CN101418566A - Method for processing soft land base/tail slag/lake silt by supercharging preconsolidation at vacuum - Google Patents

Method for processing soft land base/tail slag/lake silt by supercharging preconsolidation at vacuum Download PDF

Info

Publication number
CN101418566A
CN101418566A CNA2008101567875A CN200810156787A CN101418566A CN 101418566 A CN101418566 A CN 101418566A CN A2008101567875 A CNA2008101567875 A CN A2008101567875A CN 200810156787 A CN200810156787 A CN 200810156787A CN 101418566 A CN101418566 A CN 101418566A
Authority
CN
China
Prior art keywords
supercharging
slag
vacuum
mine tailings
lake silt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101567875A
Other languages
Chinese (zh)
Other versions
CN101418566B (en
Inventor
金亚伟
金亚君
蒋君南
孙瞿兵
唐晓武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xintai Rock and Soil Technology Co.,Ltd.
Original Assignee
YIXING XITAI GEOTEXTILE MATERIAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YIXING XITAI GEOTEXTILE MATERIAL CO Ltd filed Critical YIXING XITAI GEOTEXTILE MATERIAL CO Ltd
Priority to CN2008101567875A priority Critical patent/CN101418566B/en
Publication of CN101418566A publication Critical patent/CN101418566A/en
Application granted granted Critical
Publication of CN101418566B publication Critical patent/CN101418566B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Treatment Of Sludge (AREA)

Abstract

The invention relates to a method for treating a soft soil foundation/mine tailings/lake sludge by means of booster vacuum preconsolidation, which belongs to a construction method for the soft soil foundation/the mine tailings/the lake sludge, wherein insides of a plurality of rows of plastic drainage plates which are horizontally distributed inside soil mass/the slag/the sludge are subjected to vacuum pumping, and partial soil mass/ partial slag/ partial sludge between the plastic drainage plates is subjected to uniform supercharging simultaneously. The method can really reflect the reinforcing mechanism and the reinforcing effect of vacuum precompression on cohesive soil, tailing dam slag and the lake sludge, improves the consolidation depth by one time, shortens half of the reinforcing time, has low manufacturing cost, and is safe and effective.

Description

The method of supercharging vacuum preconsolidation soft soil foundation/mine tailings/lake silt
Technical field
The invention belongs to soft foundation/mine tailings/lake silt job practices, refer in particular to a kind of method of utilizing supercharging, vacuum preloading mode to improve the soft soil foundation/mine tailings/lake silt of the soil body/slag/silt consolidation degree fast.
Background technology
At present, the soft base processing method of China has: 1, and the vacuum preconsolidation method; 2, dynamic compaction; 3, preloading; 4, vacuum pre-pressed joint preloading.Above several method is effective substantially to sandy soil layer, general soil layer, but it is all invalid to cohesive soil vacuum preconsolidation method, dynamic compaction, can only take preloading and vacuum pre-pressed joint preloading, but these two kinds of costs are higher, must lay the 50cm sand bedding course on the viscous layer, and not environmental protection, it is very big that the preloading filler is obtained difficulty, and engineering time is very long.For special viscosity soil property (transmission coefficient 〉=10 -7Silt matter clay), all can't solve the problem of consolidation strength and engineering time with above several method, can't be applicable to the special building needs that highway in China, railway, harbour and antidetonation rank are high.
The slag of China's tailing dam is built height after handling general employing box dam, and make its precipitation, and then build height, reppd method, its poor stability, when the slag water content was big, the dam body lateral pressure increased, and can occur striding stepping on, and potential safety hazard is big.
The lake silt of China adopts the accumulation mode air dry, disposes a pond often and then pollutes plot, and is big to environmental nuisance.
Summary of the invention
The present invention in order to overcome above-mentioned deficiency, provides the method for a kind of soft soil foundation/mine tailings/lake silt just, i.e. the method for supercharging vacuum preconsolidation soft soil foundation/mine tailings/lake silt.Main innovation is the soil body/slag/mud is imposed vacuum and supercharging simultaneously, and vacuum allows the soil body/slag/mud moisture discharge fast, and the supercharging guiding soil body/slag/mud hydrone directed flow improves consolidation rate.Specifically implement like this: the method for supercharging vacuum preconsolidation soft soil foundation/mine tailings/lake silt, it is characterized in that the plurality of rows plastic draining intralamellar part that level in the soil body/slag/mud is arranged vacuumizes, simultaneously to the even supercharging of the part soil body/slag/mud between plastic draining board.
The plastic draining intralamellar part is vacuumized, be that vacuum tube is directly inserted on the top of each plastic draining board, can make the vacuum tube system keep unimpeded, the grains of sand can't enter the vacuum tube system, the vacuum plastic draining intralamellar part that goes directly, the plastic draining board filter membrane is inside and outside to produce big pressure reduction, and water content is discharged fast.Adopt the hand y junction y when plastic draining board is connected with vacuum tube, described hand y junction y is made up of two parts, and the lower end is hollow box, and the protruding pipe that several are evenly distributed is set on the upper surface length direction of hollow box.(seeing the applicant's utility model patent ZL200620068366.3 for details).
To the even supercharging of the part soil body/slag/mud between plastic draining board, it is the permeable pressure inlet that evenly distributes in the soil body/slag/mud between plastic draining board, make the soil body/slag/mud hydrone directed flow under pressure, carry out rapidly solidified to soft base/mine tailings/lake silt, in the limited duration, increase substantially ground/slag/mud intensity and consolidated depth, eliminate settlement after construction, actual effect is better.Permeable preferably pressure inlet is the permeable pressure inlet of horizontal well (REFERENCE TO RELATED people's practical new patent ZL03220509.0) among the present invention, form by the Water penetrative flexible pipe that some joints link to each other successively, Water penetrative flexible pipe is made up of spirality flexible supporting frames and filter cloth, two of every joint Water penetrative flexible pipe is equipped with the nipple that can connect, be connected with conical head on the first segment flexible pipe front end, minor details flexible pipe rear end is connected with flange.This can the filtration and the permeable pressure inlet of shrinkable horizontal well distribution pressure at the uniform velocity, make the soil body/slag/mud hydrone under pressure directed flow improve consolidation rate.
Each plastic removal material band drain of horizontal positioned is the regular hexagon layout among the present invention, and a permeable pressure inlet is placed at each orthohexagonal center.Distance between each plastic draining board can be designed to 0.8-1.5m, only need during construction the plastic draining board along continuous straight runs is put in argillic horizon/slag/mud, this layout type can be saved sand bedding course and reduce construction costs when construction, can bring into play maximum draining and diversion function, guarantees treatment effect.
Method of the present invention can make the reinforcement mechanism of vacuum preloading and consolidation effect obtain true embodiment on viscosity soil property, tailing dam slag, lake silt, and consolidated depth is doubled, Gu the strong time has shortened half, cost is lower, and is safe and effective.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Fig. 2 is the plane working drawing.
The specific embodiment
Embodiment 1, the method of supercharging vacuum preconsolidation soft soil foundation/mine tailings/lake silt, the plurality of rows plastic draining intralamellar part that level in the soil body/slag/mud is arranged vacuumizes, simultaneously to the even supercharging of the part soil body/slag/mud between plastic draining board.
Vacuum tube 2 is directly inserted on the top that is about to each plastic draining board 1, when being connected with vacuum tube 2, adopts plastic draining board 1 hand y junction y 3, this hand y junction y is made up of two parts, and the lower end is hollow box, and the protruding pipe that several are evenly distributed is set on the upper surface length direction of hollow box.
Permeable pressure inlet 4 evenly distributes in the soil body/slag/mud of 1 of plastic draining board, with the permeable pressure inlet of horizontal well is good, it is made up of the Water penetrative flexible pipe that some joints link to each other successively, Water penetrative flexible pipe is made up of spirality flexible supporting frames and filter cloth, two of every joint Water penetrative flexible pipe is equipped with the nipple that can connect, be connected with conical head on the first segment flexible pipe front end, minor details flexible pipe rear end is connected with flange.
Embodiment 2, reference example 1, and each plastic removal material band drain 1 of horizontal positioned is regular hexagon to be arranged, and the distance between each plastic draining board is designed to 0.8-1.5m (fixed according to designing requirement), and a permeable pressure inlet 4 is placed at each orthohexagonal center.

Claims (7)

1. the method for supercharging vacuum preconsolidation soft soil foundation/mine tailings/lake silt, it is characterized in that the plurality of rows plastic draining intralamellar part that level in the soil body/slag/mud is arranged vacuumizes, simultaneously to the even supercharging of the part soil body/slag/mud between plastic draining board.
2. the method for supercharging vacuum preconsolidation soft soil foundation/mine tailings according to claim 1/lake silt is characterized in that vacuum tube is directly inserted on the top of each plastic draining board.
3. the method for supercharging vacuum preconsolidation soft soil foundation/mine tailings according to claim 2/lake silt, it is characterized in that adopting when plastic draining board is connected with vacuum tube the hand y junction y, described hand y junction y is made up of two parts, the lower end is hollow box, and the protruding pipe that several are evenly distributed is set on the upper surface length direction of hollow box.
4. the method for supercharging vacuum preconsolidation soft soil foundation/mine tailings/lake silt of stating according to claim 1 is characterized in that being evenly distributed with permeable pressure inlet in the soil body/slag/mud between plastic draining board.
5. the method for supercharging vacuum preconsolidation soft soil foundation/mine tailings/lake silt of stating according to claim 4, it is characterized in that permeable pressure inlet is the permeable pressure inlet of horizontal well, form by the Water penetrative flexible pipe that some joints link to each other successively, Water penetrative flexible pipe is made up of spirality flexible supporting frames and filter cloth, two of every joint Water penetrative flexible pipe is equipped with the nipple that can connect, be connected with conical head on the first segment flexible pipe front end, minor details flexible pipe rear end is connected with flange.
6. according to the method for the described supercharging vacuum preconsolidation of one of claim 1-5 soft soil foundation/mine tailings/lake silt, each the plastic removal material band drain that it is characterized in that horizontal positioned is the regular hexagon layout, and a permeable pressure inlet is placed at each orthohexagonal center.
7. the method for supercharging vacuum preconsolidation soft soil foundation/mine tailings according to claim 6/lake silt is characterized in that the distance between each plastic draining board is designed to 0.8-1.5m.
CN2008101567875A 2008-09-26 2008-09-26 Method for processing soft land base/tail slag/lake silt by supercharging preconsolidation at vacuum Active CN101418566B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101567875A CN101418566B (en) 2008-09-26 2008-09-26 Method for processing soft land base/tail slag/lake silt by supercharging preconsolidation at vacuum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101567875A CN101418566B (en) 2008-09-26 2008-09-26 Method for processing soft land base/tail slag/lake silt by supercharging preconsolidation at vacuum

Publications (2)

Publication Number Publication Date
CN101418566A true CN101418566A (en) 2009-04-29
CN101418566B CN101418566B (en) 2011-01-12

Family

ID=40629553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101567875A Active CN101418566B (en) 2008-09-26 2008-09-26 Method for processing soft land base/tail slag/lake silt by supercharging preconsolidation at vacuum

Country Status (1)

Country Link
CN (1) CN101418566B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102116022A (en) * 2011-01-13 2011-07-06 中港基业(北京)岩土技术有限公司 Method for treating soft foundation through overpressure vacuum densification
CN103074884A (en) * 2013-01-11 2013-05-01 温州大学 Deep decompression anatonosis type vacuum preloading foundation treatment method
CN104071960A (en) * 2014-05-12 2014-10-01 江苏鑫泰岩土科技有限公司 Ecological sludge treatment method
CN107642079A (en) * 2017-08-25 2018-01-30 天津大学 A kind of vacuum preloading injecting gas boosting pipe
CN107965349A (en) * 2017-11-23 2018-04-27 长沙矿山研究院有限责任公司 Water consolidates mixed slurry loading precompressed process for dewatering and coagulating
CN109505211A (en) * 2019-01-16 2019-03-22 安徽鸿宇路桥工程有限公司 Reinforcement of Soft Soil Subgrade method
CN111501729A (en) * 2020-04-23 2020-08-07 中核第四研究设计工程有限公司 Vacuum preloading drainage consolidation method for silt titanium dioxide tailings
CN111501730A (en) * 2020-04-23 2020-08-07 中核第四研究设计工程有限公司 Vacuum preloading drainage consolidation method for uranium tailing mud
CN112459552A (en) * 2020-09-08 2021-03-09 中国电建集团华东勘测设计研究院有限公司 Production waste residue protection structure of large sand aggregate processing system and construction method
CN112962573A (en) * 2021-02-23 2021-06-15 江苏筑港建设集团有限公司 Soft foundation reinforcement treatment structure and method combining surcharge preloading and vacuum preloading

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102116022A (en) * 2011-01-13 2011-07-06 中港基业(北京)岩土技术有限公司 Method for treating soft foundation through overpressure vacuum densification
CN102116022B (en) * 2011-01-13 2012-03-21 中港基业(北京)岩土技术有限公司 Method for treating soft foundation through overpressure vacuum densification
CN103074884A (en) * 2013-01-11 2013-05-01 温州大学 Deep decompression anatonosis type vacuum preloading foundation treatment method
CN104071960A (en) * 2014-05-12 2014-10-01 江苏鑫泰岩土科技有限公司 Ecological sludge treatment method
CN104071960B (en) * 2014-05-12 2015-10-28 江苏鑫泰岩土科技有限公司 A kind of mud ecological treatment method
CN107642079A (en) * 2017-08-25 2018-01-30 天津大学 A kind of vacuum preloading injecting gas boosting pipe
CN107965349A (en) * 2017-11-23 2018-04-27 长沙矿山研究院有限责任公司 Water consolidates mixed slurry loading precompressed process for dewatering and coagulating
CN107965349B (en) * 2017-11-23 2019-05-31 长沙矿山研究院有限责任公司 Water consolidates mixed slurry load precompressed process for dewatering and coagulating
CN109505211A (en) * 2019-01-16 2019-03-22 安徽鸿宇路桥工程有限公司 Reinforcement of Soft Soil Subgrade method
CN111501729A (en) * 2020-04-23 2020-08-07 中核第四研究设计工程有限公司 Vacuum preloading drainage consolidation method for silt titanium dioxide tailings
CN111501730A (en) * 2020-04-23 2020-08-07 中核第四研究设计工程有限公司 Vacuum preloading drainage consolidation method for uranium tailing mud
CN112459552A (en) * 2020-09-08 2021-03-09 中国电建集团华东勘测设计研究院有限公司 Production waste residue protection structure of large sand aggregate processing system and construction method
CN112962573A (en) * 2021-02-23 2021-06-15 江苏筑港建设集团有限公司 Soft foundation reinforcement treatment structure and method combining surcharge preloading and vacuum preloading

Also Published As

Publication number Publication date
CN101418566B (en) 2011-01-12

Similar Documents

Publication Publication Date Title
CN101418566B (en) Method for processing soft land base/tail slag/lake silt by supercharging preconsolidation at vacuum
CN204112347U (en) Rock side slope self filling type grass planting device
CN101560757B (en) Seepage-intercepting and pollutant-removing system of large channel non-water passing slope
CN103031836A (en) Method for quickly building road on new reclamation sludge foundation
CN201272966Y (en) Apparatus for processing soft soil base/tailings/lake mud by supercharging vacuum preconsolidation
CN201165659Y (en) Direct discharging type vacuum preloading reinforced soft soil function structure
CN102061694A (en) Construction method for treating foundation through filling by adopting draining pile tubes
CN1843923B (en) House-sealing method for dry-process piling yard of red mud
CN100395413C (en) U-shape anti-seepage channel grooving technology and its equipment
CN105926709B (en) It is multi-functional to store row's Rain Garden system
CN208563522U (en) A kind of side slope riding track Rainwater collection system
CN100480471C (en) Sand cushion-free pre-compacting water-draining consolidation method for soft soil foundation
CN103074883A (en) Active type preloading combined foundation reinforcing method
CN102172198A (en) Water-saving irrigation device for road greenbelt and forming method thereof
CN206090598U (en) Vertical system of oozing of jointly arranging of tailing fill dam level
CN205604003U (en) Ecology that is suitable for sponge city water storage device that mats formation
CN110670438B (en) Soft foundation reinforcement treatment method for newly-built urban road engineering
CN203741814U (en) Blocking structure used after soft soil roadbed drainage prepressing
CN105568956A (en) Well-point dewatering combined surcharge preloading consolidation device for subgrade and application method of such device
CN201458935U (en) Assistant drying vertical well for gathering free water in sludge
CN205501928U (en) Structure of restoreing abandoned land to cultivation is distinguished in reservoir inundation submergence with making
CN208581638U (en) A kind of sandy vegetation ecological restoration device
CN102926375A (en) Sludge discharge field constructing method for speeding up dehydration, solidification and stabilization of dredged sediment
CN207944302U (en) Football pitch discharge structure
CN207699977U (en) A kind of permeable curb

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: XINTAI GEOTEXTILE MATERIAL CO., LTD.

Free format text: FORMER NAME: YIXING XITAI GEOTEXTILE MATERIAL CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: Xin Zhuang Zhen Da Cheng Cun 214267 Jiangsu city of Yixing Province

Patentee after: Jiangsu Xintai geotechnical materials Co. Ltd.

Address before: Xin Zhuang Zhen Da Cheng Cun 214267 Jiangsu city of Yixing Province

Patentee before: Yixing Xitai Geotextile Material Co., Ltd.

C56 Change in the name or address of the patentee

Owner name: JIANGSU XINTAI GEOTEXTILE MATERIAL CO., LTD.

Free format text: FORMER NAME: YIXING XITAI GEOTEXTILE MATERIAL CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: Xin Zhuang Zhen Da Cheng Cun 214267 Jiangsu city of Yixing Province

Patentee after: Jiangsu Xintai Rock and Soil Technology Co.,Ltd.

Address before: Xin Zhuang Zhen Da Cheng Cun 214267 Jiangsu city of Yixing Province

Patentee before: Yixing Xitai Geotextile Material Co., Ltd.

C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Jin Yawei

Inventor after: Jin Yajun

Inventor after: Jiang Junnan

Inventor after: Sun Jibing

Inventor after: Tang Xiaowu

Inventor after: Yang Guangqing

Inventor after: Zhang Baojie

Inventor before: Jin Yawei

Inventor before: Jin Yajun

Inventor before: Jiang Junnan

Inventor before: Sun Jibing

Inventor before: Tang Xiaowu

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: JIN YAWEI JIN YAJUN JIANG JUNNAN SUN QUBING TANG XIAOWU TO: JIN YAWEI JIN YAJUN JIANG JUNNAN SUN QUBING TANG XIAOWU YANG GUANGQING ZHANG BAOJIE

C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Jin Yawei

Inventor after: Jin Yajun

Inventor after: Jiang Junnan

Inventor after: Sun Jibing

Inventor after: Tang Xiaowu

Inventor after: Yang Guangqing

Inventor after: Zhang Baojie

Inventor after: Cai Yuanqiang

Inventor after: Wang Jun

Inventor before: Jin Yawei

Inventor before: Jin Yajun

Inventor before: Jiang Junnan

Inventor before: Sun Jibing

Inventor before: Tang Xiaowu

Inventor before: Yang Guangqing

Inventor before: Zhang Baojie

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: JIN YAWEI JIN YAJUN JIANG JUNNAN SUN QUBING TANG XIAOWU YANG GUANGQING ZHANG BAOJIE TO: JIN YAWEI JIN YAJUN JIANG JUNNAN SUN QUBING TANG XIAOWU YANG GUANGQING ZHANG BAOJIE CAI YUANQIANG WANG JUN