, four rubber main springs 2 The bottom of -1 is respectively connected to the axle housing processing surface of the middle bridge 2-18 and the rear axle 2-10 by bolts 2-11; The bolt 2-21 is connected to both ends of the balance shaft 2-16, the balance shaft 2-16 is fixed in the balance shaft bracket 2-14, and the two balance shaft brackets 2-14 are respectively connected to the vehicle frame 2- 23, while the lower end holes are connected to four lower thrust rods 2-13 through bolts 2-15, and the other ends of the four thrust rods 2-13 pass through pins 2-17, lower thrust rod brackets 2-12, and bolts 2-11 longitudinally Horizontally arranged in the middle bridge 2-18 and the rear bridge 2-10, one end of two V-shaped upper thrust rods 2-3 passes through the upper thrust rod bridge end bracket 2-8, bolt 2-9, bolt 2-7 and The pin 2-17 is connected to the processing surface of the middle part of the middle bridge 2-18 and the rear axle 2-10, and the other ends of the two V-shaped upper thrust rods 2-3 pass through the upper thrust rod beam end support 2-5 And the bolts 2-6 are connected on the four beams 2-24 and the vehicle frame 2-23, as shown in Figure 2-2, through the above installation and connection, the six thrust rods control the correct position of the bridge, and transmit the driving force and braking force at the same time . The heavy-duty force is transmitted to On the bridge, the bridge is transmitted to the ground through the tires. Its equalizing beam 2-4 is in the bow shape with an opening upward, as shown in Figure 2-3. The equalizing beam suspension structure of Embodiment 2 realizes the connection between the vehicle frame and the vehicle axle through the above connection and installation, and at the same time ensures the correct movement relationship between the wheels and the vehicle frame, and realizes the functions of bearing, guiding and shock absorption , to ensure the comfort of the driver and the integrity of the cargo, so that the vehicle has good driving performance.

实施例3与实施例1基本相同,所不同的是它的悬架是另外一种悬架的结构如图3-1所示,它是实施例3的纵向分布图,上推力杆3-1和下推力杆3-13,中桥3-14与支架3-11、四衡梁3-15通过上推力杆梁端支架3-2及上推力杆桥端支架3-4和下推力杆支架3-9的连接在四衡梁3-15的前端与后端形成两个并排的四连杆机构,能有效的控制中桥3-14和后桥3-16的纵向跳动。四根上推力杆3-1两端分别通过两个螺栓3-17连接在上推力杆梁端支架3-2和上推力杆桥端支架3-4上,上推力杆梁端支架3-2单边通过十二个螺栓3-3连接在四横梁3-15及主车架上。上推力杆桥端支架3-4通过六个螺栓3-5和一个销子3-6分别固定在中桥3-14和后桥3-16上;四根下推力杆3-13两端分别用螺栓3-12固定在支架3-11上,并用螺栓3-17固定下推力杆桥端支架3-9上,支架3-11单边用十四个螺栓3-10连接在四横梁3-15底部,下推力杆支架3-9分别用四个螺栓3-7和一个销子3-8固定在中桥3-14和后桥3-16上。Embodiment 3 is basically the same as Embodiment 1, the difference is that its suspension is another suspension structure as shown in Figure 3-1, which is the longitudinal distribution diagram of Embodiment 3, the upper thrust rod 3-1 And the lower thrust rod 3-13, the middle bridge 3-14 and the bracket 3-11, the four balance beams 3-15 pass through the upper thrust rod beam end bracket 3-2 and the upper thrust rod bridge end bracket 3-4 and the lower thrust rod bracket The connection of 3-9 forms two side-by-side four-bar linkages at the front end and the rear end of the four balance beams 3-15, which can effectively control the longitudinal jump of the middle bridge 3-14 and the rear bridge 3-16. The two ends of the four upper thrust rods 3-1 are respectively connected to the upper thrust rod beam end support 3-2 and the upper thrust rod bridge end support 3-4 by two bolts 3-17, and the upper thrust rod beam end support 3-2 is single The limit is connected on four beams 3-15 and the main vehicle frame by twelve bolts 3-3. The upper thrust rod bridge end support 3-4 is respectively fixed on the middle bridge 3-14 and the rear axle 3-16 by six bolts 3-5 and a pin 3-6; the two ends of the four lower thrust rods 3-13 are respectively Fix on the bracket 3-11 with bolt 3-12, and fix the lower thrust rod bridge end bracket 3-9 with bolt 3-17, and the bracket 3-11 is connected to the four beams 3-10 with fourteen bolts 3-10 on one side 15 bottoms, the lower thrust rod support 3-9 is fixed on the middle bridge 3-14 and the rear axle 3-16 with four bolts 3-7 and a pin 3-8 respectively.

如图3-2是实施例3的俯视图所示,四根上推力杆3-1分别在四衡梁3-15的前端和后端形成八字形布置,四根下推力杆3-13分别在四横梁3-15的前端与后端形成八字形布置,同时上推力杆3-1八字与下推力杆3-13八字开口方向相反,通过以上具体的安装实施,可以增加整车横向力,增加整车横向稳定性,提高整车行驶稳定性。As shown in Fig. 3-2, which is a top view of Embodiment 3, the four upper thrust rods 3-1 form a figure-eight arrangement at the front and rear ends of the four balance beams 3-15 respectively, and the four lower thrust rods 3-13 are arranged on the four The front end and the rear end of the beam 3-15 form a figure-of-sight arrangement, and at the same time, the opening direction of the upper thrust rod 3-1 and the lower thrust rod 3-13 are opposite to each other. Through the above specific installation and implementation, the lateral force of the vehicle can be increased, and the entire vehicle can be increased. The lateral stability of the vehicle improves the driving stability of the vehicle.

实施例4与实施例1基本相同,所不同的是它的平衡悬架板簧采用主板簧4-1和副板簧4-2连接构成,以便增加承载能力。平衡轴壳4-4和平衡轴4-3通过轴承联接起来,平衡轴壳4-4是可以转动的;平衡悬架主板簧4-1和平衡悬架副板簧4-2是通过骑马螺栓4-5分别固定在平衡轴壳4-4的上下两个槽内;上板簧滑板座4-6和下板簧滑板座4-7分别固定在前后两个桥管的上面和下面,两个平衡悬架主板簧4-1两端分别插在上板簧滑板座4-6的空腔内;两个平衡悬架副板簧4-2两端分别插在下板簧滑板座4-7的空腔内。Embodiment 4 is basically the same as Embodiment 1, except that its balance suspension leaf spring is formed by connecting the main plate spring 4-1 and the secondary leaf spring 4-2, so as to increase the bearing capacity. The balance shaft housing 4-4 and the balance shaft 4-3 are connected by bearings, and the balance shaft housing 4-4 is rotatable; the main plate spring 4-1 of the balance suspension and the auxiliary leaf spring 4-2 of the balance suspension are connected by saddle bolts 4-5 are fixed in the upper and lower grooves of the balance shaft housing 4-4 respectively; The two ends of a balance suspension main board spring 4-1 are respectively inserted in the cavity of the upper leaf spring skateboard seat 4-6; the two ends of the two balanced suspension auxiliary leaf springs 4-2 are respectively inserted in the lower leaf spring skateboard seat 4-7 within the cavity.

在空载情况下如图4-1所示,由于车辆是空载的整车重量比较轻,只有平衡悬架主板簧4-1的两端和上板簧滑板4-6的弧面接触,平衡悬架主板簧4-1的弧度比较高,抬高了平衡轴4-3、平衡轴壳4-4和平衡悬架副板簧4-2,使平衡悬架副板簧4-2没有与下板簧滑板4-7接触,既平衡悬架副板簧4-2和下板簧滑板4-7的弧面是分开的,也就没有起作用。整个悬架的刚度是由平衡悬架主板簧4-1的刚度决定的,其刚度比较小。满载时如图4-2所示,由于整车重量比较重,在重力作用下,平衡悬架主板簧4-1的弧度被压低,降低了平衡轴4-3、平衡轴壳4-4和平衡悬架副板簧4-2,消除了平衡悬架副板簧4-2和下板簧滑板4-7的接触面之间的间隙,使平衡悬架副板簧4-2与下板簧滑板4-7接触,这种情况下,平衡悬架主板簧4-1与平衡悬架副板簧4-2同时起作用。整个悬架的刚度是由平衡悬架主板簧4-1与平衡悬架副板簧4-2两个板簧的刚度叠加起来的,所以刚度比较大。In the case of no load, as shown in Figure 4-1, since the vehicle is unloaded and the weight of the whole vehicle is relatively light, only the two ends of the main plate spring 4-1 of the balance suspension are in contact with the arc surface of the upper plate spring slide plate 4-6. The radian of the balance suspension main board spring 4-1 is relatively high, and the balance shaft 4-3, the balance shaft housing 4-4 and the balance suspension sub-plate spring 4-2 are raised, so that the balance suspension sub-plate spring 4-2 has no Contact with following leaf spring slide plate 4-7, the cambered surface of both balanced suspension secondary leaf spring 4-2 and lower leaf spring slide plate 4-7 is separated, just does not have effect. The stiffness of the whole suspension is determined by the stiffness of the balance suspension main plate spring 4-1, which is relatively small. When fully loaded, as shown in Figure 4-2, due to the relatively heavy weight of the vehicle, under the action of gravity, the arc of the main spring 4-1 of the balance suspension is depressed, lowering the balance shaft 4-3, balance shaft housing 4-4 and The balance suspension sub-plate spring 4-2 eliminates the gap between the balance suspension sub-plate spring 4-2 and the contact surface of the lower leaf spring slide plate 4-7, so that the balance suspension sub-plate spring 4-2 and the lower plate Spring slide plate 4-7 contacts, and in this case, balanced suspension main board spring 4-1 works simultaneously with balanced suspension secondary leaf spring 4-2. The stiffness of the whole suspension is superimposed by the stiffness of two leaf springs of the balanced suspension main plate spring 4-1 and the balanced suspension secondary leaf spring 4-2, so the stiffness is relatively large.

实施例5与实施例1基本相同,所不同的是它的悬架是一种橡胶悬架如图5-1所示,它包括支架、弹性圆柱销5-2、轴销组件5-3、上推力杆支架5-4、螺栓5-5、中桥上推力杆5-6、上推力杆梁端支架5-8、四横梁5-9、后桥上推力杆5-10、螺栓、后桥5-12、中桥5-13、减震器5-15、限位块支架5-19、主簧和车架5-27,它的弹性元件是主簧和副簧,主簧和副簧是橡胶弹簧,它的减震器5-15两端分别连接在支架5-26和均衡梁总成5-14上。四件橡胶主簧5-22,左、右各两件上斜面通过螺栓5-21连接在左、右支架5-26上,下斜面通过螺栓5-21连接在均衡梁总成5-14的平面上如图5-1所示;两个均衡梁总成5-14其中一件两端通过左支架5-1、弹性圆柱销5-2、销轴组件5-3连接在中桥5-13和后桥5-12上,同样均衡梁总成5-14另一件两端通过右支架5-7、弹性圆柱销5-2、销轴组件5-3连接在中桥5-13和后桥5-12上,支架5-26通过螺栓5-25连接在车架5-27上如图5-3所示;左支架5-1和右支架5-7通过螺栓5-16分别连接在中桥5-13及后桥5-12上,减震器5-15通过螺栓5-20两端分别固定在支架5-26和均衡梁总成5-14上,减震器5-15与橡胶主簧5-22一起实现了重力传递,重力通过减震器5-15、车架5-27、支架5-26、橡胶主簧5-22、均衡梁总成5-14、左支架5-1、右支架5-7传到车桥上,在车辆转弯时,橡胶主簧5-22同时还承受横向力。橡胶副簧5-23通过螺栓5-24连接在支架5-26的下平面上,橡胶副簧5-23空载时与均衡梁总成5-14上平面存在有15mm间隙,满载时参与受力,间隙消除,保证空满载车辆频率相同,实现平顺性。如图5-2所示两根中桥上推力杆5-6两端通过螺栓5-11分别连接在上推力杆桥端支架5-4和上推力杆梁端支架5-8上,两根后桥上推力杆5-10两端通过螺栓5-11分别连接在上推力杆桥端支架5-4和上推力杆梁端支架5-8上,两件上推力杆桥端支架5-4通过螺栓5-5分别连接在中桥5-13和后桥5-12上,四根上推力杆5-6和5-10通过橡胶主簧5-22和均衡梁总成5-14实现纵向力、驱动力、与制动力的传递,并控制着中桥5-13与后桥5-12的向前、向后、侧向的运动。橡胶限位块5-17通过螺栓5-18安装在限位块支架5-19上,限位块支架5-19通过螺栓5-18连接在车架5-27上,以便对中桥5-13及后桥5-12的最大跳动量进行限制,保护车架5-27使其受到的冲击力减小。Embodiment 5 is basically the same as Embodiment 1, except that its suspension is a rubber suspension as shown in Figure 5-1, which includes a bracket, an elastic cylindrical pin 5-2, a shaft pin assembly 5-3, Upper thrust rod bracket 5-4, bolt 5-5, middle bridge upper thrust rod 5-6, upper thrust rod beam end bracket 5-8, four beams 5-9, rear axle upper thrust rod 5-10, bolts, rear Bridge 5-12, middle bridge 5-13, shock absorber 5-15, limit block support 5-19, main spring and vehicle frame 5-27, its elastic element is main spring and auxiliary spring, main spring and auxiliary spring The spring is a rubber spring, and its shock absorber 5-15 two ends are respectively connected on the support 5-26 and the equalizing beam assembly 5-14. Four pieces of rubber main springs 5-22, the upper slopes of the left and right parts are connected to the left and right brackets 5-26 through bolts 5-21, and the lower slopes are connected to the equalizing beam assembly 5-14 through bolts 5-21 As shown in Figure 5-1 on the plane; two ends of one of the two equalizing beam assemblies 5-14 are connected to the middle bridge 5-1 through the left bracket 5-1, elastic cylindrical pin 5-2, and pin assembly 5-3 13 and the rear axle 5-12, the other two ends of the equalizing beam assembly 5-14 are connected to the middle bridge 5-13 and On the rear axle 5-12, the bracket 5-26 is connected to the vehicle frame 5-27 through the bolt 5-25 as shown in Figure 5-3; the left bracket 5-1 and the right bracket 5-7 are respectively connected through the bolt 5-16 On the middle bridge 5-13 and the rear axle 5-12, the shock absorber 5-15 is respectively fixed on the support 5-26 and the equalizing beam assembly 5-14 by the two ends of the bolt 5-20, and the shock absorber 5-15 Together with the rubber main spring 5-22, the gravity transmission is realized, and the gravity passes through the shock absorber 5-15, the vehicle frame 5-27, the bracket 5-26, the rubber main spring 5-22, the equalizing beam assembly 5-14, and the left bracket 5-1, right support 5-7 pass on the vehicle axle, and when vehicle turns, rubber main spring 5-22 also bears lateral force simultaneously. The rubber secondary spring 5-23 is connected to the lower plane of the bracket 5-26 through the bolt 5-24. There is a gap of 15 mm between the rubber secondary spring 5-23 and the upper plane of the equalizing beam assembly 5-14 when it is unloaded. Force, gap elimination, to ensure the same frequency of empty and full vehicles, to achieve ride comfort. As shown in Figure 5-2, the two ends of the upper thrust rods 5-6 of the middle bridge are respectively connected to the bridge end bracket 5-4 of the upper thrust rod and the beam end bracket 5-8 of the upper thrust rod through bolts 5-11. The two ends of the thrust rod 5-10 on the rear axle are respectively connected to the upper thrust rod bridge end bracket 5-4 and the upper thrust rod beam end bracket 5-8 by bolts 5-11, and the two upper thrust rod bridge end brackets 5-4 The bolts 5-5 are respectively connected to the middle axle 5-13 and the rear axle 5-12, and the four upper thrust rods 5-6 and 5-10 realize the longitudinal force through the rubber main spring 5-22 and the equalizing beam assembly 5-14 , driving force, and the transmission of braking force, and control the forward, backward, and lateral motions of the middle axle 5-13 and the rear axle 5-12. The rubber stop block 5-17 is installed on the stop block support 5-19 by the bolt 5-18, and the stop block support 5-19 is connected on the vehicle frame 5-27 by the bolt 5-18, so that the bridge 5- 13 and the maximum jump of rear axle 5-12 are limited, and the impact force that protection vehicle frame 5-27 makes it suffers reduces.

