CN101483076B - Nuclear power plant experiment control system and nuclear power plant monitoring equipment - Google Patents

Nuclear power plant experiment control system and nuclear power plant monitoring equipment Download PDF

Info

Publication number
CN101483076B
CN101483076B CN2009101048346A CN200910104834A CN101483076B CN 101483076 B CN101483076 B CN 101483076B CN 2009101048346 A CN2009101048346 A CN 2009101048346A CN 200910104834 A CN200910104834 A CN 200910104834A CN 101483076 B CN101483076 B CN 101483076B
Authority
CN
China
Prior art keywords
nuclear power
unit
testing equipment
information
power station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009101048346A
Other languages
Chinese (zh)
Other versions
CN101483076A (en
Inventor
李建
黄清武
吴月军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
Daya Bay Nuclear Power Operations and Management Co Ltd
Guangdong Nuclear Power Joint Venture Co Ltd
Original Assignee
China General Nuclear Power Corp
Daya Bay Nuclear Power Operations and Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, Daya Bay Nuclear Power Operations and Management Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN2009101048346A priority Critical patent/CN101483076B/en
Publication of CN101483076A publication Critical patent/CN101483076A/en
Application granted granted Critical
Publication of CN101483076B publication Critical patent/CN101483076B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

The invention is applied to the power plant control field, and provides a nuclear power plant experiment control system and nuclear power plant monitoring equipment, including human-computer interactive units. The system also includes: a relevant system chaining unit, an operating unit and a monitoring unit. In this invention, the controlled experimental equipment are under centralized control and surveillance in the main interface to realize a nuclear power plant experiment control system, so that the nuclear power plant periodical test procedure is easier to control, the course of the nuclear power experiment is shortened, and unit security lever is increased.

Description

A kind of nuclear power station experiment control system and nuclear power station monitoring equipment
Technical field
The invention belongs to the Control of Power Plant field, relate in particular to a kind of nuclear power station experiment control system and nuclear power station monitoring equipment.
Background technology
Nuclear safety is the foundation that nuclear power station is depended on for existence.In order to guarantee nuclear safety, promptly to control pile reactivity, discharge the reactor core afterpower, contain radioactivity and controlling fires, nuclear power station has designed corresponding reactor protection system, and (Reactor Protection RPR), guarantees the nuclear safety in power station.Routine test is a kind of regular technical supervision activity; One of measure of security of operation depth defense; Its objective is that the object in order to guarantee to be supervised is consistent with standard or predetermined regulation measure; Thereby the availability of important safety related system and equipment is maintained in the design basis scope, and enough confidence levels are arranged.
In the present at home nuclear power station, RPR routine test---Test 3 tests of carrying out by operation (being called for short the T3 test), by the master control operator on master-control room hard disk platform, carry out down the auxiliary of mimic panel.Master-control room hard disk platform has the zone that is specifically designed to the T3 test, and the key of test usefulness is arranged above, withdraws from trystate, normal operation input when relevant device entering trystate and test are accomplished in order to trigger.The master-control room mimic panel can directly show the relevant device state, is convenient to master-control room operator observation, Authentication devices running status, demonstration test result.Simultaneously, (Centralized date processing, KIT) computer system can also show the variation of interrelated logic amount and analog quantity to the master-control room integrated data processing system.Master-control room warning AA alarm window can show the relevant state of reporting to the police of test.At the non-digitalization master-control room, such routine test manner of execution and process are directly perceived, efficient.
In the design of second phase of mountain range Australia; Adopted digitized master-control room; Put into power station computing machine and control system (Plant Computer Information &Control after the hard disk platform content digitizing with the first phase master-control room; KIC) in the system computer, originally hard disk platform, mimic panel, AA window annunciator, the KIT computing machine in the master-control room all cancelled.Mountain range Australia second phase master-control room adopts 4 main screen principle of design, the variation of control mode, and the information that makes the same time offer operator has been lacked many than the first phase hard disk platform master control of mountain range Australia.The master control operator obtains unit information must be on the different computers, switch between the different picture, and the process of acquired information is tortuous, complicated relatively.For the RPR routine test of interdepartmental system, if the coordinative experiments picture of special not, in the process of carrying out routine test, the master control operator must be switched between different system's pictures so, triggering pilot system and equipment, and the monitoring test equipment state; In machine group alarm inventory, seek the relevant warning of test; Simultaneously, also must the whole set state of monitoring.This makes the routine test process become complicated, tediously long, wayward, and unit safety operation is brought hidden danger.
Summary of the invention
The object of the present invention is to provide a kind of nuclear power station experiment control system, it is wayward to be intended to solve existing nuclear power station routine test, thereby causes the problem that nuclear power station routine test process is complicated, tediously long, unit safety operation brought hidden danger.
The present invention is achieved in that a kind of nuclear power station experiment control system, comprises man-machine interaction unit, and said system also comprises monitor unit, related system link unit and operating unit;
Said monitor unit, the relevant running state information that is used to keep watch on each testing equipment of being controlled, said relevant running state information is warning message and/or status information;
Said man-machine interaction unit; The title of each the testing equipment related system that is used for controlling in main interface display, can supply the user to trigger corresponding testing equipment to begin to test or the operation information of reset operation and the relevant running state information of each testing equipment that said monitoring unit monitors arrives, the testing equipment related system that receives user's input is selected information and operation information;
Said related system link unit; The testing equipment related system that is used for receiving according to said man-machine interaction unit is selected information and storage and linking relationship selected testing equipment related system in advance, is linked to the picture of user-selected testing equipment related system and through said man-machine interaction unit demonstration;
Said operating unit is used for triggering corresponding testing equipment according to the operation information that said man-machine interaction unit receives and begins test or reset operation.
Another object of the present invention is to provide a kind of nuclear power station monitoring equipment that comprises above-mentioned nuclear power station experiment control system.
In the present invention; Through each testing equipment that centralized control in main interface, supervision are controlled, realized a kind of nuclear power station experiment control system, make nuclear power station routine test process be easy to control; Shorten the process of nuclear power station test, and improved the unit safety operation level.
Description of drawings
Fig. 1 is the structural drawing of the nuclear power station experiment control system that provides of the embodiment of the invention;
Fig. 2 is the interface synoptic diagram that the embodiment of the invention provides;
Fig. 3 is that synoptic diagram is printed at the interface that the embodiment of the invention provides.
Embodiment
In order to make the object of the invention, technical scheme and advantage clearer,, the present invention is further elaborated below in conjunction with accompanying drawing and embodiment.Should be appreciated that specific embodiment described herein only in order to explanation the present invention, and be not used in qualification the present invention.
In embodiments of the present invention, through each experimental facilities that centralized control in main interface, supervision are controlled, realized a kind of nuclear power station experiment control system.
Fig. 1 shows the structure of the nuclear power station experiment control system that the embodiment of the invention provides, and for the ease of explanation, only shows the part relevant with the embodiment of the invention.
This system can be used for the nuclear power station monitoring equipment; Can be to run on the unit that software unit, hardware cell or software and hardware in these equipment combine, also can be used as independently, suspension member be integrated in these nuclear power station monitoring equipments or runs in the application system of these nuclear power station monitoring equipments.
This nuclear power station experiment control system comprises related system link unit 101, man-machine interaction unit 102, operating unit 103 and monitor unit 104.Wherein:
Man-machine interaction unit 102; The title of each testing equipment related system of controlling in main interface display, can supply the user to trigger corresponding testing equipment to begin to test or the operation information of reset operation and the relevant running state information of each testing equipment that monitor unit 104 monitors, the testing equipment related system that receives user's input is selected information and operation information.
Related system link unit 101; The testing equipment related system that receives according to man-machine interaction unit 102 is selected information and storage and linking relationship selected testing equipment related system in advance, is linked to the picture of user-selected testing equipment related system and through man-machine interaction unit 102 demonstrations.In inventive embodiments; Related system link unit 101 is stored the linking relationship of nuclear power station experiment control system and each testing equipment related system of being controlled in advance; The testing equipment related system that receives user's input according to man-machine interaction unit 102 is selected information and the linking relationship of storing in advance, and the picture that is linked to user-selected testing equipment related system also shows through man-machine interaction unit 102.
Operating unit 103, the operation information that receives according to man-machine interaction unit 102 trigger corresponding testing equipment and begin test or reset operation.Reset and promptly control corresponding testing equipment and withdraw from test, get into normal condition.
Monitor unit 104, the relevant running state information of keeping watch on each testing equipment of being controlled, in the present embodiment, the relevant running state information of demonstration comprises warning message, status information etc.
According to Daya Bay nuclear power plant's operating experience of more than ten years; In conjunction with collective and distributive type control system (DISTRIBUTED CONTROL SYSTEM; DCS) new features; The nuclear power plant reactor protection system routine test control system to nuclear power station routine test DCS design that provides with the embodiment of the invention below is that example describes, and Fig. 2 shows the interface synoptic diagram of the nuclear power plant reactor protection system routine test control system that the embodiment of the invention provides.In the present embodiment, nuclear power plant reactor protection system routine test control system is monitored two RPR A, B row equipment that must carry out routine test.The interface is divided into two row, and the left side one row show the relevant monitor message of RPR A row equipment, and the right one row show the relevant monitor message of RPR B row equipment.And, further with about two row respectively be divided into I, II, III and IV four sub-areas.
As shown in Figure 2; The I subarea of man-machine interaction unit 102 left column at main interface shows the title RPA025 of a regular test; And corresponding routine test related system man-machine interface (Man Machine Interface, picture MMI) connects RIS1C, ETY1C, RRI1C and RAZ1C; The I subarea of man-machine interaction unit 102 right row at main interface shows the title RPB025 of another routine test, and the picture of corresponding routine test related system MMI connects RIS1C, ETY1C and RRI1C.Can make things convenient for operator to be linked to the MMI picture of test related system quickly and accurately, obtain relevant information or carry out associative operation,, understand and the control unit operation with the real-time status of further inspection relevant device.
The II subarea of man-machine interaction unit 102 two row about main interface provide respectively trigger RPR A or the routine test of B row equipment begin test or SS or keyboard (the Selector switches and key pads on screen of the screen display of reset operation; KC), even reset corresponding RPR A or B row equipment withdraw from test, recover normal operating condition.Operator can realize RPR A or the beginning of B row equipment routine test or the control that resets through operation KC.
The III subarea of man-machine interaction unit 102 two row about main interface has shown RPR A, B row equipment and relevant power station computing machine and control system (Plant Computer Information &Control, KIC) warning message RPA621KA, KRT011KA and the KRT013KA of routine test execution respectively.In the present embodiment; Can distinguish whether this equipment is current receives corresponding warning message through the color of III subarea " RPA621KA ", " KRT011KA " and " KRT013KA " top
Figure GSB00000592582400051
sign;
Figure GSB00000592582400052
sign of top, right row III subareas, for example main interface " RPA621KA " is shown in red, representes that then the current RPA621KA of receiving of RPRB equipment reports to the police; If appear dimmed, represent that then the current RPA621KA that do not receive of RPRB equipment reports to the police.Whether like this, can make things convenient for operator to occurring in the relevant device process of the test reporting to the police to keep watch on and follow the tracks of, hold the executive process of relevant device routine test, demonstration test result keeps watch on set state.Certainly, sign, color etc. can change according to actual needs.
The IV subarea of man-machine interaction unit 102 two row about main interface has shown the status information of RPR A, B row equipment respectively, includes its each self-corresponding title and correlation behavior information of waiting to check equipment.Correlation behavior information includes end of a period state, actual act time, valve event situation etc.In Fig. 2; Requirement according to the routine test program; " Test equipments " lists each device name; " Initial request " lists the corresponding test original state of each equipment; " Validate request " lists the corresponding testing requirements end of a period state of each equipment, treats that the Fill Color of the icons such as that the testing equipment title is preceding is represented the valve event situation, for example; Figure indicates Fill Color and representes that then this valve is out, and does not have Fill Color to represent that then this valve is to close.Can also further use icons such as
Figure GSB00000592582400054
to distinguish the type of valve.For the needs checking equipment of actuation time, the corresponding left and right row of " Remark " row have also been listed the actual act time of each equipment correspondence and parameter actuation time of requirement respectively, and the actual act time is calculated by the DCS system automatically.This district just shows the virtual condition of each equipment, and all devices all can't be at this screen operation.
In embodiments of the present invention; The III of man-machine interaction unit 102 two row about main interface and IV subarea show that in real time each testing equipment of being controlled requires the real-time parameter of record, the testing requirements end of a period state of the warning message that promptly receives, equipment and actual act time etc. in the routine test program.And nuclear power plant reactor protection system routine test control system shows the supporting picture title of routine test " RPR025 " in upper end, main interface shown in Figure 2.
Certainly, the nuclear power plant reactor protection system routine test control system that the embodiment of the invention provides also can show other Test Information on main interface, and for example Unit 3 expression unit information are No. 3 units.
If the testing equipment that the nuclear power station experiment control system is controlled is two when above, man-machine interaction unit 102 is divided into the row of respective number, the corresponding testing equipment of each row with main interface.Certainly, also can adopt other modes to show.When if the testing equipment that the nuclear power station experiment control system is controlled has only one, just need not main interface be divided into two row.
In order to preserve the relevant information of each testing equipment in the test, so that check later on, as a preferential embodiment of the present invention, the nuclear power station experiment control system also comprises:
Preserve unit 105, before 103 pairs of each testing equipments of being controlled of operating unit reset, the relevant running state information of preserving corresponding testing equipment.In the present embodiment, the relevant running state information of preservation comprises the warning message of corresponding testing equipment before resetting, status information etc.
Print the relevant information of each testing equipment in the test for the ease of the operator, as another preferential embodiment of the present invention, the nuclear power station experiment control system also comprises:
Print unit 106 behind the print command that receives user's input, is printed the information of current main interface display.In the present embodiment, after print unit 106 received the print command of user input, special-purpose picture framework of routine test DCS and the content directly printing current main interface and shown comprise the real-time parameter that requires record in the routine test program, and be as shown in Figure 2.Further, when adopting print unit 106 to print, can also print the information such as title, date, personnel of this information of printing, as shown in Figure 3.
In order to guarantee that the nuclear power station experiment control system triggers that corresponding testing equipment begins or the correctness of reset operation; Prevent that error operations because of the operator from causing the startup that testing equipment is unnecessary or reset; As another preferential embodiment of the present invention, the nuclear power station experiment control system also comprises:
Authentication unit 107, the operation information that checking man-machine interaction unit 102 receives, and beginning or reset operation through the corresponding testing equipment of 103 triggerings of control operation unit after verifying.
In the present embodiment; The functions such as management of the key of 107 couples of KC of authentication unit can embody on supporting picture; Promptly when the operator operates KC; Eject the corresponding picture of confirming, for example prompting " whether will start the routine test of this equipment ", " whether will reset this equipment " etc. through man-machine interaction unit 102.Certainly, authentication unit 107 also can adopt other modes to verify the operation information that man-machine interaction unit 102 receives.
In embodiments of the present invention; Through each experimental facilities that centralized control in main interface, supervision are controlled, realized a kind of nuclear power station experiment control system, make nuclear power station routine test process be easy to control; Shorten the process of nuclear power station test, and improved the unit safety level.
And; Nuclear power station experiment control system centralized displaying test relevant device that the embodiment of the invention provides and multidate information thereof, relevant warning message and related valve action situation; And demonstration is carried out the actuation time that computing obtains in real time; Help the operator and implement test, the availability of Authentication devices and reliability.Simultaneously; The nuclear power station experiment control system provides the link of related system; For the master-control room operator fast, be directly acquainted with the multidate information of related system, systematically judge the functional status of nuclear power generating sets equipment and/or system, improve the rapidity and the reliability of operator's operations and diagnosis.
Further, the nuclear power station experiment control system that provides of the embodiment of the invention also has some following advantages:
1) method of operation routine test after the digitizing of nuclear power station master-control room is provided, has provided brand-new operation routine test executive means;
2) test relevant information nuclear power generating sets are complicated, interdepartmental system is carried out effective combination, and the functional status to the master-control room operator provides equipment fast and accurately and/or system has made full use of digitized characteristics;
3) implementation is simple and reliable relatively, shows through simple relatively picture, just can realize monitoring complicacy, multisystem and/or functions of the equipments state;
4) main interface display has taken into full account the characteristics of man-machine combination, has considered nuclear plant safety operation culture, the security of operation of the nuclear power station of assurance.
One of ordinary skill in the art will appreciate that; Realize that all or part of step in the foregoing description method is to instruct relevant hardware to accomplish through program; Described program can be in being stored in a computer read/write memory medium; Described storage medium is like ROM/RAM, disk, CD etc.
The above is merely preferred embodiment of the present invention, not in order to restriction the present invention, all any modifications of within spirit of the present invention and principle, being done, is equal to and replaces and improvement etc., all should be included within protection scope of the present invention.

Claims (9)

1. a nuclear power station experiment control system comprises man-machine interaction unit, it is characterized in that, said system also comprises monitor unit, related system link unit and operating unit;
Said monitor unit, the relevant running state information that is used to keep watch on each testing equipment of being controlled, said relevant running state information is warning message and/or status information;
Said man-machine interaction unit; The title of each the testing equipment related system that is used for controlling in main interface display, can supply the user to trigger corresponding testing equipment to begin to test or the operation information of reset operation and the relevant running state information of each testing equipment that said monitoring unit monitors arrives, the testing equipment related system that receives user's input is selected information and operation information;
Said related system link unit; The testing equipment related system that is used for receiving according to said man-machine interaction unit is selected information and storage and linking relationship selected testing equipment related system in advance, is linked to the picture of user-selected testing equipment related system and through said man-machine interaction unit demonstration;
Said operating unit is used for triggering corresponding testing equipment according to the operation information that said man-machine interaction unit receives and begins test or reset operation.
2. the system of claim 1 is characterized in that, said nuclear power station experiment control system is a nuclear power plant reactor protection system routine test control system.
3. system as claimed in claim 2 is characterized in that, the testing equipment of said nuclear power plant reactor protection system routine test control system control is reactor protection system A, B row equipment.
4. system as claimed in claim 3 is characterized in that, said status information is said reactor protection system A or the corresponding correlation behavior information of respectively waiting to check equipment of B row equipment.
5. system as claimed in claim 4 is characterized in that, the said correlation behavior information of respectively waiting to check equipment is one or more in end of a period state, actual act time, three kinds of information of valve event situation.
6. the system of claim 1 is characterized in that, said nuclear power station experiment control system also comprises:
Preserve the unit, be used for before said operating unit resets to each testing equipment of being controlled the relevant running state information of preserving corresponding testing equipment.
7. the system of claim 1 is characterized in that, said nuclear power station experiment control system also comprises:
Print unit is used for behind the print command that receives user's input, printing the information that current interface shows.
8. the system of claim 1 is characterized in that, said nuclear power station experiment control system also comprises:
Authentication unit is used to the operation information of verifying that said man-machine interaction unit receives, and through verifying that the back said operating unit of control triggers corresponding testing equipment and beginning or reset operation.
9. nuclear power station monitoring equipment that comprises the described nuclear power station experiment control system of the arbitrary claim of claim 1 to 8.
CN2009101048346A 2009-01-05 2009-01-05 Nuclear power plant experiment control system and nuclear power plant monitoring equipment Expired - Fee Related CN101483076B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101048346A CN101483076B (en) 2009-01-05 2009-01-05 Nuclear power plant experiment control system and nuclear power plant monitoring equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101048346A CN101483076B (en) 2009-01-05 2009-01-05 Nuclear power plant experiment control system and nuclear power plant monitoring equipment

Publications (2)

Publication Number Publication Date
CN101483076A CN101483076A (en) 2009-07-15
CN101483076B true CN101483076B (en) 2012-03-14

Family

ID=40880140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101048346A Expired - Fee Related CN101483076B (en) 2009-01-05 2009-01-05 Nuclear power plant experiment control system and nuclear power plant monitoring equipment

Country Status (1)

Country Link
CN (1) CN101483076B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101782933B (en) * 2009-12-15 2012-11-28 中广核工程有限公司 Virtual roaming design method and system of nuclear power plant control room
CN102024504B (en) * 2010-10-21 2013-04-24 中广核工程有限公司 Logic test method and device suitable for reactor protection system
CN102122533B (en) * 2010-10-28 2012-09-12 中广核工程有限公司 Method and system for monitoring safety level equipment of nuclear power plant
CN102142290B (en) * 2010-11-02 2012-09-12 中广核工程有限公司 Control method and system for periodic experiment of security-level equipment of nuclear power plant
CN102081981B (en) * 2010-11-24 2013-12-18 中广核工程有限公司 Pressure-temperature chart automatic-calling method and system for nuclear power plant
CN102157212B (en) * 2010-11-25 2012-11-14 中广核工程有限公司 Indicating method and system for nuclear power plant back-up control panel
TR201306991T1 (en) * 2010-12-10 2014-03-21 China General Nuclear Power Digitalized control system (dcs) of nuclear power unit, information processing method and device for dcs
CN102169734B (en) * 2011-01-26 2013-06-05 中广核工程有限公司 Nuclear power station valve action time testing system and method
CN103854715B (en) * 2012-11-30 2016-08-10 中广核工程有限公司 A kind of nuclear power station back-up disk controls equipment test system and method
CN104063803A (en) * 2013-03-20 2014-09-24 江苏核电有限公司 Safety instrument operation risk automatic analysis system for reactor
CN103324676A (en) * 2013-05-27 2013-09-25 中国核电工程有限公司 Routine test upstream file designing method for nuclear power plant
CN103701659A (en) * 2013-12-11 2014-04-02 中广核工程有限公司 Monitoring information transmission method and system for nuclear power plant
CN104898638B (en) * 2015-03-30 2019-04-09 北京广利核系统工程有限公司 A kind of routine test device of PWR nuclear power plant protection system
CN108573761A (en) * 2017-03-14 2018-09-25 中核核电运行管理有限公司 A kind of Nuclear Power Plant Equipment real-time performance monitoring method and system
CN110838378B (en) * 2019-10-23 2021-10-26 中广核工程有限公司 Nuclear power plant liquid level switch periodic test control system, control method and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1591252A (en) * 2004-05-20 2005-03-09 章近达 Equipment management network monitoring system
CN1993721A (en) * 2004-06-28 2007-07-04 Abb研究有限公司 System and method for inhibiting redundant warning
US7345580B2 (en) * 2003-09-05 2008-03-18 Yokogawa Electric Corporation Alarm management system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7345580B2 (en) * 2003-09-05 2008-03-18 Yokogawa Electric Corporation Alarm management system
CN1591252A (en) * 2004-05-20 2005-03-09 章近达 Equipment management network monitoring system
CN1993721A (en) * 2004-06-28 2007-07-04 Abb研究有限公司 System and method for inhibiting redundant warning

Also Published As

Publication number Publication date
CN101483076A (en) 2009-07-15

Similar Documents

Publication Publication Date Title
CN101483076B (en) Nuclear power plant experiment control system and nuclear power plant monitoring equipment
CN109493985B (en) Digital auxiliary control panel system of nuclear power plant, design method and control system
CN104488036A (en) Control room for nuclear power plant
CN103389705A (en) Operation monitoring system and method
Hashim et al. Application case study of AP1000 automatic depressurization system (ADS) for reliability evaluation by GO-FLOW methodology
Almenar et al. ATLAS online data quality monitoring
Park et al. SAMEX: A severe accident management support expert
CN101755296B (en) Ship's crew training set
CN100559423C (en) Equipment simulator
CN101976617A (en) Method for preventing accidents in mechanical cross operations by utilizing anti-misoperation locking system
Hunton et al. Vendor-Independent Design Requirements for a Boiling Water Reactor Safety System Upgrade
Ulrich et al. A computerized operator support system prototype
Stanton Human-error identification in human-computer interaction
Ma et al. Knowledge-based software design for Defense-in-Depth risk monitor system and application for AP1000
Park et al. A study on the validity of a task complexity measure for emergency operating procedures of nuclear power plants—Comparing task complexity scores with two sets of operator response time data obtained under a simulated SGTR
Ahn et al. Development of a risk-informed accident diagnosis and prognosis system to support severe accident management
Chuang et al. Design development and implementation of the human-system interface for Lungmen nuclear project
Oh et al. Safety studies on Korean fusion DEMO plant using integrated safety assessment methodology
CN101819419B (en) Active plc intelligent liquid crystal display
JP6636902B2 (en) Nuclear power plant system and training method using the same
Yang et al. Concept design of fusion power shutdown system for ITER
Blackett Evaluation of a Basic Principles SMR Simulator for Experimental Human Performance Research Studies
JP5285362B2 (en) Simulation device, simulation control method, and simulation control program
Bovell et al. Nuclear power plant control room operator control and monitoring tasks
Rinttilea et al. Handling and presentation of alarms during nuclear plant operation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUANGDONG NUCLEAR POWER JOINT CO., LTD.

Free format text: FORMER OWNER: CHINA GENERAL NUCLEAR GROUP CO., LTD.

Effective date: 20141024

Owner name: CHINA GENERAL NUCLEAR GROUP CO., LTD.

Free format text: FORMER OWNER: DAYAWAN NUCLEAR POWER RUNNING MANAGEMENT CO., LTD.

Effective date: 20141024

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: CHINA GENERAL NUCLEAR GROUP CO., LTD.

Free format text: FORMER NAME: CHINA GUANGDONG NUCLEAR POWER GROUP CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: Shenzhen science and technology building, No. 1001 Futian District Road, Shenzhen city in Guangdong province 518031 17-19 floor

Patentee after: CHINA GENERAL NUCLEAR POWER Corp.

Patentee after: DAYABAY NUCLEAR POWER OPERATIONS AND MANAGEMENT Co.,Ltd.

Address before: Shenzhen science and technology building, No. 1001 Futian District Road, Shenzhen city in Guangdong province 518031 17-19 floor

Patentee before: CHINA GUANGDONG NUCLEAR POWER GROUP Co.,Ltd.

Patentee before: DAYABAY NUCLEAR POWER OPERATIONS AND MANAGEMENT Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20141024

Address after: 518031 Guangdong city of Shenzhen province Futian District science and technology building, Shangbu Road 15

Patentee after: GUANGDONG NUCLEAR POWER JOINT VENTURE Co.,Ltd.

Patentee after: CHINA GENERAL NUCLEAR POWER Corp.

Address before: Shenzhen science and technology building, No. 1001 Futian District Road, Shenzhen city in Guangdong province 518031 17-19 floor

Patentee before: CHINA GENERAL NUCLEAR POWER Corp.

Patentee before: DAYABAY NUCLEAR POWER OPERATIONS AND MANAGEMENT Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120314

Termination date: 20220105

CF01 Termination of patent right due to non-payment of annual fee