CN101400081B - Uplink scheduling method, system and device in TDD system - Google Patents

Uplink scheduling method, system and device in TDD system Download PDF

Info

Publication number
CN101400081B
CN101400081B CN2007101753380A CN200710175338A CN101400081B CN 101400081 B CN101400081 B CN 101400081B CN 2007101753380 A CN2007101753380 A CN 2007101753380A CN 200710175338 A CN200710175338 A CN 200710175338A CN 101400081 B CN101400081 B CN 101400081B
Authority
CN
China
Prior art keywords
uplink
sub
frame
subframe
assignment information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2007101753380A
Other languages
Chinese (zh)
Other versions
CN101400081A (en
Inventor
李国庆
谌丽
高卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Telecommunications Technology CATT
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Datang Mobile Communications Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Mobile Communications Equipment Co Ltd filed Critical Datang Mobile Communications Equipment Co Ltd
Priority to CN2007101753380A priority Critical patent/CN101400081B/en
Publication of CN101400081A publication Critical patent/CN101400081A/en
Application granted granted Critical
Publication of CN101400081B publication Critical patent/CN101400081B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

An embodiment of the invention discloses an upward resource scheduling method of a TDD system, a system and a device, realizing dynamic scheduling on the upward resource on the basis of ensuring optimal transmission performance. The upward resource scheduling method comprises: a base station distributes upward resources for transmitting upward data on the user equipment, and transmits upward resource distribution information including upward sub-frame indexes in the sending time span corresponding to the upward sub-frame occupied by the upward resource, the sending time span corresponding to the upward sub-frame is arranged in advanced; the user equipment receives the distribution information, determines the upward sub-frame according to the upward sub-frame indexes and the upward sub-frame scheduling strategy, and transmits the upward data on the upward resource indicated by the distribution information in the upward sub-frame. An upward resource scheduling system comprises: user equipment and a base station. The embodiment of the invention also discloses a base station and user equipment.

Description

Uplink scheduling method in the TDD system, system and equipment
Technical field
The present invention relates to the mobile communication technology field, relate in particular to the uplink resource scheduling technology of a kind of TDD of being applied to system.
Background technology
(the 3rd Generation Partnership Project of 3G (Third Generation) Moblie standardization body, 3GPP) started Long Term Evolution (Long Term Evolution, LTE) standardization effort of technology, in the LTE in future technology, adopt shared channel to provide service for a plurality of users, thereby obtain multi-subscriber dispatching and spatial multiplexing gain, improve the availability of frequency spectrum and throughput of system, become the prevailing model that system design is adopted.
In order to support the channel shared by multiple users resource, adopting the method for dynamic dispatching is that UE distributes the resource of transmitting data in real time.Think that below the UE transmit ascending data is an example, provide the dynamic dispatching process of resource, as shown in Figure 1, evolution base station (Evolution Base Station, eNB) be that (User Equipment UE) divides the resource that is used in transmit ascending data to subscriber equipment at first by ascending resource assignment signalling (UL Grant); UE receives behind the UL Grant through handling time-delay Tue, finishes the processing to UL Grant; UE sends upstream data (UL Data) on the resource of UL Grant indication then; After eNB receives the UL Data of UE transmission,, can continue to send the Resources allocation of transmitting uplink data next time that UL Grant is UE through handling time-delay Tenb.
(Time, TDD) in the system, the up-downgoing resource is staggered the appearance at time division duplex.As shown in Figure 2, be a kind of frame structure of possible TDD system, a radio frames (Frame) is made up of two descending sub frames (DL Subframe) and three sub-frame of uplink (UL Subframe), and the length of Subframe is 1ms, and the length of Frame is 5ms.Descending/up switching point (DUSP) is the moment that is transformed to UL Subframe from DLSubframe; Up/descending switching point (UDSP) is the moment that is transformed to DL Subframe from ULSubframe.
When being the UE transmit ascending data in LTE TDD system, because UL Grant is the down direction that sends to UE from eNB, so can only issue in DL Subframe, the ascending resource that being used for of its distribution transmitted UL Data is positioned at UL Subframe.In order to realize ascending resource scheduling flexibly, the LTE technology is introduced the sub-frame of uplink index in UL Grant (UL Subframe Index USI), is used for indicating which UL Subframe of the corresponding radio frames of ascending resource of current distribution.For example at the frame structure of Fig. 2, the corresponding Subframe 2 of USI=0, the rest may be inferred the corresponding Subframe 3 of USI=1, the corresponding Subframe 4 of USI=2.But standard code does not indicate UL Grant to dispatch UL Subframe in which radio frames in UL Grant.The general employing according to handling time-delay determined to dispatch UL Subframe between follow-up K and K+1 the DUSP at the ULGrant of DL Subframe, system is fixed value of K configuration, for example during K=2, as shown in Figure 3, at the UL Grant that the Subframe 0 that is positioned at Frame N and Subframe 1 issue, its USI correspondence be the UL Subframe of Frame N+1.
Feed back re-transmission fast for the data block to loading error occurring, (Hybrid Automatic Repeat Request, HARQ) technology is adopted by a plurality of systems as a kind of solution preferably to mix automatic repeat requests.On the high speed/(High Speed Uplink/DownlinkPacket Access, HSUPA/HSDPA) technology, following LTE technology etc. all adopt that multidiameter delay stops and wait the HARQ agreement to support continuous scheduling and the transmission to data block in the downlink grouped access.Stop waiting be meant use certain HARQ process transmission data block after, before receiving feedback information, can not continue to use other data block of this process transmission; The advantage of stop-and-wait protocol is fairly simple, but efficiency of transmission is lower.Adopt the multidiameter delay stop-and-wait protocol, start a plurality of HARQ processes simultaneously, can remedy the low shortcoming of efficiency of transmission; Its basic thought is to dispose simultaneously a plurality of HARQ processes, in the process of certain HARQ progress feedback information of wait, can use other idle process transmission data block.For the data block of loading error occurring, must use identical HARQ process to retransmit, so that receiving terminal merges the data block of makeing mistakes.According to the moment of retransmit taking place predefine whether, the HARQ agreement can be divided into two kinds of synchronous HARQ and asynchronous HARQ.
Among the asynchronous HARQ, the retransmission time of data block is not predefined, but is dynamically determined by scheduler, therefore needs the HARQ process numbering (ID) that shows that ground notice receiving terminal data block is used; In the synchronous HARQ, the retransmission time of data block is predefined, is carved with fixing sequential relationship during with first biography, and its HARQ process ID can not need explicit signaling consumption by the reaction of timing relationship implicit expression.
In order to simplify the synchronous HARQ scheme in the TDD system, be the time interval (HARQ_RTT) between adjacent twice transmission of HARQ transmission setting that begins from each UL Subframe, and the ULSubframe numbering has binding relationship with the HARQ process ID, and wherein HARQ_RTT need be set at the integral multiple of radio frames according to the processing delay of equipment.As shown in Figure 4, the HARQ_RTT that sets each UL Subframe correspondence is 2 times of Frame duration; The corresponding respectively HARQ process ID of two ULSubframe that is numbered the Frame of odd number is 1,2; The corresponding respectively HARQ process ID of two UL Subframe that is numbered the Frame of even number is 3,4.
Suppose that the processing time-delay of equipment is respectively the processing delay Tenb=3ms of eNB, the processing delay Tue=2ms of UE, then the synchronous HARQ transmission time sequence of each UL Subframe correspondence of tdd frame structure as shown in Figure 2 is as shown in Figure 5.The corresponding downstream feedback of ascending HARQ transmission of carrying out at the UL of Frame N Subframe 2 can issue at the DL of Frame N+1 Subframe 1 the earliest, if transmission of data blocks is made mistakes, then Dui Ying re-transmission can be carried out minimum HARQ_RTT=10ms the earliest at the UL of Frame N+2 Subframe 2; In like manner, the downstream feedback that the ascending HARQ that carries out at the UL of Frame N Subframe 3 transmits issues as far back as the DL of Frame N+2 Subframe 0, if transmission of data blocks is made mistakes, then Dui Ying re-transmission can be carried out minimum HARQ_RTT=10ms the earliest at the UL of Frame N+2 Subframe 3; In like manner, the downstream feedback that the ascending HARQ that carries out at the UL of Frame N Subframe 4 transmits issues as far back as the DL of Frame N+2 Subframe 0, if transmission of data blocks is made mistakes, then Dui Ying re-transmission can be carried out minimum HARQ_RTT=10ms the earliest at the UL of Frame N+2 Subframe 4.
Transmission time sequence in the analysis chart 5, on the basis of considering the device processes time delay in order to guarantee the HARQ_RTT minimum of each ULSubframe correspondence: the ULGrant of UL Subframe 2 need send at the DL of Frame N+1 Subframe 1 among the Frame N+2; The UL Grant of UL Subframe3 need send at the DL of Frame N+2 Subframe 0 among the Frame N+2; The UL Grant of ULSubframe 4 need send at the DL of Frame N+2 Subframe 0 or 1 among the Frame N+2.
Be UL Subframe 3/4 follow-up 1st and 2 DUSP between at the UL Grant (USI=1/2) of UL Subframe 3/4 scheduling this moment; And be the 2nd and 3 the UL Subframe 2 between the DUSP at the UL Grant (USI=0) of UL Subframe 2 scheduling.The K value difference that each UL Grant scheduling is adopted contradicts with the rule of " dispatching UL Subframe between follow-up K and K+1 the DUSP at the UL of DL Subframe Grant " in the prior art.If in order to satisfy in the prior art " dispatching UL Subframe between follow-up K and K+1 the DUSP at the UL of DL Subframe Grant ", needing the HARQ_RTT of expansion Subframe 3/4 is 15ms.Promptly in Fig. 5, the UL Grant (USI=1) that the DL Subframe 0 of Frame N+2 sends dispatches the UL Subframe 3 of Frame N+3; The UL Subframe 4 of UL Grant (USI=2) the scheduling Frame N+3 that the DL Subframe 0 of Frame N+2 or 1 sends, the K value that K=2, and each UL Grant at this moment dispatches employing is identical.But this scheme causes the HARQ_RTT=15ms of UL Subframe 3/4, and the time interval between adjacent twice transmission increases the transmission performance that has reduced system.
Summary of the invention
The invention provides uplink scheduling method, system and equipment in a kind of TDD system, on the basis of the system of assurance optimum transmission performance, realize dynamic dispatching ascending resource.
The embodiment of the invention provides the uplink scheduling method in a kind of tdd systems, comprising:
The base station is the ascending resource of user equipment allocation transmit ascending data, and issuing of the sub-frame of uplink correspondence that takies at described ascending resource sends the ascending resource assignment information on the time interval, described assignment information comprises the sub-frame of uplink index, the described time interval that issues is according to disposing between the maximum available area that sends the ascending resource assignment information, removing the time span of subframe, the processing time-delay of base station and the processing time-delay of subscriber equipment by the time interval between the automatic repeat requests HARQ transmission of adjacent twice mixing of setting between described maximum available area and obtain;
Subscriber equipment receives described assignment information, determine sub-frame of uplink according to described sub-frame of uplink index and uplink subframe scheduling strategy, and on the ascending resource of assignment information described in the described sub-frame of uplink indication transmit ascending data, described uplink subframe scheduling strategy is to issue time interval configuration, the corresponding relation of indication sub-frame of uplink index and sub-frame of uplink according to the ascending resource assignment information.
The embodiment of the invention provides the system of the ascending resource scheduling in a kind of tdd systems, comprising:
Base station: the ascending resource that is used to the user equipment allocation transmit ascending data, and issuing of the sub-frame of uplink correspondence that takies at described ascending resource sends the ascending resource assignment information on the time interval, described assignment information comprises the sub-frame of uplink index, the described time interval that issues is according to disposing between the maximum available area that sends the ascending resource assignment information, removing the time span of subframe, the processing time-delay of base station and the processing time-delay of subscriber equipment by the time interval between adjacent twice HARQ transmission of setting between described maximum available area and obtain;
Subscriber equipment: be used to receive described assignment information, determine sub-frame of uplink according to described sub-frame of uplink index and uplink subframe scheduling strategy, and on the ascending resource of assignment information described in the described sub-frame of uplink indication transmit ascending data, described uplink subframe scheduling strategy is to issue time interval configuration, the corresponding relation of indication sub-frame of uplink index and sub-frame of uplink according to the ascending resource assignment information.
The embodiment of the invention also provides a kind of base station, comprising:
Ascending resource allocation units: the ascending resource that is used to the user equipment allocation transmit ascending data;
The assignment information transmitting element: the issuing of sub-frame of uplink correspondence that is used for taking at described ascending resource sends the ascending resource assignment information on the time interval, described assignment information comprises the sub-frame of uplink index, the described time interval that issues is according to disposing between the maximum available area that sends the ascending resource assignment information, removing the time span of subframe, the processing time-delay of base station and the processing time-delay of subscriber equipment by the time interval between adjacent twice HARQ transmission of setting between described maximum available area and obtain.
The embodiment of the invention also provides a kind of subscriber equipment, comprising:
The assignment information receiving element: be used to receive the ascending resource assignment information that the base station sends, described assignment information comprises the sub-frame of uplink index;
Sub-frame of uplink determining unit: be used for determining sub-frame of uplink according to described sub-frame of uplink index and uplink subframe scheduling strategy, described uplink subframe scheduling strategy is to issue time interval configuration according to the ascending resource assignment information, the corresponding relation of indication sub-frame of uplink index and sub-frame of uplink, the described time interval that issues is according to disposing between the maximum available area that sends the ascending resource assignment information, being removed the time span of subframe between described maximum available area by the time interval between adjacent twice HARQ transmission of setting, the processing time-delay of base station and the processing of subscriber equipment time-delay obtain;
Upstream data transmitting element: be used for transmit ascending data on the ascending resource of the indication of assignment information described in the described sub-frame of uplink.
Uplink scheduling method, system and equipment in the TDD system that the embodiment of the invention provides, the time interval that issues by the collocating uplink resource allocation information, and the sub-frame of uplink index in the ascending resource assignment information and the corresponding relation of sub-frame of uplink, make the subscriber equipment can be according to the ascending resource assignment information that the satisfies optimum transmission performance transmit ascending data on the ascending resource of base station assigns that receives, on the basis of the optimum transmission performance that keeps synchronous HARQ mechanism, realized dynamic dispatching to ascending resource.
Description of drawings
Fig. 1 is the dynamically scheduling uplink resources process schematic diagram of transmit ascending data in the prior art;
Fig. 2 is a kind of frame structure schematic diagram of TDD system in the prior art;
Fig. 3 is USI among the UL Grant and a UL Subframe corresponding relation schematic diagram in the prior art;
Fig. 4 is UL Subframe and a HARQ process ID binding relationship schematic diagram in the prior art;
Fig. 5 is the synchronous HARQ transmission time sequence schematic diagram of UL Subframe correspondence in the prior art;
Fig. 6 is the sequential relationship schematic diagram of synchronous HARQ and ascending resource scheduling in the embodiment of the invention;
Uplink scheduling method flow chart in the TDD system that Fig. 7 provides for the embodiment of the invention;
Ascending resource scheduling system block diagram in the TDD system that Fig. 8 provides for the embodiment of the invention.
Embodiment