实施例6与实施例1基本相同,所不同的是它的液压油缸连接座如图6-1所示,油缸6-1与油缸支架6-2连接,油缸支架6-2通过螺栓连接在油缸支座6-6上。图6-2是取掉油缸6-1和油缸支座6-6后的B向视图,从图6-2中可以清楚油缸支座6-6的结构型式及焊接位置。将已经打好孔的焊合件油缸支座6-6,焊接在货箱前板6-3上,紧靠油缸支座6-6的上下两端焊接前板横梁6-5,紧靠前板横梁6-5的两端焊接上前板纵梁6-4,这样就使得连接油缸支座6-6处形成一个局部框架结构。油缸支架6-2的上端两边各焊一块限位块6-7,用来承受油缸举升及下降时的剪切力。有两端口朝外U型槽的油缸支座6-6固定在由两前板纵梁6-4和两前板横梁6-5连接构成的两对边平行的框架上,框架固定在货箱前板6-3上。图6-3是图6-2中的A-A剖视图。主要是为了表示清楚油缸支座6-6的结构形式。Embodiment 6 is basically the same as Embodiment 1, except that its hydraulic cylinder connection seat is shown in Figure 6-1. The oil cylinder 6-1 is connected to the oil cylinder support 6-2, and the oil cylinder support 6-2 is connected to the oil cylinder by bolts. On the bearing 6-6. Fig. 6-2 is a view in direction B after removing the oil cylinder 6-1 and the oil cylinder support 6-6. From Fig. 6-2, the structure type and welding position of the oil cylinder support 6-6 can be clearly seen. Weld the welded part oil cylinder support 6-6 that has been drilled on the cargo box front plate 6-3, and weld the front plate beam 6-5 close to the upper and lower ends of the oil cylinder support 6-6, close to the front The two ends of the plate crossbeam 6-5 are welded to the front plate longitudinal beam 6-4, so that a local frame structure is formed at the place connecting the oil cylinder support 6-6. A limit block 6-7 is respectively welded on both sides of the upper end of the oil cylinder support 6-2, which is used to bear the shear force when the oil cylinder is lifted and descended. The oil cylinder support 6-6 with two ports facing outwards of the U-shaped groove is fixed on the two parallel frames formed by the connection of two front plate longitudinal beams 6-4 and two front plate cross beams 6-5, and the frame is fixed on the cargo box On the front panel 6-3. Fig. 6-3 is a sectional view of A-A in Fig. 6-2. Mainly in order to express clearly the structural form of oil cylinder support 6-6.

实施例7与实施例1基本相同,所不同的是它的货箱翻转铰座如图7-1是自卸车正常情况下,货箱的侧面视图,它反映了货箱翻转铰座装置端头,盖板7-1用螺栓7-2和弹垫7-3固定在铰座7-5上,油杯7-4安装在铰座7-5上。图7-2是图7-1的A-A剖视图,如图7-2所示,铰轴7-9穿过铰座7-5穿入管子7-6,管子7-6是焊接在副车架上的,销轴7-7穿过管子7-6和铰轴7-9,禁止铰轴7-9在管子7-6中转动,并用开口销7-8穿过销轴7-7用于固定销轴7-7。如图7-1和图7-2所示,铰座7-5与货箱底部焊接,再用铰轴7-9从铰座外侧穿入,其长度比铰座长点,并穿入管子7-6中,销轴7-7穿过管子7-6和铰轴7-9,使管子7-6与铰轴7-9联成一体,再用开口销7-8穿过并锁紧销轴7-7,以防止销轴7-7的掉落,从而使两铰座连接为一体,铰座7-5外侧用盖板7-1加封,铰座7-5与铰轴7-9的润滑是通过油杯7-4加入润滑油,从而保证了该装置的长久耐用性。在工作举升时,随着货箱的举升,由于铰座7-5是焊接在货箱底板上的,所以它也绕着铰轴7-9转动,而铰轴7-9是和管子7-6连接在一起的,管子7-6又焊接在副车架上,由于副车架在举升时是不动的,所以铰轴7-9和管子7-6在举升时都是不动的,所以不管是在举升还是在不工作状态下,该装置的下部都处于一种相对静止状态,且其与副车架相焊接,从而保证了该装置的举升平稳、安全的特点。Embodiment 7 is basically the same as Embodiment 1, the difference is that its cargo box flip hinge seat is shown in Figure 7-1, which is a side view of the cargo box under normal conditions of the dump truck, which reflects the end of the cargo box flip hinge seat device. , cover plate 7-1 is fixed on the hinge seat 7-5 with bolt 7-2 and spring washer 7-3, and oil cup 7-4 is installed on the hinge seat 7-5. Figure 7-2 is the A-A sectional view of Figure 7-1, as shown in Figure 7-2, the hinge shaft 7-9 passes through the hinge seat 7-5 and penetrates into the pipe 7-6, and the pipe 7-6 is welded to the sub-frame On, the pin shaft 7-7 passes through the pipe 7-6 and the hinge shaft 7-9, prohibits the hinge shaft 7-9 from rotating in the pipe 7-6, and passes through the pin shaft 7-7 with the cotter pin 7-8 for Fixed bearing pin 7-7. As shown in Figure 7-1 and Figure 7-2, the hinge seat 7-5 is welded to the bottom of the cargo box, and then the hinge shaft 7-9 is used to penetrate from the outside of the hinge seat, and its length is longer than the hinge seat, and penetrates into the pipe In 7-6, the pin shaft 7-7 passes through the pipe 7-6 and the hinge shaft 7-9, so that the pipe 7-6 and the hinge shaft 7-9 are integrated, and then the cotter pin 7-8 passes through and locks Bearing pin 7-7, to prevent the falling of bearing pin 7-7, thereby two hinge seats are connected as one, hinge seat 7-5 outside is sealed with cover plate 7-1, hinge seat 7-5 and hinge shaft 7- The lubrication of 9 is to add lubricating oil by oil cup 7-4, thus has guaranteed the long-term durability of this device. When lifting at work, along with the lifting of the cargo box, because the hinge seat 7-5 is welded on the bottom plate of the cargo box, it also rotates around the hinge axis 7-9, and the hinge axis 7-9 is connected with the pipe 7-6 are connected together, and the pipe 7-6 is welded on the sub-frame. Since the sub-frame does not move when it is lifted, the hinge shaft 7-9 and the pipe 7-6 are both The lower part of the device is in a relatively static state no matter it is lifted or not working, and it is welded with the sub-frame, thus ensuring the stable and safe lifting of the device features.

