CN101403281A - Tail pipe well drilling and well completion technique - Google Patents

Tail pipe well drilling and well completion technique Download PDF

Info

Publication number
CN101403281A
CN101403281A CNA2008101375803A CN200810137580A CN101403281A CN 101403281 A CN101403281 A CN 101403281A CN A2008101375803 A CNA2008101375803 A CN A2008101375803A CN 200810137580 A CN200810137580 A CN 200810137580A CN 101403281 A CN101403281 A CN 101403281A
Authority
CN
China
Prior art keywords
drilling
well
tail pipe
liner
drill string
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101375803A
Other languages
Chinese (zh)
Other versions
CN101403281B (en
Inventor
刘玉民
杨智光
金志富
李秋杰
杨决算
李玉海
张洪君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daqing Petroleum Administration Bureau
China National Petroleum Corp
Original Assignee
Daqing Petroleum Administration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Petroleum Administration Bureau filed Critical Daqing Petroleum Administration Bureau
Priority to CN2008101375803A priority Critical patent/CN101403281B/en
Publication of CN101403281A publication Critical patent/CN101403281A/en
Application granted granted Critical
Publication of CN101403281B publication Critical patent/CN101403281B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a liner drilling and well completion process, which mainly solves the problems of difficult guarantees of cementing quality to the liner drilling process, easy occurrence of serious drilling troubles, complex processes, a plurality of related tools, poor reliability and short maximum drilling length. The process is characterized in that: after the well completion of an intermediate casing: (1) a liner drilling string is connected; (2) the liner drilling is carried out; (3) the drilling is finished; (4) then a hanging liner and a running tool are disentangled from a liner hanger; (5) a well completion string is connected; (6) the liner is rotated to carry out well cementation; (7) the liner is set; and (8) a drill rod and the running tool are taken out. The liner drilling and well completion process is characterized by good well cementation quality, safety and reliability, simple process, fewer related tools and longest maximum drilling length.

Description

Tail pipe well drilling and well-completing process
Technical field:
The present invention relates to tail pipe well drilling technology, especially tail pipe well drilling and well-completing process in the oil drilling field.
Background technology:
Casing Drilling Technique is the revolutionary new technology in drilling well field in the world wide, is with a wide range of applications.Casing drilling has changed the operating type of conventional drilling; the broken rock in down-hole is crept into casing job synchronous, have the incorporate technical characterictic of drilling well and completion, both can reduce engineering cost; can reduce the generation of down-hole complex accident again, and help advantages such as reservoir protection.Tail pipe well drilling technology is a kind of form of casing drilling technology.Tail pipe well drilling belongs to a type of casing drilling, therefore has the advantage that reduces drilling cost, reduces down-hole accident equally.Especially to there being the deep-well of complicated abnormal conditions such as cave-in, use the tail pipe well drilling technology significant.It is perfect that tail pipe well drilling technology has experienced the development of two more than ten years abroad, obtained successful application.At present, the external existence with Bake-Hughes, Hughes-Clayton Christensen, A Moke-winner moral and four kinds of different tail pipe well drilling systems such as disposable, wherein Bake-Hughes's tail pipe well drilling system applies is maximum, and its overall performance awaits to improve.External tail pipe well drilling system architecture more complicated, its arbitrary link goes wrong, and all can cause engineering accident, and aspects such as the drilling depth ability of its reliability and deep-well can not satisfy field requirement fully.Drilling liner cementing technology can not be taken into account on cementing quality and engineering safety fully.Two kinds of technologies of the general employing of existing tail pipe well drilling technology: the one, sit earlier and hang tail pipe, do not cementing the well under the rotary tail condition then.The 2nd, under the rotary tail condition, cement the well earlier, and then sit and hang tail pipe.The former shortcoming is that cementing quality is difficult to guarantee.If the latter's shortcoming is well cementation back sits to hang and conciliates problem, the serious down-hole accident that just causes running tool to pull out not coming out.In sum, existing tail pipe well drilling technology mainly exists cementing quality to be difficult to guarantee, easily causes serious down-hole accident, and complex process, it is many to relate to instrument, poor reliability, the progress chi of deep drilling is 60 meters, does not satisfy the drilling well demand, the development of restriction tail pipe well drilling technology.
Summary of the invention:
Be difficult to guarantee in order to overcome existing tail pipe well drilling technology cementing quality, easily cause serious down-hole accident, complex process, it is many to relate to instrument, poor reliability, the deficiency that drilling well length is short the invention provides a kind of tail pipe well drilling and well-completing process, and it is good that this tail pipe well drilling and well-completing process have a cementing quality, safe and reliable, technology is simple, and it is few to relate to instrument, the characteristics that drilling well length is long.
Technical scheme of the present invention is: this tail pipe well drilling and well-completing process comprise the protective casing completion, after the protective casing well cementation;
(1), the tail pipe drill string connects; Include kelly bar, drilling rod, the rotary liner hanger that can carry out drilling and well completion respectively, tail pipe, flower basket type plug seat, float collar, drill bit;
(2), tail pipe well drilling; Carry out drilling well with gas as circulatory mediator;
(3), after the finishing drilling; Circulating fluid;
(4), sitting extension tail pipe and running tool and extension hanger frees; By the ball of in drill string, devoting oneself to work, circulating fluid boosts to 5 MPas, the rotary liner hanger slips is sat and is suspended on the upper level sleeve pipe, drilling fluid continues to boost to 8 MPas, running tool and extension hanger are freed and are kept sealing, continue to boost to 15 MPas, the well cementation passage is opened, and can carry out cementing;
(5), completion tubular column connects; Cementing head links to each other with rotating mechanism, and rotating mechanism links to each other with the tail pipe drill string;
(6), rotary tail well cementation; Rotate rotating disk, cement injection by drop into solid plug in tubing string, for drilling fluid, boosts to 15 MPas after the bruising, and solid plug and hollow plug are compound and keep sealing, and be together descending, the compound and maintenance sealing with the plug seat;
(7), set extension hanger; On submit into the instrument certain altitude, press down drill string, the rotary liner hanger sealing mechanism is set in the upper level sleeve pipe;
(8), trip out drilling rod and running tool.
Tail pipe well drilling in the such scheme carries out drilling well with drilling fluid as circulatory mediator.
The beneficial effect that the present invention has is: this tail pipe well drilling and well-completing process are owing to adopted above-mentioned technology, obtain following beneficial effect, at first be that this technology not only can participate in drilling well, can also be rotated well cementation, and drilling well is reliable, handling safety, and cementing quality is good, the situation of avoiding running tool to extract takes place, and satisfies field requirement.Next is that drilling depth is long, increases to about 300 meters by existing 60 meters.Be that technology is simple at last, it is few to relate to instrument, the reliability height, and cementing quality is good, reduces engineering cost, can reduce the generation of down-hole complex accident again, and help reservoir protection.Help applying.
Description of drawings:
Accompanying drawing 1 is a well drilling drill string structural representation of the present invention;
Accompanying drawing 2 is completion tubular column structural representations of the present invention;
Accompanying drawing 3 is rotary liner hanger structural representations that the present invention can carry out drilling and well completion respectively.
1-ball seat among the figure, 2-inner core, 3-central tube, 4-fixing pin, 5-hangs the ball lining, and 6-hangs ball, 7-liquid pass hole, 8-sliding sleeve, 9-slide-bar, 10-are sat and are hung spiral pin, 11-slips, the 12-cone, 13-sliding pin, 14-main body, 15-ball seat pin, the 16-core barrel, 17-connects pin, the 18-expansion-head, 19-backing pin, 20-expansion tube, the 21-upper saddle, 22-packing element, 23-kelly bar, the 24-drilling rod, 25-can carry out the rotary liner hanger of drilling and well completion, 26-tail pipe respectively, 27-flower basket type plug seat, 28-float collar, 29-drill bit, 30-upper level sleeve pipe, 31-cementing head, 32-rotating mechanism.
The specific embodiment:
Below in conjunction with accompanying drawing will the invention will be further described:
In conjunction with Fig. 2, shown in Figure 3, this tail pipe well drilling and well-completing process are after the protective casing well cementation by Fig. 1;
