CN101457516A - Hanging method of multilayer horizontal inhaul cable and special catwalk - Google Patents
Hanging method of multilayer horizontal inhaul cable and special catwalk Download PDFInfo
- Publication number
- CN101457516A CN101457516A CNA2008102463017A CN200810246301A CN101457516A CN 101457516 A CN101457516 A CN 101457516A CN A2008102463017 A CNA2008102463017 A CN A2008102463017A CN 200810246301 A CN200810246301 A CN 200810246301A CN 101457516 A CN101457516 A CN 101457516A
- Authority
- CN
- China
- Prior art keywords
- layer
- cable
- horizontal
- place
- jump stay
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域 technical field
本发明涉及桥梁工程中一种多层水平拉索的挂设方法,本发明还涉及用于挂设多层水平拉索的专用猫道。The invention relates to a method for hanging multi-layer horizontal stay cables in bridge engineering, and also relates to a special catwalk for hanging multi-layer horizontal stay cables.
背景技术 Background technique
在大跨连续钢桁拱施工中,中间墩钢梁双悬臂架设时常需采用多层高强钢丝拉索水平拉索辅助,以控制钢梁应力及挠度。水平拉索的锚固端和张拉端分别通过锚箱,与从钢梁节点伸出的燕子板进行销轴连接,不需要采用吊索塔架辅助(若采用塔架,则费用较高,一般大型塔架需2000多万元,中型塔架也需1000多万元)。In the construction of long-span continuous steel truss arches, multi-layer high-strength steel wire cables and horizontal cables are often used to assist the erection of double-cantilever steel beams in the middle pier to control the stress and deflection of the steel beams. The anchored end and the tensioned end of the horizontal stay cable pass through the anchor box respectively, and are pinned to the swallow plate protruding from the steel beam node, without the use of sling tower support (if the tower is used, the cost is high, generally Large-scale towers need more than 20 million yuan, and medium-sized towers also need more than 10 million yuan).
对于多层水平拉索的挂设,通常采用与斜拉索挂设相同的方法,即在钢梁上将拉索展开,通过卷杨机或吊机将拉索的锚固端安装到位后,然后通过软牵引、硬牵引将拉索的张拉端锚头戴帽,直至张拉到位。该挂设方法一般存在以下问题:(1)水平拉索的戴帽索力较大,需设置较长的硬牵引张拉杆,不仅张拉困难,硬牵引张拉杆的花费也很大(一般每根需十几万至几十万元);(2)由于各层索在竖直方向共面,后一层拉索挂设前将拉索展开时,受前一层已张拉的拉索的影响,容易出现钢丝束打绞现象。For the hanging of multi-layer horizontal stay cables, the same method as that of stay cables is usually used, that is, the stay cables are deployed on the steel girder, and the anchor ends of the stay cables are installed in place by a hoist or crane, and then Cap the tension end anchor of the cable through soft traction and hard traction until it is tensioned in place. This hanging method generally has the following problems: (1) the capping cable force of the horizontal cable is relatively large, and a long hard traction tension rod needs to be set, which is not only difficult to stretch, but also costs a lot for the hard traction tension rod (generally every (2) because each layer of cables is in the same plane in the vertical direction, when the cables are deployed before the latter layer of cables are hung, the tensioned cables of the previous layer will be affected. The impact of the steel wire bundle is prone to twisting.
发明内容 Contents of the invention
本发明的第一个目的在于克服上述现有背景技术的不足之处,而提供一种多层水平拉索的挂设方法(高强钢丝拉索)。该方法施工方便、安全可靠。The first object of the present invention is to overcome the disadvantages of the above-mentioned existing background technology, and provide a method for hanging multi-layer horizontal stay cables (high-strength steel wire stay cables). The method is convenient in construction, safe and reliable.
本发明的第二个目的涉及上述多层高强钢丝水平拉索的挂设方法采用的专用猫道。The second object of the present invention relates to the special-purpose catwalk adopted by the hanging method of the above-mentioned multi-layer high-strength steel wire horizontal stay cable.
本发明的第一个目的是通过如下措施来达到的:多层水平拉索的挂设方法,其特征在于它包括如下步骤:①.在梁面上设置放索平台,将第一层水平拉索的锚固端安装到位,通过软牵引、硬牵引将拉索的张拉端锚头戴帽,并张拉到位;②.在第一层水平拉索的上端设置用于放置第二层水平拉索的猫道,将第二层水平拉索在猫道上展开,将第二层水平拉索的锚固端安装到位,并通过软牵引、硬牵引将第二层水平拉索的张拉端锚头戴帽,并张拉到位;③.在第二层水平拉索的上端设置用于放置第三层水平拉索的猫道,将第三层水平拉索在猫道上展开,将第三层水平拉索的锚固端安装到位,并通过软牵引、硬牵引将第三层水平拉索的张拉端锚头戴帽,并张拉到位;④.直至将所有的水平拉索全部张拉到位。The first purpose of the present invention is achieved through the following measures: the method for hanging multi-layer horizontal stay cables is characterized in that it includes the following steps: 1. a cable-laying platform is set on the beam surface, and the first layer is horizontally pulled The anchor end of the cable is installed in place, and the anchor head of the tension end of the cable is capped by soft traction and hard traction, and stretched in place; cable catwalk, spread out the second layer of horizontal stay cables on the catwalk, install the anchor end of the second layer of horizontal stay cables in place, and anchor the tension end of the second layer of horizontal stay cables through soft traction and hard traction. Wear a cap and stretch it in place; ③. Set a catwalk for placing the third layer of horizontal cables on the upper end of the second layer of horizontal cables, spread out the third layer of horizontal cables on the catwalk, and place the third layer of horizontal cables The anchor end of the stay cable is installed in place, and the anchor head of the tension end of the third layer of horizontal stay cables is capped by soft traction and hard traction, and stretched in place; ④ until all the horizontal stay cables are stretched in place.
在上述技术方案中,所述的猫道包括固定水平拉索的哈夫夹具、哈夫夹具固定在横梁的下端,在横梁的两端竖直固定有栏杆,在横梁的中部位置固定有放索滑道。In the above technical solution, the catwalk includes a Huff clamp for fixing the horizontal cables, the Huff clamp is fixed at the lower end of the crossbeam, railings are vertically fixed at both ends of the crossbeam, and a cable release is fixed at the middle of the crossbeam. slide.
专用猫道,它包括固定水平拉索的哈夫夹具、哈夫夹具固定在横梁的下端,在横梁的两端竖直固定有栏杆,在横梁的中部位置固定有放索滑道。The special-purpose catwalk includes a Huff clamp for fixing horizontal cables, the Huff clamp is fixed at the lower end of the beam, railings are vertically fixed at both ends of the beam, and a cable release slideway is fixed at the middle of the beam.
在上述技术方案中,所述横梁上铺设有钢丝网。In the above technical solution, steel wire mesh is laid on the beam.
在上述技术方案中,所述在横梁间间隔放置有方木。In the above technical solution, square logs are placed at intervals between the beams.
在上述技术方案中,所述猫道上还包括支架,所述支架设置在水平拉索与钢梁悬臂之间的过渡处。In the above technical solution, the catwalk further includes a bracket, and the bracket is arranged at the transition between the horizontal stay cable and the steel beam cantilever.
本发明多层水平拉索的挂设方法具有如下优点:摒弃传统的挂设方法,在已安装的前一层索上设置临时猫道,作为后一层拉索的放索平台,减小后一层索的带帽索力,降低挂设难度,同时解决了后一层索展开受前一层索影响的问题。本发明多层水平拉索的挂设方法施工方便、安全可靠、且费用低。专用猫道的结构简单、安装使用及拆除均方便。The hanging method of multilayer horizontal cables of the present invention has the following advantages: Abandoning the traditional hanging method, setting a temporary catwalk on the installed previous layer of cables, as a cable release platform for the latter layer of cables, reducing the The capped cable force of one layer of cables reduces the difficulty of hanging, and at the same time solves the problem that the expansion of the latter layer of cables is affected by the previous layer of cables. The hanging method of multi-layer horizontal stay cables of the present invention is convenient in construction, safe and reliable, and low in cost. The structure of the special catwalk is simple, and it is convenient to install, use and dismantle.
经测算:与斜拉拉索挂设方法相比,本发明方法减少约2/3的张拉力,并且若钢桥的跨度大,则减少的张拉力更大。After calculation: compared with the cable-stayed cable hanging method, the method of the present invention reduces about 2/3 of the tension force, and if the span of the steel bridge is large, the reduced tension force is even greater.
附图说明 Description of drawings
图1为本发明多层水平拉索挂设的总体布置图。Fig. 1 is the overall layout diagram of the multilayer horizontal stay cable hanging of the present invention.
图2本发明专用猫道的主面示意图。Fig. 2 is a schematic diagram of the main surface of the special catwalk of the present invention.
图3为图2的结构俯视图。FIG. 3 is a top view of the structure in FIG. 2 .
图4为图2的横断面示意图。FIG. 4 is a schematic cross-sectional view of FIG. 2 .
图5为专用猫道的平面结构示意图(俯视状态)。Fig. 5 is a schematic plan view of the special catwalk (overlooking state).
图6为水平拉索锚固端戴帽示意图。Fig. 6 is a schematic diagram of wearing a cap at the anchor end of the horizontal stay cable.
图7为水平拉索张拉端戴帽示意图。Fig. 7 is a schematic diagram of wearing a cap at the tension end of the horizontal cable.
图8、图9、图10分别为多层水平拉索挂设方法的步骤图。Fig. 8, Fig. 9, and Fig. 10 are step diagrams of the multilayer horizontal stay cable hanging method respectively.
图中1.梁面,2、钢梁整体节点,3.索盘。In the figure, 1. beam surface, 2. integral joint of steel beam, 3. cable tray.
100.专用猫道(或称猫道),101.哈夫夹具,102.放索滑道,102A.限位板,102B.钢滚轴,103.横梁,104.方木,105.栏杆,106.钢丝网,107.支架。100. Special-purpose catwalk (or claim catwalk), 101. Huff clamp, 102. Cable slide, 102A. Limit plate, 102B. Steel roller, 103. Beam, 104. Square wood, 105. Railing, 106. Wire mesh, 107. Brackets.
200.拉索系统,201.锚箱,202.燕子板,203.水平拉索(或称拉索),204.销轴,205.张位杆,206.螺帽,207.千斤顶,208.锚头,203A.第一层水平拉索,203B.第二层水平拉索,203C.第三层水平拉索。200. Cable system, 201. Anchor box, 202. Swallow plate, 203. Horizontal cable (or cable), 204. Pin shaft, 205. Tension rod, 206. Nut, 207. Jack, 208. Anchor head, 203A. First layer of horizontal guy cables, 203B. Second layer of horizontal guy cables, 203C. Third layer of horizontal guy cables.
300.动力牵引装置。300. Power traction unit.
具体实施方式 Detailed ways
下面结合附图详细说明本发明的实施情况,但它们并不构成对本发明的限定,仅作举例而已。同时通过说明本发明的优点将变得更加清楚和容易理解。The implementation of the present invention will be described in detail below in conjunction with the accompanying drawings, but they do not constitute a limitation to the present invention, and are only examples. At the same time, the advantages of the present invention will become clearer and easier to understand.
参阅附图可知:本发明多层水平拉索的挂设方法,它包括如下步骤:①.在梁面1上设置放索平台,将第一层水平拉索203A的锚固端安装到位,通过软牵引和硬牵引将拉索的张拉端锚头戴帽(拉索的一端为锚固端,另一端为张拉端),并张拉到位;②.在第一层水平拉索203A的上端设置用于放置第二层水平拉索203B的猫道100,将第二层水平拉索203B在猫道100上展开,将第二层水平拉索203B的锚固端安装到位,通过软牵引和硬牵引将第二层水平拉索203B的张拉端锚头戴帽,并张拉到位;③.在第二层水平拉索203B的上端设置用于放置第三层水平拉索203C的猫道100,将第三层水平拉索203C在猫道100上展开,将第三层水平拉索203C的锚固端安装到位,并通过软牵引和硬牵引将第三层水平拉索203C的张拉端锚头戴帽,并张拉到位;④.直至将所有的水平拉索全部张拉到位(如图1、图8、图9、图10所示)。Referring to the accompanying drawings, it can be known that the hanging method of multilayer horizontal stay cables of the present invention comprises the following steps: 1. a cable-laying platform is set on the
需要说明的是:专用猫道(或称猫道)为临时放置拉索使用,当水增拉索被张位成水平拉索后,猫道需被拆除。另外:每层水平拉索一般包括四根拉索(但本发明不排除采用其它根数的拉索),只有当四根拉索全部被张拉到位后,才能在其上设置专用猫道,其中上端的二个拉索被哈夫夹具101固定(四根拉索呈方形分布)。且其中锚固端和张拉端的固定技术为现有技术。It should be noted that the special catwalk (or catwalk) is used for temporarily placing the cables. When the water-increased cable is stretched into a horizontal cable, the catwalk needs to be dismantled. In addition: each layer of horizontal stay cables generally includes four stay cables (but the present invention does not exclude the use of other stay cables), and only when the four stay cables are all stretched in place, can a special catway be set on it, Wherein the two stay cables at the upper end are fixed by the Huff clamp 101 (the four stay cables are distributed in a square shape). And wherein the fixing technology of the anchoring end and the tensioning end is the prior art.
猫道100包括固定水平拉索的哈夫夹具101、哈夫夹具101固定在横梁103的下端,在横梁103的两端竖直固定有栏杆105,在横梁103的中部位置固定有放索滑道102。放索滑道102的两端竖直固定有限位板102A,中间横放有钢滚轴102B,这种结构放拉索时比较省力。横梁103上铺设有钢丝网106(方便人在上面行走),在横梁103间间隔放置有方木104(方木代替横梁,可减轻重量,同时减少横梁之间的跨度)。猫道100上还包括支架107,支架107设置在水平拉索与钢梁悬臂之间的过渡处(或者说支架107设置在水平拉索与钢梁整体节点之间的过渡处,如图1所示)。支架的安装能使拉索的放置平稳,张拉稳定(如图2、图3、图4、图5)。The
在猫道101中放索滑道102与横梁103及哈夫夹具101的下半部与上半部采用螺栓连接外,其它均焊成一个整体。其中哈夫夹具101为两半月形的组焊件,通过上下部分栓接将水平拉索抱紧,放索滑道102为限位组焊结构,其底板与横梁顶板螺栓连接,水平拉索203即可在放索滑道上滑行,横梁103底面与哈夫夹具101的顶面焊接。支架107设置在已架索的张拉端的上层位置,在猫道全长铺设钢丝网106即形成沿已装水平拉索的施工通道,第二层及以上层的施工方法相同。In the
拉索系统200包括锚箱201、燕子板202、水平拉索203、销轴204、张拉杆205、螺帽206、千斤顶207及锚头208组成。锚箱201为箱形梁,与主梁整体节点2上的燕子板202通过销轴204连接,自带锚头208的水平拉索203的锚固端由这一侧的动力牵引装置300穿拉完成,水平拉索203的锚头208则由对称侧的动力牵引装置300在放索滑道102上放索并通过张拉杆205由千斤顶207将水平拉索带帽拉至设计吨位(如图6、图7所示)。The cable system 200 includes an
动力牵引装置300是拖动水平拉索203穿入锚箱201内并进行端头带帽的动力装置,可以是拱上拼装钢梁杆件4的专用起重机,也可采用卷扬机和滑轮组的牵引装置,两者均可用于水平拉索203的挂索牵引。The
具体放索过程为:在前一层水平拉索顶面安装临时猫道100后,将待装层的拉索索盘3吊起放置在燕子板202附近,锚固端锚头208安装至设计位置,通过动力牵引装置300将水平拉索203沿临时猫道100上的放索滑道102展开;由动力牵引装置300将第一根张拉杆205戴上螺帽206,然后用大吨位千斤顶207对第二根张拉杆205进行张拉,使锚头208戴帽至设计位置(如图6、图7所示)。The specific cable laying process is as follows: after the
计算研究表明:前一层拉索由于临时猫道的施工荷载的增加,其索力会有所增加,但增加量非常有限,不会影响到前一层拉索的正常工作。Computational studies show that: due to the increase in the construction load of the temporary catwalk, the cable force of the previous layer will increase, but the increase is very limited and will not affect the normal work of the previous layer of cables.
本发明方法,虽然增加了临时猫道费用,但由于减小了拉索的带帽索力、缩短了硬牵引张拉杆长度、降低了挂设难度及解决了后一层索展开受前一层索影响等问题,其社会及经济效益显著。Although the method of the present invention increases the cost of the temporary catwalk, the capped cable force of the cable is reduced, the length of the hard traction tension rod is shortened, the difficulty of hanging is reduced, and the problem of the expansion of the rear layer of the cable by the previous layer is solved. It has significant social and economic benefits.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2008102463017A CN101457516B (en) | 2008-12-30 | 2008-12-30 | Hanging method of multilayer horizontal inhaul cable |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2008102463017A CN101457516B (en) | 2008-12-30 | 2008-12-30 | Hanging method of multilayer horizontal inhaul cable |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201010147694A Division CN101798798A (en) | 2008-12-30 | 2008-12-30 | Special catwalk hung with multilayer horizontal inhaul cables |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101457516A true CN101457516A (en) | 2009-06-17 |
| CN101457516B CN101457516B (en) | 2010-10-06 |
Family
ID=40768620
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2008102463017A Active CN101457516B (en) | 2008-12-30 | 2008-12-30 | Hanging method of multilayer horizontal inhaul cable |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101457516B (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102031754B (en) * | 2009-09-29 | 2013-01-02 | 上海浦江缆索股份有限公司 | Intelligent horizontal cable releasing method |
| CN105971266A (en) * | 2016-07-01 | 2016-09-28 | 南京市第九建筑安装工程有限公司 | A self-anchoring adjustable pedal for erecting high-altitude catwalks |
| CN116876322A (en) * | 2023-07-27 | 2023-10-13 | 中交第二航务工程局有限公司 | Four-width catwalk structure of widening tower penetrating type of four main cable suspension bridges at high and low positions and construction method |
-
2008
- 2008-12-30 CN CN2008102463017A patent/CN101457516B/en active Active
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102031754B (en) * | 2009-09-29 | 2013-01-02 | 上海浦江缆索股份有限公司 | Intelligent horizontal cable releasing method |
| CN105971266A (en) * | 2016-07-01 | 2016-09-28 | 南京市第九建筑安装工程有限公司 | A self-anchoring adjustable pedal for erecting high-altitude catwalks |
| CN105971266B (en) * | 2016-07-01 | 2018-02-09 | 南京市第九建筑安装工程有限公司 | Self-anchored adjustable pedal for erecting high-altitude catwalk |
| CN116876322A (en) * | 2023-07-27 | 2023-10-13 | 中交第二航务工程局有限公司 | Four-width catwalk structure of widening tower penetrating type of four main cable suspension bridges at high and low positions and construction method |
| CN116876322B (en) * | 2023-07-27 | 2025-12-02 | 中交第二航务工程局有限公司 | Construction method of widened four-panel catwalk structure through towers for high and low four-main-cable suspension bridge |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101457516B (en) | 2010-10-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103321416B (en) | Construction method for prestress of cable-stayed grid structure | |
| CN202090286U (en) | Traction system suitable for self-anchored type double cable plane suspension bridge | |
| CN101537976B (en) | Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof | |
| CN209584873U (en) | Suspension replacement device for straddle-type double temporary cable self-balancing push-push suspension bridge | |
| CN109537476B (en) | Pin lug double temporary cable self-balancing pull-type suspension bridge sling replacement underpinning device | |
| CN201172597Y (en) | Large-span heavy-duty cable crane | |
| CN101684639A (en) | Process method for construction of steel-structured suspension bridge and light type cable carrying crane specially used in same | |
| CN101224856A (en) | Large-span heavy-duty cable crane and its installation method | |
| CN109487709B (en) | Side-riding temporary cable self-balancing push-type suspension bridge sling replacement underpinning device | |
| CN215482363U (en) | Become width of cloth formula catwalk suitable for construction of single-column tower space cable suspension bridge | |
| CN112554076B (en) | A hanging basket bottom basket continuous small stroke lowering device and construction method | |
| CN201376848Y (en) | Large-scale double-tower automatic-elevation hoisting equipment | |
| CN205329550U (en) | Suspension bridge catwalk system | |
| CN210766433U (en) | Trapezoidal hanging basket structure | |
| CN214362953U (en) | A single-column pier reinforcement structure for improving the anti-overturning ability of bridges | |
| CN101457516B (en) | Hanging method of multilayer horizontal inhaul cable | |
| CN117536126A (en) | Construction method combining low-level assembly and high-level lifting of steel tube concrete arch bridge | |
| CN112267390A (en) | Single-column pier reinforcing structure for improving bridge anti-overturning capacity | |
| CN116853963A (en) | A hoisting device and hoisting method for the main beam of a cable-stayed bridge | |
| CN212641216U (en) | A rapid installation system for prefabricated middle beams of steel box arch rib tied arch bridges | |
| CN109110655B (en) | T-shaped crown block of cable crane and matched cable saddle | |
| CN101798798A (en) | Special catwalk hung with multilayer horizontal inhaul cables | |
| CN211257921U (en) | Steel bar truss building carrier plate draws device and system to one side | |
| CN209584872U (en) | The double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device | |
| CN217948828U (en) | Front supporting point inclined climbing hanging basket for arch bridge |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD. Effective date: 20150205 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20150205 Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No. Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau Address before: 430050 No. 38, Hanyang Avenue, Wuhan, Hubei Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd. |