实施例8与实施例1基本相同,所不同的是它的货箱底板是双层底板,如图8-1所示,它是自卸车正常情况下货箱的俯视图,在下底板8-3上焊接有多根加强筋8-1,再在加强筋8-1上焊接上底板8-2构成双层箱体底板。货箱上底板8-2是由8-12块板拼接构成,每块板分别焊在各自对应位置的加强筋8-1上。图8-2是图8-1的A-A剖视图,加强筋1与连接在货箱两侧板上的横梁8-4位置相对应,使得加强筋8-1通过下底板8-3叠加在横梁8-4上。横梁8-4一端固定在箱体侧板上,另一端固定在纵梁8-5侧面上。图8-3是图8-1的B-B剖视图,如图8-3所示两根纵梁8-5固定在车架上,纵梁8-5的侧面焊有横梁8-4的一端,纵梁8-5上面焊有下底板8-3。图8-4是图8-1的C-C剖视图,如图8-4所示,货箱下底板8-3是一块整板。Embodiment 8 is basically the same as Embodiment 1, the difference is that its cargo box floor is a double-layer floor, as shown in Figure 8-1, it is a top view of the cargo box of a dump truck under normal conditions, on the lower floor 8-3 There are many reinforcing ribs 8-1 welded, and the upper base plate 8-2 is welded on the reinforcing ribs 8-1 to form a double-layer box bottom plate. The upper bottom plate 8-2 of the cargo box is formed by splicing 8-12 plates, and each plate is respectively welded on the reinforcing ribs 8-1 at respective corresponding positions. Fig. 8-2 is a sectional view of A-A in Fig. 8-1. The reinforcing rib 1 corresponds to the position of the crossbeam 8-4 connected to the two sides of the container, so that the reinforcing rib 8-1 is superimposed on the crossbeam 8 through the lower bottom plate 8-3. -4 on. Crossbeam 8-4 one end is fixed on box body side plate, and the other end is fixed on longitudinal beam 8-5 side. Fig. 8-3 is a B-B sectional view of Fig. 8-1. As shown in Fig. 8-3, two longitudinal beams 8-5 are fixed on the vehicle frame, and one end of a crossbeam 8-4 is welded on the side of the longitudinal beam 8-5, and the longitudinal A lower base plate 8-3 is welded above the beam 8-5. Fig. 8-4 is a C-C sectional view of Fig. 8-1. As shown in Fig. 8-4, the bottom plate 8-3 of the container is a whole plate.

使用时这种矿用大载重量货箱的矿用自卸车,货箱的底板不易变形,而没有上底板只有一层底板的货箱矿用自卸车,货箱底板容易变形、开裂,修复起来成本高且修复周期长,或无法修复而报废。而采用这种双层底板结构的货箱,上底板8-2损坏后很容易换掉上底板8-2,重新焊接一块上底板8-2修复方便、周期短,提高了工作效率而且成本低。When using this kind of mining dump truck with large load capacity for mining, the bottom plate of the cargo box is not easy to deform, while the cargo box mining dump truck with no upper bottom plate and only one bottom plate, the bottom plate of the cargo box is easy to deform and crack, and it needs to be repaired. The cost is high and the repair period is long, or it cannot be repaired and is scrapped. And adopt the container of this double-deck bottom plate structure, be easy to replace upper bottom plate 8-2 after upper bottom plate 8-2 is damaged, re-weld a piece of upper bottom plate 8-2 repair convenient, cycle is short, has improved working efficiency and cost is low .

实施例9与实施例1基本相同,所不同的是它车箱后底部两侧对称的固定有轮胎保护装置如图9-1和图9-2所示,轮胎保护装置的导向板座体9-6是一直角两面体,两直角面构成的斜面是通过固紧螺栓9-7连接的导向板9-5;导向板座体9-6通过焊接方式,固定在货箱侧板外底部两侧的纵梁9-4上,导向板9-5通过固紧螺栓9-7与导向板座体9-6可靠连接。Embodiment 9 is basically the same as Embodiment 1, the difference is that tire protection devices are fixed symmetrically on both sides of the rear bottom of the carriage as shown in Figure 9-1 and Figure 9-2, the guide plate seat of the tire protection device 9- 6 is a right-angled dihedron, and the slope formed by two right-angled surfaces is a guide plate 9-5 connected by fastening bolts 9-7; the guide plate base 9-6 is fixed on both sides of the outer bottom of the side plate of the cargo box by welding On the longitudinal beam 9-4, guide plate 9-5 is reliably connected with guide plate seat body 9-6 by fastening bolt 9-7.

使用时如图9-1所示,自卸车在装载完物料行驶在路面时,因为路面的坑凹不平引起车辆的震动、颠簸,货箱9-1上堆装物料跳过货箱侧板上沿9-2。在重力的作用下,散落的物料9-3将加速向下运动,当跌落撞击至轮胎保护装置的导向板9-5时,基于物理学的刚体碰撞理论、散体力学理论,物料9-3将被有力的抛向货箱两侧区域,远离车辆正常行驶路面9-9,从而避免了轮胎9-8的碾压,有效的解决了碎石对轮胎的严重损伤。从而减少大量物料散落在自卸车正常行驶路面上,减少因为路面散落的碎石对车辆轮胎的破坏,大大提高了轮胎的使用寿命。When in use, as shown in Figure 9-1, when the dump truck is driving on the road after loading materials, the vehicle will vibrate and bump due to the unevenness of the road surface, and the materials stacked on the container 9-1 will jump over the side plate of the container Along 9-2. Under the action of gravity, the scattered material 9-3 will accelerate downward movement. When falling and hitting the guide plate 9-5 of the tire protection device, based on the rigid body collision theory and bulk mechanics theory of physics, the material 9-3 It will be powerfully thrown to the areas on both sides of the cargo box, away from the normal driving road 9-9 of the vehicle, thereby avoiding the rolling of the tires 9-8, and effectively solving the serious damage to the tires caused by gravel. Thereby reducing a large amount of materials scattered on the normal driving road of the dump truck, reducing the damage to the vehicle tires caused by the gravel scattered on the road, and greatly improving the service life of the tires.

实施例10与实施例1基本相同,所不同的是它设计一种新式板簧滑板座,如图图10-1、图10-2、图10-3所示,这种座体材料使用耐磨铸钢件,座体是框架式结构,座体上平面的下表面两端是向下凸起的弧形面中间是平面;图10-1中所示下圆弧面10-1。座体下平面的上表面是向上凸起的圆弧面,图10-1中所示上圆弧面10-9。同时控制板簧座体上平面的下表面与下平面的上表面之间的最大空间垂直距离减去板簧最长10-3片总厚度所留空隙距离是18mm。座体下平面的上圆弧面上有通油道10-2和油槽10-3,通油道10-2和油槽10-3连通,以便将润滑脂注入通油道10-2导入到油槽10-3中对板簧10-8进行润滑,减少磨损,提高板簧10-8寿命。Embodiment 10 is basically the same as Embodiment 1, except that it designs a new type of leaf spring skateboard seat, as shown in Figure 10-1, Figure 10-2, and Figure 10-3. Grinding cast steel parts, the seat body is a frame structure, the two ends of the lower surface of the upper plane of the seat body are downwardly convex arc-shaped surfaces, and the middle is a plane; the lower arc-shaped surface 10-1 is shown in Fig. 10-1. The upper surface of the lower plane of the seat body is an upwardly convex arc surface, such as the upper arc surface 10-9 shown in Fig. 10-1. Simultaneously control the maximum space vertical distance between the lower surface of the upper plane of the leaf spring seat body and the upper surface of the lower plane minus the gap distance left by the longest 10-3 total thickness of the leaf spring to be 18mm. There are oil passage 10-2 and oil groove 10-3 on the upper arc surface of the lower plane of the seat body, and the oil passage 10-2 and the oil groove 10-3 are connected so that grease can be injected into the oil passage 10-2 and introduced into the oil groove In 10-3, the leaf spring 10-8 is lubricated to reduce wear and tear and improve the life of the leaf spring 10-8.

在车桥上跳时,如图10-4所示,板簧滑板座可以自限位,车桥上跳时板簧上平面接触处10-4、车桥上跳时板簧下平面接触处10-5全部为圆弧形,这样减少冲击,减小板簧10-8所受压力,提高板簧10-8寿命。When jumping on the axle, as shown in Figure 10-4, the leaf spring skateboard seat can limit itself. 10-5 is all arc-shaped, reduces impact like this, reduces the pressure that leaf spring 10-8 is subjected to, improves leaf spring 10-8 life-span.

在车桥下跳时,如图10-5所示,板簧滑板座同样可以自限位,车桥下跳时板簧下平面接触处10-6和车桥下跳时板簧上平面接触处10-7全部为圆弧形,同样减少冲击,减小板簧10-8所受压力,提高板簧10-8寿命。When jumping under the axle, as shown in Figure 10-5, the leaf spring skateboard seat can also be self-limiting, and the contact point 10-6 on the lower plane of the leaf spring is in contact with the upper plane of the leaf spring when the axle is jumping off. Places 10-7 are all arc-shaped, which also reduces the impact, reduces the pressure on the leaf spring 10-8, and improves the life of the leaf spring 10-8.

总之本发明定义了非公路用车的市场,依据确定的市场需求确定了非公路用车的技术指标,同时按技术指标要求完成了总体布局的设计,核心解决了非公路状态下的车辆地面系统。In a word, the present invention defines the market of off-highway vehicles, determines the technical indicators of off-highway vehicles according to the determined market demand, and completes the design of the overall layout according to the requirements of the technical indicators at the same time, and core solves the vehicle ground system in the off-highway state .

Claims (5)

1. the method for designing of an off-highway self-discharging vehicle, which comprises at least car body, vehicle frame, power system, driving system, railway carriage, tire, brake system, it is characterized in that: its power system (1) is connected on the main car frame (8), steering swivel system (2) is connected the outside, left front of main car frame (8), suspension system (3) is connected main car frame (8) below, brake system (4) is connected the interior and outside of main car frame (8), the hydraulic ram of hoisting system (5) is connected subframe (9) above the front end and on the header board of container (6) by the oil cylinder Connection Block, container (6) is connected above the subframe (9), subframe (9) is connected above the main car frame (8) by support and connecting panel, and operator's compartment (7) is monolateral main car frame (8) left front that is arranged in; Container (6) bottom is connected with capacity of the tipping body upset free bearing device, free bearing (7-5) and the welding of container (6) bottom, hinge (7-9) passes free bearing (7-5) and penetrates pipe (7-6), pipe (7-6) is fixed on the subframe, bearing pin (7-7) passes pipe (7-6) and hinge (7-9), spring cotter (7-8) passes bearing pin (7-7) makes bearing pin (7-7) fixing, and cover plate (7-1) is fixed on the free bearing (7-5) by bolt (7-2) and bullet pad (7-3), and lubricating cup (7-4) is fixed on the free bearing (7-5).
2. the method for designing of a kind of off-highway self-discharging vehicle according to claim 1, it is characterized in that: described container (6) and subframe (9) width are chosen between 2800~3800mm; Its operator's compartment (7) width is chosen between 1000mm~1500mm, and length is chosen in 1800mm-2400mm, highly is controlled between the 1480mm-1550mm; Its drive axle overall ratio should be between 8~13, and the maximum input torque that allows should be not less than 15000Nm, and wheelspan should be controlled at 2000~3000mm; Road clearance is not less than 350mm; Main car frame (8) adopts grooved end face bolted connection, and main car frame (8) width is chosen between the 1000mm-1800mm; The steering shaft axle load is greater than 8 tons, and steering resisting torque is greater than 6200Nm.
3. the method for designing of a kind of off-highway self-discharging vehicle according to claim 1, it is characterized in that: described suspension system (3) is a kind of equalizer suspension frame structure, which comprises at least main spring, attaching parts, propelling rod, equalizer, various support, back axle (2-10), axle, jackshaft (2-18), bearing, vehicle frame (2-23), four crossbeams (2-24), its equalizer (2-4) is the concave shape that opening makes progress; Its main spring is rubber spring (2-1); Upper thrust rod (2-3) is the vee shape structure; Totally four of rubber springs (2-1), be connected the two ends of vehicle frame (2-23) left side equalizer (2-4) above two by bolt (2-2), be connected the two ends of vehicle frame (2-23) right side equalizer (2-4) above other two by bolt (2-2), four rubber springs (2-1) are connected on the axle housing finished surface of jackshaft (2-18) and back axle (2-10) below by bolt (2-11); Equalizer (2-4) middle part rubber shaft bearing (2-19), rubber shaft bearing lid (2-20), bolt (2-21) is connected balance shaft (2-16) two ends, balance shaft (2-16) is fixed in the balance shaft support (2-14), two balance shaft supports (2-14) are connected on the vehicle frame (2-23) by bolt (2-22), stomidium connects four lower thrust rods (2-13) end by bolt (2-15) under the balance shaft support (2-14) simultaneously, wherein the other end of two lower thrust rods (2-13) is by pin (2-17), lower thrust rod support (2-12), bolt (2-11) vertical equity is arranged in parallel in the jackshaft (2-18), and the other end of other two lower thrust rods (2-13) is by pin (2-17), lower thrust rod support (2-12), bolt (2-11) vertical equity is arranged in parallel in the back axle (2-10); Two V-arrangement upper thrust rods (2-3) end is connected on the finished surface of jackshaft (2-18) and back axle (2-10) middle part bridge package location by upper thrust rod bridge end support (2-8), bolt (2-9), bolt (2-7) and pin (2-17) respectively, and two V-arrangement upper thrust rods (2-3) other end is connected on four crossbeams (2-24) and the vehicle frame (2-23) by upper thrust rod beam-ends support (2-5) and bolt (2-6).
4. the method for designing of a kind of off-highway self-discharging vehicle according to claim 1, it is characterized in that: described suspension system (3) is a kind of structure of suspension, which comprises at least upper thrust rod (3-1), upper thrust rod beam-ends support (3-2), upper thrust rod bridge end support (3-4), lower thrust rod bridge end support (3-9), support (3-11); Lower thrust rod (3-13); Jackshaft (3-14); Four crossbeams (3-15); Back axle (3-16) and attaching parts, upper thrust rod (3-1) and lower thrust rod (3-13), jackshaft (3-14) forms two four-bar linkages side by side with support (3-11), four crossbeams (3-15) by the front end that is connected four crossbeams (3-15) and the rear end of upper thrust rod fine strain of millet end support (3-2) and upper thrust rod support (3-4) and lower thrust rod support (3-9); Four upper thrust rods (3-1) two ends are connected on upper thrust rod beam-ends support (3-2) and the upper thrust rod bridge end support (3-4) by two bolts (3-17) respectively, monolateral 12 bolts (3-3) that pass through of upper thrust rod beam-ends support (3-2) are connected on four crossbeams (3-15) and the main car frame, and upper thrust rod bridge end support (3-4) is separately fixed on jackshaft (3-14) and the back axle (3-16) by six bolts (3-5) and a pin (3-6); Four lower thrust rods (3-13) end uses bolt (3-12) to be fixed on the support (3-11) respectively, the other end uses bolt (3-17) to be fixed on the lower thrust rod bridge end support (3-9) respectively, support (3-11) 14 bolts of monolateral usefulness (3-10) are connected four crossbeams (3-15) bottom, and lower thrust rod support (3-9) uses four bolts (3-7) and a pin (3-8) to be fixed on jackshaft (3-14) and the back axle (3-16) respectively; Four upper thrust rods (3-1) form splayed in the front-end and back-end of four crossbeams (3-15) respectively and arrange, four lower thrust rods (3-13) form the splayed layout in the front end and the rear end of four crossbeams (3-15) respectively, and the splayed distribution of four upper thrust rods (3-1) is opposite with the splayed opening direction that the splayed of four lower thrust rods (3-13) distributes.
5. the method for designing of a kind of off-highway self-discharging vehicle according to claim 1, it is characterized in that: be connected with the hydraulic ram Connection Block on the hydraulic ram of described hoisting system (5), cylinder bracket (6-2) by bolted connection on cylinder support (6-6), the upper end of cylinder bracket (6-2) is fixed with limiting stopper (6-7), two-port U type groove cylinder support (6-6) outwardly is fixed on the parallel framework of two opposite side that connected and composed by two header board longerons (6-4) and two header board crossbeams (6-5), frame fixation is on container header board (6-3), and cylinder bracket (6-2) is connected with oil cylinder (6-1).
CN2008102325055A 2008-11-28 2008-11-28 Design method of non-highway dump truck Active CN101486327B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008102325055A CN101486327B (en) 2008-11-28 2008-11-28 Design method of non-highway dump truck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008102325055A CN101486327B (en) 2008-11-28 2008-11-28 Design method of non-highway dump truck

Related Child Applications (4)

Application Number Title Priority Date Filing Date
CN2010105548669A Division CN102001303B (en) 2008-11-28 2008-11-28 Design method of comfortable off-highway dump truck
CN2010105548048A Division CN102001302B (en) 2008-11-28 2008-11-28 Off-highway dump truck for reducing abrasion and prolonging service life of plate spring
CN2010105548739A Division CN101983877B (en) 2008-11-28 2008-11-28 A non-highway dump truck with large carrying capacity
CN2010105548974A Division CN102001304B (en) 2008-11-28 2008-11-28 Off-highway dump truck convenient for disassembly

Publications (2)

Publication Number Publication Date
CN101486327A CN101486327A (en) 2009-07-22
CN101486327B true CN101486327B (en) 2011-04-13

Family

ID=40889438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008102325055A Active CN101486327B (en) 2008-11-28 2008-11-28 Design method of non-highway dump truck

Country Status (1)

Country Link
CN (1) CN101486327B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102653222A (en) * 2012-05-15 2012-09-05 三一矿机有限公司 Balanced suspension device of dump truck and dump truck comprising same
CN103754143A (en) * 2013-12-26 2014-04-30 柳州正菱集团有限公司 Footstock of oil cylinder of dumper truck
CN103895465A (en) * 2014-04-16 2014-07-02 株洲时代新材料科技股份有限公司 Vehicle and rubber spring suspension system thereof
CN104085341A (en) * 2014-07-18 2014-10-08 三一矿机有限公司 Dumper lifting mechanism, application method thereof and dumper
CN110159622A (en) * 2019-05-31 2019-08-23 巨硕精密机械(常熟)有限公司 Connecting unit of profile material with holes
CN113753131A (en) * 2021-06-28 2021-12-07 吴桃 Five-wheel vehicle chassis
CN116176172A (en) * 2022-12-08 2023-05-30 湖南中联重科车桥有限公司 Different shaft through drive axle, vehicle chassis and vehicle
CN117022089A (en) * 2023-07-28 2023-11-10 中国重汽集团济南动力有限公司 A method of arranging the cargo box of an 8×4 dump truck

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2656209Y (en) * 2003-11-03 2004-11-17 中国重型汽车集团有限公司 Under cylinder back pushing type self unloading car lifting mechanism
CN201056174Y (en) * 2007-05-09 2008-05-07 内蒙古第一机械制造(集团)有限公司 Lift type back discharge of concrete self-discharging transport vehicle
CN201148111Y (en) * 2008-01-17 2008-11-12 安徽江淮汽车股份有限公司 All air suspension suitable for heavy truck

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2656209Y (en) * 2003-11-03 2004-11-17 中国重型汽车集团有限公司 Under cylinder back pushing type self unloading car lifting mechanism
CN201056174Y (en) * 2007-05-09 2008-05-07 内蒙古第一机械制造(集团)有限公司 Lift type back discharge of concrete self-discharging transport vehicle
CN201148111Y (en) * 2008-01-17 2008-11-12 安徽江淮汽车股份有限公司 All air suspension suitable for heavy truck

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
范翠玲等.TL3400系列非公路用自卸车.工程机械.2007,388-11. *

Also Published As

Publication number Publication date
CN101486327A (en) 2009-07-22

Similar Documents

Publication Publication Date Title
CN101486327B (en) Design method of non-highway dump truck
CN203753236U (en) Wide-body dump truck
CN103818483B (en) A kind of wide dumper
CN113352825B (en) Heavy vehicle with all-oil-gas spring suspension and rigid wide-body dumper
CN201300761Y (en) Off-highway used dump truck
CN201183440Y (en) Cargo vehicle variable hardness rubber balance suspension apparatus
CN107264219B (en) Mining truck rear suspension assembly
CN202847812U (en) Truck frame assembly
CN102303644A (en) Heavy-load electric vehicle chassis
CN106005010A (en) Mining dump truck frame with load level of 300 tons
CN103625493A (en) Large-axle-load railway vehicle bogie
CN206086879U (en) Load 300 tonner mining dump truck frame
CN113147551A (en) Super-tonnage three-bridge rigid mining dump truck
CN102001302B (en) Off-highway dump truck for reducing abrasion and prolonging service life of plate spring
CN102001304B (en) Off-highway dump truck convenient for disassembly
CN103043565A (en) Telescopic handler
CN101983877B (en) A non-highway dump truck with large carrying capacity
CN102001303B (en) Design method of comfortable off-highway dump truck
CN203126869U (en) Novel five-shaft bogie for railway paving equipment
CN105438044A (en) All-wheel-drive off-highway wide-body dumper
CN102815247A (en) Mineral dumper
CN218536480U (en) A reinforced mine-used rigid dump truck compartment
CN202242864U (en) Air suspension system applied to heavy truck
CN104742986B (en) Heavy off-road vehicle cab front overhang connecting device
CN102310736A (en) Air suspension system applied to heavy truck

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant