CN101392601A - Water proof comprehensive treatment construction method for construction roof - Google Patents

Water proof comprehensive treatment construction method for construction roof Download PDF

Info

Publication number
CN101392601A
CN101392601A CNA200810194899XA CN200810194899A CN101392601A CN 101392601 A CN101392601 A CN 101392601A CN A200810194899X A CNA200810194899X A CN A200810194899XA CN 200810194899 A CN200810194899 A CN 200810194899A CN 101392601 A CN101392601 A CN 101392601A
Authority
CN
China
Prior art keywords
construction method
deck
waterproof
construction
comprehensive treatment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA200810194899XA
Other languages
Chinese (zh)
Inventor
邵长亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU XINGXIA BUILDING INSTALLATION CO Ltd
Original Assignee
JIANGSU XINGXIA BUILDING INSTALLATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU XINGXIA BUILDING INSTALLATION CO Ltd filed Critical JIANGSU XINGXIA BUILDING INSTALLATION CO Ltd
Priority to CNA200810194899XA priority Critical patent/CN101392601A/en
Publication of CN101392601A publication Critical patent/CN101392601A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides a construction method for waterproof comprehensive treatment on building roofing, which relates to the technical field of constructional engineering, in particular to the technical field of roofing waterproof system. The construction method comprises the following steps: cleaning leaking and penetrating parts; densifying the leaking and penetrating parts by a chemical slurry injecting method; densifying the clearance on the other surface of a structural layer by the chemical slurry injecting method after leak stoppage materials are completely solidified; brushing concave parts of the structural layer to be level by structural mortar; and brushing polyurethane film coating or spreading SBS coiled materials after the structural layer is dried. The construction method combines the self structural waterproof action and the waterproof action outside the structure for treatment, thereby achieving better waterproof effect. In addition, the construction method has the advantages of having simple working procedures, convenient construction and material fetching, bringing convenience to application, greatly reducing the probability of reworking and later maintenance, and reducing unnecessary loss and time waste.

Description

Water proof comprehensive treatment construction method for construction roof
Technical field
The present invention relates to construction engineering technical field, particularly the waterproofing system technical field of roofing.
Background technology
The house leaks, seeps water is a big common quality defect of building construction, and this brings very big inconvenience to the user for this, also caused certain waste, thereby buildings waterproof has become everybody focus.Usually, in the junction of new and old buildings, all there are in various degree infiltration and drainage in the finishing boring position of roof panel and the indivedual anneal cracks seam of roof panel position, as adopt single leak stopping or paste the purpose that the method for coiled material all can not fundamentally be accomplished sealing, indivedual little infiltration points also can appear, if can with coiled material, leak stopping, film and method such as slip casting suits measures to local conditions to fully utilize, from the method for structure itself and structural outer comprehensive waterproof, be the target that pursue this area.
Summary of the invention
The object of the invention is to invent the water proof comprehensive treatment construction method for construction roof of a kind of leak stopping or good leak-proof effect.
The present invention includes following steps:
The position of 1) will leak, oozing is cleaned out;
2) position of adopting the method for chemical grouting will leak, ooze is closely knit;
3) after loss circulation material solidifies fully, the slit is closely knit in the another side employing chemical grouting method of deck;
4) deck is recessed position is whitewashed smooth with the structure mortar;
5) treat the deck drying after, brushing polyurethane coating film or hot process are completely spread the SBS coiled material.
In addition, step 2 of the present invention) in, position hacking and recessed structure surface layer 20~30mm with leaking, oozing after cleaning out, firmly daub into deck with the chemical slip casting material layering again.
Be also noted that the chemical slip casting material of daubing into deck is than the recessed 5~10mm of structure surface layer.
The present invention adopts scientific and rational method, administers from structure self waterproof waterproof outside structure method that combines, and has obtained good waterproof effect, and operation is simple, and it is convenient to construct, and draws materials conveniently.The present invention is in line with the principle of " interior anti-, control outward ", in conjunction with the self-characteristic of waterproofing materials and in conjunction with different ooze, the flexible the selection of material of leakage area." interior anti-" be structure from waterproof, thereby mainly utilize the chemical characteristic of material to make itself and the principle of composition generation chemical reaction compact structure in the concrete make structure itself reach hardheaded purpose by the method for chemical grouting and chemical plugging." control outward " is that the structural outer waterproof is laid equal stress on, consider the ageing of material and other changeable factors, film together or the waterproof measure of coiled material increasing in structural outer, water directly is isolated in beyond the deck, can't penetrate into deck, accomplish that multilayer sets up defences, guarantee waterproof quality, fundamentally obtained the excellent waterproof effect, bring convenience to use, greatly reduce the probability of doing over again and keeping in repair later on, also reduced unnecessary loss and time waste.
The specific embodiment
1, structure is from waterproofing work
At first ooze at the place of looking for, leaking the position also will leak, the point that oozes (or seam) is cleaned out, generally speaking, the anneal crack seam should select for use the method for chemical grouting that deck is closely knit, if leak source or bigger crack then can be with leak source (or seam) position hacking and recessed structure surface layer 20~30mm, and clean out, require to specifications chemical plugging material (as the leak stopping king) the back layering that stirs is firmly daubed into deck and (and kept more recessed 5~10mm) than structure surface layer, treat that loss circulation material solidifies the back fully and adopts the chemical grouting method that the slit is all closely knit at the another side of deck.And then the position that deck is recessed is whitewashed smooth with the structure mortar.
2, treat (specifically deciding according to selected material) after the deck drying, brushing polyurethane coating film or hot process are completely spread the SBS coiled material and are done the second road waterproofing course.
3, material
Coiled material or polyurethane: do the structure exterior waterproof coating and use.
Leak stopping king, chemical grouting liquid: use when slip casting and leak stopping.
4, quality control
4.1 the quality control of polyurethane coating film waterproof.
4.1.1 the quality of polyurethane water-proof paint and formation waterproof coating should meet the following requirements:
Solid content: be not less than 94%;
Pull and stretch intensity: be not less than 1.65N/mm2;
Fracture elongation: be not less than 300%;
Flexible :-30 ° of C bending flawlesses;
Impermeability: 0.3N/mm2,30min is non-leakage.
(annotate: above standard can be carried out according to the standard of locality according to different zones)
4.1.2 with scraper plate or round brush blade coating prepared mixture, order is brushed equably on the substrate surface of base treatment agent drying, require thin uniformity during brushing, planar base layer is advisable to brush 3~4 times, every is 0.8~1.0kg/m2 all over the brushing amount, opposite basic unit is advisable to brush 3~4 times, and every is 0.5~0.6kg/m2 all over the brushing amount.The gross thickness of waterproof coating is qualified to be not less than 2mm.
4.2 waterproof coiled material quality
4.2.1 coiled material performance indications
1), impermeability: 0.3N/mm2,30min is non-leakage.
2), heat resistance: the 90-105 degree is fricton-tight, trickling, drippage.
3), (longitudinal and transverse) pulling force: 〉=450N/mm
4), maximum pull elongation per unit length: 〉=30%
5), low-temperature tenderness :-18 ° of C
6), tearing strength: N 〉=250
(annotate: above standard can be carried out according to the standard of locality according to different zones)
4.2.2 installation of membrane direction and order: the levels coiled material must not vertical mutually paving during paving.Eject the installation of membrane normal line, to determine paving position and control lap width (being not less than 100mm).Leveling layer should be dry during installation of membrane, uses 1m 2About coiled material be layered in the clean basic unit, the basic unit that covered after 2~3 hours does not have watermark, the no condensate water in coiled material surface gets final product.
Adopt hot melt paving coiled material to meet the following requirements: A, fired heater heating coiled material should be even, must not excessive heat or burn coiled material; Thickness forbids to adopt the hot melt construction less than the polymer modified bituminous waterproof sheet material of 4mm.Roll the shop coiled material immediately behind the hot melt of B, coiled material surface, the air below the coiled material should drain, and the roll-in bonding firmly, must not hollowing.C, coiled material seam areas must be overflowed the modified bitumen glue of hot melt.The coiled material of D, paving should be smooth straight, and the overlap joint size is accurate, must not twist, fold.Must uniformity in when heating construction coiled material fabric width, require the distance of the nozzle of fired heater and coiled material should be suitable, being heated to the coiled material surface can be with bonding when bright black is arranged.If fusing is not enough, can influence the adhesive strength and the sealing performance of coiled material seam; It is too high to heat, and can make the aging zoom of modified bitumen and coiled material is burnt.

Claims (3)

1, water proof comprehensive treatment construction method for construction roof is characterized in that may further comprise the steps:
The position of 1) will leak, oozing is cleaned out;
2) position of adopting the method for chemical grouting will leak, ooze is closely knit;
3) after loss circulation material solidifies fully, the slit is closely knit in the another side employing chemical grouting method of deck;
4) deck is recessed position is whitewashed smooth with the structure mortar;
5) treat the deck drying after, brushing polyurethane coating film or hot process are completely spread the SBS coiled material.
2, according to the described water proof comprehensive treatment construction method for construction roof of claim 1, it is characterized in that step 2) in, position hacking and recessed structure surface layer 20~30mm with leaking, oozing after cleaning out, firmly daub into deck with the chemical slip casting material layering again.
3,, it is characterized in that daubing into the chemical slip casting material of deck than the recessed 5~10mm of structure surface layer according to the described water proof comprehensive treatment construction method for construction roof of claim 2.
CNA200810194899XA 2008-10-23 2008-10-23 Water proof comprehensive treatment construction method for construction roof Pending CN101392601A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA200810194899XA CN101392601A (en) 2008-10-23 2008-10-23 Water proof comprehensive treatment construction method for construction roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA200810194899XA CN101392601A (en) 2008-10-23 2008-10-23 Water proof comprehensive treatment construction method for construction roof

Publications (1)

Publication Number Publication Date
CN101392601A true CN101392601A (en) 2009-03-25

Family

ID=40493094

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA200810194899XA Pending CN101392601A (en) 2008-10-23 2008-10-23 Water proof comprehensive treatment construction method for construction roof

Country Status (1)

Country Link
CN (1) CN101392601A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101994399A (en) * 2010-10-30 2011-03-30 河南国基建设集团有限公司 Method for repairing leaked coiled-material water-proof roof
CN102312582A (en) * 2011-07-12 2012-01-11 江苏天誉建材检验有限公司 Construction method for applying polyurea to old flexible waterproof roof for renovation transformation
CN102561686A (en) * 2010-12-17 2012-07-11 中国建筑第七工程局有限公司 Construction method of polyurethane waterproof coating film under low-temperature and wet environment
CN105089290A (en) * 2015-08-05 2015-11-25 海南红杉科创实业有限公司 Method for repairing roof
CN111561174A (en) * 2020-06-13 2020-08-21 中国二十二冶集团有限公司 Construction method for roof waterproof repair and roof waterproof repair structure
CN112196298A (en) * 2020-09-10 2021-01-08 斯科瑞新材料科技(山东)股份有限公司 Novel building waterproof process and material
CN112681790A (en) * 2020-12-15 2021-04-20 国家电投集团江西中业兴达电力实业有限公司 Grouting treatment method for concrete roof cracks

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101994399A (en) * 2010-10-30 2011-03-30 河南国基建设集团有限公司 Method for repairing leaked coiled-material water-proof roof
CN101994399B (en) * 2010-10-30 2012-09-26 河南国基建设集团有限公司 Method for repairing leaked coiled-material water-proof roof
CN102561686A (en) * 2010-12-17 2012-07-11 中国建筑第七工程局有限公司 Construction method of polyurethane waterproof coating film under low-temperature and wet environment
CN102561686B (en) * 2010-12-17 2014-04-16 中国建筑第七工程局有限公司 Construction method of polyurethane waterproof coating film under low-temperature and wet environment
CN102312582A (en) * 2011-07-12 2012-01-11 江苏天誉建材检验有限公司 Construction method for applying polyurea to old flexible waterproof roof for renovation transformation
CN102312582B (en) * 2011-07-12 2013-04-03 江苏天誉建材检验有限公司 Construction method for applying polyurea to old flexible waterproof roof for renovation transformation
CN105089290A (en) * 2015-08-05 2015-11-25 海南红杉科创实业有限公司 Method for repairing roof
CN111561174A (en) * 2020-06-13 2020-08-21 中国二十二冶集团有限公司 Construction method for roof waterproof repair and roof waterproof repair structure
CN112196298A (en) * 2020-09-10 2021-01-08 斯科瑞新材料科技(山东)股份有限公司 Novel building waterproof process and material
CN112681790A (en) * 2020-12-15 2021-04-20 国家电投集团江西中业兴达电力实业有限公司 Grouting treatment method for concrete roof cracks

Similar Documents

Publication Publication Date Title
CN101392601A (en) Water proof comprehensive treatment construction method for construction roof
CN102775956B (en) Asphalt-based non-curable heat-resistant waterproof sealant and preparation method thereof
KR100278173B1 (en) Double waterproof sheet for concrete structure
KR101286575B1 (en) Rubberized asphalt membrane and Felt sheet complex waterproofing material for the exterior waterproofing of the concrete structure
CN110528789A (en) A kind of roof waterproof engineering construction method
US10184061B2 (en) Efficient waterborne nano-silicon rubber sealing waterproof agent
CN205421740U (en) Non -cured rubberized asphalt coating combines composite waterproof structure of self -adhesion coiled material
CN112227755A (en) Waterproof repairing structure and method for old roof
CN108708453A (en) Basementwaterproofing construction method
CN110984406A (en) Waterproof leakage-repairing construction method using non-cured rubber asphalt waterproof coating
CN108675712A (en) A kind of combination of rigidity and flexibility waterproof material and construction method
KR100941747B1 (en) The bridge deck waterproofing system and application method
CN101586367B (en) Method for preventing decorative surfaces of ceramic tiles in shower room from leaking water
CN108086490A (en) A kind of anti-water-stopping system and ground in underground, top surface and elevation construction method
CN207776289U (en) A kind of water-proof insulating roof system
CN207863199U (en) A kind of waterproof and insulation integrated plate
CN112609976A (en) Construction process of intelligent exhaust circulation system
CN207376387U (en) A kind of light-concrete structure with high-durability energy
CN101532324A (en) Waterproof and insulation integrated construction method
CN110424641A (en) A kind of waterproof and insulation integrated system wet-laying construction technology of modified-high polymer
CN100489253C (en) Construction method for waterproof layer of roofing
CN114197915B (en) Minimally invasive self-healing waterproof method for roof
CN107842117A (en) A kind of waterproof and insulation integrated plate
CN117801704A (en) Polymer composite waterproof coiled material free of protective layer, and preparation method and use method thereof
CN113982315B (en) Construction method for repairing ancient building roof in waterproof manner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090325