(1), the tail pipe drill string connects.The main effect of this operation is to form the tail pipe drill string.Include kelly bar 23, drilling rod 24, the rotary liner hanger 25 that can carry out drilling and well completion respectively, tail pipe 26, flower basket type plug seat 27, float collar 28, drill bit 29, they are successively by being threaded, drive kelly bar 23 drilling wells and well cementation by rotating disk, being connected and freeing of the rotary liner hanger 25 control drilling rods 24 by can carrying out drilling and well completion respectively and tail pipe 26.
(2), tail pipe well drilling.The main effect of this operation is to utilize the tail pipe drill string steadily to creep into.Adopt and existingly commonly to creep into used gas and carry out drilling well, also adopt and existingly commonly creep into used drilling fluid and carry out drilling well as circulatory mediator as circulatory mediator.When adopting gas to carry out drilling well, can improve drilling depth length, increase to about 300 meters by existing 60 meters as circulatory mediator.
(3), after the finishing drilling.Circulating fluid.The main effect of this operation is the cleaning well, and is ready for the extension hanger construction simultaneously.
(4), sitting extension tail pipe and running tool and extension hanger frees.The main effect of this operation is that tail pipe is sat extension and drill string and tail pipe and freed.By the ball of in drill string, devoting oneself to work, the work ball is put into the upper end of the ball seat 1 of this rotary liner hanger 25 that can carry out drilling and well completion respectively from drill string, the sphere of work ball and ball seat 1 upper end produces sealing, when pressure reaches 5 MPas, the fixing pin 4 that inner core 2 is fixedlyed connected with central tube 3 is cut off, inner core 2 is descending, inner core 2 is also spacing to hanging ball 6 by hanging ball lining 5, the sealing ring of inner core 2 upper ends lost efficacy, drilling fluid enters in the sliding sleeve 8 upper end boss from liquid pass hole 7, the seat that promotion sliding sleeve 8 is cut off between sliding sleeve 8 and the slide-bar 9 is hung spiral pin 10, sliding sleeve 8 is up, and it is up along cone 12 lower end male cone (strobilus masculinus)s to promote slips 11, outwards expands at the effect lower slips 11 of cone 12 conical surfaces, slips 11 outer anchor teeth are stuck in the upper level sleeve pipe, and tail pipe is realized sitting and is hung in the upper level sleeve pipe.Drilling fluid continues to boost to 8 MPas, the sliding pin 13 that inner core 2 is connected with central tube 3 is cut off, inner core 2 no longer carries out spacing to hanging ball 6, hanging ball 6 inwardly shifts out, central tube 3 is freed with the suspension of main body 14, and at this moment main body 14 can be rotated with central tube 3 synchronously by spline, but central tube 3 no longer carries the load of main body 14 and its underpart, realize running tool and sit freeing and keeping sealing of on-hook structure, just drill string and tail pipe are freed.Continue to boost to 15 MPas, ball seat 1 is cut off with the ball seat pin 15 that is connected between the inner core 2, and work ball and ball seat 1 together come off, and the well cementation passage is opened, and can carry out cementing.Hang tail pipe thereby solve to sit earlier, cement the well under the rotary tail condition then, improved cementing quality, avoided running tool to pull out to come out serious down-hole accident phenomenon and taken place.
(5), completion tubular column connects.The main effect of this operation is to finish the completion tubular column combination at the tail pipe drill string.Link to each other with rotating mechanism 32 by cementing head 31, rotating mechanism 32 is connected to form completion tubular column with the tail pipe drill string.
(6), rotary tail well cementation.The main effect of this operation is to drive the completion tubular column rotation by rotating disk to finish well cementation.By completion tubular column cement injection in tail pipe, driving completion tubular column by rotating disk simultaneously rotates, after cementing finishes, by in completion tubular column, dropping into solid plug, solid plug sits on the upper end of the inner core 2 of this rotary liner hanger 25 that can carry out drilling and well completion respectively from completion tubular column, solid plug and inner core 2 upper ends produce sealing, for drilling fluid, boost to 15 MPas after the bruising, make core barrel 16 and central tube 3 be fixedly coupled pin 17 and cut off, inner core 2 and core barrel 16 together come off, solid plug and hollow plug are compound and keep sealing, and be together descending, the compound and maintenance sealing with the plug seat, on carry completion tubular column, realize drill string and the thorough disengagement of sending into mechanism.
(7), set extension hanger.The main effect of this operation is that tail pipe is sealed in the upper level sleeve pipe.In the up process of completion tubular column, central tube 3 is up, and expansion-head 18 is no longer spacing to backing pin 19, backing pin 19 ejects, and backing pin 19 cards are sitting in expansion-head 18 upper ends, press down completion tubular column, in the process that completion tubular column falls, central tube 3 falls and also and then falls, and backing pin 19 is realized sealing firmly by the type conical bench distending expansion tube 20 of expansion-head 18 in the process that central tube 3 falls, simultaneously, by expansion tube 20 and packing element upper saddle 21 extruding packing elements 22, realize soft seal more again, finally reach double-sealing.The rotary liner hanger sealing mechanism is set in the upper level sleeve pipe, and tail pipe sets operation and finishes.
(8), trip out completion tubular column and running tool.The main effect of this operation is to trip out completion tubular column and send into mechanism.Finally finish the construction of tail pipe well drilling and completion.
In sum, owing to adopted above-mentioned technology to obtain following beneficial effect, at first, because boring Well drill string and completion tubular column are basic identical, just substantially finish drilling well and well cementation with an endowel Technology, this technology not only can participate in drilling well thus, can also be rotated well cementation, and drilling well Reliably, handling safety, cementing quality is good, and the situation of avoiding running tool to extract takes place, Satisfy field requirement. Secondly, existingly commonly creep into used gas as circulation because having adopted again Medium carries out drilling well, thereby has increased drill footage length, increases to 300 by existing 60 meters About rice. At last, can carry out respectively drilling and well completion because adopting on tail pipe drill string and the completion tubular column Rotary liner hanger 25 so that technology is simple, it is few to relate to instrument, the reliability height is carried High cementing quality reduces engineering cost, can reduce the generation of down-hole complex accident again, and have Be beneficial to reservoir protection, for major contribution has been made in the development of oil drilling. This tail pipe bores thus Well and well-completing process have outstanding substantive distinguishing features and significant progressive.