The embodiment of the invention provides uplink scheduling method, system and the equipment in a kind of TDD system, realizes the dynamic dispatching to ascending resource on the basis of the system of assurance optimum transmission performance.The embodiment of the invention is applicable to the TDD system, in UL Grant, introduces on the basis of sub-frame of uplink index USI and uses, and be that the ascending resource scheduling that the UE transmit ascending data carries out is that example describes at this in only with LTE TDD system.The minimum HARQ_RTT that the embodiment of the invention adopts the processing delay satisfy equipment to require by system configuration is to guarantee the optimum transmission performance of system; By Time-Series analysis to synchronous HARQ transmission and scheduling of resource, processing delay and HARQ_RTT according to equipment determine to issue between the maximum available area of UL Grant, and according to the time interval that issues that disposes UL Grant between maximum available area, simultaneously by collocating uplink subframe scheduling strategy, set up USI among the UL Grant and the implicit expression corresponding relation of UL Subframe, to realize dynamic dispatching to ascending resource.
Fig. 6 has provided the sequential relationship of synchronous HARQ and ascending resource scheduling, supposes that the minimum HARQ_RTT that satisfies the device processes delay requirement equals twice Frame length.As can be seen, as shown in Equation 1:
d=HARQ_RTT-Ts-Tenb-Tue [1]
Wherein, Tenb is the processing time-delay of eNB equipment; Tue is the processing time-delay of UE equipment; Ts is the time span of a Subframe.DL Subframe in interval d sends at the UL Grant of transmitting uplink data next time, both can guarantee that eNB had finished the processing to last transmitting uplink data, interval d can guarantee that again UE can finish the processing to UL Grant before transmitting uplink data next time, so can be called between the maximum available area that issues UL Grant.Between definite maximum available area, after the d, can take following several method configuration distributing time interval and uplink subframe scheduling strategy in light of the circumstances,, below various concrete performances be described in detail to carry out the dynamic dispatching of ascending resource.
Embodiment one
Among the embodiment one, suppose that the interval d of the UL Subframe P correspondence of adjacent Frame does not overlap in time, shown in formula [2]:
Ts+Tenb+Tue≥HARQ_RTT-Tframe [2]
Wherein, Tframe is the length of a Frame.
The situation that embodiment one corresponding coincidence subinterval equals 0, in this case, the time interval that issues of the pre-configured UL Grant of system is d between maximum available area, and pre-configured uplink subframe scheduling strategy, the implicit expression corresponding relation that is sub-frame of uplink index USI and the UL Subframe among the radio frames Frame that dispatches among the UL Grant is: at the UL Grant of UL Subframe P after being disposed by UE, always dispatching a follow-up nearest UL Subframe P, also is that system is pre-configured according to the corresponding relation between the subframe numbering of existing LTE technology USI and ULSubframe simultaneously.
Pre-configured according to system, the ascending resource scheduling of eNB and UL Grant process of transmitting comprise:
A11, eNB are that UE divides the ascending resource that is coordinated in UL Subframe P among the Frame N;
ENB is that UE distributes ascending resource may be based on the first scheduling of resource of being carried out that passes of data block, also may be to retransmit the scheduling of resource of being carried out based on data block after transmission of data blocks is made mistakes; If data block retransmits, because adopt the synchronous HARQ technology, so the subframe numbering of the UL Subframe that dispatches when the subframe of the UL Subframe of this data block retransfer scheduling is numbered P with this data block of last time transmission is identical, the time interval of this transmission and this data block of last time transmission is the pre-configured HARQ_RTT of system;
A12, eNB determine the time interval that issues of UL Grant according to configuration, and selectedly issue DL Subframe available on the time interval;
ENB adopts timing mechanism, can safeguard transmission time sequence voluntarily, and eNB can determine the time interval that issues of UL Grant according to the transmission time sequence of configuration and maintenance voluntarily, and the time interval that issues of UL Grant is d between maximum available area in the present embodiment;
For example, eNB can determine that the absolute time that the UL Subframe P of this scheduling takies is 100ms according to the transmission time sequence of safeguarding voluntarily, if the HARQ_RTT=10ms of system configuration, Ts=1ms, Tenb=3ms, Tue=2ms, then can determine and issue time interval, be d=4ms between maximum available area, further can determine and issue time interval between absolute time the 94ms~97ms, eNB can obtain DL Subframe available between the 94ms~97ms after determining;
A13, eNB send UL Grant to UE on selected DL Subframe, to the indication of ascending resource assignment information, it is corresponding with the subframe numbering P of the UL Subframe P that distributes that the USI value is set.
UE receives the processing method behind the UL Grant, comprising:
B11, UE handle this signaling after receiving the UL Grant of eNB transmission, obtain the ascending resource assignment information, are defined as the subframe numbering P of the UL Subframe of its distribution according to USI;
The upstream data UL Data that b12, UE preparation will send;
B13, UE send upstream data UL Data according to being configured on the indicated ascending resource of UL Grant among the follow-up nearest UL Subframe P to eNB.
Uplink scheduling method in the TDD system that the employing embodiment of the invention one provides, the implicit expression corresponding relation that issues sub-frame of uplink index USI and the UL Subframe among the radio frames Frame that dispatches among time interval and the UL Grant of the pre-configured UL Grant of system, because the interval d of the ULSubframe P correspondence of adjacent Frame does not overlap in time, so the configuration distributing time interval is to issue d between the maximum available area of UL Grant, and configuration pin to the UL Grant of UL Subframe P after being disposed by UE, always dispatch a follow-up nearest UL Subframe P, adopt this method can guarantee that HARQ_RTT satisfies the minimum time of device processes time delay and remains unchanged, to guarantee the optimum transmission performance of system, realized dynamic dispatching simultaneously to ascending resource.
Embodiment two
Among the embodiment two, suppose that the interval d of the UL Subframe P correspondence of adjacent Frame has coincidence in time, shown in formula [3]:
Ts+Tenb+Tue<HARQ_RTT-Tframe [3]
Embodiment two is corresponding to overlap subintervals greater than 0 situation, in this case, because each radio frames all has two adjacent radio frames, so at the UL Subframe P in some specific radio frames, d is divided into three parts between the maximum available area that issues UL Grant of its correspondence, the two parts that comprise two ends overlap subinterval and middle non-coincidence subinterval, the coincidence subinterval that in order to express easily claims front end is the first coincidence subinterval, and the coincidence subinterval of rear end is the second coincidence subinterval.As shown in Figure 6, for d between the maximum available area of the UL Subframe P correspondence among the radio frames Frame N+3, be divided into three parts and comprise: non-available subinterval is positioned at the middle part of d; Between the maximum available area corresponding with UL Subframe P among the Frame N+2 between the d first overlaps the subinterval, is positioned at the front portion of d; Between the maximum available area corresponding with UL Subframe P among the Frame N+4 between the d second overlaps the subinterval, is positioned at the rear portion of d.In each overlaps subinterval, send at the UL Grant of UL Subframe P after being disposed by UE, both can dispatch follow-up nearest UL Subframe P, also can dispatch the UL Subframe P that closes on for follow-up time, if do not adopt this moment certain measure will cause the fuzzy of resource allocation.At this situation, the measure of taking among the embodiment two is that each overlaps a UL Subframe P transmission UL Grant at the less Frame of number of frames among the adjacent Frame in the subinterval.In this case, the time interval that issues of the pre-configured UL Grant of system is to remove among the d between maximum available area between the remaining area that is positioned at the first coincidence subinterval, comprises that promptly non-coincidence subinterval and second overlaps the subinterval.The pre-configured uplink subframe scheduling strategy of system, the implicit expression corresponding relation that is sub-frame of uplink index USI and the UL Subframe among the radio frames Frame that dispatches among the UL Grant is: at the ULGrant of UL Subframe P after being disposed by UE, always dispatching a follow-up nearest UL Subframe P, also is that system is pre-configured according to the corresponding relation between the subframe numbering of existing LTE technology USI and UL Subframe simultaneously.
Pre-configured according to system, the ascending resource scheduling of eNB and UL Grant process of transmitting comprise:
A21, eNB are that UE divides the ascending resource that is coordinated in UL Subframe P among the Frame N;
ENB is that UE distributes ascending resource may be based on the first scheduling of resource of being carried out that passes of data block, also may be to retransmit the scheduling of resource of being carried out based on data block after transmission of data blocks is made mistakes;
A22, eNB determine the time interval that issues of UL Grant according to configuration, and selectedly issue DL Subframe available on the time interval;
ENB adopts timing mechanism, can safeguard transmission time sequence voluntarily, eNB can determine the time interval that issues of UL Grant according to the transmission time sequence of safeguarding voluntarily, and the time interval that issues of UL Grant is between maximum available area d and removes first and overlap between the remaining area in subinterval in the present embodiment;
For example, eNB can determine that the absolute time that the UL Subframe P of this scheduling takies is 100ms according to the transmission time sequence of safeguarding voluntarily, if the HARQ_RTT=10ms of system configuration, Ts=1ms, Tenb=2ms, Tue=1ms, be d=6ms between maximum available area, the coincidence subinterval is 1ms, then can determine and issue time interval is 5ms, further can determine and issue time interval between absolute time the 94ms~98ms, eNB can obtain DLSubframe available between the 94ms~98ms after determining;
A23, eNB send UL Grant to UE on selected DL Subframe, the ascending resource assignment information is indicated, and it is corresponding with the subframe numbering P of the UL Subframe P that distributes that the USI value is set.
UE receives the processing method behind the UL Grant, comprising:
B21, UE handle this signaling after receiving the UL Grant of eNB transmission, obtain the ascending resource assignment information, are defined as the subframe numbering P of the UL Subframe of its distribution according to USI;
The upstream data UL Data that b22, UE preparation will send;
B23, UE send upstream data UL Data according to being configured on the indicated ascending resource of UL Grant among the follow-up nearest UL Subframe P to eNB.
Uplink scheduling method in the TDD system that the employing embodiment of the invention two provides, the implicit expression corresponding relation that issues sub-frame of uplink index USI and the UL Subframe among the radio frames Frame that dispatches among time interval and the UL Grant of the pre-configured UL Grant of system, because the interval d of the ULSubframe P correspondence of adjacent Frame has coincidence in time, so the configuration distributing time interval is to issue between the maximum available area of ULGrant d to remove first and overlap between the remaining area in subinterval, and configuration pin to the UL Grant of ULSubframe P after being disposed by UE, always dispatch a follow-up nearest ULSubframe P, adopt this method can guarantee that HARQ_RTT satisfies the minimum time of device processes time delay and remains unchanged, to guarantee the optimum transmission performance of system, realized dynamic dispatching simultaneously to resource.
Embodiment three
Embodiment three is also corresponding to overlap the subinterval greater than 0 situation, and at this situation, the measure of taking is that each only overlaps in subinterval the ULSubframe P transmission UL Grant at the Frame that number of frames is bigger among the adjacent Frame.In this case, the time interval that issues of the pre-configured UL Grant of system is to remove second between maximum available area among the d to overlap between the remaining area in subinterval, promptly comprises non-coincidence from the interval and first coincidence subinterval.The pre-configured uplink subframe scheduling strategy of system, the implicit expression corresponding relation that is sub-frame of uplink index USI and the UL Subframe among the radio frames Frame that dispatches among the UL Grant is: at the UL Grant of UL Subframe P after being disposed by UE, UE judges the subinterval that receives ULGrant, if receive in non-coincidence subinterval, then in a follow-up nearest ULSubframe P, send upstream data UL Data to eNB; If receive in the first coincidence subinterval, then sending upstream data UL Data according to being configured among a follow-up contiguous UL Subframe P to eNB, also is that system is pre-configured according to the corresponding relation between the subframe numbering of existing LTE technology USI and UL Subframe simultaneously.
Pre-configured according to system, the ascending resource scheduling of eNB and UL Grant process of transmitting comprise:
A31, eNB are that UE divides the ascending resource that is coordinated in UL Subframe P among the Frame N;
ENB is that UE distributes ascending resource may be based on the first scheduling of resource of being carried out that passes of data block, also may be to retransmit the scheduling of resource of being carried out based on data block after transmission of data blocks is made mistakes;
A32, eNB determine the time interval that issues of UL Grant according to configuration, and selectedly issue DL Subframe available on the time interval;
ENB adopts timing mechanism, can safeguard transmission time sequence voluntarily, eNB can determine the time interval that issues of UL Grant according to the transmission time sequence of safeguarding voluntarily, and the time interval that issues of UL Grant is between maximum available area d and removes second and overlap between the remaining area in subinterval in the present embodiment;
For example, eNB can determine that the absolute time that the UL Subframe P of this scheduling takies is 100ms according to the transmission time sequence of safeguarding voluntarily, if the HARQ_RTT=10ms of system configuration, Ts=1ms, Tenb=2ms, Tue=1ms, be d=6ms between maximum available area, overlap subinterval=1ms, then can determine and issue time interval is 5ms, further can determine and issue time interval between absolute time the 93ms~97ms, wherein the first coincidence subinterval is 93ms, non-coincidence subinterval is between the 94ms~97ms, and eNB can obtain DLSubframe available between the 93ms~97ms after determining;
A33, eNB send UL Grant to UE on selected DL Subframe, the ascending resource assignment information is indicated, and it is corresponding with the subframe numbering P of the UL Subframe P that distributes that the USI value is set.
UE receives the processing method behind the UL Grant, comprising:
B31, UE handle this signaling after receiving the UL Grant of eNB transmission, obtain the ascending resource assignment information, are defined as the subframe numbering P of the UL Subframe of its distribution according to USI;
The upstream data UL Data that b32, UE preparation will send;
B33, UE judge the subinterval that receives UL Grant according to the uplink subframe scheduling strategy, if receive, then send upstream data UL Data to eNB according to being configured on the indicated ascending resource of UL Grant among follow-up nearest UL Subframe P in non-coincidence subinterval; The subinterval receives if overlap first, then sends upstream data UL Data according to being configured on the indicated ascending resource of ULGrant among follow-up contiguous UL Subframe P to eNB;
Because whole system is a clock synchronization system, so UE can safeguard identical transmission time sequence with eNB, UE can judge first according to the absolute time that receives UL Grant and overlap subinterval or non-coincidence subinterval, thereby determines that further eNB is the particular location of the transmitting uplink data resource of its distribution.
Uplink scheduling method in the TDD system that the employing embodiment of the invention three provides, the implicit expression corresponding relation that issues sub-frame of uplink index USI and the UL Subframe among the radio frames Frame that dispatches among time interval and the UL Grant of the pre-configured UL Grant of system, because the interval d of the ULSubframe P correspondence of adjacent Frame has coincidence in time, so the configuration distributing time interval is to issue between the maximum available area of ULGrant d to remove second and overlap between the remaining area in subinterval, and configuration pin to the UL Grant of UL Subframe P after being disposed by UE, UE judges the subinterval that receives UL Grant, if receive in non-coincidence subinterval, then dispatch a follow-up nearest UL Subframe P; If receive in the first coincidence subinterval, then dispatch a contiguous UL Subframe P follow-up time, adopt this method can guarantee that HARQ_RTT is the minimum time that satisfies the device processes time delay, to guarantee the optimum transmission performance of system, realized dynamic dispatching simultaneously to ascending resource.
The processing method of taking in the TDD system under the different situations that provide at above each embodiment, the embodiment of the invention provides uplink scheduling method, system and the equipment in a kind of TDD system, has realized the dynamic dispatching to resource on the basis of the system of assurance optimum transmission performance.Ascending resource scheduling scheme in the TDD system that the embodiment of the invention provides, the time interval that issues that needs the pre-configured ascending resource assignment information that comprises subframe index of system, and the corresponding relation of pre-configured subframe index and data transmission subframe, provide uplink scheduling method in a kind of TDD system based on system pre-configured, as shown in Figure 7, comprising:
S701, base station are the ascending resource of user equipment allocation transmit ascending data, and issuing of the sub-frame of uplink correspondence that takies at described ascending resource sends the ascending resource assignment information on the time interval, described assignment information comprises the sub-frame of uplink index, and the described time interval that issues is according to disposing between the maximum available area that sends the ascending resource assignment information;
S702, subscriber equipment receive described assignment information, determine sub-frame of uplink according to described sub-frame of uplink index and uplink subframe scheduling strategy, and on the ascending resource of assignment information described in the described sub-frame of uplink indication transmit ascending data, described uplink subframe scheduling strategy is to issue time interval configuration, the corresponding relation of indication sub-frame of uplink index and sub-frame of uplink according to the ascending resource assignment information.
Provide ascending resource scheduling system in a kind of TDD system simultaneously based on the pre-configured embodiment of the invention of system, as shown in Figure 8, having comprised:
Base station 801: be used to subscriber equipment 802 to distribute the ascending resource of transmit ascending data, and issuing of the sub-frame of uplink correspondence that takies at ascending resource sends the ascending resource assignment information on the time interval, the ascending resource assignment information comprises the sub-frame of uplink index, and issuing time interval is according to disposing between the maximum available area that sends the ascending resource assignment information;
Subscriber equipment 802: be used to receive the ascending resource assignment information, determine sub-frame of uplink according to sub-frame of uplink index and uplink subframe scheduling strategy, and transmit ascending data on the ascending resource of ascending resource assignment information indication in sub-frame of uplink, the uplink subframe scheduling strategy is to issue time interval configuration, the corresponding relation of indication sub-frame of uplink index and sub-frame of uplink according to the ascending resource assignment information.
Wherein, base station 801 comprises:
Ascending resource allocation units 8011: the ascending resource that is used to the user equipment allocation transmit ascending data;
Assignment information transmitting element 8012: the issuing of sub-frame of uplink correspondence that is used for taking at ascending resource sends the ascending resource assignment information on the time interval, the ascending resource assignment information comprises the sub-frame of uplink index, and issuing time interval is according to disposing between the maximum available area that sends the ascending resource assignment information.
Subscriber equipment 802 comprises:
Assignment information receiving element 8021: be used to receive the ascending resource assignment information that the base station sends, the ascending resource assignment information comprises the sub-frame of uplink index;
Sub-frame of uplink determining unit 8022: be used for determining sub-frame of uplink according to sub-frame of uplink index and uplink subframe scheduling strategy, the uplink subframe scheduling strategy is to issue time interval configuration, the corresponding relation of indication sub-frame of uplink index and sub-frame of uplink according to the ascending resource assignment information;
Upstream data transmitting element 8023: be used for transmit ascending data on the ascending resource of sub-frame of uplink ascending resource assignment information indication.
Wherein, sub-frame of uplink determining unit 8022 also can comprise:
Distinguish subelement 80221: be used to distinguish between the sending area of ascending resource assignment information;
Determine subelement 80222: be used for when the ascending resource assignment information sends in the first coincidence subinterval, determining that follow-up contiguous subframe is numbered the sub-frame of uplink of determining according to the sub-frame of uplink index; When the ascending resource assignment information sends in non-coincidence subinterval, determine that follow-up nearest subframe is numbered the sub-frame of uplink of determining according to the sub-frame of uplink index.
Uplink scheduling method, system and equipment in the TDD system that the embodiment of the invention provides, the time interval that issues by the collocating uplink resource allocation information, and the corresponding relation of the subframe index in the ascending resource assignment information and the data transmission subframe in the radio frames of dispatching, make the subscriber equipment can be according to the ascending resource assignment information that the satisfies optimum transmission performance transmit ascending data on the ascending resource of base station assigns that receives, on the basis of the optimum transmission performance that keeps synchronous HARQ mechanism, realized dynamic dispatching to ascending resource.
For the scheduling downlink resource process in the TDD system, if in the downlink resource assignment signalling (DL Grant) of indicating downlink resource allocation information, introduced the descending sub frame index, the also scheme that can provide according to the embodiment of the invention, by pre-configured downlink resource assignment information issue time interval and descending sub frame scheduling strategy, realize in the downlink data transmission process dynamic dispatching to downlink resource.
Obviously, those skilled in the art can carry out various changes and modification to the present invention and not break away from the spirit and scope of the present invention.Like this, if of the present invention these are revised and modification belongs within the scope of claim of the present invention and equivalent technologies thereof, then the present invention also is intended to comprise these changes and modification interior.

Claims (11)

1. the uplink scheduling method in the tdd systems is characterized in that, comprising:
The base station is the ascending resource of user equipment allocation transmit ascending data, and issuing of the sub-frame of uplink correspondence that takies at described ascending resource sends the ascending resource assignment information on the time interval, described assignment information comprises the sub-frame of uplink index, the described time interval that issues is according to disposing between the maximum available area that sends the ascending resource assignment information, removing the time span of subframe, the processing time-delay of base station and the processing time-delay of subscriber equipment by the time interval between the automatic repeat requests HARQ transmission of adjacent twice mixing of setting between described maximum available area and obtain;
Subscriber equipment receives described assignment information, determine sub-frame of uplink according to described sub-frame of uplink index and uplink subframe scheduling strategy, and on the ascending resource of assignment information described in the described sub-frame of uplink indication transmit ascending data, described uplink subframe scheduling strategy is to issue time interval configuration, the corresponding relation of indication sub-frame of uplink index and sub-frame of uplink according to the ascending resource assignment information.
2. the method for claim 1, it is characterized in that, when not overlapping the subinterval between the maximum available area of the sub-frame of uplink correspondence of same sub numbering in the adjacent radio frames, the described time interval that issues is configured between described maximum available area, described uplink subframe scheduling policy configurations is: the ascending resource assignment information is dispatched follow-up nearest subframe and is numbered the sub-frame of uplink of determining according to described sub-frame of uplink index after being handled by subscriber equipment.
3. the method for claim 1, it is characterized in that, when between the maximum available area of the sub-frame of uplink correspondence of same sub numbering in the adjacent radio frames subinterval of coincidence being arranged, comprise between described maximum available area that first overlaps the subinterval, non-coincidence subinterval and second overlaps the subinterval, the described first coincidence subinterval is meant the coincidence subinterval between the maximum available area corresponding with the sub-frame of uplink of same sub numbering in the previous adjacent radio frames, and the described second coincidence subinterval is meant the coincidence subinterval between the maximum available area corresponding with the sub-frame of uplink of same sub numbering in the back adjacent radio frames.
4. method as claimed in claim 3, it is characterized in that, when between the maximum available area of the sub-frame of uplink correspondence of same sub numbering in the adjacent radio frames subinterval of coincidence being arranged, the described time interval that issues is configured to remove between described maximum available area the first coincidence subinterval, described uplink subframe scheduling policy configurations is: the ascending resource assignment information is dispatched follow-up nearest subframe and is numbered the sub-frame of uplink of determining according to described sub-frame of uplink index after being handled by subscriber equipment.
5. method as claimed in claim 3, it is characterized in that, when between the maximum available area of the sub-frame of uplink correspondence of same sub numbering in the adjacent radio frames subinterval of coincidence being arranged, the described time interval that issues is configured to remove between described maximum available area the second coincidence subinterval, described uplink subframe scheduling policy configurations is: send if the ascending resource assignment information overlaps the subinterval described first, described assignment information is dispatched follow-up contiguous subframe and is numbered the sub-frame of uplink of determining according to described sub-frame of uplink index after being handled by subscriber equipment; If the ascending resource assignment information sends in described non-coincidence subinterval, described assignment information is dispatched follow-up nearest subframe and is numbered the sub-frame of uplink of determining according to described sub-frame of uplink index after being handled by subscriber equipment.
6. as claim 2 or 4 described methods, it is characterized in that, describedly determine sub-frame of uplink, comprising according to sub-frame of uplink index and uplink subframe scheduling strategy:
Subscriber equipment is determined the subframe numbering of described sub-frame of uplink according to described sub-frame of uplink index;
Determine the sub-frame of uplink that follow-up nearest described subframe is numbered according to described uplink subframe scheduling strategy.
7. method as claimed in claim 5 is characterized in that, described uplink subframe scheduling strategy according to sub-frame of uplink index and configuration is determined sub-frame of uplink, comprising:
Subscriber equipment is determined the subframe numbering of described sub-frame of uplink according to described sub-frame of uplink index;
According to described uplink subframe scheduling strategy, if overlapping the subinterval described first, described assignment information sends, then determine the sub-frame of uplink of follow-up contiguous described subframe numbering; Perhaps, if described assignment information sends in described non-coincidence subinterval, then determine the sub-frame of uplink that follow-up nearest described subframe is numbered.
8. the ascending resource scheduling system in the tdd systems is characterized in that, comprising:
Base station: the ascending resource that is used to the user equipment allocation transmit ascending data, and issuing of the sub-frame of uplink correspondence that takies at described ascending resource sends the ascending resource assignment information on the time interval, described assignment information comprises the sub-frame of uplink index, the described time interval that issues is according to disposing between the maximum available area that sends the ascending resource assignment information, removing the time span of subframe, the processing time-delay of base station and the processing time-delay of subscriber equipment by the time interval between the automatic repeat requests HARQ transmission of adjacent twice mixing of setting between described maximum available area and obtain;
Subscriber equipment: be used to receive described assignment information, determine sub-frame of uplink according to described sub-frame of uplink index and uplink subframe scheduling strategy, and on the ascending resource of assignment information described in the described sub-frame of uplink indication transmit ascending data, described uplink subframe scheduling strategy is to issue time interval configuration, the corresponding relation of indication sub-frame of uplink index and sub-frame of uplink according to the ascending resource assignment information.
9. a base station is characterized in that, comprising:
Ascending resource allocation units: the ascending resource that is used to the user equipment allocation transmit ascending data;
The assignment information transmitting element: the issuing of sub-frame of uplink correspondence that is used for taking at described ascending resource sends the ascending resource assignment information on the time interval, described assignment information comprises the sub-frame of uplink index, the described time interval that issues is according to disposing between the maximum available area that sends the ascending resource assignment information, removing the time span of subframe, the processing time-delay of base station and the processing time-delay of subscriber equipment by the time interval between the automatic repeat requests HARQ transmission of adjacent twice mixing of setting between described maximum available area and obtain.
10. a subscriber equipment is characterized in that, comprising:
The assignment information receiving element: be used to receive the ascending resource assignment information that the base station sends, described assignment information comprises the sub-frame of uplink index;
Sub-frame of uplink determining unit: be used for determining sub-frame of uplink according to described sub-frame of uplink index and uplink subframe scheduling strategy, described uplink subframe scheduling strategy is to issue time interval configuration according to the ascending resource assignment information, the corresponding relation of indication sub-frame of uplink index and sub-frame of uplink, the described time interval that issues is according to disposing between the maximum available area that sends the ascending resource assignment information, being removed the time span of subframe between described maximum available area by the time interval between the automatic repeat requests HARQ transmission of adjacent twice mixing of setting, the processing time-delay of base station and the processing of subscriber equipment time-delay obtain;
Upstream data transmitting element: be used for transmit ascending data on the ascending resource of the indication of assignment information described in the described sub-frame of uplink.
11. subscriber equipment as claimed in claim 10 is characterized in that, described sub-frame of uplink determining unit comprises:
Distinguish subelement: be used to distinguish between the sending area of ascending resource assignment information;
Determine subelement: be used for when described assignment information sends in the first coincidence subinterval, determining that follow-up contiguous subframe is numbered the sub-frame of uplink of determining according to described sub-frame of uplink index; When described assignment information sends in non-coincidence subinterval, determine that follow-up nearest subframe is numbered the sub-frame of uplink of determining according to described sub-frame of uplink index; When between the maximum available area of the sub-frame of uplink correspondence of same sub numbering in the adjacent radio frames subinterval of coincidence being arranged, comprise between described maximum available area that first overlaps subinterval, non-coincidence subinterval and the second coincidence subinterval, the described first coincidence subinterval is meant the coincidence subinterval between the maximum available area corresponding with the sub-frame of uplink of same sub numbering in the previous adjacent radio frames, and the described second coincidence subinterval is meant the coincidence subinterval between the maximum available area corresponding with the sub-frame of uplink of same sub numbering in the back adjacent radio frames.
CN2007101753380A 2007-09-28 2007-09-28 Uplink scheduling method, system and device in TDD system Active CN101400081B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007101753380A CN101400081B (en) 2007-09-28 2007-09-28 Uplink scheduling method, system and device in TDD system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007101753380A CN101400081B (en) 2007-09-28 2007-09-28 Uplink scheduling method, system and device in TDD system

Publications (2)

Publication Number Publication Date
CN101400081A CN101400081A (en) 2009-04-01
CN101400081B true CN101400081B (en) 2010-06-02

Family

ID=40518271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007101753380A Active CN101400081B (en) 2007-09-28 2007-09-28 Uplink scheduling method, system and device in TDD system

Country Status (1)

Country Link
CN (1) CN101400081B (en)

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101895379B (en) * 2009-05-21 2014-09-10 中兴通讯股份有限公司 Method and system for realizing uplink retransmission of access link
WO2010133043A1 (en) 2009-05-22 2010-11-25 华为技术有限公司 Method for dispatching multi sub-frames and the system, the terminal and the base station thereof
CN102035795B (en) * 2009-09-30 2014-07-02 中兴通讯股份有限公司 Transmission method of notification message of multimedia broadcasting multicast business, device and system thereof
CN102149198A (en) * 2010-02-05 2011-08-10 中兴通讯股份有限公司 Method and system for transmitting machine service data and machine terminal
CN102387543B (en) * 2010-09-02 2015-08-12 中兴通讯股份有限公司 The collocation method of dynamic subframe and device in a kind of tdd systems
CN102651679B (en) * 2011-02-28 2016-02-03 华为技术有限公司 Data transmission method, evolution base station and subscriber equipment
US9602251B2 (en) * 2012-01-27 2017-03-21 Sharp Kabushiki Kaisha Devices for reconfiguring uplink and downlink allocations in time domain duplexing wireless systems
CN103249153B (en) 2012-02-10 2017-12-08 中兴通讯股份有限公司 A kind of TDD system dynamic frame structure distribution method, system and evolution base station
CN103313270B (en) * 2012-03-15 2018-08-28 中兴通讯股份有限公司 The method and device of enhanced uplink covering, base station
CN102638333B (en) * 2012-03-22 2015-06-10 电信科学技术研究院 Method and device for scheduling uplink data
CN102892205B (en) * 2012-09-27 2015-09-09 电信科学技术研究院 A kind of method of schedule re-transmission data and device
US9893870B2 (en) * 2013-02-06 2018-02-13 Sony Corporation Communication control device to control automatic repeat request processes
JP6580698B2 (en) * 2015-03-31 2019-09-25 華為技術有限公司Huawei Technologies Co.,Ltd. Communication method, base station, and user equipment in time division duplex system
JP6590287B2 (en) * 2015-05-14 2019-10-16 華為技術有限公司Huawei Technologies Co.,Ltd. Data transmission method and data transmission apparatus
CN108476428B (en) * 2016-01-13 2021-10-12 瑞典爱立信有限公司 Method and network node for handling signals transmitted from a wireless device
WO2017166311A1 (en) * 2016-04-01 2017-10-05 华为技术有限公司 Method, device and system for uplink information transmission
CN107733578B (en) * 2016-08-12 2020-03-24 电信科学技术研究院 Method and device for feeding back downlink data
CN108667590B (en) * 2016-08-12 2021-11-23 中兴通讯股份有限公司 Transmission interval indication method and device
CN108811147B (en) * 2017-05-05 2023-04-07 中兴通讯股份有限公司 Information transmission method and device
CN109963346A (en) * 2017-12-25 2019-07-02 珠海市魅族科技有限公司 The dispatching method and device of uplink retransmission resource, transmission block repeating method and device
CN112153733A (en) 2019-06-28 2020-12-29 大唐移动通信设备有限公司 Transmission delay indication method and device
CN111371487B (en) * 2020-03-10 2021-12-14 展讯通信(上海)有限公司 Data transmission method and device based on satellite system, storage medium, UE (user Equipment) and base station

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1536904A (en) * 2003-04-07 2004-10-13 华为技术有限公司 Method for scheduling up service resource
CN1969482A (en) * 2004-06-16 2007-05-23 三星电子株式会社 Method and apparatus for data transmission/scheduling for uplink packet data service in a mobile communication system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1536904A (en) * 2003-04-07 2004-10-13 华为技术有限公司 Method for scheduling up service resource
CN1969482A (en) * 2004-06-16 2007-05-23 三星电子株式会社 Method and apparatus for data transmission/scheduling for uplink packet data service in a mobile communication system

Also Published As

Publication number Publication date
CN101400081A (en) 2009-04-01

Similar Documents

Publication Publication Date Title
CN101400081B (en) Uplink scheduling method, system and device in TDD system
CN101754268B (en) User uplink data scheduling method and user equipment
CN101132262B (en) Method for implementing synchronous HARQ in TDD system and data transmission
CN101399632B (en) Method and device for matching resource for data transmission
CN101222309B (en) Configuration method and device for LTE TDD system ascending HARQ course
CN110740016B (en) Internet of vehicles communication feedback timing method and equipment
CN101115012B (en) Apparatus and method of scheduling data packet in a communication system
CN102523606B (en) Data interaction method and apparatus
CN101247171A (en) Device and method for using appointed resource to transmit control channel
RU2009112395A (en) METHOD AND DEVICE FOR MULTIPLEXING DATA AND MANAGEMENT
CN103220104A (en) Transmission method of PUSCH
CN101399646B (en) Method and apparatus for indicating ACK/NACK transmission by LTE-TDD system
CN102594438A (en) Data transmission method, device and system
CN107040952B (en) Uplink transmission method and device
CN101128035B (en) Inter-channel timing method in time division code division multi-address system
CN101567773A (en) Method, system and device for sending data in time division duplex system
CN101309522B (en) Uplink reply message feedback method and mobile terminal
CN102916791A (en) PUSCH (physical uplink shared channel) transmission method and mobile terminal in dynamic TDD (time division duplex) system for supporting carrier aggregation
CN101399645A (en) ACK/NACK scheduling method and scheduling device for LTE-TDD system
CN101499895A (en) Uplink scheduling method in time division duplex system
CN105898878A (en) Transceiving method of signaling and data under free license frequency band
CN101873205A (en) Indicating and feedback method, system and apparatus of uplink control channel in multi-carrier wave system
CN101779394A (en) Apparatus and method for discontinuous reception in mobile telcommunication system
CN101272165A (en) Device and method of transmission power control information
CN103297208A (en) HARQ transmission method capable of supporting PUSCH

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: INST OF TELECOMMUNICATION SCIENCE AND TECHNOLGOY

Free format text: FORMER OWNER: DATANG MOBILE COMMUNICATION EQUIPMENT CO., LTD.

Effective date: 20110422

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100083 NO. 29, XUEYUAN ROAD, HAIDIAN DISTRICT, BEIJING TO: 100191 NO. 40, XUEYUAN ROAD, HAIDIAN DISTRICT, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20110422

Address after: 100191 Haidian District, Xueyuan Road, No. 40,

Patentee after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100083 Haidian District, Xueyuan Road, No. 29,

Patentee before: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

CP01 Change in the name or title of a patent holder

Address after: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210602

Address after: 100085 1st floor, building 1, yard 5, Shangdi East Road, Haidian District, Beijing

Patentee after: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY