CN101463718A - Same-well production technique column for low-permeation horizontal well - Google Patents

Same-well production technique column for low-permeation horizontal well Download PDF

Info

Publication number
CN101463718A
CN101463718A CNA2008102498904A CN200810249890A CN101463718A CN 101463718 A CN101463718 A CN 101463718A CN A2008102498904 A CNA2008102498904 A CN A2008102498904A CN 200810249890 A CN200810249890 A CN 200810249890A CN 101463718 A CN101463718 A CN 101463718A
Authority
CN
China
Prior art keywords
bridge
injection
low
well
packer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008102498904A
Other languages
Chinese (zh)
Other versions
CN101463718B (en
Inventor
张全胜
郝金克
李文波
吕玮
董社霞
吕芳蕾
宋相隆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co
Original Assignee
Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co filed Critical Oil Production Technology Research Institute of Sinopec Shengli Oilfield Co
Priority to CN2008102498904A priority Critical patent/CN101463718B/en
Publication of CN101463718A publication Critical patent/CN101463718A/en
Application granted granted Critical
Publication of CN101463718B publication Critical patent/CN101463718B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention relates to a low-permeability horizontal well identical-well injection-production technique pipe column. The pipe column comprises an oil pipe column, a pump, a bridge packer A, a bridge packer B, an inner pipe, a bridge dividing valve and an injection allocator; and the pipe is characterized in that the pump, the bridge packer A, the bridge dividing valve, the bridge packer B and the injection allocator are arranged and connected at an oil pipe in sequence; the inner pipe is arranged in the oil pipe, the middle part thereof is connected with the bridge dividing valve, and the two ends thereof are connected with the bridge packer A and the bridge packer B. The invention is characterized in that the developing cost can be reduced, the investment is less, the return is obtained quick, the construction is convenient, identical-layer injection-production distance can be regulated flexibly, the water-injection pressure loss can be reduced, the injection-production corresponding rate can be improved, the augmented-injection requirement of the low-permeability horizontal well can be met, the stabilized production period of the low-permeability horizontal well can be prolonged, and the extraction percentage of the low-permeability reservoir can be improved. Therefore, the invention is applied widely in the injection-production technique of oil production.