Claims (2)

1, a kind of tail pipe well drilling and well-completing process is characterized in that: after the protective casing well cementation;
(1), the tail pipe drill string connects; Include kelly bar (23), drilling rod (24), the rotary liner hanger (25) that can carry out drilling and well completion respectively, tail pipe (26), flower basket type plug seat (27), float collar (28), drill bit (29);
(2), tail pipe well drilling; Carry out drilling well with gas as circulatory mediator;
(3), after the finishing drilling; Circulating fluid;
(4), sitting extension tail pipe and running tool and extension hanger frees; By the ball of in drill string, devoting oneself to work, circulating fluid boosts to 5 MPas, the rotary liner hanger slips is sat and is suspended on the upper level sleeve pipe, drilling fluid continues to boost to 8 MPas, running tool and extension hanger are freed and are kept sealing, continue to boost to 15 MPas, the well cementation passage is opened, and can carry out cementing;
(5), completion tubular column connects; Cementing head (31) links to each other with rotating mechanism (32), and rotating mechanism (23) links to each other with the tail pipe drill string;
(6), rotary tail well cementation; Rotate rotating disk, cement injection by drop into solid plug in tubing string, for drilling fluid, boosts to 15 MPas after the bruising, and solid plug and hollow plug are compound and keep sealing, and be together descending, the compound and maintenance sealing with the plug seat;
(7), set extension hanger; On submit into the instrument certain altitude, press down drill string, the rotary liner hanger sealing mechanism is set in the upper level sleeve pipe;
(8), trip out drilling rod and running tool.
2, tail pipe well drilling according to claim 1 and well-completing process is characterized in that: tail pipe well drilling, carry out drilling well with drilling fluid as circulatory mediator.
CN2008101375803A 2008-11-21 2008-11-21 Tail pipe well drilling and well completion technique Active CN101403281B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101375803A CN101403281B (en) 2008-11-21 2008-11-21 Tail pipe well drilling and well completion technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101375803A CN101403281B (en) 2008-11-21 2008-11-21 Tail pipe well drilling and well completion technique

Publications (2)

Publication Number Publication Date
CN101403281A true CN101403281A (en) 2009-04-08
CN101403281B CN101403281B (en) 2011-06-08

Family

ID=40537414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101375803A Active CN101403281B (en) 2008-11-21 2008-11-21 Tail pipe well drilling and well completion technique

Country Status (1)

Country Link
CN (1) CN101403281B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567676A (en) * 2015-10-12 2017-04-19 中石化石油工程技术服务有限公司 Expansive tail pipe drilling operation device and operation method thereof
CN110331932A (en) * 2019-07-11 2019-10-15 中煤科工集团重庆研究院有限公司 Coal bed gas tail pipe well drilling method suitable for coal mine gob/wear goaf
CN111075349A (en) * 2019-12-20 2020-04-28 山西晋城无烟煤矿业集团有限责任公司 Construction method of ground mining empty well suspension type well body structure
CN114718520A (en) * 2022-03-18 2022-07-08 中国石油大学(华东) Method and device for drilling and producing marine natural gas hydrate

