CN101458186A - Mold for crack-containing bolting test - Google Patents

Mold for crack-containing bolting test Download PDF

Info

Publication number
CN101458186A
CN101458186A CNA2008101585233A CN200810158523A CN101458186A CN 101458186 A CN101458186 A CN 101458186A CN A2008101585233 A CNA2008101585233 A CN A2008101585233A CN 200810158523 A CN200810158523 A CN 200810158523A CN 101458186 A CN101458186 A CN 101458186A
Authority
CN
China
Prior art keywords
crack
mould
base plate
vertical connecting
test according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101585233A
Other languages
Chinese (zh)
Other versions
CN101458186B (en
Inventor
张宁
李术才
李明田
杨磊
刘钦
刘人太
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN2008101585233A priority Critical patent/CN101458186B/en
Publication of CN101458186A publication Critical patent/CN101458186A/en
Application granted granted Critical
Publication of CN101458186B publication Critical patent/CN101458186B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention relates to a mould used for a crack-contained anchored test. The mould comprises a base seat; the base seat is provided with a base plate; side plates, end plates and vertical connecting rods are arranged on the base plate; the two end plates are vertically inserted and connected between the two ends of the two side plates respectively to form a frame body that is provided with an opening at the upper part; the two vertical connecting rods are arranged between the two side plates outside the two ends of the frame body respectively; the two side plates are connected by horizontal connecting rods that are vertically connected with the vertical connecting rods; the center of the base plate is provided with a crack fixed device; the crack fixed device is provided with plastic thin slices. When in use, after crack and anchor rods are fixed, each screw nut is tightly fastened, semi-solid state rock-like materials or similar materials are casted into the mould of the frame body and then fully vibrated. Then after being maintained, the mould is dismounted. When the mould is dismounted, the screw nut A on the side plate is loosened firstly; and the side plates are dismounted; then a device fixing the crack at the bottom is dismounted; finally, the base plate and the end plates are dismounted. The invention has the advantages that the structure is simple, the cost is low, the assembly and dismounting are convenient, the efficiency is high, etc.

Description

The mould that is used for crack-containing bolting test
Technical field
The present invention relates to a kind of test mould, relate in particular to a kind of mould that is used for the crack-containing bolting test of shop experiment.
Background technology
In energy development, mining and cut slope, exist come in every shape, the having intense influence and restricting the behavior of rock mass of joint plane that scale is different, these joint planes.The mechanical behavior of the rock mass under load action is actually the concentrated expression of its immanent structure face.Rock mass engineering project practice many times both at home and abroad shows, the unstability of rock mass engineering project, and great majority are owing to the expansion of defectives such as its inner joint, crack causes.Be the deformation failure of restriction rock mass, anchor pole commonly used is reinforced in the rock mass engineering project.A large amount of bolt anchorages that adopt in China's mine working, railway tunnel and all kinds of underground works.The reinforcement effect of anchor pole is fairly obvious, especially in the joint fissure rock mass.But also lack the further investigation of three-dimensional fracture expansion and anchor pole at present to three-dimensional jointed rock mass crack arrest mechanism.
Similar test is the effective ways of this problem of research, and still, how crack and anchor pole are set in class rock material or analog material is the successful key of research, and solution to this problem just is to make on the mould of test specimen.At present, be used for making mould kind that class rock material or analog material contain the crack and add the anchor test specimen seldom, and the more complicated all of several moulds seldom, on the one hand, the complex manufacturing technology of mould own, the processing cost that gets up is very high; On the other hand, making test test specimen flow process is loaded down with trivial details, uses inconvenience, and is time-consuming, and can't firmly fix anchor pole, can not effectively simulate the reinforcing crack arrest effect of anchor pole to the crack.
Summary of the invention
For overcoming above-mentioned the deficiencies in the prior art, the invention provides that a kind of fabrication and processing is convenient, simple in structure, easy accessibility, can reuse, cost is low, the succinct mould that is used for crack-containing bolting test of processing test specimen flow process.
The objective of the invention is to adopt following technical proposals to realize: a kind of mould that is used for crack-containing bolting test, comprise base, base is provided with base plate, vertically be provided with side plate, end panel and vertical connecting part on the base plate, the both ends plate vertically is plugged between the two ends of biside plate respectively, surround the framework of a upper opening jointly, two vertical connecting parts are arranged at respectively between the biside plate of outside, framework two ends, between the biside plate by being connected with vertical connecting part horizontal brace rod spare connected vertically; The base plate center is provided with fixedly crack device, and fixedly the crack device is provided with plastic tab.
Be symmetrically arranged with cannelure and end hole on the described side plate, the two ends of end panel are placed in the cannelure.
Described end panel is provided with some borings.
Described horizontal brace rod spare passes the end hole on the side plate, horizontal brace rod spare end and middle female A of butterfly and the hole that is respectively equipped with on the horizontal direction, and the vertical connecting part passes the hole.
The female B of butterfly on the vertical direction is arranged at described vertical connecting part top, and the bottom is connected with base plate with spring shim by nut.
Described fixedly crack device comprises truncated cone-shaped hole, semicircle stage body, latch and screw, the truncated cone-shaped hole is positioned at the base plate center, be provided with two semicircle stage bodies in the truncated cone-shaped hole, clamping has plastic tab between the two halves Rotary-table, and the two halves Rotary-table is connected by web member with the latch of base plate bottom.
The height of described semicircle stage body is less than the thickness of base plate.
Described web member is screw or screw or bolt.
Be provided with scale value around the truncated cone-shaped hole on the described base plate downside.
The present invention in use, after crack, anchor pole fixed, fastening each nut was poured into semisolid class rock material or analog material in the framework mould of being made up of side plate and end plates, fully vibrate, through after certain curing period, i.e. collapsible die.During form removal, unclamp the female A of butterfly on the side plate earlier, the side plate of dismantling is torn the device in the fixedly crack of bottom again open, tears base plate and end panel at last open.In addition, can according to the scale value on the base plate, the crack of different angles be set according to designing requirement; By passing the different hole of end panel, the anchor pole of different angles is set.
The present invention compares with the mould that other are used for being provided with at test specimen crack and anchor pole, has following significant technical advantage and characteristics:
(1) simple structure, easy to process, cost is low.Used sheet material, nut or the like all are to have bought easily, and price is low, have very much economic advantages.
(2) assembling, convenient disassembly.The assembling of entire die is just fastening by several butterflies mothers and screw thread member, therefore, has shortened the average required time of each test specimen, has improved test efficiency.
(3) controllability.Can the crack of different angles be set according to the angle index value on the base plate bottom surface, convenient and swift.The angle of anchor pole can realize by the different hole of passing on the end panel.Satisfy the requirement of different tests to crack and anchor pole angle.
(4) making test specimen flow process is succinct.The processing of whole test specimen roughly divided for three steps can finish the first step: crack and anchor pole are set, fastening mould; Second step: cast class rock material or analog material, vibrate; The 3rd step: form removal.
Description of drawings
Fig. 1 is a synoptic diagram of the present invention;
Fig. 2 is a vertical view of the present invention;
Fig. 3 is that the M of Fig. 2 is to view;
Fig. 4 is that the N of Fig. 2 is to view;
Fig. 5 is a ground plan of the present invention;
Fig. 6 is the I-I sectional view of Fig. 2;
Fig. 7 is the II-II sectional view of Fig. 2;
Fig. 8 is a crack of the present invention stationary installation synoptic diagram;
Fig. 9 is the side plate synoptic diagram;
Figure 10 is the vertical view of Fig. 9;
Figure 11 is the base plate synoptic diagram;
Figure 12 is the vertical view of Figure 11;
Figure 13 is a horizontal brace rod spare synoptic diagram;
Figure 14 is the vertical view of Figure 13;
Wherein, 1. end panel, 2. side plate, 3. base plate, 4. base, the 5. female A of dish, 6. vertical connecting part, the 7. female B of butterfly, 8. nut, 9. spring shim, 10. horizontal brace rod spare, 11. borings, 12. the semicircle stage body, 13. screws, 14. latches, 15. plastic tab, 16. cannelures, 17. end hole, 18. the truncated cone-shaped hole, 19. holes, 20. scale values.
Embodiment
The present invention is further described below in conjunction with drawings and Examples.
Among Fig. 1-14, base 4 is provided with base plate 3, vertically be provided with side plate 2, end panel 1 and vertical connecting part 6 on the base plate 3, both ends plate 1 vertically is plugged between the two ends of biside plate 2 respectively, surround the framework of a upper opening jointly, two vertical connecting parts are arranged at respectively between the biside plate 2 of outside, framework two ends, between the biside plate 2 by being connected with vertical connecting part 6 horizontal brace rod spares 10 connected vertically; Base plate 3 centers are provided with fixedly crack device, and fixedly the crack device is provided with plastic tab 15.
Be symmetrically arranged with cannelure 16 and end hole 17 on the side plate 2, the two ends of end panel 1 are placed in the cannelure 16.
End panel 1 is provided with some borings 11, and boring 11 is used for fixing anchor pole, and anchor pole passes boring 11.
Horizontal brace rod spare 10 passes the end hole 17 on the side plate 2, horizontal brace rod spare 10 ends and middle female A5 of butterfly and the hole 19 that is respectively equipped with on the horizontal direction, and vertical connecting part 6 passes hole 19.
The female B7 of butterfly on the vertical direction is arranged at vertical connecting part 6 tops, and the bottom is connected with base plate 3 with spring shim 9 by nut 8.
Fixedly the crack device comprises truncated cone-shaped hole 18, semicircle stage body 12, latch 14 and screw 13, truncated cone-shaped hole 18 is positioned at base plate 3 centers, be provided with two semicircle stage bodies 12 in the truncated cone-shaped hole 18, clamping has plastic tab 15 between the two halves Rotary-table 12, and the latch of two halves Rotary-table 12 and base plate 3 bottoms 14 is connected by web member.
The size of plastic tab 15 can be regulated; Realize by built-in plastic tab 15 in crack in the test specimen, truncated cone-shaped hole 18, semicircle stage body 12, latch 14 and screw 13 are used for fixing plastic tab 15, principle of work is such: when screw 13 is tightened, can force two semicircle stage bodies 12 to moving down, in addition because the horizontal section in truncated cone-shaped hole 18 is downwards diminishing, therefore, along with the position that two semicircle stage bodies 12 are downward is low more, will be tight more between them, plastic tab 15 is clipped in the middle of two semicircle stage bodies 12, and plastic tab 15 is fixed.
The height of semicircle stage body 12 is less than the thickness of base plate 3.
Web member is screw 13 or screw or bolt.
Be provided with scale value 20 around the truncated cone-shaped hole 18 on base plate 3 downsides.
Plastic tab 15 also can be connected by other usual way of this area with base plate 3.

Claims (9)

1, a kind of mould that is used for crack-containing bolting test, comprise base, it is characterized in that: base is provided with base plate, vertically be provided with side plate, end panel and vertical connecting part on the base plate, the both ends plate vertically is plugged between the biside plate two ends respectively, surround the framework of a upper opening jointly, two vertical connecting parts are arranged at respectively between the biside plate of outside, framework two ends, between the biside plate by being connected with vertical connecting part horizontal brace rod spare connected vertically; The base plate center is provided with fixedly crack device, and fixedly the crack device is provided with plastic tab.
2, the mould that is used for crack-containing bolting test according to claim 1 is characterized in that, is symmetrically arranged with cannelure and end hole on the described side plate, and the two ends of end panel are placed in the cannelure.
3, the mould that is used for crack-containing bolting test according to claim 1 is characterized in that, described end panel is provided with some borings.
4, the mould that is used for crack-containing bolting test according to claim 1, it is characterized in that, described horizontal brace rod spare passes the end hole on the side plate, horizontal brace rod spare end and middle female A of butterfly and the hole that is respectively equipped with on the horizontal direction, and the vertical connecting part passes the hole.
5, the mould that is used for crack-containing bolting test according to claim 1 is characterized in that, the female B of the butterfly on the vertical direction is arranged at described vertical connecting part top, and the bottom is connected with base plate with spring shim by nut.
6, the mould that is used for crack-containing bolting test according to claim 1, it is characterized in that, described fixedly crack device comprises truncated cone-shaped hole, semicircle stage body, latch and screw, the truncated cone-shaped hole is positioned at the base plate center, be provided with two semicircle stage bodies in the truncated cone-shaped hole, clamping has plastic tab between the two halves Rotary-table, and the two halves Rotary-table is connected by web member with the latch of base plate bottom.
7, the mould that is used for crack-containing bolting test according to claim 6 is characterized in that, the height of described semicircle stage body is less than the thickness of base plate.
8, the mould that is used for crack-containing bolting test according to claim 6 is characterized in that, described web member is screw or screw or bolt.
9, the mould that is used for crack-containing bolting test according to claim 1 is characterized in that, is provided with scale value around the truncated cone-shaped hole on the described base plate downside.
CN2008101585233A 2008-11-03 2008-11-03 Mold for crack-containing bolting test Expired - Fee Related CN101458186B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101585233A CN101458186B (en) 2008-11-03 2008-11-03 Mold for crack-containing bolting test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101585233A CN101458186B (en) 2008-11-03 2008-11-03 Mold for crack-containing bolting test

Publications (2)

Publication Number Publication Date
CN101458186A true CN101458186A (en) 2009-06-17
CN101458186B CN101458186B (en) 2010-12-08

Family

ID=40769172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101585233A Expired - Fee Related CN101458186B (en) 2008-11-03 2008-11-03 Mold for crack-containing bolting test

Country Status (1)

Country Link
CN (1) CN101458186B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102519767A (en) * 2011-12-16 2012-06-27 武汉大学 Mould for manufacturing fissure surface of rock like test block
CN102587889A (en) * 2012-02-10 2012-07-18 中国矿业大学 Experimental system for simulating solid-phase particles to plug coal (rock) cracks
CN102620967A (en) * 2012-04-06 2012-08-01 河海大学 Rock-class test piece mould for field of rock mechanics
CN103196717A (en) * 2013-03-07 2013-07-10 同济大学 Rock-similar sample mold capable of accurately positioning filling-type prefabricated cracks
CN103604672A (en) * 2013-11-22 2014-02-26 山东大学 Even construction device and operation method for three-dimensional random fracture in geotechnical engineering
CN103674650A (en) * 2013-12-16 2014-03-26 山东科技大学 Standard test die for manufacturing mine paste filling material
CN105628463A (en) * 2015-03-09 2016-06-01 绍兴文理学院 Sample preparation mold for fractured rock mass model sample
CN105738180A (en) * 2016-05-03 2016-07-06 中国石油大学(华东) Mold for manufacturing fracture-containing rock sample with anchor rod
CN105806686A (en) * 2016-03-04 2016-07-27 中国石油大学(华东) Mold for manufacturing anchored randomized crossover through crack rock mass
CN106979882A (en) * 2017-05-27 2017-07-25 安徽理工大学 A kind of device and method for being used to make concrete by three-point bending coped beam
CN108663244A (en) * 2018-04-03 2018-10-16 中国科学院武汉岩土力学研究所 A kind of accurate method for making sample of inclination bolted discontinuous rock and bolted discontinuous rock

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102519767A (en) * 2011-12-16 2012-06-27 武汉大学 Mould for manufacturing fissure surface of rock like test block
CN102587889B (en) * 2012-02-10 2015-04-22 中国矿业大学 Experimental system for simulating solid-phase particles to plug coal (rock) cracks
CN102587889A (en) * 2012-02-10 2012-07-18 中国矿业大学 Experimental system for simulating solid-phase particles to plug coal (rock) cracks
CN102620967A (en) * 2012-04-06 2012-08-01 河海大学 Rock-class test piece mould for field of rock mechanics
CN103196717A (en) * 2013-03-07 2013-07-10 同济大学 Rock-similar sample mold capable of accurately positioning filling-type prefabricated cracks
CN103196717B (en) * 2013-03-07 2015-07-29 同济大学 A kind of rocks sample mould accurately locating packed type prefabricated crack
CN103604672A (en) * 2013-11-22 2014-02-26 山东大学 Even construction device and operation method for three-dimensional random fracture in geotechnical engineering
CN103674650A (en) * 2013-12-16 2014-03-26 山东科技大学 Standard test die for manufacturing mine paste filling material
CN105628463A (en) * 2015-03-09 2016-06-01 绍兴文理学院 Sample preparation mold for fractured rock mass model sample
CN105628463B (en) * 2015-03-09 2018-08-17 绍兴文理学院 The sampling die of crack rock model sample
CN105806686A (en) * 2016-03-04 2016-07-27 中国石油大学(华东) Mold for manufacturing anchored randomized crossover through crack rock mass
CN105738180A (en) * 2016-05-03 2016-07-06 中国石油大学(华东) Mold for manufacturing fracture-containing rock sample with anchor rod
CN106979882A (en) * 2017-05-27 2017-07-25 安徽理工大学 A kind of device and method for being used to make concrete by three-point bending coped beam
CN106979882B (en) * 2017-05-27 2019-06-04 安徽理工大学 It is a kind of for making the device and method of concrete by three-point bending coped beam
CN108663244A (en) * 2018-04-03 2018-10-16 中国科学院武汉岩土力学研究所 A kind of accurate method for making sample of inclination bolted discontinuous rock and bolted discontinuous rock

Also Published As

Publication number Publication date
CN101458186B (en) 2010-12-08

Similar Documents

Publication Publication Date Title
CN101458186B (en) Mold for crack-containing bolting test
CN1995571B (en) Built-in steel truss concrete combined huge size beam column frame and its manufacture method
CN203337435U (en) Concrete axial tensile test piece mould
CN201289451Y (en) Mold for anchor-loading test containing cranny
CN202937005U (en) Cast-in-situ concrete beam lateral template reinforcement device
CN110455643A (en) A kind of symmetrical expression double shear interfacial adhesion experimental rig and test method
CN205685510U (en) A kind of fabricated shear wall model structure unitary mould
CN110726615A (en) Loading device suitable for T-shaped beam column node test and using method thereof
CN108000702B (en) Bidirectional pretensioning prestressed concrete track slab die and application thereof
CN215760469U (en) Building structure movement joint position shear force wall aluminum mould board location reinforcement device
CN208347298U (en) It is integrally formed aluminum alloy building template unit
CN201681006U (en) Testing mold for manufacturing boss resin casting body bonding strength testing parts
CN201943349U (en) Steel hoop supporting device for high pier, pillar and beam template formworks
CN111979924B (en) Arch ring construction structure and construction method
CN207597584U (en) Accentric support frame
CN202974736U (en) Stretching test piece die
CN215563537U (en) Energy-consuming dry-type connecting device based on memory alloy
CN100441322C (en) Y-shaped static-indeterminant combination reinforced beam oversize vibration screen
CN210315193U (en) Triangular bracket with hinged support based on PBL shear key
CN103243809A (en) Unidirectional limitable hinged support for hinging pipe frame column foot and construction method of unidirectional limitable hinged support
CN211013830U (en) Be applicable to experimental loading device of T font beam column node
CN209319982U (en) Assembly concrete exterior wall board mold
CN203452268U (en) Box-type combined concrete column
CN217326450U (en) Large-section upright post formwork device
CN103184724B (en) Adjustable damping device of external prestressing cable during bridge reinforcement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101208

Termination date: 20111103