Description

Same-well production technique column for low-permeation horizontal well
One, technical field
The present invention relates to a kind of oil exploitation water injection well lower tubular column, particularly a kind of same-well production technique column for low-permeation horizontal well.
Two, background technology
Traditional oil exploitation water injection well lower tubular column, be generally special independent producing well flow string, water injection well is a water injection string, need prepare special filling pipe, water injecting pump to the stratum water filling by water-injection station during the water filling of water injection well water injection string, to replenish stratum energy, improve oil production, be the essential equipment of oil exploitation, the shortcoming or the deficiency of its existence are: 1. facility complexity must be provided with water tank, water flooding pump station, water filling flow process and filtration as water injection well and wait until auxiliary equipment; 2. investment is big, the cycle is long, expense is high, take effect slowly, particularly produced-water reinjection, also needs a whole set of produced-water reinjection treatment facility, and expense cost can be bigger; 3. the water filling water source of some low, little, difficult, inclined to one side blocks and oil reservoir is a hang-up.Existing a kind of same-well injection is adopted tubing string, form by sand screen, well washing apparatus, cup packer, screen casing, electric submersible pump etc., but it applies on the straight well, and adopt water in the water layer in same well, inject producing horizon, therefore, in horizontal well, can't use, more be difficult in the hyposmosis horizontal well use.
Three, summary of the invention
The purpose of this invention is to provide a kind of same-well production technique column for low-permeation horizontal well, adopt bridge-type packer, bridge-type flow divider and the combination of injection allocation device, in with layer, adopt the water water filling, the shortcoming or the deficiency that had both overcome effectively or avoided existing in the above-mentioned prior art can successfully realize hyposmosis horizontal well same-well injection excavating technology again.
Same-well production technique column for low-permeation horizontal well of the present invention, comprise tubing string, pump, bridge-type packer A, bridge-type packer B, interior pipe, bridge-type flow divider, injection allocation device, it is characterized in that described pump, bridge-type packer people, bridge-type flow divider, bridge-type packer B and injection allocation device are installed and connected on the oil pipe in turn, pipe is installed in the oil pipe in described, its middle part is connected with the bridge-type flow divider, and two ends are connected with bridge-type packer B with bridge-type packer A.
Wherein, described pump is positioned at straight well section place.Described bridge-type packer A is positioned at before the mined bed, between the extraction interval and injection interval of bridge-type packer B in mined bed.Described bridge-type flow divider is arranged in mined bed extraction interval place, which is provided with shunting switching mechanism.Described shunting switching mechanism comprise on the branch fluid circumference and the cross section of one end on be distributed with split channel, one side this split channel starter gate valve and spring be installed.Described injection allocation device is arranged in mined bed injection interval place.
The present invention has following advantage compared with prior art:
1, effectively reduces development cost, less investment, instant effect, easy construction;
But 2 flexible modulation are annotated with layer and are adopted distance, reduce the water injection pressure loss, improve to annotate and adopt corresponding rate, satisfy the augmented injection needs of hyposmosis horizontal well;
3, effectively prolong the stable production period of hyposmosis horizontal well, improve the recovery ratio of LOW PERMEABILITY RESERVOIR;
Four, description of drawings
Fig. 1 is a kind of structural representation of the present invention
Fig. 2 is for pressing A-A shown in Figure 1 to structural representation
Fig. 3 is for pressing shunting switching mechanism schematic diagram shown in Figure 1
Fig. 4 is for pressing A-A shown in Figure 3 to structural representation
Five, the specific embodiment
Consult Fig. 1-Fig. 4, a kind of same-well production technique column for low-permeation horizontal well comprises tubing string, pump, bridge-type packer A, bridge-type packer B, interior pipe, bridge-type flow divider, injection allocation device.Pump 1, bridge-type packer A3, bridge-type flow divider 6, bridge-type packer B7 and injection allocation device 8 are installed and connected on the oil pipe 4 in turn.Interior pipe 5 is installed in the oil pipe 4, and its middle part is connected with bridge-type flow divider 6, and two ends are connected with bridge-type packer B7 with bridge-type packer A3.
Pump 1 is positioned at the straight well section place of sleeve pipe 2.Bridge-type packer A3 is positioned at before the mined bed, between the extraction interval and injection interval of bridge-type packer B7 in mined bed.Bridge-type flow divider 6 is arranged in mined bed extraction interval place, which is provided with shunting switching mechanism.Shunting switching mechanism comprise on branch fluid 63 circumference and the cross section of one end on be distributed with split channel, one side this split channel starter gate valve 62 and spring 61 be installed.Injection allocation device 8 is arranged in mined bed injection interval place.
During site operation,, inject from the oil jacket annular space when tubing string during down to design attitude, ALT-CH alternate channel conversion by first bridge-type packer A3, in the pipe 5, enter again in the oil pipe 4 in entering, enter injection interval through injection allocation device 8 through bridge-type flow divider 6, bridge-type packer B7; Simultaneously, the shunting transformational structure of the oil of extraction interval by bridge-type flow divider 6 is transformed into the oil pipe 4 through bridge-type packer A3 from the annular space of interior pipe and oil pipe, and by oil well pump 1 pump to ground.So just realize the technology of subsection water injection, oil recovery in the same horizontal interval.

Claims (6)

1, a kind of same-well production technique column for low-permeation horizontal well, comprise tubing string, pump, bridge-type packer A, bridge-type packer B, interior pipe, bridge-type flow divider, injection allocation device, it is characterized in that described pump, bridge-type packer A, bridge-type flow divider, bridge-type packer B and injection allocation device are installed and connected on the oil pipe in turn, pipe is installed in the oil pipe in described, its middle part is connected with the bridge-type flow divider, and two ends are connected with bridge-type packer B with bridge-type packer A.
2, same-well production technique column for low-permeation horizontal well according to claim 1 is characterized in that described pump is positioned at straight well section place.
3, same-well production technique column for low-permeation horizontal well according to claim 1 is characterized in that described bridge-type packer A is positioned at before the mined bed, between the extraction interval and injection interval of bridge-type packer B in mined bed.
4, same-well production technique column for low-permeation horizontal well according to claim 1 is characterized in that described bridge-type flow divider is arranged in mined bed extraction interval place, which is provided with shunting switching mechanism.
5, same-well production technique column for low-permeation horizontal well according to claim 4, it is characterized in that described shunting switching mechanism comprises on the branch fluid circumference and the cross section of one end on be distributed with split channel, one side this split channel starter gate valve and spring be installed.
6, same-well production technique column for low-permeation horizontal well according to claim 1 is characterized in that described injection allocation device is arranged in mined bed injection interval place.
CN2008102498904A 2008-12-31 2008-12-31 Same-well production technique column for low-permeation horizontal well Active CN101463718B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008102498904A CN101463718B (en) 2008-12-31 2008-12-31 Same-well production technique column for low-permeation horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008102498904A CN101463718B (en) 2008-12-31 2008-12-31 Same-well production technique column for low-permeation horizontal well

Publications (2)

Publication Number Publication Date
CN101463718A true CN101463718A (en) 2009-06-24
CN101463718B CN101463718B (en) 2012-05-23

Family

ID=40804484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008102498904A Active CN101463718B (en) 2008-12-31 2008-12-31 Same-well production technique column for low-permeation horizontal well

Country Status (1)

Country Link
CN (1) CN101463718B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337872A (en) * 2011-09-19 2012-02-01 中国石油化工股份有限公司 One-grade three-section integrated water distribution tubular column of horizontal well
CN102505921A (en) * 2011-11-04 2012-06-20 中国石油天然气股份有限公司 Open hole horizontal well water exploration pipe column
CN102704900A (en) * 2012-06-28 2012-10-03 中国石油化工股份有限公司 Subsection water injection tubular column for shallow measurement in vertical well section of horizontal well
CN104481484A (en) * 2014-12-26 2015-04-01 东营市福利德石油科技开发有限责任公司 Horizontal well segmented intermittent steam huff and puff injection-production integrated pipe column
CN105358792A (en) * 2013-07-04 2016-02-24 Ior加拿大有限公司 Method for producing oil from induced fractures using a single wellbore and multiple-channel tubing
CN106246150A (en) * 2016-09-18 2016-12-21 中国石油天然气股份有限公司 Oil field fracturing transformation method
CN105672965B (en) * 2016-04-14 2018-04-06 荆州市翔龙石油科技有限公司 A kind of bridge-type separate layer water injection string and its operating procedure
CN108071376A (en) * 2016-11-17 2018-05-25 中国石油天然气股份有限公司 Injection and production string in coal-bed gas well
CN112240194A (en) * 2020-11-17 2021-01-19 东北石油大学 Multi-stage oil-water separation and same-well injection-production method in horizontal shaft
CN112240193A (en) * 2020-11-17 2021-01-19 东北石油大学 Multistage oil-water separation and same-well injection-production device in horizontal shaft
CN113431529A (en) * 2020-03-23 2021-09-24 中国石油天然气股份有限公司 Underground oil-water separation same-well injection-production system and tubular column

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6089322A (en) * 1996-12-02 2000-07-18 Kelley & Sons Group International, Inc. Method and apparatus for increasing fluid recovery from a subterranean formation
CN201037385Y (en) * 2006-10-17 2008-03-19 中国石油化工股份有限公司 Bridge type leak-stopping pipe column

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337872A (en) * 2011-09-19 2012-02-01 中国石油化工股份有限公司 One-grade three-section integrated water distribution tubular column of horizontal well
CN102505921A (en) * 2011-11-04 2012-06-20 中国石油天然气股份有限公司 Open hole horizontal well water exploration pipe column
CN102505921B (en) * 2011-11-04 2014-02-05 中国石油天然气股份有限公司 Open hole horizontal well water exploration pipe column
CN102704900A (en) * 2012-06-28 2012-10-03 中国石油化工股份有限公司 Subsection water injection tubular column for shallow measurement in vertical well section of horizontal well
CN105358792A (en) * 2013-07-04 2016-02-24 Ior加拿大有限公司 Method for producing oil from induced fractures using a single wellbore and multiple-channel tubing
CN104481484A (en) * 2014-12-26 2015-04-01 东营市福利德石油科技开发有限责任公司 Horizontal well segmented intermittent steam huff and puff injection-production integrated pipe column
CN105672965B (en) * 2016-04-14 2018-04-06 荆州市翔龙石油科技有限公司 A kind of bridge-type separate layer water injection string and its operating procedure
CN106246150A (en) * 2016-09-18 2016-12-21 中国石油天然气股份有限公司 Oil field fracturing transformation method
CN108071376A (en) * 2016-11-17 2018-05-25 中国石油天然气股份有限公司 Injection and production string in coal-bed gas well
CN113431529A (en) * 2020-03-23 2021-09-24 中国石油天然气股份有限公司 Underground oil-water separation same-well injection-production system and tubular column
CN112240194A (en) * 2020-11-17 2021-01-19 东北石油大学 Multi-stage oil-water separation and same-well injection-production method in horizontal shaft
CN112240193A (en) * 2020-11-17 2021-01-19 东北石油大学 Multistage oil-water separation and same-well injection-production device in horizontal shaft

Also Published As

Publication number Publication date
CN101463718B (en) 2012-05-23

Similar Documents

Publication Publication Date Title
CN101463718B (en) Same-well production technique column for low-permeation horizontal well
CN201165866Y (en) Horizontal well division and combination extracting pipe column
CN201212387Y (en) Gas injection, gas production and brine discharge integration process pipe column for underground gas storage
CN205225215U (en) Mining device for two sets of oil reservoir separate-layer mining
CN201972682U (en) Gas-injection oil-exploitation tubular column adopting packer technology for horizontal well
CN102996159A (en) Multiphase medium plugging device and method for gas extraction drill hole
CN205936557U (en) Water injection and oil production pipe column
CN110295879A (en) A kind of staged fracturing horizontal well in segments period note adopts dual string
CN107387020B (en) Two-gas co-mining device
CN106930764B (en) Multilayer sandstone-type uranium mineralization with respect separate zone production technique
CN203239303U (en) Exploitation device for injection and production in the same well
CN204082116U (en) Oil well horizontal well oil jacket is with note formula two envelope single deck tape-recorder volume fracturing tubing string
CN202531037U (en) Segmented completion pipe string of bottom water tight gas reservoir horizontal well
CN208456570U (en) A kind of extracting device of oil
CN201301694Y (en) Hydraulic jet pump separate zone oil production process pipe string
CN204252929U (en) Oil production water shutoff pipe column
CN203420679U (en) Large-displacement composite lifting system for deep well and ultra-deep well
CN203175503U (en) Tubular column for safety production in fluid producing and injecting process through one well of offshore oilfield
CN201053309Y (en) Down-hole filter for water filling well
CN101936152A (en) Seaborne thick oil thermal extracting and lifting technology and device
CN202954798U (en) Multifunctional water extraction and injection safety production string
CN201025018Y (en) Once pipe pole using hierarchical acidification pressure crack technology
CN204703878U (en) A kind of high injection allocation water gaging horizontal well two sections of subsection water injection tubing strings
CN104975834A (en) Steam-carbon dioxide assisted gravity oil drainage oil production method
CN201517374U (en) Gas recovery well completion pipe string

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant