CN101476319A - Curing method for fast forming crust layer on yard surface - Google Patents
Curing method for fast forming crust layer on yard surface Download PDFInfo
- Publication number
- CN101476319A CN101476319A CNA2009100280779A CN200910028077A CN101476319A CN 101476319 A CN101476319 A CN 101476319A CN A2009100280779 A CNA2009100280779 A CN A2009100280779A CN 200910028077 A CN200910028077 A CN 200910028077A CN 101476319 A CN101476319 A CN 101476319A
- Authority
- CN
- China
- Prior art keywords
- silt
- stockyard
- sludge
- yard
- crust layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000001723 curing Methods 0.000 title description 6
- 239000000463 material Substances 0.000 claims abstract description 20
- 238000000034 method Methods 0.000 claims abstract description 13
- 238000003756 stirring Methods 0.000 claims abstract description 13
- 239000000203 mixture Substances 0.000 claims abstract description 10
- 238000007711 solidification Methods 0.000 claims abstract description 10
- 230000008023 solidification Effects 0.000 claims abstract description 10
- 238000002156 mixing Methods 0.000 claims abstract description 5
- 239000010802 sludge Substances 0.000 claims description 24
- 208000034189 Sclerosis Diseases 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 18
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 9
- 238000003860 storage Methods 0.000 abstract description 7
- 230000002787 reinforcement Effects 0.000 abstract description 3
- 238000004904 shortening Methods 0.000 abstract description 2
- 238000011065 in-situ storage Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 4
- 239000003562 lightweight material Substances 0.000 description 4
- 239000002245 particle Substances 0.000 description 4
- 239000013049 sediment Substances 0.000 description 2
- 239000012258 stirred mixture Substances 0.000 description 2
- 238000007726 management method Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000002910 solid waste Substances 0.000 description 1
Images
Landscapes
- Treatment Of Sludge (AREA)
Abstract
一种在堆场表面快速形成硬壳层的固化方法,涉及水利、水环境治理、以及港口、航道工程建设中产生的大量疏浚淤泥堆场进行快速地基处理的方法。本发明包括以下步骤:a)将淤泥与固化材料进行混合搅拌,并将混合物铺设于堆场表面;b)待铺设的固化淤泥硬化后,施工人员和机械上到硬壳层表面,再把混合物依次向前铺设,直至整个堆场铺满。本发明针对高含水率淤泥吹填后强度低,施工人员和机械无法进入,需要等待较长时间才能进行地基加固处理的难题,提出在吹填结束后较短时间内,通过人工在吹填淤泥表面快速形成硬壳层的方法,为施工人员和机械的进入提供一个人造的施工平台,从而缩短整个堆场地基处理的时间。
The invention relates to a solidification method for rapidly forming a hard crust on the surface of a storage yard, which involves water conservancy, water environment treatment, and a method for rapid foundation treatment of a large amount of dredged silt storage yards produced in the construction of ports and waterway projects. The invention comprises the following steps: a) mixing and stirring the silt and the solidified material, and laying the mixture on the surface of the stockyard; b) after the solidified silt to be laid is hardened, the construction personnel and the machinery are put on the surface of the hard shell, and then the mixture is Lay forward in turn until the entire yard is covered. Aiming at the problem that the strength of high moisture content silt is low after filling, construction personnel and machinery cannot enter, and it takes a long time to perform foundation reinforcement treatment, the invention proposes to manually fill the silt in a short period of time after the completion of the filling The method of quickly forming a hard shell on the surface provides an artificial construction platform for the entry of construction personnel and machinery, thereby shortening the time for foundation treatment of the entire yard.
Description
技术领域 technical field
本发明涉及水利、水环境治理、以及港口、航道工程建设中产生的大量疏浚淤泥堆场进行快速地基处理的方法,适用于高含水率疏浚淤泥吹填占地的土地还原工程,最终达到淤泥堆场占地的重新利用。The invention relates to water conservancy, water environment treatment, and a method for rapid foundation treatment of a large number of dredged silt yards generated in the construction of ports and waterway projects. Re-use of field land.
背景技术 Background technique
随着水利、水环境治理和港口、航道等工程建设的发展,不可避免的会产生大量的疏浚淤泥,疏浚淤泥是一种高含水率的固体废物,无法直接利用,通常以征用土地设置堆场放置为主,占用了大量的土地资源。据估计江苏省每年的清淤量达到5000万方,珠江三角洲地区每年的清淤量达到8000万方,太湖重污染底泥的疏浚量达到2512~3448万方。仅以太湖为例,如果将重污染底泥全部挖出,按填高3米堆放,就需要占地8.4~11.5平方公里。随着城市和工农业用地的紧张,土地征用问题已经成为制约水利和水环境治理工程的主要瓶颈。With the development of water conservancy, water environment management, ports, waterways and other engineering constructions, a large amount of dredged silt will inevitably be produced. Dredged silt is a kind of solid waste with high moisture content, which cannot be used directly. Usually, the land is requisitioned to set up a storage yard. Placement-based, taking up a lot of land resources. It is estimated that the annual dredging volume in Jiangsu Province reaches 50 million cubic meters, the annual dredging volume in the Pearl River Delta region reaches 80 million cubic meters, and the dredging volume of heavily polluted sediment in Taihu Lake reaches 25.12-34.48 million cubic meters. Taking Taihu Lake as an example, if all the heavily polluted sediment is dug out and stacked at a height of 3 meters, it will need to occupy an area of 8.4 to 11.5 square kilometers. With the shortage of urban and industrial and agricultural land, land acquisition has become a major bottleneck restricting water conservancy and water environment improvement projects.
水底的淤泥的疏浚大多采用绞吸、耙吸或泵吸等方式,淤泥疏浚出后浓度通常仅为15~20%(每方淤泥中含有0.8~0.85方水),对于这样高含水率的淤泥,吹填后承载力极低,需要等待若干年才能在表层形成一定厚度的硬壳后,此时施工机械才能够进入对堆场进行地基加固作业,这就导致淤泥堆场占地时间长的问题,严重影响了土地资源的有效利用。The dredging of underwater silt mostly adopts suction, rake suction or pump suction, etc. The concentration of silt after dredging is usually only 15-20% (0.8-0.85 cubic meters of water in each silt). For such high moisture content silt , the bearing capacity after dredging is extremely low, and it takes several years to form a hard shell of a certain thickness on the surface. At this time, construction machinery can enter the storage yard for foundation reinforcement operations, which leads to long land occupation of the silt storage yard. This problem has seriously affected the effective use of land resources.
发明内容 Contents of the invention
本发明针对高含水率淤泥吹填后强度低,施工人员和机械无法进入,需要等待较长时间才能进行地基加固处理的难题,提出在吹填结束后较短时间内(1个月以内),通过人工在吹填淤泥表面快速形成硬壳层的方法,为施工人员和机械的进入提供一个人造的施工平台,从而缩短整个堆场地基处理的时间。The present invention aims at the problem that the strength of the high-moisture content mud is low after filling, construction personnel and machinery cannot enter, and it takes a long time to carry out foundation reinforcement treatment. By artificially forming a hard crust on the surface of dredged silt, an artificial construction platform is provided for the entry of construction personnel and machinery, thereby shortening the time for the foundation treatment of the entire yard.
本发明为实现上述目的采用如下技术方案:The present invention adopts following technical scheme for realizing above-mentioned purpose:
一种在堆场表面快速形成硬壳层的固化方法,其特征在于包括以下步骤:A kind of solidifying method that forms hard shell layer rapidly on the surface of stockyard, it is characterized in that comprising the following steps:
a)将淤泥与固化材料进行混合搅拌,并将混合物铺设于堆场表面;a) Mix and stir the silt and solidified material, and lay the mixture on the surface of the yard;
b)待铺设的固化淤泥硬化后,施工人员和机械上到硬壳层表面,再把混合物依次向前铺设,直至整个堆场铺满。b) After the solidified silt to be laid is hardened, construction personnel and machinery go up to the surface of the hard shell layer, and then lay the mixture forward in sequence until the entire yard is covered.
本发明对于上述步骤a)为通过挖掘机将搅拌后的混合物铺设在堆场表面。本发明对于上述步骤a)为用泥浆泵将搅拌后的混合物铺设在堆场表面。本发明对于上述步骤a)为利用原位淤泥固化机将固化材料与淤泥在堆场内进行就地混合搅拌,直接在淤泥表面形成硬壳层。For the above step a) in the present invention, an excavator is used to lay the stirred mixture on the surface of the stockyard. For the above step a) in the present invention, a mud pump is used to lay the stirred mixture on the surface of the yard. For the above step a) in the present invention, the in-situ sludge solidification machine is used to mix and stir the solidified material and the sludge in the yard, and directly form a hard shell on the surface of the sludge.
本发明采用上述技术方案,与现有技术相比具有如下优点:The present invention adopts above-mentioned technical scheme, has following advantages compared with prior art:
(1)能够快速形成硬壳层:无论是预先将淤泥与固化材料(轻质材料)进行混合搅拌后在淤泥表层进行铺设,或者将固化材料洒在吹填场表面进行就地混合搅拌的方法,都可以快速形成具有一定厚度和强度的改良淤泥,硬壳一般经过1~2天的硬化,即具有承担人和轻型机械安全行走的强度。(1) A hard crust can be quickly formed: whether it is the method of mixing and stirring the sludge and the solidified material (light material) in advance and laying it on the surface of the sludge, or sprinkling the solidified material on the surface of the dredging field for in-situ mixing and stirring , can quickly form improved silt with a certain thickness and strength. The hard shell generally hardens after 1 to 2 days, that is, it has the strength to bear people and light machinery to walk safely.
(2)人工硬壳层强度稳定、性质均匀、施工便利。高含水率吹填淤泥与固化材料不论是预先混合搅拌再铺设还是就地混合搅拌,都很容易搅拌均匀,改良后的强度稳定。(2) The artificial hard shell has stable strength, uniform properties and convenient construction. The high moisture content dredger silt and solidified material are easy to mix evenly, and the strength after improvement is stable, whether it is mixed in advance and then laid or mixed in place.
(3)处理成本低。淤泥与固化材料不论是预先固化还是原位固化搅拌,处理的成本均低于50元/m3,以硬壳层厚度0.3~0.5m计算,每亩堆场表面硬壳层的费用为1.0~1.6万元。(3) Low processing cost. Regardless of whether the sludge and solidified materials are pre-cured or in-situ solidified and stirred, the cost of treatment is less than 50 yuan/m 3 , and the cost of hard crust per mu of storage yard is 1.0 to 0.5m. 16,000 yuan.
附图说明 Description of drawings
图1是先将淤泥与固化材料(轻质材料)利用固化机4进行混合搅拌后再用挖掘机5进行铺设的施工示意图;Fig. 1 is the construction schematic diagram of laying with
图2是先将淤泥与固化材料(轻质材料)利用固化机4进行混合搅拌后再用泥浆泵6进行铺设的施工示意图;Fig. 2 is the construction schematic diagram that mud and solidified material (lightweight material) are mixed and stirred by solidifying
图3是先将固化材料7洒在淤泥表面,再利用原位淤泥固化机8将淤泥与固化材料进行原位混合搅拌的施工示意图。Fig. 3 is a construction schematic diagram of sprinkling the
图4是本发明一种具体的堆场表面硬壳层施工顺序示意图。首先从围堰向前铺设硬壳层,等硬壳层具有一定强度后依次向前延伸。Fig. 4 is a schematic diagram of the construction sequence of a specific hard shell layer on the surface of the storage yard according to the present invention. First lay the hard shell forward from the cofferdam, and then extend forward sequentially after the hard shell has a certain strength.
以上的图中有:1、堆场围堰;2、吹填淤泥;3、固化淤泥/固化轻质淤泥(硬壳层);4、淤泥固化机;5、挖掘机;6、泥浆泵;7、固化材料铺洒;8、原位淤泥固化机;9、输泥管道。The above figures include: 1. Yard cofferdam; 2. Dredging and filling silt; 3. Solidified silt/solidified light silt (hard crust); 4. Sludge solidification machine; 5. Excavator; 6. Slurry pump; 7. Sprinkling of solidified materials; 8. In-situ sludge solidification machine; 9. Mud delivery pipeline.
具体实施方式 Detailed ways
实施例1Example 1
一种在堆场表面快速形成硬壳层的固化方法,该方法包括以下步骤:A kind of curing method that quickly forms hard shell layer on the surface of stockyard, this method comprises the following steps:
(1)开动淤泥固化机4,将淤泥与固化材料(也可以加入轻质化材料如EPS颗粒、破碎橡胶颗粒等)进行混合搅拌;(1) start the
(2)搅拌后利用挖掘机5在堆场表面进行铺设;(2) utilize
(3)铺设好待固化淤泥硬化后(约1~2天),人工或轻型铺设机械就可以驶上硬壳层,再依次向前铺设,直至整个淤泥堆场铺满。(3) After the solidified silt has hardened after laying (about 1 to 2 days), manual or light laying machinery can be driven onto the hard shell layer, and then laid forward in sequence until the entire silt yard is covered.
实施例2Example 2
一种在堆场表面快速形成硬壳层的固化方法,该方法包括以下步骤:A kind of curing method that quickly forms hard shell layer on the surface of stockyard, this method comprises the following steps:
(1)开动淤泥固化机4,将淤泥与固化材料(也可以加入轻质化材料如EPS颗粒、破碎橡胶颗粒等)进行混合搅拌;(1) start the
(2)搅拌后利用泥浆泵6在堆场表面进行铺设;(2) Utilize the
(3)铺设好待固化淤泥硬化后(约1~2天),施工人员就可以走上前面铺设的硬壳层表面,再将泥浆泵输泥管向前延伸依次铺设,直至整个淤泥堆场铺满。(3) After the solidified silt is laid and hardened (about 1 to 2 days), the construction personnel can walk on the surface of the hard shell layer laid before, and then extend the mud pump mud pipe forward and lay it sequentially until the entire silt yard Paved.
实施例3Example 3
一种在堆场表面快速形成硬壳层的固化方法,该方法包括以下步骤:A kind of curing method that quickly forms hard shell layer on the surface of stockyard, this method comprises the following steps:
(1)人工或机械将固化材料洒铺在淤泥表面,(1) manually or mechanically spread the solidified material on the surface of the mud,
(2)利用原位淤泥固化机8将淤泥与固化材料7进行就地混合搅拌;(2) Utilize the in-situ
(3)搅拌好待固化淤泥硬化后(约1~2天),人工或轻型原位固化机就可以驶上前面铺好的硬壳层,再依次向前铺设,直至整个淤泥堆场铺满。(3) After mixing well and waiting for the solidified sludge to harden (about 1 to 2 days), a manual or light in-situ solidification machine can be driven onto the previously laid hard shell layer, and then laid forward in sequence until the entire sludge yard is covered. .
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2009100280779A CN101476319A (en) | 2009-01-14 | 2009-01-14 | Curing method for fast forming crust layer on yard surface |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2009100280779A CN101476319A (en) | 2009-01-14 | 2009-01-14 | Curing method for fast forming crust layer on yard surface |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101476319A true CN101476319A (en) | 2009-07-08 |
Family
ID=40837094
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2009100280779A Pending CN101476319A (en) | 2009-01-14 | 2009-01-14 | Curing method for fast forming crust layer on yard surface |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101476319A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104775414A (en) * | 2015-03-24 | 2015-07-15 | 华中科技大学 | Super-soft dredger fill surface layer solidification crusting and foundation treatment method |
CN105019422A (en) * | 2015-06-04 | 2015-11-04 | 河海大学 | Foundation construction method for local solidification of topsoil and composite pile bearing |
CN105149316A (en) * | 2015-07-03 | 2015-12-16 | 浙江理工大学 | Stacking and capacity increasing method for landfill by building storage cavern through solidified municipal sludge |
CN106800363A (en) * | 2017-03-10 | 2017-06-06 | 中国科学院武汉岩土力学研究所 | A kind of mud/sludge stockyard in-situ solidifying device |
CN107513992A (en) * | 2017-08-16 | 2017-12-26 | 北京中永基固化剂科技发展有限公司 | A kind of shallow surface solidifying agent consolidation continuous construction method of mud |
CN108929004A (en) * | 2017-05-26 | 2018-12-04 | 北京高能时代环境技术股份有限公司 | Sludge in-situ stabilizes solidification construction technology |
CN109898491A (en) * | 2019-03-04 | 2019-06-18 | 盐城工学院 | A kind of manufacturing process of straw solidification mud ecology crust layer and the crust layer of formation |
CN109930590A (en) * | 2019-03-06 | 2019-06-25 | 华中科技大学 | A kind of hard shell workbench manufacturing equipment and method suitable for dredging silt |
CN110241806A (en) * | 2019-06-30 | 2019-09-17 | 华中科技大学 | A method for forming a hard crust on the surface of a dredged mud slurry yard and the hard crust |
WO2022247016A1 (en) * | 2021-05-27 | 2022-12-01 | 中铁十九局集团第三工程有限公司 | Roadbed water and soil combined surcharge preloading system |
-
2009
- 2009-01-14 CN CNA2009100280779A patent/CN101476319A/en active Pending
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104775414B (en) * | 2015-03-24 | 2017-05-03 | 华中科技大学 | Super-soft dredger fill surface layer solidification crusting and foundation treatment method |
CN104775414A (en) * | 2015-03-24 | 2015-07-15 | 华中科技大学 | Super-soft dredger fill surface layer solidification crusting and foundation treatment method |
CN105019422B (en) * | 2015-06-04 | 2018-11-16 | 河海大学 | Topsoil is cured in situ the foundation construction method that carrying is combined with stake |
CN105019422A (en) * | 2015-06-04 | 2015-11-04 | 河海大学 | Foundation construction method for local solidification of topsoil and composite pile bearing |
CN105149316A (en) * | 2015-07-03 | 2015-12-16 | 浙江理工大学 | Stacking and capacity increasing method for landfill by building storage cavern through solidified municipal sludge |
CN105149316B (en) * | 2015-07-03 | 2016-05-18 | 浙江理工大学 | The curing municipal sludge of a kind of use builds the landfill yard of bank and piles high compatibilizing method |
CN106800363A (en) * | 2017-03-10 | 2017-06-06 | 中国科学院武汉岩土力学研究所 | A kind of mud/sludge stockyard in-situ solidifying device |
CN108929004A (en) * | 2017-05-26 | 2018-12-04 | 北京高能时代环境技术股份有限公司 | Sludge in-situ stabilizes solidification construction technology |
CN107513992A (en) * | 2017-08-16 | 2017-12-26 | 北京中永基固化剂科技发展有限公司 | A kind of shallow surface solidifying agent consolidation continuous construction method of mud |
CN109898491A (en) * | 2019-03-04 | 2019-06-18 | 盐城工学院 | A kind of manufacturing process of straw solidification mud ecology crust layer and the crust layer of formation |
CN109898491B (en) * | 2019-03-04 | 2021-08-13 | 盐城工学院 | Forming method of straw-solidified silt ecological hard shell layer and formed hard shell layer |
CN109930590A (en) * | 2019-03-06 | 2019-06-25 | 华中科技大学 | A kind of hard shell workbench manufacturing equipment and method suitable for dredging silt |
CN109930590B (en) * | 2019-03-06 | 2024-03-19 | 华中科技大学 | Hard shell working platform manufacturing equipment and method suitable for dredging sludge |
CN110241806A (en) * | 2019-06-30 | 2019-09-17 | 华中科技大学 | A method for forming a hard crust on the surface of a dredged mud slurry yard and the hard crust |
CN110241806B (en) * | 2019-06-30 | 2024-05-14 | 华中科技大学 | Method for forming a hard crust layer on the surface of a dredged sludge slurry yard and hard crust layer |
WO2022247016A1 (en) * | 2021-05-27 | 2022-12-01 | 中铁十九局集团第三工程有限公司 | Roadbed water and soil combined surcharge preloading system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101476319A (en) | Curing method for fast forming crust layer on yard surface | |
CN104863113B (en) | The method and mixing plant of original place curing process are carried out to in-situ soil | |
CN108468325B (en) | Large-area coastal beach sea mud rapid curing construction method | |
CN101824820B (en) | Construction process for reclamation by hydraulic filling of silt and device thereof | |
CN104818707B (en) | Application cotton stalk consolidation and solidification dredging silt, the method for new barged-in fill | |
CN113699971A (en) | Soft soil stratum in-situ curing agent preparation feeding equipment and curing process thereof | |
CN105672391A (en) | Method for firstly curing and then excavating sludge at bottoms of city inland rivers and lakes | |
CN105019425B (en) | A kind of construction method of displacement hull and cured layer combined foundation structure | |
CN106192974B (en) | A kind of device and method of sludge solidification processing | |
CN108708372A (en) | One kind having pressure complex cement aeolian accumulation mortar mixing pile pile-formation process | |
CN102767156B (en) | Diking method through filling sludge and curing agent into mold bags | |
CN101008178B (en) | Construction Technology of Mixing Method for Soft Foundation Treatment | |
CN1245557C (en) | Bubble Mix Lightweight Soil | |
CN109914174B (en) | Construction method for backfilling, stone throwing and silt squeezing of pond | |
CN110080160B (en) | Ecological anti-seepage structure based on gravel-mixed clay and herb layer and its construction method | |
CN111676987A (en) | Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method | |
CN107513992B (en) | continuous construction method for solidifying curing agent on shallow surface layer of sludge | |
CN110512592A (en) | A Reinforcement Treatment System for Supersoft Foundation Carbonized by Vacuum Preloading Conduit Pile Gas Injection | |
CN110294579A (en) | A kind of method of disposal of sludge solidification, resource reutilization | |
CN104775414B (en) | Super-soft dredger fill surface layer solidification crusting and foundation treatment method | |
CN102116007B (en) | Isolation Waterproof Filling Method for Highway Foundation Surface Treatment | |
CN110451748A (en) | A kind of paddling process sludge curing agent and the preparation method and application thereof | |
CN117229004A (en) | Method for preparing underwater undispersed marine sludge solidified soil based on monomer in-situ polymerization and solidified composition | |
CN100425555C (en) | Pipeline sludge solidification treatment method | |
CN100460600C (en) | Blowing-filling sea-mud solidification construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20090708 |