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5884702A (en) * 1996-03-01 1999-03-23 Smith International, Inc. Liner assembly and method
CN2748629Y (en) * 2004-09-24 2005-12-28 辽河石油勘探局 Liner hanger for drilling completion operation
CN200943455Y (en) * 2006-04-20 2007-09-05 中国石化集团胜利石油管理局钻井工艺研究院 Expandable tail tube suspension device for petroleum drilling well

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567676A (en) * 2015-10-12 2017-04-19 中石化石油工程技术服务有限公司 Expansive tail pipe drilling operation device and operation method thereof
CN106567676B (en) * 2015-10-12 2018-09-11 中石化石油工程技术服务有限公司 Buckling type tail drillng operation device and its operational method
CN110331932A (en) * 2019-07-11 2019-10-15 中煤科工集团重庆研究院有限公司 Coal bed gas tail pipe well drilling method suitable for coal mine gob/wear goaf
CN110331932B (en) * 2019-07-11 2020-11-24 中煤科工集团重庆研究院有限公司 Coal bed gas tail pipe drilling method suitable for coal mine goaf/through goaf
CN111075349A (en) * 2019-12-20 2020-04-28 山西晋城无烟煤矿业集团有限责任公司 Construction method of ground mining empty well suspension type well body structure
CN111075349B (en) * 2019-12-20 2021-08-27 山西晋城无烟煤矿业集团有限责任公司 Construction method of ground mining empty well suspension type well body structure
CN114718520A (en) * 2022-03-18 2022-07-08 中国石油大学(华东) Method and device for drilling and producing marine natural gas hydrate
CN114718520B (en) * 2022-03-18 2024-03-29 中国石油大学(华东) Method and device for drilling and extracting marine natural gas hydrate

Also Published As

Publication number Publication date
CN101403281B (en) 2011-06-08

Similar Documents

Publication Publication Date Title
CN102953698B (en) A kind of expansion-type rotatable tail pipe hanger
CN103277060A (en) Mechanical-hydraulic double-acting release rotary tail pipe hanger
CN102996089B (en) Multi-stage hydraulic expansion tail pipe suspension system with reducing expansion cone for horizontal well for thermal recovery of heavy oil
CN101614117B (en) Expansion tube type liner hanger
CN101906946B (en) Hydraulic expansion-type rotary liner hanger
CN201460778U (en) Expansion pipe type tail pipe hanger
CN105604508B (en) Extension hanger
CN101403281B (en) Tail pipe well drilling and well completion technique
CN100538003C (en) The expansion sieve tube hanging method
CN103015930B (en) Multilevel heavy-load rotary liner hanger
CN102536160A (en) Ball seat type rubber plug system for liner cementing
CN101285375A (en) Sleeve expanding method for horizontal well
CN106150414B (en) A kind of mechanical and hydraulic double-acting rotary liner hanger of anti-slips retraction
CN210370560U (en) Multipurpose packer feeding tool
CN103573226A (en) Well completion sand prevention process and sand prevention strings thereof
CN106567676A (en) Expansive tail pipe drilling operation device and operation method thereof
CN201705252U (en) Hydraulic expansion type rotating liner hanger
CN203296727U (en) Mechanical-hydraulic double-action release rotary tail pipe hanger
CN202970603U (en) Drilling liner hanger sealing box
CN101173601B (en) Rotatable hydraulic expanding type tail pipe hanger
CN202970565U (en) Thickened oil thermal recovery horizontal well multistage hydraulic pressure expansion tail pipe suspension system with variable diameter expansion cone
CN201486494U (en) Expansion pipe hanging connecting device
CN203022667U (en) Hydraulic releasing rotary tail pipe hanger
CN101440702A (en) Sieve tube well completion method under insufficient balance condition and temporary blocking type sieve tube
CN202140062U (en) Hydraulic drilling-free tail pipe hanging packer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 163453 Heilongjiang Province, Daqing City Ranghulu District Central Plains Road No. 99

Patentee after: DAQING PETROLEUM ADMINISTRATION Co.,Ltd.

Address before: 163453 Heilongjiang Province, Daqing City Ranghulu District No. 263 South Central Avenue

Patentee before: DA QING PETROLEUM ADMINISTRATION BUREAU

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220107

Address after: 163453 Heilongjiang Province, Daqing City Ranghulu District Central Plains Road No. 99

Patentee after: DAQING PETROLEUM ADMINISTRATION Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Address before: 163453 Heilongjiang Province, Daqing City Ranghulu District Central Plains Road No. 99

Patentee before: DAQING PETROLEUM ADMINISTRATION Co.,Ltd.