CN101441462A - Shearing control method and control device of disc shear - Google Patents

Shearing control method and control device of disc shear Download PDF

Info

Publication number
CN101441462A
CN101441462A CNA2008102177462A CN200810217746A CN101441462A CN 101441462 A CN101441462 A CN 101441462A CN A2008102177462 A CNA2008102177462 A CN A2008102177462A CN 200810217746 A CN200810217746 A CN 200810217746A CN 101441462 A CN101441462 A CN 101441462A
Authority
CN
China
Prior art keywords
speed
shearing
steel plate
pinch roller
tracker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008102177462A
Other languages
Chinese (zh)
Other versions
CN101441462B (en
Inventor
江业泰
罗廷鉴
郭同铀
邢宝勤
钟剑鹏
雷国福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoguan Iron And Steel Group Co Ltd Guandong Prov
Shaogang Songshan Co Ltd Guangdong
Original Assignee
Shaoguan Iron And Steel Group Co Ltd Guandong Prov
Shaogang Songshan Co Ltd Guangdong
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoguan Iron And Steel Group Co Ltd Guandong Prov, Shaogang Songshan Co Ltd Guangdong filed Critical Shaoguan Iron And Steel Group Co Ltd Guandong Prov
Priority to CN2008102177462A priority Critical patent/CN101441462B/en
Publication of CN101441462A publication Critical patent/CN101441462A/en
Application granted granted Critical
Publication of CN101441462B publication Critical patent/CN101441462B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Metal Rolling (AREA)
  • Control Of Metal Rolling (AREA)

Abstract

本发明涉及一种圆盘剪剪切控制方法及其控制装置,该方法包括如下步骤:带钢头部到达入口夹送辊前部,发令器以入口夹送辊为速令主体发出剪切咬入速度命令;带钢头部到达主剪刃,发令器以主剪刃为速令主体、保持剪切咬入速度不变,控制入口夹送辊跟随主剪刃的线速度并保持同步;带钢头部到达出口夹送辊,以主剪刃为速令主体发出加速令,控制主剪刃在0.5-2秒时间内加速达到高速剪切令的剪切速度并保持高速,控制出口夹送辊跟随主剪刃的线速度且保持同步。本发明控制方法及其控制装置有效地减小了咬入瞬时各机械部件所受的冲击载荷,延长剪切设备使用寿命,降低维护成本,同时减少了切边卡溜槽的故障几率,提高了设备的稳定性及利用率。

The invention relates to a disc shearing control method and its control device. The method comprises the following steps: the head of the steel strip reaches the front of the entrance pinch roller, and the initiator uses the entrance pinch roller as the speed to command the main body to send a shear bite. input speed command; when the strip steel head reaches the main cutting edge, the starter takes the main cutting edge as the speed command body, keeps the cutting and biting speed constant, and controls the entrance pinch roller to follow the linear speed of the main cutting edge and maintain synchronization; The steel head reaches the pinch roller at the exit, and the main body issues an acceleration order with the main shearing edge as the speed, controlling the main shearing edge to accelerate to the shearing speed of the high-speed shearing order within 0.5-2 seconds and maintaining the high speed, controlling the exit pinch The rollers follow the linear speed of the main cutting edge and keep in sync. The control method and the control device of the present invention effectively reduce the impact load on the mechanical parts at the moment of biting, prolong the service life of the shearing equipment, reduce maintenance costs, reduce the failure probability of the cutting edge stuck in the chute, and improve the efficiency of the equipment. stability and utilization.

Description

A kind of circle shear is sheared control method and control device thereof
Technical field
The present invention relates to a kind of steel plate processing and manufacturing equipment and technology, more particularly, the present invention relates to a kind of rotary shear equipment of rolled plate and shear control method.
Background technology
The domestic production line that thirties medium plates are arranged at present, in the Runout area of steel rolling production-line, limit portion shearing equipment mainly contains bilateral scissors and two kinds of device types of circle shear.To adopting the production line of rotary shear equipment, at present, shearing machine body electric drive system generally adopts variable frequency regulating speed control, 0-50 rev/mins of speed adjustable ranges; Wherein, shear rotating speed and be commonly referred to as " low velocity shear " below 20 rev/mins, shear rotating speed and be commonly referred to as " high speed shear " more than 20 rev/mins.
The shearing control procedure that the tradition circle shear extensively adopts is as follows: the operator sends cut command according to incoming band steel thickness setting shear rate; From cutting edge is nipped the overall process that incoming band steel finishes to shearing, all shear by the constant speed of setting.But there are the following problems for the control method that this constant speed is sheared:
If constant speed is set at low speed, the instantaneous shock load of nipping that cutting edge and each mechanical part of kinematic train are born is less, the broken limit of downcutting after nipping is entering broken limit chute and subsequent is moving comparatively steady, the probability of failure of broken checkpost chute is lower, each mechanical part of kinematic train and cutting edge are all had the better protect effect, prolonged the serviceable life of equipment; But shear rate does not satisfy the requirement of High-efficient Production rhythm.
If setting speed is at a high speed, because the instantaneous shock load of nipping is bigger, shock load was bigger when particularly high-strength thick-specification was sheared, and because of the broken limit of downcutting is the passive movement state, the not stationarity that excessive velocities will cause moving increases greatly, and probability of failure also increases greatly, thus cause equipment such as cutting edge accelerate to damage and broken checkpost chute failure rate higher, cause often to produce and interrupt, seriously restricted rhythm of production.
The problems referred to above also form long-term puzzlement to industry: to adopting the steel rolling production-line of rotary shear equipment, industry is considered will be in the transformation of steel rolling production-line, abandon equipment status still to belong to intact circle shear and adopt bilateral scissors, thereby face very big waste economically and difficult prospect that personnel/technology remodeling adapts to again; For at the new steel rolling production-line of building, industry just can not be selected circle shear for use and can only face unique type selecting of bilateral scissors on equipment, cause the simplification of lectotype selection, causes technology and is on a sticky wicket economically.
Summary of the invention
At requiring, the objective of the invention is to provide a kind of circle shear to shear control method and control device thereof, this control method and control device thereof have following advantage: instantaneous each mechanical part suffered shock load has effectively reduced to nip, prolong shearing equipment serviceable life, reduce maintenance cost, reduce the probability of failure of the card chute of cutting edge simultaneously, improved the stability and the utilization factor of equipment.
For this reason, one of technical solution of the present invention is the controller that described circle shear comprises entrance pinch roll, main cutting edge, outlet pinch roll, rollgang, control device and output control command thereof, described pinch roll comprises top roll, lower roll, described main cutting edge comprises lower scissor blade and upper scissor blade, and described control device has been set up the speed regulator of following the tracks of tracker, each pinch roll and the main cutting edge of steel plate position; This control method comprises the steps:
A): the operation and the position of described tracker monitoring steel plate;
Does B): described tracker judge that steel plate head arrives the entrance pinch roll front portion? as be not judged as not, return steps A, as to be judged as be to forward step C to): described controller is that speed makes main body send shearing the biting speed order with the entrance pinch roll;
D): behind the step C, does described tracker judge that steel plate head arrives main cutting edge? as be judged as not, go back to step C, as be judged as and be, forward step e to): described controller is that speed makes main body, keeps the shearing biting speed constant with main cutting edge, simultaneously, the control entrance pinch roll is followed the linear velocity of main cutting edge and is kept synchronously;
F): after the step e, does described tracker judge that steel plate head arrives the outlet pinch roll? as be judged as not, go back to step e, as be judged as and be, forward step G to): described controller is that speed makes main body send the acceleration order with main cutting edge, control main cutting edge and quicken to reach the shear rate of high speed shear order in time second and keep high speed at 0.5-2, simultaneously, control outlet pinch roll is followed the linear velocity of main cutting edge and is kept synchronously;
H): behind the step G, does described tracker judge that the steel plate afterbody arrives between main cutting edge and the outlet pinch roll? as be judged as not, go back to step G, as be judged as and be, forward step I to): described controller is that speed makes main body and keeps its high-speed cruising state constant with the outlet pinch roll, simultaneously, stop main cutting edge and entrance pinch roll;
Does J): behind the step I, described tracker judge that the steel plate afterbody leaves the outlet pinch roll? as be not judged as not, go back to step I, as to be judged as be to forward step K to): described controller finishes the speed command of outlet pinch roll, and the material state for the treatment of is got back to by system.
Control method essence of the present invention, utilize newly-increased tracker to calculate exactly, on the monitoring production line respectively with the position of steel, correspondingly, the band steel position that puts in place that newly-increased controller records according to tracker, to each pinch roll, the control command that rotating speed is regulated in the speed regulator output of main cutting edge, control the rotating speed and the linear velocity of each pinch roll and main cutting edge, make circle shear realize to arriving the bit strip steel, steel plate is made the shearing program of " low speed nip high speed shear ", thereby reduced to nip the suffered shock load of instantaneous each mechanical part of steel plate effectively, reduced the probability of failure of the card chute of cutting edge simultaneously, prolong service life of equipment, reduce maintenance cost, improve the stability and the utilization factor of equipment, be particularly suitable for the control of rotary shear equipment on the medium plate production line, operation and application.
Evidence: control method of the present invention and shearing program have the following aspects beneficial effect: failure rate reduces greatly, has realized the continuous production of stability and high efficiency; Significantly reduce by shearing the relevant device failure rate that causes in the production line, strengthened the stability of system; Obtain significant technique effect, also obtained considerable economic and social benefit; Particularly, the advantage of the control method of the present invention and the program of shearing is as follows:
One, equipment operation rate, utilization factor significantly promote.
With average thickness 16mm is example, adopts control method of the present invention and shearing program, and every steel plate can be saved 11 seconds production times, and equipment operation rate improves 38%.Day shears tonnage and promotes the highest level that reaches domestic equipment of the same type.
Two, steel-fastening failure rate descends.
After adopting control method of the present invention and shearing program, be reduced to present about 1% by traditional monthly average steel-fastening failure rate 8%.Calculate by activity durations of 720 hours every month, then can reduce the fault 50.4 hours product time of mistake in every month, by mean hours 130 tons/hour of output, 50 yuan of/ton meters of ton plate benefit then can be created economic benefit in every month: 50.4 * 130 * 50=327600 unit more.Then can create economic benefit the whole year: 327600 * 12=3931200 unit more.The newly-increased economic benefit of control method of the present invention is very outstanding.
Three, stabilization of equipment performance significantly promotes.
After adopting control method of the present invention and shearing program, the vibration of plant equipment and electrical system and current value are all comparatively stable, to management maintenance working strength and all reductions greatly of spare parts consumption of system.Tradition shearing technique and equipment, a pair of chute only reaches 1 month service time.After adopting control method of the present invention, a pair of chute can reach 4 months service time.Then month saving spare parts consumption quantity is 0.75 pair, and every pair of chute is by 7000 yuan, and then can save the spare part expense in every month is 0.75 * 7000=5250 unit.Year can be saved 6300 yuan.The shearing displacement of broken limit blade is far longer than 1500 tons traditional/sheet greater than 2500 tons/sheet, and year can be saved about 200 on blade, and year can be saved about 40000 yuan of blade spare parts.
Because above-mentioned advantage, control method of the present invention and shearing program all have very high reference to similar devices, similar applications and are worth and wide enforcement promotion prospect.A kind of controlling schemes of very strong competitive power is provided when transforming and build steel rolling production-line for industry.
Control method of the present invention also comprises following concrete improvement:
In order to optimize tracker the band steel that moves on the production line is carried out accurate position calculation and tracking, described tracker comprises computing machine, and also comprise the tachogenerator that is arranged on each pinch roll lower roll both sides and main cutting edge both sides, the speed data of described each tachogenerator of computer acquisition is carried out the run location that mathematical computations is followed the tracks of steel plate; Concrete computing method can adopt method such as numerical integration as:
Incoming band steel at the range ability in circle shear district is L r = ∫ 0 t Vdt , Wherein V is occupying the instant travelling speed in district for the band steel, and velocity amplitude is directly measured by scrambler; And then the band steel toe position Lh of portion can be calculated by following formula: L h=L z-L r, L wherein zActual physics length for the circle shear shear zone.
When described tracker confirms that steel plate head arrives the perpendicular bisector position of pinch roll, described controller is controlled the top roll of this pinch roll from preparing highly to depress and carry out corresponding speed order, when described tracker confirmed that the steel plate afterbody arrives described pinch roll perpendicular bisector position, the top roll that described controller is controlled this pinch roll was lifted to the preparation height and stops corresponding speed order.
Guarantee that for more effective tracker carries out the adjustment of accurate position calculation and tracking and Working position to head, the afterbody of the band steel that moves on the production line, strengthen closed-loop control, described control device also comprises the metal detector that is arranged on each pinch roll front portion, metal detector is surveyed steel plate, and described control device feeds back to the position of described tracker in order to calibration steel plate with detectable signal.
For the continuity of strengthening shear action, guarantee the fairness that is connected at the front and back station with steel:
Also comprise following operation B1 before the described step C): after the metal detection utensil of entrance pinch roll front portion detects the head of steel plate, the position correction before described controller cuts across the steel plate that puts in place; Also comprise following operation F1 before the described step G): after the metal detection utensil of outlet pinch roll front portion detects the head of steel plate, the position correction during described controller is sheared the steel plate that puts in place.
Among the described step C, send when shearing the biting speed order, described controller is controlled main cutting edge and is followed the linear velocity of entrance pinch roll and keep synchronous; Among the described step B, described tracker verifies according to the signal of the metal detector of entrance pinch roll front portion whether steel plate head arrives the front portion of entrance pinch roll; In the described step F, described tracker verifies according to the signal of the metal detector of outlet pinch roll front portion whether steel plate head arrives the outlet pinch roll; Among the described step H, described tracker verifies according to the signal of the metal detector of outlet pinch roll front portion whether the steel plate afterbody arrives between main cutting edge and the outlet pinch roll.
Can on same production line, process the band steel of many kinds, most amounts continuously, automatically, simultaneously in order better to guarantee tracker:
Described controller comprises data server, the PLC controller of the shearing information of monitoring steel plate, the steel plate position that this data server records according to described tracker and all shearing information (comprising steel grade, heat (batch) number, length and width, one-tenth-value thickness 1/10) of the steel plate that puts in place are carried out speeds match, and various speed are in time assigned to each speed regulator by described PLC controller, realize that speed change shears.
Described tracker also comprises the tachogenerator that is arranged on each pinch roll lower roll both sides and main cutting edge both sides, the velocity amplitude that described controller also records each tachogenerator feeds back to data server and/or PLC controller, realizes the closed-loop control to each speed regulator.And in the past conventional art, control mode adopts open loop control usually; Usually do not adopt tachogenerator, when adopting 8 coding rate sensors to realize closed-loop control among the technology of the present invention embodiment, velocity amplitude is fed back to the position that tracking control server is calculated rolled piece.
Correspondingly, another correlation technique solution of the present invention is a kind of employing control device of circle shear shearing control method as mentioned above, it comprises the controller of exporting control command, described circle shear comprises entrance pinch roll, main cutting edge, outlet pinch roll, rollgang, described pinch roll comprises top roll, lower roll, described main cutting edge comprises lower scissor blade and upper scissor blade, it is characterized in that: described control device also comprises the speed regulator of tracker, each pinch roll and the main cutting edge of following the tracks of steel plate position; The steel plate position that described controller is determined according to described tracker sends corresponding speed command to each speed regulator in good time.
Evidence: control device of the present invention has the following aspects beneficial effect: one, equipment operation rate, utilization factor significantly promote.Two, steel-fastening failure rate descends.Three, stabilization of equipment performance significantly promotes.In other words, the failure rate of control device of the present invention reduces greatly, has realized the continuous production of stability and high efficiency; Significantly reduce by shearing the relevant device failure rate that causes in the production line, strengthened the system stability of production line; Obtain significant technique effect, also obtained considerable economic and social benefit.
And because above-mentioned advantage, control device of the present invention all has very high reference to similar devices, similar applications and is worth and wide enforcement promotion prospect.A kind of lectotype selection of very strong competitive power is provided when transforming and build steel rolling production-line for industry.
Control device of the present invention also comprises following concrete improvement:
In order to optimize tracker the band steel that moves on the production line is carried out accurate position calculation and tracking: described control device also comprises the metal detector that is arranged on each pinch roll front portion, metal detector is surveyed steel plate, and described control device feeds back to the position of described tracker in order to calibration steel plate with detectable signal; Described tracker comprises computing machine, and also comprises the tachogenerator that is arranged on each pinch roll lower roll both sides and main cutting edge both sides, and the speed data of described each tachogenerator of computer acquisition is carried out the run location that mathematical computations is followed the tracks of steel plate.
Can process the band steel of polytype, most amounts continuously, automatically, simultaneously in order better to guarantee tracker on same production line: described controller comprises data server, the PLC controller of the shearing information of monitoring steel plate, the steel plate position that this data server records according to described tracker and all shearing information (comprising steel grade, heat (batch) number, length and width, one-tenth-value thickness 1/10) of the steel plate that puts in place are carried out speeds match, and various speed are in time assigned to each speed regulator by described PLC controller, realize that speed change shears.
The invention will be further described below in conjunction with the drawings and specific embodiments.
Description of drawings
Fig. 1 is the schematic block diagram of the inventive method embodiment 1.
Fig. 2 is the schematic block diagram of the inventive method embodiment 2.
Fig. 3 is the control device schematic block diagram of apparatus of the present invention embodiment.
Fig. 4 is the physical construction synoptic diagram of apparatus of the present invention embodiment.
Embodiment
Method embodiment 1.
As Fig. 1, be depicted as the schematic block diagram of the inventive method embodiment 1.Described circle shear comprises entrance pinch roll, main cutting edge, outlet pinch roll, rollgang, described pinch roll comprises top roll, lower roll, described main cutting edge comprises lower scissor blade and upper scissor blade, the control device of described circle shear comprises the tracker of track band steel position, the speed regulator of controller, each pinch roll and main cutting edge of output control command, and this control method is executed example 1 and comprised the steps:
A): the operation and the position of described tracker monitoring band steel;
Does B): described tracker judge that band steel toe portion arrives the entrance pinch roll front portion? as be not judged as not, return steps A, as to be judged as be to forward step C to): described controller is that speed makes main body send shearing the biting speed order with the entrance pinch roll;
D): behind the step C, does described tracker judge that band steel toe portion arrives main cutting edge? as be judged as not, go back to step C, as be judged as and be, forward step e to): described controller is that speed makes main body, keeps the shearing biting speed constant with main cutting edge, simultaneously, the control entrance pinch roll is followed the linear velocity of main cutting edge and is kept synchronously;
F): after the step e, does described tracker judge that band steel toe portion arrives the outlet pinch roll? as be judged as not, go back to step e, as be judged as and be, forward step G to): described controller is that speed makes main body send the acceleration order with main cutting edge, control main cutting edge and quicken to reach the shear rate of high speed shear order in time second and keep high speed at 0.5-2, simultaneously, control outlet pinch roll is followed the linear velocity of main cutting edge and is kept synchronously;
H): behind the step G, does described tracker judge that band steel afterbody arrives between main cutting edge and the outlet pinch roll? as be judged as not, go back to step G, as be judged as and be, forward step I to): described controller is that speed makes main body, keeps high speed shear speed constant with the outlet pinch roll, simultaneously, stop main cutting edge and entrance pinch roll;
Does J): behind the step I, described tracker judge that band steel afterbody leaves the outlet pinch roll? as be not judged as not, go back to step I, as to be judged as be to forward step K to): described controller finishes the speed command of outlet pinch roll, switches to the shearing of next band steel.
Method embodiment 2.
As Fig. 2, be depicted as the schematic block diagram of the inventive method embodiment 2.Circle shear described in this method comprises entrance pinch roll, main cutting edge, outlet pinch roll, rollgang, described pinch roll comprises top roll, lower roll, described main cutting edge comprises lower scissor blade and upper scissor blade, the control device of described circle shear comprises the tracker of track band steel position, the speed regulator of controller, each pinch roll and main cutting edge of output control command
Described tracker comprises computing machine, and also comprises the tachogenerator that is arranged on each pinch roll lower roll 2 side and main cutting edge 2 sides, and the speed data of described each tachogenerator of computer acquisition is carried out the run location that mathematical computations is come the track band steel;
Described control device also comprises the metal detector that is arranged on each pinch roll front portion, and metal detector is surveyed the band steel, and described control device feeds back to the position of described tracker in order to verification band steel with detectable signal.
Described controller comprises data server, the PLC controller of the shearing information of monitoring band steel, the band steel position that this data server records according to described tracker and to all shearing information (comprising steel grade, heat (batch) number, length and width, one-tenth-value thickness 1/10) of bit strip steel: carry out speeds match, and various speed are in time assigned to each speed regulator by described PLC controller, realize that speed change shears.The velocity amplitude that described controller also records each tachogenerator feeds back to data server and/or PLC controller, realizes the closed-loop control to each speed regulator.
This control method comprises the steps:
A): the operation and the position of described tracker monitoring band steel;
Is B): described tracker gathered the signal of the metal detector of entrance pinch roll front portion simultaneously and is verified, judges that band steel toe portion arrives the entrance pinch roll front portion? as be judged as not, return steps A, as to be judged as be to forward step B1 earlier to): described controller is to the position correction before cutting across to the bit strip steel; Forward step C again to): described controller is that speed makes main body send the order of shearing biting speed with the entrance pinch roll; Simultaneously, described controller is controlled main cutting edge and is followed the linear velocity of entrance pinch roll and keep synchronous;
D): behind the step C, does described tracker judge that band steel toe portion arrives main cutting edge? as be judged as not, go back to step C, as be judged as and be, forward step e to): described controller is that speed makes main body, keeps the shearing biting speed constant with main cutting edge, simultaneously, the control entrance pinch roll is followed the linear velocity of main cutting edge and is kept synchronously;
After the step e, forward step F 1 earlier to): after the metal detection utensil of outlet pinch roll front portion detects the head of band steel, described controller is to the position correction in shearing to the bit strip steel, forward step F again to): described tracker is gathered the signal of the metal detector of outlet pinch roll front portion simultaneously and is verified, do you judge that band steel toe portion arrives the outlet pinch roll? as be judged as not, go back to step e, as be judged as and be, G): described controller is that speed makes main body send the acceleration order with main cutting edge, controlling main cutting edge quickens to reach the shear rate of high speed shear order and keeps high speed at 0.5-2 in time second, simultaneously, control outlet pinch roll is followed the linear velocity of main cutting edge and is kept synchronously;
H): behind the step G, is described tracker gathered the signal of the metal detector of outlet pinch roll front portion simultaneously and is verified that judgement band steel afterbody arrives between main cutting edge and the outlet pinch roll? as be judged as not, go back to step G, as be judged as and be, forward step I to): described controller is that speed makes main body, keeps high speed shear speed constant with the outlet pinch roll, simultaneously, stop main cutting edge and entrance pinch roll;
Does J): behind the step I, described tracker judge that band steel afterbody leaves the outlet pinch roll? as be not judged as not, go back to step I, as to be judged as be to forward step K to): described controller finishes the speed command of outlet pinch roll, switches to the shearing of next band steel.
In above-mentioned relevant step, when described tracker confirms that band steel toe portion arrives the perpendicular bisector position of pinch roll or main cutting edge, described controller is controlled the top roll of this pinch roll or main cutting edge from preparing highly to depress and carry out corresponding speed order, when described tracker confirmed that band steel afterbody arrives described pinch roll or main cutting edge perpendicular bisector position, the top roll that described controller is controlled this pinch roll or main cutting edge was lifted to the preparation height and stops corresponding speed order.
Device embodiment.
As Fig. 3,4, shown in be respectively control device schematic block diagram and the physical construction synoptic diagram of apparatus of the present invention embodiment.This circle shear comprises entrance pinch roll 10, main cutting edge 20, outlet pinch roll 30, rollgang 40, cataclasmly cuts 50.Described pinch roll 10,30 all comprises top roll, lower roll respectively, and described cutting edge 20 comprises lower scissor blade and upper scissor blade.
And described control device comprises the tracker of track band steel S position, near the speed regulator 13,23,33 (being installed in each roller and the main cutting edge position) of controller, each pinch roll and main cutting edge of output control command, and it comprises the drive motor (all will not know clearly and show) of Frequency Converter Control; Corresponding speed command is sent to each speed regulator 13,23,33 in the band steel S position that described controller is determined according to described tracker in good time, and is specific as follows:
Described tracker comprises computing machine 60 and also comprises and be arranged on each pinch roll 10,30 lower rolls 2 side, main cutting edge 2 sides and the cataclasm tachogenerator 12,22,32,52 of cutting 50 2 sides amounts to 8 (being the velometer of incremental rotary encoder formula) that they record the speed data of each point.Described controller comprises data server 70, PLC controller 71, the man-machine interface 72 of the shearing information of monitoring band steel.Described control device also comprise be separately positioned on each pinch roll 10,30 front portion, to the band steel S metal detector 11,31 surveyed of portion end to end.Metal detector 11 is installed in preceding 1.5 meters of circle shear entrance pinch roll, and apart from main cutting edge 2.8m, metal detector 31 is installed in preceding 0.2 meter of circle shear outlet pinch roll, respectively shown in Fig. 4 lower number.Its function is that if be with steel to skid when position that tracking server calculates and physical location were variant, metal detector was proofreaied and correct band steel physical location, makes tracking control server correct position deviation automatically in operational process.
Computing machine 60 keeps data communication to be connected with data server 70, man-machine interface 72 by Fast Ethernet 80, simultaneously, computing machine 60, data server 70, man-machine interface 72 keep data communication to be connected by industrial control network 81 with PLC controller 71, and PLC controller 71 keeps data to get in touch by fieldbus 82 and each speed regulator 13,23,33 again.Apparatus of the present invention adopt the control hardware of 2 aspects, can realize the fluid drive shearing; And in the past conventional art, only adopt the control hardware of independent 1 aspect usually, be difficult to realize the speed change shearing.
Computing machine 60 is gathered the speed data of each tachogenerator 12,22,32,52 and the metal detection signal of metal detector 11,31 by the input I/O interface 61 and the output I/O interface 62 of industrial control network 81, fieldbus 82, carries out that mathematical computations is followed the tracks of, the run location of verification band steel S.
Be set with all shearing information (comprising steel grade, heat (batch) number, length and width, one-tenth-value thickness 1/10) of various band steel S in data server 70 and the man-machine interface 73, the information that the band steel S that will record when described computing machine 60 puts in place passes to data server 70, data server 70 and man-machine interface 72 be determined to bit strip steel S all set shearing information line speed coupling of going forward side by side, various speed are in time assigned to each speed regulator 13,23,33 by industrial control network 81, PLC controller 71, fieldbus 82, realized the speed change shearing.
The above-mentioned control structure of apparatus of the present invention, tracker computing machine 60 can be finished the calculating of the complicated rate curve of all rolled pieces (maximum 36) completely and the result is assigned the controller to the PLC of lower floor by data server 70, finish information (steel grade, heat (batch) number, length and width, the thick and various shearing information) transmission of all rolled pieces completely by operation, arbitrary rolled piece begins to roll off the production line to finally cutting into finished product from the heating furnace charging roller, all operational factors, action command all controlling, make the PLC controller be able to the various parameters of correct execution.
Band steel shear effect.
According to table 1, mate as follows to band steel data and shear rate:
Table 1 shear rate parameter set-point
Thickness specification (mm): Nip main make speed (rev/min): Acceleration time (s): High speed shear master make speed (rev/min):
8~10mm 35 1 50
10~16mm 30 1.2 48
16~20mm 25 1.5 45
20~25mm 18 1.5 40
Be respectively 10mm, 16mm, 20mm below with thickness, length is that the ideal format band steel of 40000m is an example, by shear time, sting the data contrast of the instantaneous operator dash current of steel, steel-fastening failure rate, the effect of speed change shearing of the present invention be described.
Thickness 10mm is with steel
Project The tradition constant speed is sheared Speed change of the present invention is sheared
Shear rate Biting speed: 40r/min shear rate: 40r/min Biting speed: 35r/min shear rate: 50r/min
Shear time 54s 42s
Operator is stung steel drift and is hit electric current 205% 182%
The steel-fastening failure rate 8% ≤1%
Thickness 16mm is with steel
Project The tradition constant speed is sheared Speed change of the present invention is sheared
Shear rate Biting speed: 35r/min shear rate: 35r/min Biting speed: 30r/min shear rate: 48r/min
Shear time 62s 51s
Operator is stung steel drift and is hit electric current 215% 196%
The steel-fastening failure rate 8% ≤1%
Thickness 20mm is with steel
Project The tradition constant speed is sheared Speed change of the present invention is sheared
Shear rate Biting speed: 30r/min shear rate: 30r/min Biting speed: 25r/min shear rate: 45r/min
Shear time 71s 58s
Operator is stung steel drift and is hit electric current 225% 205%
The steel-fastening failure rate 7% ≤1%
By last digital proof: the failure rate of control method of the present invention and shear reduces greatly, can guarantee the continuous production of stability and high efficiency, the apparatus for production line failure rate that causes significantly reduces by shearing, the stability of system significantly strengthens, and obvious technical effects, economic benefit and social benefit are very considerable.

Claims (10)

1、一种圆盘剪剪切控制方法,所述圆盘剪包括入口夹送辊、主剪刃、出口夹送辊、输送辊道、控制装置及其输出控制命令的发令器,所述夹送辊包括上辊、下辊,所述主剪刃包括下剪刃和上剪刃,所述控制装置增设了跟踪钢板位置的跟踪器、各夹送辊和主剪刃的速度调节器;该控制方法包括如下步骤:1. A method for controlling disc shears, wherein the disc shears include an inlet pinch roller, a main shear blade, an outlet pinch roller, a conveying roller table, a control device and an initiator for outputting control commands thereof, the clamp The feeding roller includes an upper roller and a lower roller, and the main shearing edge includes a lower shearing edge and an upper shearing edge, and the control device adds a tracker for tracking the position of the steel plate, a speed regulator for each pinch roller and the main shearing edge; The control method comprises the steps of: A):所述跟踪器监测钢板的运行和位置;A): The tracker monitors the operation and position of the steel plate; B):所述跟踪器判断钢板头部是否到达入口夹送辊前部?如判断为否,返回步骤A,如判断为是,转到步骤C):所述发令器以入口夹送辊为速令主体发出剪切咬入速度命令;B): The tracker judges whether the head of the steel plate reaches the front of the entrance pinch roller? If it is judged as no, return to step A, if it is judged as yes, go to step C): the commander uses the entrance pinch roller as the speed to command the main body to issue a shear bite speed command; D):步骤C后,所述跟踪器判断钢板头部是否到达主剪刃?如判断为否,转回步骤C,如判断为是,转到步骤E):所述发令器以主剪刃为速令主体、保持剪切咬入速度不变,同时,控制入口夹送辊跟随主剪刃的线速度并保持同步;D): After step C, the tracker judges whether the head of the steel plate has reached the main shearing edge? If it is judged as no, go back to step C, if it is judged as yes, go to step E): the starter uses the main cutting edge as the main body of the speed command, keeps the cutting and biting speed constant, and at the same time, controls the entrance pinch roller Follow the linear speed of the main cutting edge and keep in sync; F):步骤E后,所述跟踪器判断钢板头部是否到达出口夹送辊?如判断为否,转回步骤E,如判断为是,转到步骤G):所述发令器以主剪刃为速令主体发出加速令,控制主剪刃在0.5-2秒时间内加速达到高速剪切令的剪切速度并保持高速,同时,控制出口夹送辊跟随主剪刃的线速度且保持同步;F): After step E, the tracker judges whether the head of the steel plate has reached the exit pinch roller? If it is judged to be no, go back to step E, if it is judged to be yes, go to step G): the initiator uses the main shearing edge as the speed to make the main body issue an acceleration order, and controls the main shearing edge to accelerate within 0.5-2 seconds to reach The shearing speed of the high-speed shearing order is maintained at a high speed, and at the same time, the exit pinch roller is controlled to follow the linear speed of the main shearing edge and maintain synchronization; H):步骤G后,所述跟踪器判断钢板尾部是否到达主剪刃与出口夹送辊之间?如判断为否,转回步骤G,如判断为是,转到步骤I):所述发令器以出口夹送辊为速令主体、并保持其高速运行状态不变,同时,停止主剪刃和入口夹送辊;H): After step G, the tracker determines whether the tail of the steel plate has reached between the main shearing edge and the exit pinch roller? If it is judged as no, go back to step G, if it is judged as yes, go to step I): the commander uses the outlet pinch roller as the main body of the speed command, and keeps its high-speed running state unchanged, and at the same time, stops the main shearing edge and entry pinch rollers; J):步骤I后,所述跟踪器判断钢板尾部是否离开出口夹送辊?如判断为否,转回步骤I,如判断为是,转到步骤K):所述发令器结束出口夹送辊的速度命令,系统回到待料状态。J): After step I, the tracker judges whether the tail of the steel plate leaves the exit pinch roller? If it is judged as no, go back to step I, if it is judged as yes, go to step K): the initiator ends the speed command of the pinch roller at the exit, and the system returns to the state of waiting for material. 2、如权利要求1所述圆盘剪剪切控制方法,其特征在于:所述跟踪器包括计算机,且还包括设置在各夹送辊下辊两侧、和主剪刃两侧的测速传感器,所述计算机采集各测速传感器的速度数据进行数学计算来跟踪钢板的运行位置;所述跟踪器确认钢板头部到达夹送辊的中垂线位置时,所述发令器控制该夹送辊的上辊从准备高度压下并执行相应速令,所述跟踪器确认钢板尾部到达所述夹送辊中垂线位置时,所述发令器控制该夹送辊的上辊抬升到准备高度并终止相应速令。2. The disc shearing control method according to claim 1, characterized in that: the tracker includes a computer, and also includes speed sensors arranged on both sides of the lower roller of each pinch roller and on both sides of the main shearing edge , the computer collects the speed data of each speed sensor and carries out mathematical calculation to track the running position of the steel plate; The upper roller is pressed down from the preparation height and the corresponding speed order is executed. When the tracker confirms that the tail of the steel plate reaches the vertical line position of the pinch roller, the initiator controls the upper roller of the pinch roller to lift to the preparation height and terminates. Corresponding decree. 3、如权利要求1或2所述圆盘剪剪切控制方法,其特征在于:所述控制装置还包括设置在各夹送辊前部的金属检测器,金属检测器对钢板进行探测,所述控制装置将探测信号反馈到所述跟踪器用以校验钢板的位置。3. The disc shearing control method according to claim 1 or 2, characterized in that: the control device also includes a metal detector arranged at the front of each pinch roller, and the metal detector detects the steel plate, so The control device feeds back the detection signal to the tracker to verify the position of the steel plate. 4、如权利要求3所述圆盘剪剪切控制方法,其特征在于:所述步骤C之前还包括如下操作B1):入口夹送辊前部的金属检测器具检测到钢板的头部后,所述发令器对到位钢板进行开剪之前的位置校正;所述步骤G之前还包括如下操作F1):出口夹送辊前部的金属检测器具检测到钢板的头部后,所述发令器对到位钢板进行剪切中的位置校正。4. The disc shearing control method according to claim 3, characterized in that: before the step C, the following operation B1) is also included: after the metal detection device at the front of the entrance pinch roller detects the head of the steel plate, The starter corrects the position of the steel plate in place before cutting; before the step G, the following operation F1) is also included: after the metal detector at the front of the exit pinch roller detects the head of the steel plate, the starter checks the The steel plate is in place for positional correction in shear. 5、如权利要求3所述圆盘剪剪切控制方法,其特征在于:所述步骤C中,发出剪切咬入速度命令的同时,所述发令器控制主剪刃跟随入口夹送辊的线速度而保持同步;所述步骤B中,所述跟踪器根据入口夹送辊前部的金属检测器的信号来验证钢板头部是否到达入口夹送辊的前部;所述步骤F中,所述跟踪器根据出口夹送辊前部的金属检测器的信号来验证钢板头部是否到达出口夹送辊;所述步骤H中,所述跟踪器根据出口夹送辊前部的金属检测器的信号来验证钢板尾部是否到达主剪刃与出口夹送辊之间。5. The disc shearing control method according to claim 3, characterized in that: in said step C, while issuing the command for shearing biting speed, said initiator controls the main shearing edge to follow the direction of the entrance pinch roller. line speed while maintaining synchronization; in the step B, the tracker verifies whether the steel plate head reaches the front of the entrance pinch roller according to the signal of the metal detector at the front of the entrance pinch roller; in the step F, The tracker verifies whether the steel plate head reaches the exit pinch roll according to the signal of the metal detector at the front of the exit pinch roll; signal to verify whether the tail of the steel plate reaches between the main shear edge and the exit pinch roller. 6、如权利要求1所述圆盘剪剪切控制方法,其特征在于:所述发令器包括监测钢板的剪切信息的数据服务器、PLC控制器,该数据服务器根据所述跟踪器测得的钢板位置、和到位钢板的所有剪切信息(包括钢种、炉号、长、宽、厚度值)进行速度匹配,并将各种速度适时地通过所述PLC控制器下达给各个速度调节器,实现变速剪切。6. The disc shearing control method according to claim 1, characterized in that: said initiator includes a data server and a PLC controller for monitoring the shearing information of the steel plate, and said data server is based on the data measured by said tracker. The steel plate position, and all the shear information (including steel type, furnace number, length, width, thickness value) of the steel plate in place are speed matched, and various speeds are sent to each speed regulator through the PLC controller in a timely manner. Realize variable speed shearing. 7、如权利要求6所述圆盘剪剪切控制方法,其特征在于:所述跟踪器还包括设置在各夹送辊下辊两侧、和主剪刃两侧的测速传感器,所述发令器还将各测速传感器测得的速度值反馈给数据服务器和/或PLC控制器,实现对各速度调节器的闭环控制。7. The disc shearing control method according to claim 6, characterized in that: the tracker also includes speed measuring sensors arranged on both sides of the lower roller of each pinch roller and on both sides of the main shearing edge, and the sending order The controller also feeds back the speed values measured by each speed sensor to the data server and/or PLC controller, so as to realize the closed-loop control of each speed regulator. 8、一种采用如权利要求1-7之一所述圆盘剪剪切控制方法的控制装置,其包括输出控制命令的发令器,所述圆盘剪包括入口夹送辊、主剪刃、出口夹送辊、输送辊道,所述夹送辊包括上辊、下辊,所述主剪刃包括下剪刃和上剪刃,其特征在于:所述控制装置还包括跟踪钢板位置的跟踪器、各夹送辊和主剪刃的速度调节器;所述发令器根据所述跟踪器确定的钢板位置,向各个速度调节器适时发出相应的速度命令。8. A control device adopting the disc shear control method as claimed in any one of claims 1-7, which includes an initiator for outputting control commands, and the disc shears include inlet pinch rollers, main shear blades, Exit pinch rollers, conveying roller table, the pinch rollers include upper rollers and lower rollers, the main shearing edges include lower shearing edges and upper shearing edges, and it is characterized in that: the control device also includes a tracking device for tracking the position of the steel plate The speed regulators of each pinch roller and the main shearing edge; the initiator sends corresponding speed commands to each speed regulator in due course according to the position of the steel plate determined by the tracker. 9、如权利要求8所述圆盘剪剪切控制方法的控制装置,其特征在于:所述控制装置还包括设置在各夹送辊前部的金属检测器,金属检测器对钢板进行探测,所述控制装置将探测信号反馈到所述跟踪器用以校验钢板的位置;所述跟踪器包括计算机,且还包括设置在各夹送辊下辊两侧、和主剪刃两侧的测速传感器,所述计算机采集各测速传感器的速度数据进行数学计算来跟踪钢板的运行位置。9. The control device of the disc shearing control method according to claim 8, characterized in that: the control device further includes a metal detector arranged at the front of each pinch roller, and the metal detector detects the steel plate, The control device feeds back the detection signal to the tracker to verify the position of the steel plate; the tracker includes a computer, and also includes speed sensors arranged on both sides of the lower roller of each pinch roller and on both sides of the main shearing edge , the computer collects the speed data of each speed sensor and performs mathematical calculation to track the running position of the steel plate. 10、如权利要求8所述圆盘剪剪切控制方法的控制装置,其特征在于:所述发令器包括监测钢板的剪切信息的数据服务器、PLC控制器,该数据服务器根据所述跟踪器测得的钢板位置、和到位钢板的所有剪切信息(包括钢种、炉号、长、宽、厚度值)进行速度匹配,并将各种速度适时地通过所述PLC控制器下达给各个速度调节器,实现变速剪切。10. The control device of the disc shearing control method according to claim 8, characterized in that: the initiator includes a data server and a PLC controller for monitoring the shearing information of the steel plate, and the data server is based on the tracker The measured position of the steel plate and all the shear information of the steel plate in place (including steel type, furnace number, length, width, and thickness) are speed matched, and various speeds are assigned to each speed through the PLC controller in a timely manner Regulator for variable speed shearing.
CN2008102177462A 2008-11-26 2008-11-26 Shearing control method and control device of disc shear Expired - Fee Related CN101441462B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008102177462A CN101441462B (en) 2008-11-26 2008-11-26 Shearing control method and control device of disc shear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008102177462A CN101441462B (en) 2008-11-26 2008-11-26 Shearing control method and control device of disc shear

Publications (2)

Publication Number Publication Date
CN101441462A true CN101441462A (en) 2009-05-27
CN101441462B CN101441462B (en) 2010-08-25

Family

ID=40725926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008102177462A Expired - Fee Related CN101441462B (en) 2008-11-26 2008-11-26 Shearing control method and control device of disc shear

Country Status (1)

Country Link
CN (1) CN101441462B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101716597B (en) * 2009-12-15 2012-05-30 中冶南方(武汉)自动化有限公司 Method for preventing broken pieces of strip tail from being clamped and sheared during strip tail shearing of cold-rolled strip steel production unit
CN102773766A (en) * 2011-05-12 2012-11-14 上海宝信软件股份有限公司 Self-zeroing control method for cutting of flying shear
CN103034199A (en) * 2012-12-11 2013-04-10 济钢集团有限公司 Control system and control method of bilateral scissors capable of fast shearing
CN103722230A (en) * 2012-10-10 2014-04-16 北新集团建材股份有限公司 Cutting-off method
CN103920923A (en) * 2013-11-12 2014-07-16 柳州本金机电设备有限公司 High-precision flying shear
CN104209580A (en) * 2014-09-02 2014-12-17 山东亨圆铜业有限公司 Fixed-length copper round tube cutting machine
CN104249187A (en) * 2013-06-25 2014-12-31 宝山钢铁股份有限公司 High-yield-strength oriented silicon steel shearing process
CN104570933A (en) * 2014-12-31 2015-04-29 南京埃斯顿自动控制技术有限公司 Flying shear control method based on high-order curve
CN105583456A (en) * 2016-03-09 2016-05-18 莱芜钢铁集团电子有限公司 Steel plate cutting method and device
CN105665292A (en) * 2015-11-10 2016-06-15 武汉科技大学 Automatic coiled material separation equipment and control method for automatic coiled material separation process
CN105773301A (en) * 2016-03-31 2016-07-20 西安石油大学 Synchronous control system of linear velocity closed-loop controlled slitter line
CN106735535A (en) * 2017-01-19 2017-05-31 河钢股份有限公司邯郸分公司 A kind of control method for preventing double clipping steel-fastenings at the end of the broken tail of strip
CN106890852A (en) * 2015-12-21 2017-06-27 宝山钢铁股份有限公司 Reduce the method that finishing mill stings steel impact
CN110576214A (en) * 2019-09-17 2019-12-17 攀钢集团西昌钢钒有限公司 trimming quality control method
CN110883101A (en) * 2019-10-23 2020-03-17 首钢集团有限公司 Method and device for controlling thickness of strip steel
CN112139251A (en) * 2019-06-26 2020-12-29 宝山钢铁股份有限公司 Device and method for controlling speed of front roller way of finish rolling flying shear in grading manner
CN114101776A (en) * 2021-11-08 2022-03-01 武汉钢铁有限公司 Edge wave control method for thickness transition and speed-up and speed-down processes of circle shear

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101716597B (en) * 2009-12-15 2012-05-30 中冶南方(武汉)自动化有限公司 Method for preventing broken pieces of strip tail from being clamped and sheared during strip tail shearing of cold-rolled strip steel production unit
CN102773766B (en) * 2011-05-12 2016-01-13 上海宝信软件股份有限公司 Self-zeroing control method sheared by flying shear
CN102773766A (en) * 2011-05-12 2012-11-14 上海宝信软件股份有限公司 Self-zeroing control method for cutting of flying shear
CN103722230A (en) * 2012-10-10 2014-04-16 北新集团建材股份有限公司 Cutting-off method
CN103034199A (en) * 2012-12-11 2013-04-10 济钢集团有限公司 Control system and control method of bilateral scissors capable of fast shearing
CN104249187A (en) * 2013-06-25 2014-12-31 宝山钢铁股份有限公司 High-yield-strength oriented silicon steel shearing process
CN104249187B (en) * 2013-06-25 2016-06-01 宝山钢铁股份有限公司 High-yield strength oriented silicon steel shears technique
CN103920923A (en) * 2013-11-12 2014-07-16 柳州本金机电设备有限公司 High-precision flying shear
CN104209580A (en) * 2014-09-02 2014-12-17 山东亨圆铜业有限公司 Fixed-length copper round tube cutting machine
CN104209580B (en) * 2014-09-02 2017-03-22 山东亨圆铜业有限公司 Fixed-length copper round tube cutting machine
CN104570933A (en) * 2014-12-31 2015-04-29 南京埃斯顿自动控制技术有限公司 Flying shear control method based on high-order curve
CN104570933B (en) * 2014-12-31 2017-09-15 南京埃斯顿自动控制技术有限公司 A kind of flying shearing machine control method based on luminance curve
CN105665292A (en) * 2015-11-10 2016-06-15 武汉科技大学 Automatic coiled material separation equipment and control method for automatic coiled material separation process
CN106890852A (en) * 2015-12-21 2017-06-27 宝山钢铁股份有限公司 Reduce the method that finishing mill stings steel impact
CN105583456A (en) * 2016-03-09 2016-05-18 莱芜钢铁集团电子有限公司 Steel plate cutting method and device
CN105773301A (en) * 2016-03-31 2016-07-20 西安石油大学 Synchronous control system of linear velocity closed-loop controlled slitter line
CN106735535A (en) * 2017-01-19 2017-05-31 河钢股份有限公司邯郸分公司 A kind of control method for preventing double clipping steel-fastenings at the end of the broken tail of strip
CN112139251A (en) * 2019-06-26 2020-12-29 宝山钢铁股份有限公司 Device and method for controlling speed of front roller way of finish rolling flying shear in grading manner
CN110576214A (en) * 2019-09-17 2019-12-17 攀钢集团西昌钢钒有限公司 trimming quality control method
CN110883101A (en) * 2019-10-23 2020-03-17 首钢集团有限公司 Method and device for controlling thickness of strip steel
CN114101776A (en) * 2021-11-08 2022-03-01 武汉钢铁有限公司 Edge wave control method for thickness transition and speed-up and speed-down processes of circle shear
CN114101776B (en) * 2021-11-08 2023-03-14 武汉钢铁有限公司 Edge wave control method for thickness transition and speed-up and speed-down processes of circle shear

Also Published As

Publication number Publication date
CN101441462B (en) 2010-08-25

Similar Documents

Publication Publication Date Title
CN101441462B (en) Shearing control method and control device of disc shear
CN105251776B (en) Cold continuous rolling mill strip steel tracking processing method
CN103567230B (en) Micro-tension control system and method
CN103223423B (en) Control method for walking-stopping type high-side-pressure sizing press
CN201266314Y (en) Synchronous control system for shearing fixed length of steel rod straightener
CN201069528Y (en) Control device for rotary flying cutter
CN106180207B (en) A kind of control system for rolling plate thickness
CN103962384A (en) Method for controlling dynamic shearing of hot continuous rolling mill
CN106903172A (en) A kind of control method for realizing steel plate in the position tracking switching of rolling different zones
CN104808637A (en) Cold bend forming production line
CN102773256B (en) Optimal control method for strip tail shear by flying shear at continuous annealing unit inlet
CN210626972U (en) Zinc-plating unit entry section area tail shearing control device
CN101323033A (en) A Control Method of Hydraulic Rolling Shear for Medium and Heavy Plates
CN110315245A (en) Strip steel taping head position control method
CN205520738U (en) Control system is cuted to rod
CN105382331B (en) A kind of method of flying shear control
CN1218792C (en) Rolled member head shape controlling method
CN101726189B (en) Synchronous control method for lifting stepping beam of stepping plate blank heating furnace
CN107470360B (en) A kind of think gauge stainless steel strip devices for taking-up and method for coiling
CN205600030U (en) Flying shear control system is cuted to copper
CN114378361B (en) Feeding device for steel shearing machine and waste steel treatment system
CN214335533U (en) Control system of hot sawing machine
CN208662672U (en) A kind of servo flying shear control system
CN102989780B (en) Electricity-saving control device and control method for vertical mill
CN113426840A (en) Negative tolerance rolling and short rule control method for bar production line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100825