CN101482467B - Specimen pre-loading multifunctional clamper group - Google Patents

Specimen pre-loading multifunctional clamper group Download PDF

Info

Publication number
CN101482467B
CN101482467B CN2009100606824A CN200910060682A CN101482467B CN 101482467 B CN101482467 B CN 101482467B CN 2009100606824 A CN2009100606824 A CN 2009100606824A CN 200910060682 A CN200910060682 A CN 200910060682A CN 101482467 B CN101482467 B CN 101482467B
Authority
CN
China
Prior art keywords
loading
prestrain
anchor clamps
flexible
fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009100606824A
Other languages
Chinese (zh)
Other versions
CN101482467A (en
Inventor
彭刚
周万清
徐港
姜袁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges University CTGU
Original Assignee
China Three Gorges University CTGU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges University CTGU filed Critical China Three Gorges University CTGU
Priority to CN2009100606824A priority Critical patent/CN101482467B/en
Publication of CN101482467A publication Critical patent/CN101482467A/en
Application granted granted Critical
Publication of CN101482467B publication Critical patent/CN101482467B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a test piece pre-loading multifunctional fixture group, which consists of a rigid pre-loading fixture and/or a flexible pre-loading fixture; In the rigid pre-loading fixture, a first main pull rod is connected to two supporting pier type clamping plates; In the flexible pre-loading fixture, a second main pull rod is connected to two outer clamping plates; two inner clamping platesare disposed between the two outer clamping plates; and a secondary pull rod, a spring and/or a damper are installed between the outer clamping plate and the inner clamping plate. Another technical scheme is composed by removing the secondary pull rod. The third technical scheme is composed by removing the secondary pull rod and the inner clamping plates. Since the fixture group provided in the invention comprises not only rigid pre-loading fixture, but also flexible pre-loading fixture, when testing, the fixture can be pre-loaded flexibly and/or rigidly in three directions to the square or hexahedron test piece according to needs to form different strained conditions of the test piece, thereby, the mechanical properties loading test of test piece under double axes and three axes can be realized on a single shaft dynamic/static force loading equipment.

Description

The specimen pre-loading multifunctional clamper group
Technical field
The present invention relates in a kind of civil engineering work building materials be carried out the improvement of the anchor clamps of mechanical test, particularly a kind of specimen pre-loading multifunctional clamper group.
Background technology
In field of civil engineering, the power static(al) load test of building materials such as concrete, rock has comprehensive progress and development, utilize servo-type single shaft, three sound power load test equipment can carry out conventional material mechanical performance test, for engineering construction provides effective detection means.But in existing experimental technique, also do not have a kind of test method can the true force-bearing situation of simulation material under complex stress condition, such as periphery material to damping energy-absorbing function etc. in the effect of contraction of core material, the power loading procedure; In addition, how to carry out the material sound power performance test under the lasting for a long time loading effect economically, also be among the exploration at present, the test unit and the test method that meet material actual loading situation become the guardian technique problem.Therefore, reinforcement can the simulation material real bearing state and can be continued the development and an emphasis that is developed to for material mechanical performance research of unit clamp that test specimen is loaded for a long time, especially can be under the twin shaft of realization material on the single shaft sound power loading equipemtn and three complicated applied force states the anchor clamps of the load test of mechanical property.
Summary of the invention
Technical matters to be solved by this invention is that a kind of specimen pre-loading multifunctional clamper group that can simulate real bearing state will be provided, it can be under the twin shaft of realizing material on the single shaft sound power loading equipemtn and three complicated applied force states the load test of mechanical property.
In order to solve the problems of the technologies described above, technical scheme of the present invention is: a kind of specimen pre-loading multifunctional clamper group, it is made up of rigidity prestrain anchor clamps and/or flexible prestrain anchor clamps, in the rigidity prestrain anchor clamps, first main tie connects two buttress type clamping plate, and in the flexible prestrain anchor clamps, second main tie connects two external splints, two inner splints are located between two external splints, and time pull bar, spring and/or damper are installed between external splint and the inner splint.
Another kind of technical scheme of the present invention is: a kind of specimen pre-loading multifunctional clamper group, it is made up of rigidity prestrain anchor clamps and/or flexible prestrain anchor clamps, in the rigidity prestrain anchor clamps, first main tie connects two buttress type clamping plate, in the flexible prestrain anchor clamps, second main tie connects two external splints, and two inner splints are located between two external splints, and spring and/or damper are installed between external splint and the inner splint.
The third technical scheme of the present invention is: a kind of specimen pre-loading multifunctional clamper group, it is made up of rigidity prestrain anchor clamps and/or flexible prestrain anchor clamps, in the rigidity prestrain anchor clamps, first main tie connects two buttress type clamping plate, in the flexible prestrain anchor clamps, second main tie connects two external splints, and two external splint inboards respectively are equipped with spring and/or damper.
Specimen pre-loading multifunctional clamper group provided by the invention, owing to both comprised rigidity prestrain anchor clamps, comprise flexible prestrain anchor clamps again, spring in the flexible prestrain anchor clamps can be simulated the elastic restraint effect of periphery material, damper can simulation material the damper restriction effect, the difference that inferior pull bar sockets fastening degree can be adjusted the mechanics parameter of spring and damper, can realize the flexible loading effect of material by various combination, during test, on three directions of square hexahedron test specimen, can install one arbitrarily as required, or two, or three flexibilities (rigidity) prestrain anchor clamps, or with flexibility and rigidity prestrain anchor clamps mixing use, it is unidirectional that test specimen is formed, two-way, three-dimensional flexibility (rigidity) stress, or it is unidirectional that test specimen is formed, two-way, three-dimensional is flexible mixes stress with rigidity, thus under the twin shaft of having realized test specimen on the single shaft sound power loading equipemtn and three complicated applied force states the load test of mechanical property.
Description of drawings
The invention will be further described below in conjunction with drawings and Examples.
Fig. 1 is the structural representation of first kind of embodiment of the present invention;
Fig. 2 is the structural representation of another embodiment of the present invention;
Fig. 3 is the structural representation of the third embodiment of the present invention.
Embodiment
A kind of specimen pre-loading multifunctional clamper group as shown in Figure 1, it is made up of rigidity prestrain anchor clamps 1 and/or flexible prestrain anchor clamps 2, in the rigidity prestrain anchor clamps 1, first main tie 3 connects two buttress type clamping plate 4, in the flexible prestrain anchor clamps 2, second main tie 3 ' 5, two inner splints 6 of two external splints of connection are located between two external splints 5, and time pull bar 7, spring 8 and/or damper 9 are installed between external splint 5 and the inner splint 6.During test, if flexible prestrain anchor clamps 2 will be installed on the above-below direction of test specimen 10, adjust earlier time pull bar 7 with spring 8 and damper 9 parameter adjustments to the design load size, then an external splint 5 is placed on the base of sound power loading equipemtn, make inner splint 6 up, place test specimen 10 on the inner splint 6 again and adjust centering, again another piece inner splint 6 is placed on the test specimen 10, after adjusting centering once more, open loading equipemtn test specimen 10 and these flexible prestrain anchor clamps 2 are preloaded into design level, insert second main tie 3 ' also fastening interior outer nut, so far can realize the installation of the flexible prestrain anchor clamps 2 of above-below direction.Test specimen 10 is taken off, repeat said process the flexible prestrain anchor clamps 2 of two other direction can be installed on test specimen 10.If rigidity prestrain anchor clamps 1 are installed on test specimen, the flexible prestrain anchor clamps of method and installation 2 are identical, just save the adjustment process of inferior pull bar 7, spring 8 and damper 9 in the flexible prestrain anchor clamps 2.
The present invention also can in this structure, only be equipped with spring 8 and/or damper 9 according to the specimen pre-loading multifunctional clamper group of designing another kind of structure shown in Figure 2 between external splint 5 and the inner splint 6, with the different restrained conditions of simulation periphery material.
The present invention can also be according to the specimen pre-loading multifunctional clamper group of designing the third structure shown in Figure 3, in this structure, second main tie 3 ' 5, two external splint 5 inboards of two external splints of connection of flexible prestrain anchor clamps 2 respectively are equipped with spring 8 and/or damper 9.Spring 8 and/or damper 9 directly acted on form the different restrained conditions that stress state is simulated periphery material on the test specimen 10.

Claims (3)

1. specimen pre-loading multifunctional clamper group, it is characterized in that: it is made up of rigidity prestrain anchor clamps (1) and/or flexible prestrain anchor clamps (2), in the rigidity prestrain anchor clamps (1), first main tie (3) connects two buttress type clamping plate (4), in the flexible prestrain anchor clamps (2), second main tie (3 ') connects two external splints (5), two inner splints (6) are located between two external splints (5), and time pull bar (7), spring (8) and/or damper (9) are installed between external splint (5) and the inner splint (6).
2. specimen pre-loading multifunctional clamper group, it is characterized in that: it is made up of rigidity prestrain anchor clamps (1) and/or flexible prestrain anchor clamps (2), in the rigidity prestrain anchor clamps (1), first main tie (3) connects two buttress type clamping plate (4), in the flexible prestrain anchor clamps (2), second main tie (3 ') connects two external splints (5), and two inner splints (6) are located between two external splints (5), and spring (8) and/or damper (9) are installed between external splint (5) and the inner splint (6).
3. specimen pre-loading multifunctional clamper group, it is characterized in that: it is made up of rigidity prestrain anchor clamps (1) and/or flexible prestrain anchor clamps (2), in the rigidity prestrain anchor clamps (1), first main tie (3) connects two buttress type clamping plate (4), in the flexible prestrain anchor clamps (2), second main tie (3 ') connects two external splints (5), and two external splints (5) inboard respectively is equipped with spring (8) and/or damper (9).
CN2009100606824A 2009-02-04 2009-02-04 Specimen pre-loading multifunctional clamper group Expired - Fee Related CN101482467B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100606824A CN101482467B (en) 2009-02-04 2009-02-04 Specimen pre-loading multifunctional clamper group

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100606824A CN101482467B (en) 2009-02-04 2009-02-04 Specimen pre-loading multifunctional clamper group

Publications (2)

Publication Number Publication Date
CN101482467A CN101482467A (en) 2009-07-15
CN101482467B true CN101482467B (en) 2011-03-30

Family

ID=40879675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100606824A Expired - Fee Related CN101482467B (en) 2009-02-04 2009-02-04 Specimen pre-loading multifunctional clamper group

Country Status (1)

Country Link
CN (1) CN101482467B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102564849B (en) * 2011-12-29 2015-05-27 北京建筑大学 Asphalt mixture test fixture and using method thereof
CN102759483B (en) * 2012-06-29 2014-04-16 宁波福士汽车部件有限公司 Automobile pipe pressure test device
CN104129548B (en) * 2014-07-07 2016-08-24 长兴大宇科机电有限公司 Pole group's turnover clamp
CN104344997B (en) * 2014-11-04 2017-01-11 同济大学 Passive type restraint loading device for triaxial test
US10344857B2 (en) 2015-02-03 2019-07-09 Zhilin WANG Gear-lever mechanism using meshing and pushing to rotate
CN112432850B (en) * 2020-11-16 2021-07-23 河海大学 Three-way independent loading novel mixed boundary true triaxial apparatus
CN113138116B (en) * 2021-04-01 2022-04-08 北京科技大学 Rigid-flexible rock pressure testing machine device for teaching demonstration

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2715138Y (en) * 2004-06-24 2005-08-03 石油大学(北京) Core holder simulating multi stratum stress field coupling action
CN201087832Y (en) * 2007-05-25 2008-07-16 浙江工业大学 Clamper for fine material tension test
CN201368827Y (en) * 2009-02-04 2009-12-23 三峡大学 Testpiece preload multifunctional fixture set

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2715138Y (en) * 2004-06-24 2005-08-03 石油大学(北京) Core holder simulating multi stratum stress field coupling action
CN201087832Y (en) * 2007-05-25 2008-07-16 浙江工业大学 Clamper for fine material tension test
CN201368827Y (en) * 2009-02-04 2009-12-23 三峡大学 Testpiece preload multifunctional fixture set

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开平8-184542A 1996.07.16

Also Published As

Publication number Publication date
CN101482467A (en) 2009-07-15

Similar Documents

Publication Publication Date Title
CN101482467B (en) Specimen pre-loading multifunctional clamper group
Psycharis et al. Shear resistance of pinned connections of precast members to monotonic and cyclic loading
Swensen et al. Behavior of screw and adhesive connections to gypsum wallboard in wood and cold-formed steel-framed wallettes
KR101176374B1 (en) Seismic control brace apparatus and bracing method
CN201368827Y (en) Testpiece preload multifunctional fixture set
CN110715798B (en) Test device and test method for measuring self-loosening of bolt
JP6949404B2 (en) New 3D anti-vibration device
Villaverde et al. Aseismic roof isolation system: analytic and shake table studies
CN204924892U (en) Effect test device is adhered to in uniaxial extension effect protective coating down
CN105388107A (en) Protective coating adhesion effect test device and test method under action of uniaxial tension
Morgan et al. Cyclic behavior of high-damping rubber bearings
Hatami et al. A numerical study on the use of geofoam to increase the external stability of reinforced soil walls
CN114279667B (en) Pseudo-static anti-seismic testing device and method for wallboard joint
Watkins et al. An experimental investigation of a wall-to-floor connector for self-centering walls
Costa et al. Experimental study of the out-of-plane behaviour of unreinforced sacco stone masonry walls: Comparative analysis of two different test setups
Kim et al. Experimental investigation of hybrid buckling-restrained braces
Li et al. Study on the aging time variation law of mechanical properties of the laminated rubber bearing in coastal bridges considering frictional slip
Abrams Dynamic and static testing of reinforced concrete masonry structures
EP2734675B1 (en) Bearing preset system
Issa et al. An experimental and numerical investigation of the cyclic performance of a smart self-centering bracing system
Yajun et al. Tests on seismic behavior of pre-cast shear walls with vertical reinforcements spliced by two different grout ways
CN204924881U (en) Test device that concrete sulphate that draws compressive stress corrodes can apply simultaneously
Colato et al. Stonecutters cable-stayed bridge: full-scale testing of dynamic control devices
CN101761532B (en) Anchor bolt connecting device of artificial hollow plate and connecting method thereof
Richards et al. Quantifying length-effects on buckling-restrained braces that are considerably longer than associated qualification tests

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110330

Termination date: 20140204