CN101478178B - 一种变电站两种标准之间的转换方法 - Google Patents
一种变电站两种标准之间的转换方法 Download PDFInfo
- Publication number
- CN101478178B CN101478178B CN2008102048495A CN200810204849A CN101478178B CN 101478178 B CN101478178 B CN 101478178B CN 2008102048495 A CN2008102048495 A CN 2008102048495A CN 200810204849 A CN200810204849 A CN 200810204849A CN 101478178 B CN101478178 B CN 101478178B
- Authority
- CN
- China
- Prior art keywords
- protection
- information
- modeling
- logical node
- iec61850
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 31
- 230000001131 transforming effect Effects 0.000 title claims description 11
- 238000006243 chemical reaction Methods 0.000 claims abstract description 12
- 230000004224 protection Effects 0.000 claims description 86
- 238000013507 mapping Methods 0.000 claims description 33
- 238000005070 sampling Methods 0.000 claims description 16
- 230000004807 localization Effects 0.000 claims description 8
- 230000009471 action Effects 0.000 claims description 5
- 238000005314 correlation function Methods 0.000 claims description 4
- 230000033001 locomotion Effects 0.000 claims description 4
- 238000004088 simulation Methods 0.000 claims description 4
- 230000001681 protective effect Effects 0.000 abstract description 3
- 230000007704 transition Effects 0.000 abstract description 2
- 238000004891 communication Methods 0.000 description 24
- 230000005540 biological transmission Effects 0.000 description 7
- 238000005516 engineering process Methods 0.000 description 4
- 238000009472 formulation Methods 0.000 description 4
- 239000000203 mixture Substances 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000011664 signaling Effects 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 230000001133 acceleration Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000003990 capacitor Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000012938 design process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000003012 network analysis Methods 0.000 description 1
- 238000012549 training Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
Abstract
Description
61850Ref | 103Group | 103I tem | desc |
/LD1/GndPDIS1.GndStr | 3 | 1 | 距离1段(相间,接地) |
/LD1/GndPDIS2.GndStr | 3 | 2 | 接地距离II段 |
/LD1/GndPDIS3.GndStr | 3 | 3 | 接地距离III段 |
/LD1/GndPDIS4.GndStr | 3 | 4 | 相间距离II段 |
/LD1/GndPDIS5.GndStr | 3 | 5 | 相间距离III段 |
ASCI服务 | ASDU | 103Group | 103COT | Desc |
RequestDataSetValues | ASDU10 | 4 | 42 | 召唤软压板 |
RequestDataSetValues | ASDU10 | 5 | 42 | 召唤模拟量 |
SetDataSetValues | ASDU10 | 4 | 40 | 投退软压板 |
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008102048495A CN101478178B (zh) | 2008-12-30 | 2008-12-30 | 一种变电站两种标准之间的转换方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008102048495A CN101478178B (zh) | 2008-12-30 | 2008-12-30 | 一种变电站两种标准之间的转换方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101478178A CN101478178A (zh) | 2009-07-08 |
CN101478178B true CN101478178B (zh) | 2013-07-17 |
Family
ID=40838823
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008102048495A Active CN101478178B (zh) | 2008-12-30 | 2008-12-30 | 一种变电站两种标准之间的转换方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101478178B (zh) |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101694952B (zh) * | 2009-09-28 | 2012-04-25 | 国电南京自动化股份有限公司 | 由iec61850 scd文件生成嵌入式远动系统装置定义的方法 |
CN102123045A (zh) * | 2011-01-18 | 2011-07-13 | 河南龙源许继科技发展股份有限公司 | 基于iec61850的高压设备在线监测的建模方法 |
WO2012131074A1 (en) * | 2011-03-31 | 2012-10-04 | Alstom Technology Ltd | Method for managing process automation control and associated system |
CN102497363B (zh) * | 2011-12-07 | 2014-06-04 | 北京四方继保自动化股份有限公司 | 一种iec103主子站协议的双重引擎驱动的通用处理方法及系统 |
CN102710019B (zh) * | 2012-06-11 | 2014-09-17 | 广东电网公司电力科学研究院 | 电力系统源端维护的刀闸转换方法及装置 |
CN103454926A (zh) * | 2012-10-09 | 2013-12-18 | 深圳市爱科赛科技有限公司 | 一种智能变电站辅助系统建模的方法和装置 |
CN103605780B (zh) * | 2013-11-29 | 2016-08-24 | 长园深瑞继保自动化有限公司 | Iec61850数据的接口处理系统 |
CN103779962B (zh) * | 2013-12-09 | 2016-03-30 | 中国南方电网有限责任公司 | 基于智能远动机的61850模型与cim模型的转换方法 |
CN104065667A (zh) * | 2014-07-03 | 2014-09-24 | 国电南瑞科技股份有限公司 | 一种基于单元映射法变电站间隔层防误闭锁的网络规约互转方法 |
CN105790229A (zh) * | 2014-12-15 | 2016-07-20 | 成都交大运达电气有限公司 | 一种基于iec61850的铁路牵引供电系统馈线保护装置 |
CN106202149B (zh) * | 2016-06-22 | 2019-07-23 | 南京南瑞继保电气有限公司 | 一种iec61850模型文件转换方法 |
CN111031136B (zh) * | 2019-12-18 | 2021-10-26 | 华南理工大学 | 一种r-sv电力报文的实现方法 |
-
2008
- 2008-12-30 CN CN2008102048495A patent/CN101478178B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN101478178A (zh) | 2009-07-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101478178B (zh) | 一种变电站两种标准之间的转换方法 | |
CN101432612B (zh) | 智能电子设备配置验证 | |
Higgins et al. | Distributed power system automation with IEC 61850, IEC 61499, and intelligent control | |
CN102937685B (zh) | 一种变电站用基于实时仿真技术的一体化测试平台 | |
CN102209074B (zh) | 一种电力系统全数字动态仿真系统 | |
Cheng et al. | Modernizing substation automation systems: Adopting IEC standard 61850 for modeling and communication | |
US8599526B2 (en) | Protection lockout in substation automation | |
CN103488835A (zh) | 一种调度自动化系统的仿真平台及其仿真方法 | |
CN103023149A (zh) | 一种基于iec61850标准的智能配电终端及智能配电系统 | |
CN101291060A (zh) | 用于变电站或配电自动化系统的智能电子设备 | |
CN105071532A (zh) | 一种变电站自动化系统 | |
CN103199624A (zh) | 基于iec 61850的智能变电站 | |
CN102768705A (zh) | 一种基于iec61968的配电网模型互操作及功能验证方法 | |
CN106292576B (zh) | 一种scl模型与cim模型的映射方法 | |
Rangelov et al. | The IEC 61850 standard—Communication networks and automation systems from an electrical engineering point of view | |
CN106300684A (zh) | 一种面向变电站备用电源系统的智能一体化监控方法 | |
CN101741060A (zh) | 分界断路器设备及其远程监控方法 | |
CN103227450A (zh) | 在线故障恢复方法及系统 | |
Gadde et al. | Real-time hardware-in-the-loop implementation of protection and self-healing of microgrids | |
Madonsela et al. | Advances in telecontrol and remote terminal units (rtu) for power substations | |
Kardam et al. | Communication and load balancing using SCADA model based integrated substation | |
Gu et al. | Self-healing control technology for distribution networks | |
Holtschulte et al. | Cluster Automation System for Dynamic Grid Control at Distribution Level | |
CN105866630A (zh) | 一种应对全站信息缺失的故障诊断方法和系统 | |
CN209545252U (zh) | 一种智能变电站管理系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: SHANGHAI ELECTRIC COMMUNICATION CO., LTD. Free format text: FORMER OWNER: SHANGHAI JIULONG ELECTRIC SCIENCE + TECHNOLOGY CO., LTD. Effective date: 20120703 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20120703 Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Applicant after: Shanghai Electric Power Corporation Co-applicant after: Shanghai Electric Power Communication Co., Ltd. Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Applicant before: Shanghai Electric Power Corporation Co-applicant before: Shanghai Jiulong Electric Power Co., Ltd. |
|
ASS | Succession or assignment of patent right |
Owner name: SHANGHAI ELECTRIC COMMUNICATION CO., LTD. STATE EL Free format text: FORMER OWNER: SHANGHAI ELECTRIC COMMUNICATION CO., LTD. Effective date: 20120925 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20120925 Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Applicant after: Shanghai Electric Power Corporation Applicant after: Shanghai Electric Power Communication Co., Ltd. Applicant after: State Grid Corporation of China Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Applicant before: Shanghai Electric Power Corporation Applicant before: Shanghai Electric Power Communication Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |