CN101457591B - Steel beam through hole reinforcement method - Google Patents
Steel beam through hole reinforcement method Download PDFInfo
- Publication number
- CN101457591B CN101457591B CN2008101546968A CN200810154696A CN101457591B CN 101457591 B CN101457591 B CN 101457591B CN 2008101546968 A CN2008101546968 A CN 2008101546968A CN 200810154696 A CN200810154696 A CN 200810154696A CN 101457591 B CN101457591 B CN 101457591B
- Authority
- CN
- China
- Prior art keywords
- reinforcing ring
- steel
- hole
- steel beam
- reinforcing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
The invention discloses a method for reinforcing steel beam through holes. Through holes are opened in the plastic zone of the steel beam; the structures of needed reinforcing rings are determined according to the positions and diameters of the holes, the reinforcing rings are welded on the through holes. The method meets the need of modern engineering practice, solves the problem of reinforcing after opening through holes in the plastic zone, and expands application range of reinforcing methods, which can not only be applied to common steel frame beams but also be applied to the steel beams of steel reinforced concrete columns (CFT), the steel beam of concrete filled steel tubular column (SRC), steel frame composite beam, etc.
Description
Technical field
The present invention relates to multilayer and high-rise steel structure reinforcement in the civil engineering, relate in particular to steel beam through hole reinforcement method.
Background technology
Existing " high-rise civil building steel work tecnical regulations " is middle regulation (JGJ99-98): when the circular port diameter is less than or equal to 1/3 deck-molding, can refuse reinforcement; When greater than 1/3 deck-molding, available annular stiffening rib is strengthened, and also available sleeve pipe or annular stiffening plate are strengthened.These several reinforcement measures can only be arranged on outside beam-ends is equivalent to the scope of deck-molding, and require the orifice diameter must not be greater than 1/2 of deck-molding.If require in the plastic zone, to punch, must develop a kind of through hole reinforcement, to adapt to the demand of modernization project practice.
Summary of the invention
Purpose of the present invention provides a kind of steel beam through hole reinforcement method behind the hole of opening just in order to overcome above-mentioned deficiency of the prior art in the plastic zone.
The present invention is achieved by following technical proposals: a kind of steel beam through hole reinforcement method, in the plastic zone of girder steel, open the hole; Determine the structure of needed reinforcing ring according to position of opening, aperture, reinforcing ring is welded on the described through hole; Wherein: described hole and reinforcing ring should satisfy following parameter request: 1. offset
2. the pillar edge is to the distance of through hole central point
3. reinforcing ring aperture D is: 100~600mm; 4. aperture ratio
Described H is the girder steel height, and the periphery of described reinforcing ring is provided with step, and the axis of great circle of described step is D
3, described step width is h
1, highly be b
1, the width of reinforcing ring is h
2, the thickness of reinforcing ring is b
2, be the inclined-plane between the tip circle on the reinforcing ring step and the roundlet of step, the inclination angle on described inclined-plane is α, D
3〉=2h
1+ 2 (b
2-b
1) tan α+2h
2+ D, wherein: h
1=12 ± 2mm, α=30 ° ± 5 °, h
2Value: I.100≤D≤during 300mm, h
2=20 ± 4mm; During II.300≤D≤600mm, h
2=40 ± 4mm; b
1=5~10mm, b
2Than about the thick 10mm of steel beam web plate thickness that needs reinforcement.
Described reinforcement annulus is by tow sides and girder steel welding.
The invention has the beneficial effects as follows: be applicable to the modernization project need of practice, solved the problem of in the plastic zone, opening reinforcement behind the hole, enlarged the scope of application of reinforcement, not only go for common steel-frame beam, can also be used for forms such as profile steel concrete column (CFT) girder steel, steel core concrete column (SRC) girder steel, steel frame compound beam.
Description of drawings
Fig. 1 is a structural representation of the invention process;
Fig. 2 is the structural representation of reinforcing ring of the present invention;
Fig. 3 is the A portion enlarged drawing of Fig. 2;
Fig. 4 is the side schematic diagram of Fig. 2;
Fig. 5 is a reinforcing ring welding schematic diagram.
Reference numeral: 1, pillar, 2, girder steel, 3, reinforcing ring.
The specific embodiment
Below in conjunction with drawings and Examples the present invention is further described:
As Fig. 1~shown in Figure 5, a kind of steel beam through hole reinforcement method of the present invention at first according to designing requirement, is determined opening diameter and position of opening, determines the concrete size of reinforcing ring, i.e. relevant parameters such as thickness, internal diameter, external diameter according to opening diameter and position.Selected reinforcing ring need check its bending resistance and shear-carrying capacity, to reach the double requirements of intensity and function of use through the new girder steel of the final formation of welding processing technology.Concrete grammar is:
In the plastic zone of girder steel 2, open the hole; Determine the structure of needed reinforcing ring 3 according to position of opening, aperture, reinforcing ring 3 is welded on the described through hole;
Wherein: described hole and reinforcing ring should satisfy following parameter request: 1. offset
2. pillar 1 edge is to the distance of through hole central point
3. reinforcing ring aperture D is: 100~600mm; 4. aperture ratio
Described H is girder steel 2 height, and the periphery of described reinforcement bad 3 is provided with step, and the axis of great circle of described step is D
3, described step width is h
1, highly be b
1, the width of reinforcing ring 3 is h
2, the thickness of reinforcing ring 3 is b
2, be the inclined-plane between the tip circle on reinforcing ring 3 steps and the roundlet of step, the inclination angle on described inclined-plane is α, D
3〉=2h
1+ 2 (b
2-b
1) tan α+2h
2+ D, wherein: h
1=12 ± 2mm, α=30 ° ± 5 °, h
2Value: I.100≤D≤during 300mm, h
2=20 ± 4mm; During II.300≤D≤600mm, h
2=40 ± 4mm; b
1=5~10mm, b
2Than about the thick 10mm of steel beam web plate thickness that needs reinforcement; Described reinforcement annulus 3 is by welding at I side, II side tow sides position and girder steel.
All be that requirement reinforcement position must be positioned at outside the girder steel plastic hinge region about the girder steel reinforcement measure in the past, and sometimes some pipeline, circuit etc. must pass through plastic hinge region, at this moment the outer reinforcement technology of plastic hinge region just can not be suitable fully.At this shortcoming of previous reinforcement technology, this reinforcement can be used for plastic hinge region, as long as it is just passable to meet the relative dimensions requirement, has so just brought very big convenience to the designer.
After design, can add up quantity and size that girder steel punches, carry out industrialization, portion's product production according to engine request according to the present invention again.In addition, be exactly that these method fabrication and installation are convenient, efficient, at last through the checking computations of the process of the girder steel intensity after the reinforcement, can satisfy the double requirements of intensity and use.
Reinforcing ring 3 is by casting, and material property and processing and fabricating must satisfy the requirement of existing China Engineering Construction Standardization Association standard " cast steel node tecnical regulations ".Earlier hold through hole successfully in the place of needs perforate, allow through hole tolerance 15mm according to designing requirement; Put the position when reinforcing ring 3 is installed earlier well, undertaken tentatively fixing by periphery four edge peak elder generations spot welding up and down of welding I side then; Determine errorless after, weld the automatic welding of I side earlier, and then weld the automatic welding of II side, form unified whole.
Although in conjunction with the accompanying drawings the preferred embodiments of the present invention are described above; but the present invention is not limited to the above-mentioned specific embodiment; the above-mentioned specific embodiment only is schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present invention; not breaking away under the scope situation that aim of the present invention and claim protect, can also make a lot of forms, these all belong within protection scope of the present invention.
Claims (2)
1. a steel beam through hole reinforcement method is characterized in that, opens the hole in the plastic zone of girder steel; Determine the structure of needed reinforcing ring according to position of opening, aperture, reinforcing ring is welded on the described through hole; Wherein: described hole and reinforcing ring should satisfy following parameter request: 1. offset
2. the pillar edge is to the distance of through hole central point
3. reinforcing ring aperture D is: 100~600mm; 4. aperture ratio
Described H is the girder steel height, and the periphery of described reinforcing ring is provided with step, and the axis of great circle of described step is D
3, described step width is h
1, highly be b
1, the width of reinforcing ring is h
2, the thickness of reinforcing ring is b
2, be the inclined-plane between the tip circle on the reinforcing ring step and the roundlet of step, the inclination angle on described inclined-plane is α, D
3〉=2h
1+ 2 (b
2-b
1) tan α+2h
2+ D, wherein: h
1=12 ± 2mm, α=30 ° ± 5 °, h
2Value: I.100≤D≤during 300mm, h
2=20 ± 4mm; During II.300≤D≤600mm, h
2=40 ± 4mm; b
1=5~10mm, b
2Than the thick 10mm of steel beam web plate thickness that needs reinforcement.
2. steel beam through hole reinforcement method according to claim 1 is characterized in that, described reinforcing ring is by tow sides and girder steel welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101546968A CN101457591B (en) | 2008-12-30 | 2008-12-30 | Steel beam through hole reinforcement method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101546968A CN101457591B (en) | 2008-12-30 | 2008-12-30 | Steel beam through hole reinforcement method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101457591A CN101457591A (en) | 2009-06-17 |
CN101457591B true CN101457591B (en) | 2010-08-18 |
Family
ID=40768693
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008101546968A Active CN101457591B (en) | 2008-12-30 | 2008-12-30 | Steel beam through hole reinforcement method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101457591B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI568913B (en) * | 2014-07-01 | 2017-02-01 | Senqcia Corp | Liang Buqiang Metal Parts and Beam Reinforcement Structure |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103696535A (en) * | 2013-12-26 | 2014-04-02 | 南京工业大学 | Circular opening accessory with high utilization rate of corrugated web beam |
CN104179297B (en) * | 2014-08-21 | 2016-06-15 | 四川金锋建设有限公司 | Girder steel threading hole reinforced structure |
CN106012870B (en) * | 2016-06-06 | 2018-10-23 | 上海交通大学 | The hole edge that uniaxial compression opens oblong hole steel plate is put more energy into reinforcement |
CN105970840B (en) * | 2016-06-06 | 2018-10-23 | 上海交通大学 | A kind of reinforcement being provided with continuous elliptical aperture compression steel plate |
CN105970839B (en) * | 2016-06-06 | 2018-10-23 | 上海交通大学 | Cable-stayed bridge steel case bridge tower crosses the pasting board reinforcement in rope hole |
CN106087779B (en) * | 2016-06-06 | 2018-10-23 | 上海交通大学 | The pasting board reinforcement in current hole is opened up inside steel case bridge tower |
CN106012871B (en) * | 2016-06-06 | 2018-10-23 | 上海交通大学 | The coaming plate reinforcement of steel case bridge tower oblong manhole |
CN107100324A (en) * | 2017-06-27 | 2017-08-29 | 厦门大学嘉庚学院 | It is a kind of to strengthen punch reinforced beam bearing capacity and the device of anti-seismic performance |
-
2008
- 2008-12-30 CN CN2008101546968A patent/CN101457591B/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI568913B (en) * | 2014-07-01 | 2017-02-01 | Senqcia Corp | Liang Buqiang Metal Parts and Beam Reinforcement Structure |
Also Published As
Publication number | Publication date |
---|---|
CN101457591A (en) | 2009-06-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101457591B (en) | Steel beam through hole reinforcement method | |
CN111395351B (en) | Assembled supporting structure of foundation pit and supporting construction method | |
CN202831233U (en) | Connected node of protracting inner diaphragm steel girder and concrete-filled steel-tubular columns inscribed a pipe coat | |
CN101914952A (en) | Connecting joint between hollow steel tube concrete column and steel girder and construction method thereof | |
CN101392600A (en) | Trussed-beam steel beam reinforcing structure | |
CN105971827A (en) | Transfer ring beam for concrete cylinder and steel cylinder combined tower and construction method thereof | |
CN208763204U (en) | A kind of vertical connecting structure of low layer assembled architecture prefabricated panel | |
CN108755962A (en) | A kind of partial precast assembly hollow profile steel concrete hollow column and construction method | |
CN101691782A (en) | Node for thin-wall steel tube regenerative mixed column and reinforced concrete beam and construction method thereof | |
WO2017024844A1 (en) | Bolt connection structure between column and beam in aluminum alloy house | |
CN201309797Y (en) | Reinforced structure of steel crane girder | |
CN110005200B (en) | Construction process for concrete pouring compaction of horizontal hidden beam | |
CN207296182U (en) | Assembled architecture skeleton reinforcing steel bar concrete column | |
CN102041806A (en) | Construction method for inserting steel column in bored pile | |
CN109610706A (en) | A kind of assembled combined hollow floor and preparation method thereof | |
CN102877549A (en) | Rigid connection joint of steel tube concrete pile and steel beam | |
CN111962950A (en) | Steel tube concrete column-H-shaped steel beam-steel support-Pi-shaped connecting piece combined type corner column middle node and manufacturing method | |
CN204139694U (en) | Inner wall belt strengthens the steel pipe king-post of structure | |
CN207863185U (en) | A kind of Novel steel pipe concrete pole splicing apparatus of band edge sleeve-board cylinder | |
CN110359358A (en) | Steel-concrete combined structure taper cast iron bolt connection piece | |
CN202882119U (en) | Rigid connection joint of steel tube concrete pile and steel beam | |
CN214365094U (en) | Elevator well protector | |
CN212927241U (en) | Steel pipe concrete column-H steel beam-support-Pi-shaped combined corner column middle node | |
CN211114642U (en) | Connection structure of security protection door and main wall body | |
CN203188379U (en) | Steel reinforced concrete beam column joint adopting steel plates with holes above and below core area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |