CN101446195A - 多观测系统同步观测地震测井方法 - Google Patents

多观测系统同步观测地震测井方法 Download PDF

Info

Publication number
CN101446195A
CN101446195A CNA2008102299987A CN200810229998A CN101446195A CN 101446195 A CN101446195 A CN 101446195A CN A2008102299987 A CNA2008102299987 A CN A2008102299987A CN 200810229998 A CN200810229998 A CN 200810229998A CN 101446195 A CN101446195 A CN 101446195A
Authority
CN
China
Prior art keywords
wave detector
observation
observation system
shot
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008102299987A
Other languages
English (en)
Inventor
王丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BGP Inc
Original Assignee
CNPC Great Wall Drilling Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Great Wall Drilling Co filed Critical CNPC Great Wall Drilling Co
Priority to CNA2008102299987A priority Critical patent/CN101446195A/zh
Publication of CN101446195A publication Critical patent/CN101446195A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

本发明涉及一种多观测系统同步观测地震测井方法,该方法是基于地震勘探波前扩散原理即两极检波器接收放一炮所收到的信息为一极接收的二倍,生产效率提高一倍,可以节约1/2井场占用时间,节约一炮成本消耗,而且信息的准确度要高于一极接收的质量,打破传统的一个观测系统干完再干另一个观测系统的作法,采用多井放炮激发、一极或多极接收、多个观测系统同步观测的作业方式采集测井资料,达到提高测井质量的作业效率的目的。本发明提供的多观测系统同步观测地震测井方法,易于实施,工作可靠,利用该方法可以大大提高地震测井作业效率和质量,缩短测井作业和井场占用时间,获得良好的经济效益。

Description

多观测系统同步观测地震测井方法
技术领域:
本发明涉及一种用于石油勘探、开发过程的测井技术。
背景技术:
垂直地震测井是石油勘探开发过程常用的测井方法,由于其测井资料精度高,作业周期短,解决地质问题迅速,在现场实际应用中获得良好效果。在通常情况下,一口井的探测有3-6个零偏、非零偏观测系统,目前地震测井作业的常规做法是各个观测系统激发炮井独立放炮激发,接收井中检波器只对一个观察系统的激发井炮接收,对于多个观测系统,同一深度的接收需要重复多次放置检波器,因而不但放炮速度慢,井场占用时间长,作业效率低,而且每个观测系统资料质量不高。
发明内容:
本发明的目的是提供一种测井工程质量高且作业效率高、井场占用时间短的多观测系统同步观测地震测井方法。
本发明是这样实现的。此种地震测井方法是基于地震勘探波前扩散原理即两极检波器接收放一炮所收到的信息为一极接收的二倍,生产效率提高一倍,可以节约1/2井场占用时间,节约一炮成本消耗,而且信息的准确度要高于一极接收的质量,打破传统的一个观测系统干完再干另一个观测系统的作法,采用多井放炮激发、一极或多极接收、多个观测系统同步观测的作业方式采集测井资料,达到提高测井质量和作业效率的目的。具体做法如下:
(1)、按照设计要求的观测系统个数,将每个观测系统的炮点准备工作做好;并且给不同观测系统的炮点按顺序编号:1炮点、2炮点,3炮点...;
(2)、将井场中的检波器、井下电缆、地震仪器连接好,准备下井接收;
(3)、将检波器下到井中指定的接收位置,达到接收条件后,1炮点激发,检波器接收,接收后检波器不动,2炮点激发,检波器再接收,检波器不动,3炮点激发,检波器再接收...直到这个检波器接收点的所有观测系统都激发接收完;检波器再移动到下一个接收位置上去,同上进行多个观测系统炮点的激发和检波器接收过程;直至把井中所有检波器接收点的多个观测系统信息全部观测完毕;
(4)、回到室内将采集到的地震数据按不同观测系统分离,同一观测系统的数据放到一起。
本发明提供的多观测系统同步观测地震测井方法易于实施,工作可靠,利用该方法可以大大提高地震测井作业效率和质量,缩短测井作业和井场占用时间,获得良好的经济效益。
附图说明:
图1、图2分别为一口炮点井激发、一极和两极接收时的作业状况示意图。图2、图3分别为两口炮点井激发、一极和两极接收时的作业状况示意图。
具体实施方式:
本发明由以下实施例给出,下面结合附图予以说明。
如图所示,标号“1”为地震勘探测试作业车,“2”为地表,“3”为地下,“4”为放炮井点,“5”为接收井及检波器,“6”为地震波,“7”为放炮爆炸声像。其中,图1、2为常规的单井独立放炮激发一极或多极接收的作业状况示意图,图3、4为多井激发、一极或多极接收的作业状况示意图。实施效果表明,采用后一方式进行测井作业,效率可成倍或数倍于前一种方式。

Claims (1)

1、一种多观测系统同步观测地震测井方法,其特征在于:该方法是基于地震勘探波前扩散原理即两极检波器接收放一炮所收到的信息为一极接收的二倍,生产效率提高一倍,可以节约1/2井场占用时间,节约一炮成本消耗,而且信息的准确度要高于一极接收的质量,打破传统的一个观测系统干完再干另一个观测系统的作法,采用多井放炮激发、一极或多极接收、多个观测系统同步观测的作业方式采集测井资料,达到提高测井质量的作业效率的目的;其具体做法是:
(1)、按照设计要求的观测系统个数,将每个观测系统的炮点准备工作做好;并且给不同观测系统的炮点按顺序编号:1炮点、2炮点,3炮点...;
(2)、将井场中的检波器、井下电缆、地震仪器连接好,准备下井接收;
(3)、将检波器下到井中指定的接收位置,达到接收条件后,1炮点激发,检波器接收,接收后检波器不动,2炮点激发,检波器再接收,检波器不动,3炮点激发,检波器再接收...直到这个检波器接收点的所有观测系统都激发接收完。检波器再移动到下一个接收位置上去,同上进行多个观测系统炮点的激发和检波器接收过程。直至把井中所有检波器接收点的多个观测系统信息全部观测完毕;
(4)、回到室内将采集到的地震数据按不同观测系统分离,同一观测系统的数据放到一起。
CNA2008102299987A 2008-12-22 2008-12-22 多观测系统同步观测地震测井方法 Pending CN101446195A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008102299987A CN101446195A (zh) 2008-12-22 2008-12-22 多观测系统同步观测地震测井方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008102299987A CN101446195A (zh) 2008-12-22 2008-12-22 多观测系统同步观测地震测井方法

Publications (1)

Publication Number Publication Date
CN101446195A true CN101446195A (zh) 2009-06-03

Family

ID=40742049

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008102299987A Pending CN101446195A (zh) 2008-12-22 2008-12-22 多观测系统同步观测地震测井方法

Country Status (1)

Country Link
CN (1) CN101446195A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102607566A (zh) * 2011-01-25 2012-07-25 鸿富锦精密工业(深圳)有限公司 道路实景导航系统及方法
CN102798884A (zh) * 2011-05-25 2012-11-28 淮南矿业(集团)有限责任公司 巷道顶板二维地震勘探方法及系统
CN103777246A (zh) * 2014-02-08 2014-05-07 中国石油化工集团公司 地震勘探仪器与vsp测井仪器共源接收系统

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102607566A (zh) * 2011-01-25 2012-07-25 鸿富锦精密工业(深圳)有限公司 道路实景导航系统及方法
CN102798884A (zh) * 2011-05-25 2012-11-28 淮南矿业(集团)有限责任公司 巷道顶板二维地震勘探方法及系统
CN102798884B (zh) * 2011-05-25 2015-06-17 淮南矿业(集团)有限责任公司 巷道顶板二维地震勘探方法及系统
CN103777246A (zh) * 2014-02-08 2014-05-07 中国石油化工集团公司 地震勘探仪器与vsp测井仪器共源接收系统
CN103777246B (zh) * 2014-02-08 2017-02-01 中国石油化工集团公司 地震勘探仪器与vsp测井仪器共源接收系统

Similar Documents

Publication Publication Date Title
CN102759745B (zh) 一种基于数字地质露头模型正演的碳酸盐岩储层预测方法
US10859726B2 (en) Multi-mode acoustic tool and method
CN104049278B (zh) 多震源多拖缆触发时序控制系统及方法
CN202170793U (zh) 一种随钻声波测井装置和发射换能器
CN104747184A (zh) 隧道掌子面前方岩体三维波速成像的随钻测量方法与装置
CN107642114B (zh) 桩基浇注前桩底隐患探查方法及其探查装置
CN105473814A (zh) 具有横向偶极天线配置的井下核磁共振(nmr)工具
CN102162358B (zh) 一种随钻声波测井装置
CN102565848B (zh) 利用共振波成像探测溶洞的方法
CN103726836A (zh) 基于声波测井资料提取模式波慢度的方法
CN101571041A (zh) 电磁地震测井系统和方法
CN104360395A (zh) 一种井上下全空间地震波数据采集系统和勘探方法
CN102073061B (zh) 使用数字地听仪的地听信息高密度记录系统
CN103645505A (zh) 一种定量检测地层中裂缝发育程度的方法
CN102828744B (zh) 四极子源短源距声波全波测井仪
CN102720484A (zh) 一种随钻声波测井仪器及测井方法
CN101446195A (zh) 多观测系统同步观测地震测井方法
CN109188528B (zh) 井间弹性波层析成像系统和方法
CN104749637A (zh) 随钻地震钻头震源侧帮地质构造探测方法
CN103255756A (zh) 一种用地质雷达勘测桩基溶洞的方法
CN102520441B (zh) 一种井巷定向探测地震勘探数据采集方法
CN101950032A (zh) 一种用于近地表调查的多波激发方法
CN104020488B (zh) 无线分布式弹性波反射体探测装置、系统和方法
CN105332395A (zh) 一种机械成孔混凝土灌注桩桩底持力层检测方法
Shamir et al. In situ stress orientation near the San Andreas fault: preliminary results to 2.1 km depth from the Cajon Pass scientific drillhole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: DONGFANG GEOPHYSICAL EXPLORATION CO. LTD., CHINA P

Free format text: FORMER OWNER: CHINESE PETROLEUM GROUP CHANGCHENG DRILLING ENGINEERING CO., LTD.

Effective date: 20100920

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100724 NO.6, LIUPUKANG MIDDLE STREET, XICHENG DISTRICT, BEIJING TO: 072751 NO.189, FANYANG WEST ROAD, ZHUOZHOU CITY, HEBEI PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20100920

Address after: 072751 No. 189 Yang Xi Road, Zhuozhou, Hebei

Applicant after: Dongfang Geophysical Exploration Co., Ltd., China Petrochemical Corp.

Address before: 100724 No. 6, Kang Street, six, Xicheng District, Beijing

Applicant before: Chinese Petroleum Group Changcheng Drilling Engineering Co., Ltd.

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20090603