CN101476323A - Miniature piling machine - Google Patents
Miniature piling machine Download PDFInfo
- Publication number
- CN101476323A CN101476323A CNA2009100290889A CN200910029088A CN101476323A CN 101476323 A CN101476323 A CN 101476323A CN A2009100290889 A CNA2009100290889 A CN A2009100290889A CN 200910029088 A CN200910029088 A CN 200910029088A CN 101476323 A CN101476323 A CN 101476323A
- Authority
- CN
- China
- Prior art keywords
- frame
- base
- pile hammer
- pile monkey
- guide rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The invention relates to a minitype piling device, which comprises a base, a frame, a windlass and a pile hammer, wherein a steel wire rope of the windlass is connected with the pile hammer through a guiding pulley on the upper part of the frame, the frame is lower than 2.20 m, and a pile hammer guiding mechanism is arranged in front of the frame. The pile hammer guiding mechanism comprises an overground guide rod arranged on the upper part of the base and an underground guide rod arranged on the lower part of the base, a hanging ring is arranged on the top of the pile hammer, a pothook provided with a long control handle is matched with the hanging ring, and the end part of the steel wire rope of the windlass is hinged with the middle part of the pothook body. Aiming at the base sedimentation problem of silt groundsill or soft soil groundsill equipment of transformer substations, the minitype piling device is developed under the requirements that limited safety height is 2.2 m and the power is not cut off, and breaks through a forbidden zone that piling is difficult in a running transformer substation in a special construction environment when basic reinforcement is carried out. The minitype piling device is easy to operate, and has small volume and favorable adaptability to the reinforcement and correction of the base sedimentation of industrial production devices.
Description
Technical field
The present invention relates to a kind of construction equipment of pile foundation, particularly a kind of miniature piling machine.
Background technology
China's Coastal Areas, rapid economic development needs newly-built a large amount of transformer station, and wherein a part of transformer station will be built on the soft foundation inevitably.In a single day links such as the exploration of transformer station, design, construction make a fault on coastal sea silt, alluvial plain, lake base, may cause the sedimentation on substation equipment basis, and then can directly influence the safe operation of electric power facility.Because the foundation settlement development lasts longer, so the class accident just is found after equipment puts into operation often, to face great risk and under the electrification in high voltage service condition sedimentation basis reinforced, existing reinforcement means and plant equipment all can not adapt to the technical requirements of electrification in high voltage place operation.
At present at home to the reinforcing on similar basis, adopt deep mixing method or compaction grouting method mostly, but these methods of evidence also are not suitable for underpin under the deep muck foundation condition in coastal area, and possible disturbance power supply unit basis is stable, the particularly ground stabilization that disperses for this kind equipment basis of transformer station, its cost is very high, and consolidation effect is not obvious.
In a single day high voltage substation puts into effect, generally do not allow to have a power failure, and the difficult point of this transformer station's enforcement underpin is:
(1) the 220kV transformer station charged place construction operation that is in operation, safety requirements is high, and the strengthening construction operation height restriction under charging equipment is at 2.2m;
(2) various existing construction machineries are subjected to the safe construction distance limit, all can not enter site operation;
(3) can not the former basis of disturbance when underpin;
(4) because equipment and basis from heavy and light, can not utilize the counter-force that is reinforced the basis when reinforcing.
Summary of the invention
The technical problem to be solved in the present invention is at transformer station's mud or soft foundation Equipment Foundations settlement issues, under the requirement that limits safe altitude 2.2m, do not have a power failure, has proposed the reliable miniature piling machine of a kind of construction safety.
The technical problem to be solved in the present invention is achieved through the following technical solutions, a kind of miniature piling machine, comprise base, frame, hoist engine and pile monkey, the wire rope of hoist engine joins by the leading block and the pile monkey of upper rack, be characterized in: the high 1.50~2.20m of frame, frame front is provided with the pile monkey guiding mechanism, described pile monkey guiding mechanism comprises the ground top guide bar that is arranged on base top and is arranged on the ground lower guide rod of base bottom, be provided with a link at the top of pile monkey, what cooperate with link is provided with hook, hook is provided with a long joystick, and the middle part of the end of hoist engine wire rope and described hook coupler body is hinged.
The technical problem to be solved in the present invention can also come further to realize by the following technical programs, described ground top guide bar and ground lower guide rod are set to one, be arranged three in parallel, described pile monkey is located between three guide rods, vertically is provided with the three road slideways that cooperate with guide rod on the pile monkey accordingly.
The present invention compared with prior art, at transformer station's sea alluvial plain based device foundation settlement problem, at restriction safe altitude 2.2m, do not have a power failure the electricity requirement under, developed miniature piling machine, carried out the reinforcing experimental study, explored and under complicated soft foundation condition, adopted miniature steel pipe pile reinforced power equipment basis, to stop the effective ways of its sedimentation, broken through the forbidden zone of carrying out underpin inconvenience piling in this special construction environment of transformer station that is in operation, the stake top application that adopts in the test adds the prestressed reinforcement new technology, have remarkable effect to reducing foundation settlement, successfully solved this technical barrier.Prove that by experimental study this technology is used the pile foundation underpinning principle, adopt and squeeze into the shaped steel pile tube that declines, penetrate soft layer, can effectively stop foundation settlement.
It is simple to operate, at first prefabricated stub lifting is put in place, and hoist engine is sling pile monkey, pulls joystick downwards, and hook is thrown off with link, and then the pile monkey freely falling body is downward, precast piling is thrown into underground.Construction period does not have a power failure, and has avoided the loss of operating a switch and having a power failure and giving power supply department and cause with electric unit.This pile driving equipment volume is small and exquisite, and the space that a very important person can stand is the energy piling construction just, is subjected to the restriction of space environment hardly, and the foundation settlement reinforcement and rectification for the equipment of industrial product has good compliance equally.Can often occur as local foundation settlement during the civic building building reinforce is transformed at present, the indoor Liang Huanzhu that takes out transforms, service load strengthens various technical barriers such as needing to increase the basis, the remarkable advantages of the present invention is, its service condition is loose, the less space environment of reinforced structure that is subjected to influences, and has brilliant market developing prospect.
Description of drawings
Fig. 1 is a structure diagram of the present invention.
Fig. 2 is the vertical view of Fig. 1.
The specific embodiment
A kind of small-sized pile driving equipment, comprise base 6, frame 7, hoist engine 8 and pile monkey 4, the wire rope of hoist engine joins by the leading block and the pile monkey 4 of upper rack, frame 7 high 1.50~2.20m, frame 7 front portions are provided with the pile monkey guiding mechanism, described pile monkey guiding mechanism comprises ground top guide bar 5 that is arranged on base top and the ground lower guide rod 9 that is arranged on the base bottom, be provided with a link 1 at the top of pile monkey 4, being provided with of cooperating with link 1 links up with 3, hook 3 is provided with a long joystick 2, and the middle part of the end of hoist engine wire rope and described hook 3 coupler bodies is hinged.Described ground top guide bar 5 and ground lower guide rod 9 are set to one, be arranged three in parallel, and described pile monkey is located between three guide rods, vertically are provided with the three road slideways that cooperate with guide rod on the pile monkey 4 accordingly.
Excavation pit at first during construction, the purpose of excavation of foundation pit is for ringing engine provides the underground space, so that make the pile monkey of pile driver have enough distances that falls, when determining pile penetration, the falling apart from must not be of pile monkey less than 1.5m.
Claims (2)
1. miniature piling machine, comprise base (6), frame (7), hoist engine (8) and pile monkey (4), the wire rope of hoist engine (8) joins by the leading block and the pile monkey (4) on frame (7) top, it is characterized in that: the high 1.50~2.20m of frame (7), frame (7) front portion is provided with the pile monkey guiding mechanism, described pile monkey guiding mechanism comprises ground top guide bar (5) that is arranged on base (6) top and the ground lower guide rod (9) that is arranged on the base bottom, be provided with a link (1) at the top of pile monkey (4), what cooperate with link (1) is provided with hook (3), hook (3) is provided with a long joystick (2), and the middle part of the end of hoist engine wire rope and described hook (3) coupler body is hinged.
2. miniature piling machine according to claim 1, it is characterized in that: described ground top guide bar (5) and ground lower guide rod (9) are set to one, be arranged three in parallel, described pile monkey (4) is located between three guide rods, and pile monkey (4) is gone up and vertically is provided with the three road slideways that cooperate with guide rod accordingly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100290889A CN101476323B (en) | 2009-01-20 | 2009-01-20 | Miniature piling machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100290889A CN101476323B (en) | 2009-01-20 | 2009-01-20 | Miniature piling machine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101476323A true CN101476323A (en) | 2009-07-08 |
CN101476323B CN101476323B (en) | 2011-03-02 |
Family
ID=40837098
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100290889A Expired - Fee Related CN101476323B (en) | 2009-01-20 | 2009-01-20 | Miniature piling machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101476323B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101858081A (en) * | 2010-07-05 | 2010-10-13 | 天津建岩岩土工程有限公司 | Simple and easy pore-forming device of cast-in-place pile hammer |
CN108252304A (en) * | 2016-12-29 | 2018-07-06 | 上海雄程海洋工程股份有限公司 | Electric impacting pile hammer |
CN108360519A (en) * | 2018-04-28 | 2018-08-03 | 林幼清 | A kind of crane piling machine |
CN116163304A (en) * | 2023-03-28 | 2023-05-26 | 广东省源天工程有限公司 | Intelligent pile driving system based on hydraulic vibration hammer |
-
2009
- 2009-01-20 CN CN2009100290889A patent/CN101476323B/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101858081A (en) * | 2010-07-05 | 2010-10-13 | 天津建岩岩土工程有限公司 | Simple and easy pore-forming device of cast-in-place pile hammer |
CN108252304A (en) * | 2016-12-29 | 2018-07-06 | 上海雄程海洋工程股份有限公司 | Electric impacting pile hammer |
CN108252304B (en) * | 2016-12-29 | 2023-09-15 | 上海雄程海洋工程股份有限公司 | Electric impact pile driving hammer |
CN108360519A (en) * | 2018-04-28 | 2018-08-03 | 林幼清 | A kind of crane piling machine |
CN116163304A (en) * | 2023-03-28 | 2023-05-26 | 广东省源天工程有限公司 | Intelligent pile driving system based on hydraulic vibration hammer |
CN116163304B (en) * | 2023-03-28 | 2023-10-20 | 广东省源天工程有限公司 | Intelligent pile driving system based on hydraulic vibration hammer |
Also Published As
Publication number | Publication date |
---|---|
CN101476323B (en) | 2011-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103306289B (en) | Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof | |
CN207110015U (en) | A kind of integrated prefabricated pumping plant with automatic crushing function | |
CN101476323B (en) | Miniature piling machine | |
CN102953373B (en) | Quicksand condition For Artificial Excavation Caisson Pile construction | |
CN201354458Y (en) | Small-sized pile driving device | |
CN104532853B (en) | Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning | |
CN111058475A (en) | High-intensity seismic area pile foundation joist constant-weight retaining wall structure and construction method | |
CN104196072A (en) | Plateau mountain foundation pit excavation construction device | |
CN102926388B (en) | Earth moving method for deep foundation pit excavation | |
CN202499663U (en) | Wellhead vertical lifting machine | |
CN102966109A (en) | Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation | |
CN210002403U (en) | Pile sinking device for precast pile combining hammering and static pressure | |
CN102285592A (en) | Lifting bucket control system and control method | |
CN114991165A (en) | Construction method for subway deep foundation pit adjacent to railway business line | |
CN202882002U (en) | Earth moving device used in deep foundation pit excavation | |
CN203513129U (en) | Lifting device for conveying digging pile construction materials | |
CN208361757U (en) | The hanging device of railroad bridge drilled pile reinforcing cage under a kind of high-voltage line | |
CN202073088U (en) | Device for preventing steel reinforcement cage of cast-in-place bored pile from floating upward | |
CN206570823U (en) | A kind of broken rock mass slope protective reinforcing structure | |
CN113431030A (en) | Larsen steel sheet pile construction method when encountering air obstacle | |
CN202228859U (en) | Mudflat construction equipment and barrel-shaped foundation thereof | |
CN203174605U (en) | Gravity type anchor body applied in special geology | |
CN202007413U (en) | Cross-based electric pile | |
CN205387717U (en) | Raise formula flood control foundation structure | |
CN201162217Y (en) | Construction equipment for concrete pedestal pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110302 Termination date: 20120120 |