CN101394590B - CAMEL call persistence control method and system - Google Patents

CAMEL call persistence control method and system Download PDF

Info

Publication number
CN101394590B
CN101394590B CN2007101535916A CN200710153591A CN101394590B CN 101394590 B CN101394590 B CN 101394590B CN 2007101535916 A CN2007101535916 A CN 2007101535916A CN 200710153591 A CN200710153591 A CN 200710153591A CN 101394590 B CN101394590 B CN 101394590B
Authority
CN
China
Prior art keywords
apply charging
duration
call
report
permission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007101535916A
Other languages
Chinese (zh)
Other versions
CN101394590A (en
Inventor
张军锋
姜建中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jiutai Cable Co., Ltd.
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN2007101535916A priority Critical patent/CN101394590B/en
Publication of CN101394590A publication Critical patent/CN101394590A/en
Application granted granted Critical
Publication of CN101394590B publication Critical patent/CN101394590B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)
  • Telephonic Communication Services (AREA)
  • Meter Arrangements (AREA)

Abstract

The invention provides a CAMEL calling continuing control method, which comprises the following steps: after a gsmSSF sends a last-time application accounting report to an SCP and a watchdog timer starts, the watchdog timer is stopped, and the current value of the watchdog timer is compared with the maximum-period which allows the calling to last and is carried in a new application accounting message if the new application accounting message sent down by the SCP is received; and the allowable duration which is allowed by the connection is obtained according to the comparison result, and the calling continuing control is executed according to an overtime release indication carried in the application accounting message when the allowable duration is exceeded. A CAMEL calling continuing control system is also provided, and comprises a comparison unit and a control unit. Therefore, the calling is ensured in the controllable range by adopting the method and the system, thereby ensuring accounting accuracy and rapid validity, and avoiding abnormal system processing at the same time.

Description

CAMEL calls out the Sustainable Control method and system
Technical field
The present invention relates to the communications field, more specifically, relate to a kind of CAMEL and call out the Sustainable Control method and system.
Background technology
Mobile network user is used enhancing logical, and (Customized Applications for Mobile network Enhanced Logic CAMEL) is the expansion development of intelligent network aspect moving to be called for short intelligent movable.Intelligent movable is a kind of network characterization, adopts the idea of modular structure professional, has (Operator Specific Service, the CAMEL_OSS) value-added service of network operator's specific transactions of the market competitiveness.(Home PLMN HPLMN), can obtain the CAMEL_OSS business support equally even the mobile subscriber roams out Home Public Land Mobile Network.New business open less investment, instant effect, the professional the whole network that covers, the operation risk reduces greatly.
Fig. 1 is the system architecture diagram of mobile intelligent net.As shown in Figure 1, comprise following functional entity:
Attaching position register (Home Location Register; HLR) 101; Store user-dependent CAMEL Subscription Information, relevant CAMEL subscription data when user position update or data variation, be sent to VLR Visitor Location Register (Visitor Location Register, VLR) in;
Service control function (GSM Service Control Function, gsmSCF) 102, comprising provides the service logic that call request CAMEL_OSS business is carried out logic control, handles simultaneously and professional relevant behavior;
GMSC (Gateway Mobile service Switching Centre; GMSC) 103; When processing need that CAMEL supports professional the time, GMSC 103 receives relevant CAMEL subscription data from HLR 101, and to Service Switching Function (GSM Service Switching Function; GsmSSF) request indication; In processing procedure, the call state (incident) of GMSC 103 monitor request is also notified gsmSSF its state, makes gsmSSF can control the processing of calling out among the GMSC 103;
GsmSSF 104, and call identifying request CAMEL_OSS is provided the means of Business Processing, and with call treatment and call business logic interactive action;
VLR 105, and storage roams in the CAMEL subscription data CAMEL-Subscription-Information that the mobile subscriber in this VLR 105 zones is correlated with;
Mobile switching centre (Mobile service Switching Centre, MSC) 106, when processing need that CAMEL supports professional the time; MSC 106 receives user-dependent CAMEL subscription data from VLR 105, and to gsmSSF 104 request indications, in processing procedure; The call state (incident) of MSC 106 monitor request is also notified gsmSSF 104 its states; Make gsmSSF 104 can control among the MSC 106 processing of calling out, when handling, during the calling of CD and MPTY to supplementary service ECT; MSC 106 receives SS-CSI from VLR 105, and sends the supplementary service call notification to gsmSCF 102; And
Special resource function (GSM Specialised Resource Function; GsmSRF) 107; Through to control, for all terminal uses provide the reciprocation with network such as resources such as dtmf receiver, speech identifying function, rules conversion, notice and speech processes.
In Fig. 1:
CAP:CAMEL Applications Part, the CAMEL Application Part agreement; And
MAP:Mobile Applications Part, the MAP agreement.
Existing mobile intelligent network can be realized control and billing function are in real time efficiently implemented in conversation; The effectively bad user's of control arrearage, malicious overdraft are to the impairment of benefit of Virtual network operator; Reduce the business risk of telecom operators, ensure normal operating income.
Fig. 2 is the CAMEL calling Sustainable Control figure according to prior art.
Concrete implementation is to use the related news stipulated in the CAMEL agreement and operation flow to carry out.Below with reference to Fig. 2 this implementation procedure is described, in Fig. 2, the abbreviation parameter declaration is following:
Tcp:Timer for Period allowed to call out the maximum cycle that continues before " Apply Charging Report " sends;
Delta: sending " Apply Charging Report " and receiving the duration between new " Apply Charging " message; And
Tccd:Control of Call Duration Timer, supervision timer, supervision is sent " Apply Charging Report " and is received the time between new " Apply Charging " message, prevents that resource from taking for a long time.
At first, SCP issues " Apply Charging " message to gsmSSF, has wherein carried the maximum duration of call Tcp1 and the overtime indication that whether discharges that this time allow conversation, and indication is called out and continued when Tcp1 is overtime in this message;
Secondly, SCP issues " being connected to resource ", " set up temporarily and connect ", " connection " and " continuation " message to gsmSSF, and gsmSSF is established to the speech channel of destination (unit of special resource possibly perhaps is provided for terminal called, ip intelligent peripherals network element);
After gsmSSF receives that message " is replied " in the destination, begin to start the Tcp timer, duration Tcp1;
After Tcp1 was overtime, gsmSSF sent " Apply Charging Report " to SCP, and the duration of report conversation this moment is Tcp1, and starts the Tccd timer;
Next; GsmSSF receives " Apply Charging " message that issues, and has wherein carried the maximum duration of call Tcp2 and the overtime indication that whether discharges that this time allow conversation, and indication is when Tcp2 is overtime in this message; Call out and continue or call release; GsmSSF stops the Tccd timer, and the value of timer is composed to Delta1, and calculates and report " Apply Charging Report " preceding maximum duration that allows conversation for (Tcp2-Delta1);
After (Tcp2-Delta1) time arrives; GsmSSF will report " Apply Charging Report " message to SCP; The duration of call of this moment is (Tcp1+Tcp2); Carry in " Apply Charging " that if SCP issues overtime whether to discharge indication be not discharge, with continue waiting for new " Apply Charging " message; And
If what carry in " Apply Charging " that SCP issues is overtime release indication, gsmSSF will initiate the process of call release so.
In existing C AMEL agreement, be [1,864000] to the Tcp parameter range; Unit is 0.1 second, and is [1,20] second to the span of Tccd timer; The span of Delta just [1,20] second so, and in the process of handling; Be directly to use Tcp-Delta, following consequence may occur like this:
When Tcp<Delta, obtain a value of not expecting, will cause conversing and not receive the control of expection; And
When gsmSSF judges Tcp<Delta; The duration of the actual conversation in terminal is above reporting " Apply Charging Report " preceding maximum duration of call that allows; Because existing protocol does not stipulate how gsmSSF should handle in this case, handle inconsistent so will cause gsmSSF to handle unusual perhaps each gsmSSF.
Summary of the invention
Technical problem to be solved by this invention is as the Tcp that fills in " Apply Charging " message (allowing to call out the maximum cycle that continues before reporting " Apply Charging Report " to send) during less than Delta (receiving the duration between " Apply Charging " message last time " Apply Charging Report " to this); How to prevent that gsmSSF from taking place to handle unusual; And the scheme and the concrete filling explanation of message parameter that provide flow process further to handle are to satisfy the normal needs that move of requirement and system that CAMEL charges.
In order to solve the problems of the prior art; The present invention proposes a kind of CAMEL and call out the Sustainable Control method; This method comprises: gsmSSF to SCP send last time Apply Charging Report and start supervision timer after; If received the new Apply Charging message that SCP issues, stop supervision timer, and the maximum cycle that continues is called out in the permission of carrying in the currency of supervision timer and the new Apply Charging message compared; And according to comparative result; Obtain the permission duration that connection allows, when arrive allowing duration, indicate according to the overtime release of carrying in the new Apply Charging message and to carry out the calling Sustainable Control; Wherein, At comparative result is that currency is called out under the situation of the maximum cycle that continues greater than allowing, and gsmSSF reports Apply Charging Report to SCP, and the duration of call in the Apply Charging Report is the duration of call and the currency sum in Apply Charging Report last time.
Being currency at comparative result is shown under the situation of call release under the overtime situation of the duration that allowed greater than allowing to call out the overtime release dial gauge that carries in the maximum cycle that continues and the new Apply Charging message; GsmSSF reports Apply Charging Report to SCP; And initiate release message to discharge ongoing calling to MSC or terminal; Wherein, the duration of call in the Apply Charging Report is the duration of call and the currency sum in Apply Charging Report last time.
According to the method for the invention, also comprise: gsmSSF handles other test point incident and the report that suspends according to the duration of call in the Apply Charging Report.
At comparative result is that currency is not more than under the situation that allows the lasting maximum cycle of calling; When arriving the permission duration; If being shown in, the overtime release dial gauge that carries in the new Apply Charging message allows to continue to call out under the overtime situation of duration; Then gsmSSF will report Apply Charging Report to SCP, and restart supervision timer, wait for next Apply Charging message; Wherein, the duration of call in the Apply Charging Report is the duration of call and the maximum cycle sum that allows calling to continue in Apply Charging Report last time.
The present invention also provides a kind of CAMEL to call out the Sustainable Control system; This system comprises: comparing unit; Be used at gsmSSF to SCP transmission Apply Charging Report last time and after starting supervision timer; Under the situation of having received the new Apply Charging message that SCP issues, stop supervision timer, and the maximum cycle that continues is called out in the permission of carrying in the currency of supervision timer and the new Apply Charging message compared; And control unit, be used for comparative result according to comparing unit, obtain the permission duration that connection allows; When arriving the permission duration; Indicating according to the overtime release of carrying in the new Apply Charging message and to carry out the calling Sustainable Control, wherein, is that currency is greater than allowing to call out under the situation of the maximum cycle that continues at comparative result; GsmSSF reports Apply Charging Report to SCP, and the duration of call in the Apply Charging Report is the duration of call and the currency sum in Apply Charging Report last time.
Control unit is that currency is shown under the situation that allows call release under the overtime situation of duration greater than allowing to call out the overtime release dial gauge that carries in lasting maximum cycle and the new Apply Charging message at the comparative result of comparing unit; After allowing duration overtime; Make gsmSSF report Apply Charging Report to SCP; And initiate release message to discharge ongoing calling to MSC or terminal; Wherein, the duration of call in the Apply Charging Report is the duration of call and the currency sum in Apply Charging Report last time.
According to system of the present invention, also comprise: processing unit is used for making gsmSSF to handle other test point incident and the report that suspends according to the duration of call of Apply Charging Report.
Control unit is that currency is not more than under the situation that allows the lasting maximum cycle of calling at comparative result; When arriving the permission duration; If being shown in, the overtime release dial gauge that carries in the new Apply Charging message allows to continue to call out under the overtime situation of duration; Then make gsmSSF report Apply Charging Report, and restart supervision timer, wait for next Apply Charging message to SCP; Wherein, the duration of call in the Apply Charging Report is the duration of call and the maximum cycle sum that allows calling to continue in Apply Charging Report last time.
Thereby, to adopt method and system of the present invention can guarantee to call out in controllable scope, thereby guaranteed the accuracy and the effective and rapid property of chargeing, the processing of anti-locking system simultaneously occurs unusual.
Other features and advantages of the present invention will be set forth in specification subsequently, and, partly from specification, become obvious, perhaps understand through embodiment of the present invention.The object of the invention can be realized through the structure that in the specification of being write, claims and accompanying drawing, is particularly pointed out and obtained with other advantages.
Description of drawings
Accompanying drawing is used to provide further understanding of the present invention, and constitutes the part of specification, is used to explain the present invention with embodiments of the invention, is not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is the system architecture diagram of mobile intelligent net;
Fig. 2 is the CAMEL calling Sustainable Control figure according to prior art;
Fig. 3 is a flow chart of calling out the Sustainable Control method according to CAMEL of the present invention;
Fig. 4 calls out the process chart that discharges when overtime according to the Tcp of the embodiment of the invention;
Fig. 5 calls out the process chart that continues when overtime according to the Tcp of the embodiment of the invention;
SDL figure when Fig. 6 reports the true duration of call of permission according to the embodiment of the invention " Apply Charging Report ";
Fig. 7 is the SDL figure that the continuation of Fig. 6 is handled; And
Fig. 8 is a block diagram of calling out the Sustainable Control system according to CAMEL of the present invention.
Embodiment
Below in conjunction with accompanying drawing the preferred embodiments of the present invention are described, should be appreciated that preferred embodiment described herein only is used for explanation and explains the present invention, and be not used in qualification the present invention.
Fig. 3 is a flow chart of calling out the Sustainable Control method according to CAMEL of the present invention.As shown in Figure 3, may further comprise the steps:
S302; GsmSSF to SCP send last time Apply Charging Report and start supervision timer after; If received the new Apply Charging message that SCP issues; Stop supervision timer, and the maximum cycle that continues is called out in the permission of carrying in the currency of supervision timer and the new Apply Charging message compared; And
S304 according to comparative result, obtains the permission duration that connection allows, and when arrive allowing duration, indicates according to the overtime release of carrying in the Apply Charging message and to carry out the calling Sustainable Control.
At comparative result is that currency is greater than allowing to call out under the situation of the maximum cycle that continues; And the overtime release dial gauge that carries in the new Apply Charging message is shown in and allows call release under the overtime situation of duration; Then gsmSSF will report Apply Charging Report to SCP; And initiate release message to discharge ongoing calling to MSC or terminal, wherein, the duration of call in the Apply Charging Report is the duration of call and the currency sum in Apply Charging Report last time.
According to the method for the invention, also comprise: gsmSSF handles other test point incident and the report that suspends according to the duration of call in the Apply Charging Report.
At comparative result is that currency is not more than under the situation that allows the lasting maximum cycle of calling; And the overtime release dial gauge that carries in the new Apply Charging message is shown in and allows to continue to call out under the overtime situation of duration; Then gsmSSF will report Apply Charging Report to SCP, and restart supervision timer, wait for next Apply Charging message; Wherein, the duration of call in the Apply Charging Report is the duration of call and the currency sum in Apply Charging Report last time.
Fig. 4 calls out the process chart that discharges when overtime according to the Tcp of the embodiment of the invention.
Fig. 5 calls out the process chart that continues when overtime according to the Tcp of the embodiment of the invention.
SDL figure when Fig. 6 reports the true duration of call of permission according to the embodiment of the invention " Apply Charging Report ".
Fig. 7 is the SDL figure that the continuation of Fig. 6 is handled.
Like Fig. 4, Fig. 6 and shown in Figure 7, the entire process process of calling out release when Tcp is overtime is following:
At first, SCP issues " Apply Charging " message to gsmSSF, has wherein carried the maximum duration of call Tcp1 and the overtime indication that whether discharges that this time allow conversation, and when indication Tcp1 is overtime in this message, calls out and continues;
Secondly, SCP issues " being connected to resource ", " set up temporarily and connect ", " connection " and " continuation " message to gsmSSF, and gsmSSF is established to the speech channel of destination (unit of special resource possibly perhaps is provided for terminal called, ip intelligent peripherals network element);
After gsmSSF receives that message " is replied " in the destination, begin to start the Tcp timer, duration Tcp1;
After Tcp1 was overtime, gsmSSF sent " Apply Charging Report " to SCP, and the duration of report conversation this moment is Tcp1, and starts the Tccd timer, waited for that SCP sends new " Apply Charging " message;
After receiving that SCP issues " Apply Charging " message, gsmSSF gets into Fig. 6 and handles;
S602, receive " Apply Charging " message after, carry out parameter and judge the routine inspection with state judgement or the like some message;
S604 judges whether received response message this moment;
S606 if the response message of receiving then stops the Tccd timer, composes its value to Delta;
S608 judges that whether Tcp is greater than Delta;
S610, if Tcp<Delta, flow process gets into S614, if Tcp>Delta, so, flow process gets into S612;
S612, carry out normal Tcp on the occasion of " Apply Charging " handling process;
S614, the S702 that gets into Fig. 7 handles;
S702, the S614 of map interlinking 6;
Whether S704 judges that Tcp is overtime to discharge, and is overtime release in this flow process, gets into S712;
S712 sends " Apply Charging Report ", and filling in the parameter duration of call is the real duration of call; Send the preceding maximum duration that allows calling greater than " Apply Charging Report " that SCP allowed; And the mark release cause is that Tcp is overtime, and the calling activation marker is FALSE, gets into S712;
S714 handles the call information request suspend, fills in relevant parameter according to call duration truly, gets into S716;
S716 accomplishes the record that charge information is provided, and gets into S718;
S718 initiates the release to calling out, and gets into S720;
S720 closes the related application of gsmSSF and SCP in this process, gets into S722; And
S722, the gsmSSF state is idle, and processing finishes.
Fig. 5 calls out the process chart that continues when overtime according to the Tcp of the embodiment of the invention.
Describe Tcp below in conjunction with Fig. 6 and Fig. 7 and call out the entire process process that continues when overtime:
At first, SCP issues " Apply Charging " message to gsmSSF, has wherein carried the maximum duration of call Tcp1 and the overtime indication that whether discharges that this time allow conversation, and when indication Tcp1 is overtime in this message, calls out and continues;
Secondly, SCP issues " being connected to resource ", " set up temporarily and connect ", " connection " and " continuation " message to gsmSSF, and gsmSSF is established to the speech channel of destination (unit of special resource possibly perhaps is provided for terminal called, ip intelligent peripherals network element);
Next, after gsmSSF receives that message " is replied " in the destination, begin to start the Tcp timer, duration Tcp1;
After Tcp1 was overtime, gsmSSF sent " Apply Charging Report " to SCP, and the duration of report conversation this moment is Tcp1, and starts the Tccd timer, waited for that SCP sends new " Apply Charging " message;
After receiving that SCP issues " Apply Charging " message, gsmSSF gets into the processing of Fig. 6;
S602, receive " Apply Charging " message after, carry out parameter and judge the routine inspection with state judgement or the like some message;
S604 judges whether received response message this moment;
S606 stops the Tccd timer, its value is composed given Delta;
S608 judges that whether Tcp is greater than Delta;
S610, if Tcp<Delta, flow process gets into S614, if Tcp>Delta, so, flow process gets into S612;
S612, carry out normal Tcp on the occasion of " Apply Charging " handling process;
S614, the S702 that gets into Fig. 7 handles;
S702, the S614 of map interlinking 6;
Whether S704 judges that Tcp is overtime to discharge, and is overtime continuation in this flow process, gets into S706;
S706; Handle Apply Charging Report, send " Apply Charging Report ", filling in the parameter duration of call is real duration of call Tcp1+Delta1; Send the preceding maximum duration that allows calling greater than " Apply Charging Report " that SCP allowed; And the mark release cause is that Tcp is overtime, and the calling activation marker is FALSE, gets into S708;
S708 restarts the Tccd timer, waits for the further indication of SCP, gets into S710;
S710, the state of gsmSSF remains unchanged, and waits for the SCP indication;
Issue " Apply Charging " message when gsmSSF receives SCP, wherein carried the maximum duration of call Tcp3 and the overtime indication that whether discharges that this time allow conversation, when indication Tcp3 was overtime in this message, calling discharged;
Because what carry in " Apply Charging " is overtime release indication, after (Tcp3-Delta2) time arrives, gsmSSF will initiate the process of call release; And
At last, gsmSSF will report " Apply Charging Report " message to SCP, and the duration of call of this moment is (Tcp1+Delta1+Tcp3).
Fig. 8 is a block diagram of calling out Sustainable Control system 800 according to CAMEL of the present invention.As shown in Figure 8; This system comprises: comparing unit 802; Be used at gsmSSF to SCP transmission Apply Charging Report last time and after starting supervision timer; Under the situation of having received the new Apply Charging message that SCP issues, stop supervision timer, and the maximum cycle that continues is called out in the permission of carrying in the currency of supervision timer and the new Apply Charging message compared; And control unit 804, be used for comparative result according to comparing unit 802, obtain the permission duration that connection allows, when arrive allowing duration, indicate according to the overtime release of carrying in the new Apply Charging message and to carry out the calling Sustainable Control.
Control unit 804 is that currency is greater than allowing to call out under the situation of the maximum cycle that continues at the comparative result of comparing unit 802; And the overtime release dial gauge that carries in the new Apply Charging message is shown in and allows call release under the overtime situation of duration; Then make gsmSSF report Apply Charging Report to SCP; And initiate release message to discharge ongoing calling to MSC or terminal; Wherein, the duration of call in the Apply Charging Report is the duration of call and the currency sum in Apply Charging Report last time.
According to system of the present invention, also comprise: processing unit 806 is used for making gsmSSF to handle other test point incident and the report that suspends according to the duration of call of Apply Charging Report.
Control unit 804 is that currency is not more than under the situation that allows the lasting maximum cycle of calling at comparative result; And the overtime release dial gauge that carries in the new Apply Charging message is shown in and allows to continue to call out under the overtime situation of duration; Then make gsmSSF report Apply Charging Report, and restart supervision timer, wait for next Apply Charging message to SCP; Wherein, the duration of call in the Apply Charging Report is the duration of call and the currency sum in Apply Charging Report last time.
In sum; The invention solves as the Tcp that fills in " Apply Charging " message (allow call out continue maximum cycle) during less than Delta (receiving the duration between " Apply Charging " message last time " Apply Charging Report " to this); How to prevent that gsmSSF from taking place to handle unusual; And provide further scheme and the message parameter of handling of flow process specifically to fill in, to satisfy accuracy and the normal needs that move of real-time requirement and system that CAMEL charges.
More than be merely the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various changes and variation.All within spirit of the present invention and principle, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (8)

1. a CAMEL calls out the Sustainable Control method, it is characterized in that, comprising:
Service Switching Function module gsmSSF to the service control point (SCP) send last time Apply Charging Report and start supervision timer after; If received the new Apply Charging message that SCP issues; Stop said supervision timer, and the maximum cycle that continues is called out in the permission of carrying in the currency of said supervision timer and the said new Apply Charging message compared; And
According to comparative result; Obtain the permission duration of connection; When arriving said permission duration; Indicating according to the overtime release of carrying in the said new Apply Charging message and to carry out the calling Sustainable Control, wherein, is that said currency is called out under the situation of the maximum cycle that continues greater than said permission at said comparative result; Said gsmSSF reports Apply Charging Report to said SCP, and the duration of call in the said Apply Charging Report is the duration of call and the said currency sum in said last time of the Apply Charging Report.
2. CAMEL according to claim 1 calls out the Sustainable Control method; It is characterized in that; At said comparative result is that the overtime release dial gauge that carries in said currency maximum cycle lasting greater than said permission calling and the said new Apply Charging message is shown under the situation of call release under the overtime situation of said permission duration; Said gsmSSF reports Apply Charging Report to said SCP, and initiates release message to discharge ongoing calling to MSC or terminal
Wherein, the duration of call in the said Apply Charging Report is the duration of call and the said currency sum in said last time of the Apply Charging Report.
3. CAMEL according to claim 2 calls out the Sustainable Control method, it is characterized in that, also comprises:
Said gsmSSF handles other test point incident and the report that suspends according to the duration of call in the said Apply Charging Report.
4. CAMEL according to claim 1 calls out the Sustainable Control method; It is characterized in that; At comparative result is that said currency is not more than said permission and calls out the overtime release dial gauge that carries in the maximum cycle that continues and the said new Apply Charging message and be shown under the situation that continues under the overtime situation of said permission duration to call out, and said gsmSSF reports Apply Charging Report to SCP, and restarts said supervision timer; Wait for next Apply Charging message
Wherein, the duration of call in the said Apply Charging Report is that the maximum cycle sum that continues is called out in the duration of call and said permission in said last time of the Apply Charging Report.
5. a CAMEL calls out the Sustainable Control system, it is characterized in that, comprising:
Comparing unit; Be used at gsmSSF to SCP transmission Apply Charging Report last time and after starting supervision timer; Under the situation of having received the new Apply Charging message that said SCP issues; Stop said supervision timer, and the maximum cycle that continues is called out in the permission of carrying in the currency of said supervision timer and the said new Apply Charging message compared; And
Control unit; Be used for comparative result according to said comparing unit; Obtain the permission duration that connection allows, and when arriving said permission duration, indicate according to the overtime release of carrying in the said new Apply Charging message and carry out the calling Sustainable Control; Wherein, Being said currency at said comparative result calls out under the situation of the maximum cycle that continues greater than said permission, and said gsmSSF reports Apply Charging Report to said SCP, and the duration of call in the said Apply Charging Report is the duration of call and the said currency sum in said last time of the Apply Charging Report.
6. CAMEL according to claim 5 calls out the Sustainable Control system; It is characterized in that; Said control unit is that the overtime release dial gauge that carries in said currency maximum cycle lasting greater than said permission calling and the said new Apply Charging message is shown under the situation of call release under the overtime situation of said permission duration at the comparative result of said comparing unit; After said permission duration is overtime; Make said gsmSSF report Apply Charging Report, and initiate release message to discharge ongoing calling to MSC or terminal to said SCP
Wherein, the duration of call in the said Apply Charging Report is the duration of call and the said currency sum in said last time of the Apply Charging Report.
7. CAMEL according to claim 6 calls out the Sustainable Control system, it is characterized in that, also comprises:
Processing unit is used for making said gsmSSF to handle other test point incident and the report that suspends according to the duration of call of said Apply Charging Report.
8. CAMEL according to claim 5 calls out the Sustainable Control system; It is characterized in that; Said control unit is that said currency is not more than said permission and calls out the overtime release dial gauge that carries in the maximum cycle that continues and the said new Apply Charging message and be shown under the situation that continues under the overtime situation of said permission duration to call out at comparative result, makes said gsmSSF report Apply Charging Report to said SCP, and restarts said supervision timer; Wait for next Apply Charging message
Wherein, the duration of call in the said Apply Charging Report is that the maximum cycle sum that continues is called out in the duration of call and said permission in said last time of the Apply Charging Report.
CN2007101535916A 2007-09-19 2007-09-19 CAMEL call persistence control method and system Expired - Fee Related CN101394590B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007101535916A CN101394590B (en) 2007-09-19 2007-09-19 CAMEL call persistence control method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007101535916A CN101394590B (en) 2007-09-19 2007-09-19 CAMEL call persistence control method and system

Publications (2)

Publication Number Publication Date
CN101394590A CN101394590A (en) 2009-03-25
CN101394590B true CN101394590B (en) 2012-05-23

Family

ID=40494614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007101535916A Expired - Fee Related CN101394590B (en) 2007-09-19 2007-09-19 CAMEL call persistence control method and system

Country Status (1)

Country Link
CN (1) CN101394590B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117831532A (en) * 2024-03-05 2024-04-05 大方智造(天津)科技有限公司 CAX system interaction method based on AI voice command

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Nokia.aChChargingAddress in ApplyCharging/ApplyChargingReport.《3GPP TSG CN WG2 Meeting #29 N2-030270》.2003,全文. *

Also Published As

Publication number Publication date
CN101394590A (en) 2009-03-25

Similar Documents

Publication Publication Date Title
US8095127B2 (en) Subscriber management and accounting using event detection in a wireless device
JP4475954B2 (en) Billing method and system for calls forwarded to prepaid subscriber voice mail
US7844261B2 (en) Number portability and services utilizing number range owner information
US20030037176A1 (en) Method, apparatus and software program for message transmission between telecommunications network elements
WO2000011859A1 (en) Charging in a telecommunications system
US8060087B2 (en) CDMA intelligent network system and its method, device for realizing international roaming service
EP1195044A1 (en) Controlling setup or continuation of a call charged from a prepaid group account
EP1802027A1 (en) Method, apparatus and computer program product for online charging
EP1389024A1 (en) A method of setting up an application initiated call to a mobile station within a camel network, and a telecommunications system, comprising a camel network
WO2003103265A1 (en) System and method for determining tariffs for real-time calls involving ported directory numbers
US7974611B2 (en) Method, apparatus or software for managing a call in a telecommunications network
EP2219359A1 (en) Seamless switching between pre-paid and post-paid charging
CN100442930C (en) Mobile exchanging center and called parner processing method
CN101394590B (en) CAMEL call persistence control method and system
CN100417276C (en) Call state detecting method
CN101394591B (en) CAMEL call persistence control method and system
CN1512797A (en) Method for providing intelligent service in mobile virtual network
KR100941578B1 (en) System and Method for pre-paid in case of roaming overseas, and home location register therefor
KR20040061305A (en) Method for processing disconnect call charge at intelligent network busy
WO2010040321A1 (en) Method and system for triggering the intelligent network services
KR20040085626A (en) Control Method for Charging in Asynchronous IMT-2000 Network
CN103906031A (en) System and method for enabling prepaid intelligent network user to implement calling during international roaming

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU JIUTAI CABLE CO., LTD.

Free format text: FORMER OWNER: ZTE CORPORATION

Effective date: 20141030

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 518057 SHENZHEN, GUANGDONG PROVINCE TO: 226000 NANTONG, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20141030

Address after: Nantong City, Jiangsu province 226000 Ping Chao Zhen Tong Yang Road No. 588

Patentee after: Jiangsu Jiutai Cable Co., Ltd.

Address before: 518057 Nanshan District science and Technology Industrial Park, Guangdong high tech Industrial Park, ZTE building

Patentee before: ZTE Corporation

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120523

Termination date: 20160919