CN101418221A - Remixing process of dry pulverized coke and wet pulverized coke of coke making raw material - Google Patents
Remixing process of dry pulverized coke and wet pulverized coke of coke making raw material Download PDFInfo
- Publication number
- CN101418221A CN101418221A CNA2007100473363A CN200710047336A CN101418221A CN 101418221 A CN101418221 A CN 101418221A CN A2007100473363 A CNA2007100473363 A CN A2007100473363A CN 200710047336 A CN200710047336 A CN 200710047336A CN 101418221 A CN101418221 A CN 101418221A
- Authority
- CN
- China
- Prior art keywords
- coke powder
- wet
- dried
- tons
- hour
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention relates to a process for re-preparing the coking waste of dry coke powder and wet coke powder in a coking plant. The process comprises the following steps: (1) a working procedure of mixing the dry coke powder and the wet coke powder, during which according to proportion, the dry coke powder enters to a dry and wet material blender through a speed regulation rotary valve; the wet coke powder with water content of between 40 and 45 weight percent enters the dry and wet material blender through the transportation of a 1<*> number belt conveyer; and the dry coke powder and the wet coke powder are evenly mixed to obtain a coke powder mixture with the water content of less than or equal to 10 weight percent; and (2) a working procedure of adding the coke powder, during which the coke powder mixture is transported to a middle feed bin through a serpentiform conveyer; according to the requirement of the re-preparing amount, the coke powder mixture enters a 3 <*> number belt conveyer through a speed regulation spiral conveyer and is transported to a working procedure of coking. The process solves the problem of comprehensive utilization of the dry coke powder and the wet coke powder of the coking waste, makes waste profitable, saves energy, improves the environmental and sanitary conditions of the coking plant and increases economic benefit.
Description
Technical field
The present invention relates to the technical process of dried coke powder of a kind of waste material and wet coke powder blending device, specifically, the allotment of labor that returns who relates to a kind of dried coke powder of coke-oven plant's coking waste material and wet coke powder plants.
Background technology
In the Coking and Gas production process of daily coke-oven plant, will produce some dried coke powders, obtain by the fly-ash separator gathering system.Wet coke powder is that pit kiln adopts wet dedusting to be disposed in the settling tank, through grab crane will wet coke powder pick up in the pond stack spill dried.The wet coke powder water ratio that spills after doing is 41.7 weight %, and is original, adopts the take-away method to handle dried coke powder and wet coke powder, still, along with the marketization of commodity, does, the take-away of wet coke powder handles and have certain difficulty and influence environmental protection.In order in factory, to solve the problem of outlet of useless coke powder, the present inventor has designed and will do, wet coke powder according to a certain percentage, be blended in the raw coal as the coking raw material, return the novel process of joining utilization.
But, because dried coke powder when under the situation of humidification not, transporting, adding on the endless belt conveyor of coking process, can cause dust from flying, cause the secondary pollution of plant area, can not reach the purpose of utilization; And wet coke powder (water ratio 41.7 weight %) when intermediate bunker is stored and carry, can produce the putty phenomenon though can not cause dust from flying.
Summary of the invention
Recycle problem in order to solve dried coke powder of coking plant waste material and wet coke powder, overcome defective of the prior art, what the invention provides a kind of environmental protection, energy-conservation dried coke powder and wet coke powder returns allotment of labor's skill.Through test, determined the proper state and the physical data of material to be processed, earlier dried coke powder and wet coke powder are carried out the compound that thorough mixing obtains water ratio≤10 weight %, and then solve the normal problem of joining utilization of carrying, store and return.
The present invention is achieved in that dried coke powder of this coking waste material and wet coke powder and returns allotment of labor's skill and comprises that the mixed processes of (1) dried, wet coke powder and (2) coke powder add operation.
(1) do wet coke powder mixed processes:
Dried coke powder enters dried, wet feed mixing machine from dried coke powder feed bin in proportion through push-pull valve and speed governing rotary valve; Water ratio is that the wet coke powder of 40~45 weight % is delivered to discharging hopper by shovel loader, through 1
*Number endless belt conveyor is carried, and enters dried wet feed mixing machine in proportion, does, wet coke powder is through mixing, and obtains the coke powder compound of water ratio≤10 weight %, through 2
*Number endless belt conveyor is transported to interim stockyard.
(2) coke powder adds operation
The coke powder compound is delivered to the buffering feed bin through shovel loader, through push-pull valve by snakelike conveyor delivery to intermediate bunker, the coke powder compound in the intermediate bunker is pressed back the needs of dosage by the speed governing worm conveyor, after the verification of swash plate type under meter, enters 3
*Number endless belt conveyor is transported to coking process.
The discharging hopper both sides are provided with the oscillating plate motor in the mixed processes of the present invention, at discharge opening place, discharging hopper bottom vane-type stepless speed regulation arch breaking apparatus are set.
In the intermediate bunker in the coke powder interpolation operation of the present invention air bubble arch breaking apparatus and vertical broken arch feeding device are set.
It is 2 tons/hour~20 tons/hour that the coke powder of the speed governing worm conveyor in the coke powder interpolation operation of the present invention is carried back the dosage regulation range.
The coke powder that coke powder of the present invention adds the speed governing worm conveyor in the operation carries back the dosage regulation range to be preferably 2 tons/hour, 4 tons/hour, 6 tons/hour, 8 tons/hour, 10 tons/hour or 20 tons/hour.
Mixed processes mainly solves the mixed problem of dried, wet coke powder among the present invention, adds conveying, storage that operation mainly solves compound, returns problems such as joining metering.
Among the present invention in the mixed processes technical process key equipment be discharging hopper and do, the wet feed mixing machine.The both sides of discharging hopper are provided with the oscillating plate motor.The arch breaking apparatus of vane-type stepless speed regulation is set at the discharge opening place of discharging hopper bottom, has solved wet coke powder (water ratio<41.7 weight %) and tied the problem of encircleing with the discharging hopper headwall.Owing to adopt aforesaid device, guaranteed that wet coke powder enters endless belt conveyor by discharging hopper smoothly.Do, the effect of wet feed mixing machine dried, the wet mixing machine that is that (1) dried coke powder and wet coke powder enter according to a certain ratio.(2) in doing, wetting mixing machine, the coke powder of doing, wet need mix, and makes dried, wet compound can send defeated continuously, uniformly forward.
The present invention adds that key equipment is intermediate bunker and speed governing worm conveyor in the operation.The structure of intermediate bunker mainly solves compound and bulkhead knot arch problem and the reinforced problem of even successive, air bubble arch breaking apparatus and vertical broken arch feeding device are set in the intermediate bunker, guarantee compound feeding uniformly continuously in feed bin, material is wall built-up not, can regulate the dosage of returning of material arbitrarily, the speed governing worm conveyor mainly solves the conveying of coke powder compound and returns the adjusting problem of dosage, and it is 2 tons/hour, 4 tons/hour, 6 tons/hour, 8 tons/hour, 10 tons/hour or 20 tons/hour that coke powder is carried back the dosage regulation range.
The present invention has following tangible advantage:
One, solved the problem of complex utilization of dried coke powder of coking waste material and wet coke powder preferably, turned waste into wealth, can save raw coal more than 3000 tons in 1 year, save energy is increased economic efficiency.
Having solved wet coke powder carries and mixing transportation problem dried, warm coke powder at the discharging hopper inner broken arch.
Three, solved compound and do not tie arch in intermediate bunker, evenly problems such as operational throughput are regulated in conveying and stepless change continuously.
Four, improve on-site environment and sanitary condition greatly, prevent the infringement of flyash, improve the worker health level worker's health.
Description of drawings
Fig. 1, Fig. 2 are time allotment of labor's process flow figure of dried coke powder of coking waste material of the present invention and wet coke powder.
Fig. 1 be do, the process flow sheet of wet coke powder mixed processes.
Fig. 2 is the process flow sheet that coke powder adds operation.
Number in the figure is represented: 1-shovel loader, 2-discharging hopper, 3-oscillating plate motor, 4-vane-type stepless speed regulation arch breaking apparatus, 5-1
*Number endless belt conveyor, the dried coke powder feed bin of 6-, the 7-push-pull valve, 8-speed governing rotary valve, 9-does, the wet feed mixing machine, 10-2
*Number endless belt conveyor, the interim stockyard of 11-, the 12-shovel loader, 13-cushions feed bin, 14-push-pull valve, the snakelike transfer roller of 15-, 16-intermediate bunker, 17-air bubble arch breaking apparatus, the vertical broken arch feeding device of 18-, 19-speed governing worm conveyor, 20-swash plate type under meter, 21-3
*Number endless belt conveyor.
Embodiment
Specify below in conjunction with 1~2 pair of one embodiment of the present of invention of accompanying drawing, but embodiment is not a limitation of the present invention.
The allotment of labor's skill of returning of dried coke powder of this coking waste material and wet coke powder comprises that the mixed processes of dried, wet coke powder and coke powder add operation, and do (1), wet coke powder mixed processes: dried coke powder enters dried, wet feed mixing machine [9] from dried coke powder feed bin [6] in proportion through push-pull valve [7] and speed governing rotary valve [8]; Water ratio is that the wet coke powder of 41.7 weight % is delivered to discharging hopper [2] by shovel loader [1], through 1
*Number endless belt conveyor [5] is carried and is entered dried, wet feed mixing machine [9] in proportion, does, wet coke powder is after mixing.Obtain the coke powder compound of water ratio≤10 weight %, through 2
*Number endless belt conveyor [10] is transported to interim stockyard.(2) coke powder adds operation: the coke powder compound is delivered to intermediate bunker [16] through shovel loader [12], and the coke powder compound in the intermediate bunker [16] is pressed back the needs of dosage by speed governing worm conveyor [19], after swash plate type under meter [20] verification, enters 3
*Number endless belt conveyor [12] is delivered to coking process, and the discharging hopper in the mixed processes [2] both sides are provided with oscillating plate motor [3], in the discharging exit of discharging hopper [2] bottom vane-type stepless speed regulation arch breaking apparatus [4] are set.Add in the intermediate bunker [16] in the operation that air bubble arch breaking apparatus [17] and vertical broken arch feeding device [8] being set, it is 10 tons/hour that the coke powder of the speed governing worm conveyor [19] in the interpolation operation is carried back dosage.
Claims (5)
1, the allotment of labor that returns of dried coke powder of a kind of coking waste material and wet coke powder plants, and it is characterized in that this technology comprises that the mixed processes of dried, wet coke powder and coke powder add operation:
(1) dried, wet coke powder mixed processes
Dried coke powder enters dried, wet feed mixing machine [9] from dried coke powder feed bin [6] in proportion through push-pull valve [7] and speed governing rotary valve [8]; Water ratio is that the wet coke powder of 40~45 weight % is delivered to discharging hopper [2] by shovel loader [1], through 1
*Number endless belt conveyor [5] is carried, and enters dried, wet feed mixing machine [9] in proportion, do, wet coke powder after mixing, obtain the coke powder compound of water ratio≤10 weight %, through 2
*Number endless belt conveyor [10] is transported to interim stockyard [11];
(2) coke powder adds operation
The coke powder compound is delivered to buffering feed bin [13] through shovel loader [12], be delivered to intermediate bunker [16] through push-pull valve [14] by snakelike transfer roller [15], coke powder compound in the intermediate bunker [16] send machine [19] to press back the needs of dosage by the speed governing spiral, after swash plate type under meter [20] verification, enters 3
*Number endless belt conveyor [12] is delivered to coking process.
2, according to claim 1 time allotment of labor's skill is characterized in that discharging hopper in the mixed processes [2] both sides are provided with oscillating plate motor [3], are provided with vane-type stepless speed regulation arch breaking apparatus [4] at the discharge opening place of discharging hopper [2] bottom.
3, according to claim 1 time allotment of labor's skill is characterized in that in the intermediate bunker [16] in the coke powder interpolation operation air bubble arch breaking apparatus [17] and vertical broken arch feeding device [18] being set.
4, according to claim 1 time allotment of labor skill is characterized in that it is 2 tons/hour~20 tons/hour that coke powder that coke powder adds the speed governing worm conveyor [19] in the operation is carried back the dosage regulation range.
5, according to claim 4 time allotment of labor skill is characterized in that it is 2 tons/hour, 4 tons/hour, 6 tons/hour, 8 tons/hour, 10 tons/hour or 20 tons/hour that coke powder that coke powder adds the speed governing worm conveyor [19] in the operation is carried back the dosage regulation range.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200710047336A CN101418221B (en) | 2007-10-23 | 2007-10-23 | Remixing process of dry pulverized coke and wet pulverized coke of coke making raw material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200710047336A CN101418221B (en) | 2007-10-23 | 2007-10-23 | Remixing process of dry pulverized coke and wet pulverized coke of coke making raw material |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101418221A true CN101418221A (en) | 2009-04-29 |
CN101418221B CN101418221B (en) | 2012-09-05 |
Family
ID=40629227
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200710047336A Active CN101418221B (en) | 2007-10-23 | 2007-10-23 | Remixing process of dry pulverized coke and wet pulverized coke of coke making raw material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101418221B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102154047A (en) * | 2011-01-10 | 2011-08-17 | 福建龙耀煤业科技有限公司 | Batching production line for producing anthracite coal briquettes |
CN102492507A (en) * | 2011-11-16 | 2012-06-13 | 安徽天之源型煤有限公司 | Casting briquette and production method |
CN102530559A (en) * | 2012-02-29 | 2012-07-04 | 三一重工股份有限公司 | Multi-bin pneumatic conveying device and concrete stirring station with same |
CN102585867A (en) * | 2012-03-08 | 2012-07-18 | 无锡亿恩科技股份有限公司 | System for conditioning through coking charge coal humidity difference |
CN110947309A (en) * | 2019-12-16 | 2020-04-03 | 湖北中油科昊机械制造有限公司 | High-efficient environmental protection mixes car |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3235261C2 (en) * | 1982-09-23 | 1984-08-02 | Hartung, Kuhn & Co Maschinenfabrik GmbH, 4000 Düsseldorf | Process and device for using waste heat and for obtaining water gas when cooling coke |
CN1097021A (en) * | 1993-06-29 | 1995-01-04 | 于庆琛 | A kind of method of making casting formed coke with coke powder |
CN1112952A (en) * | 1994-12-22 | 1995-12-06 | 何国威 | Coking by one's self with one third of coke and coke powder to produce high quality metallurgical coke and metallurgical casting coke |
CN1078605C (en) * | 1996-04-02 | 2002-01-30 | 济南钢铁集团总公司 | Coal compounding method for producing wet-milled metallurgical coke powder, and process for producing same |
CN100500805C (en) * | 2006-11-07 | 2009-06-17 | 武汉钢铁集团鄂城钢铁有限责任公司 | Dust settling fine coke reblending coal coking method and its technology |
CN100999674A (en) * | 2006-12-22 | 2007-07-18 | 石家庄五环矿山设备有限公司 | Braize resupplied, vibrating and pulverizing tech. |
-
2007
- 2007-10-23 CN CN200710047336A patent/CN101418221B/en active Active
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102154047A (en) * | 2011-01-10 | 2011-08-17 | 福建龙耀煤业科技有限公司 | Batching production line for producing anthracite coal briquettes |
CN102154047B (en) * | 2011-01-10 | 2013-06-19 | 福建龙耀煤业科技有限公司 | Batching production line for producing anthracite coal briquettes |
CN102492507A (en) * | 2011-11-16 | 2012-06-13 | 安徽天之源型煤有限公司 | Casting briquette and production method |
CN102530559A (en) * | 2012-02-29 | 2012-07-04 | 三一重工股份有限公司 | Multi-bin pneumatic conveying device and concrete stirring station with same |
CN102530559B (en) * | 2012-02-29 | 2015-07-08 | 三一重工股份有限公司 | Multi-bin pneumatic conveying device and concrete stirring station with same |
CN102585867A (en) * | 2012-03-08 | 2012-07-18 | 无锡亿恩科技股份有限公司 | System for conditioning through coking charge coal humidity difference |
CN102585867B (en) * | 2012-03-08 | 2014-08-13 | 无锡亿恩科技股份有限公司 | System for conditioning through coking charge coal humidity difference |
CN110947309A (en) * | 2019-12-16 | 2020-04-03 | 湖北中油科昊机械制造有限公司 | High-efficient environmental protection mixes car |
Also Published As
Publication number | Publication date |
---|---|
CN101418221B (en) | 2012-09-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101879755B (en) | Drying-free dry-mixed mortar complete equipment | |
CN105773835B (en) | Ceramic raw material mix grinding centralized system is for Processes and apparatus | |
CN101418221B (en) | Remixing process of dry pulverized coke and wet pulverized coke of coke making raw material | |
CN104889137A (en) | Large-scale fly ash stabilization solidification system | |
CN207808071U (en) | A kind of concrete batching and mixing tower | |
CN104493967A (en) | System for preparing ceramsite through sludge | |
CN101560067B (en) | Technology for preparing cement by dry carbide slag method | |
CN204398156U (en) | A kind of construction site cement mixing equipment | |
CN108789837A (en) | The full-automatic mixing plant of concrete | |
CN101879743A (en) | Continuous production process and production device of inorganic light aggregate thermal insulation mortar | |
CN105132050B (en) | A kind of method for producing water coal slurry and its equipment | |
CN213596170U (en) | Production line for producing cement clinker by solid-waste blending | |
CN102389726B (en) | Mixed processing device of solid waste and curing agent | |
CN202465280U (en) | Carbon material homogenizing and mixing equipment | |
CN204450850U (en) | building concrete mixer | |
CN209923399U (en) | Rotary hearth furnace raw material processing system | |
CN203144254U (en) | Urban sludge blending combustion treatment device | |
CN102154047A (en) | Batching production line for producing anthracite coal briquettes | |
CN206589157U (en) | A kind of concrete batching and mixing tower structure | |
CN204702664U (en) | A kind of limestone kiln Charge Mixture Control equipment based on PLC frequency transformer | |
CN206599200U (en) | Electroplating sludge feed system | |
CN201098956Y (en) | Coal ash pulping device | |
CN202702408U (en) | Device suitable for mixing concrete by four powder admixtures in mixing plant | |
CN205466750U (en) | Linkage proportioning device | |
CN211111123U (en) | Raffinate curing system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 200032, 807 Jia Jia Road, Shanghai, Xuhui District Patentee after: SHANGHAI HUANQIU ENGINEERING CO., LTD. Address before: 200032, 807 Jia Jia Road, Shanghai, Xuhui District Patentee before: Shanghai Huanqiu Petrochemistry Engineering Co., Ltd. |