CN101388805A - Test monitoring method and system - Google Patents

Test monitoring method and system Download PDF

Info

Publication number
CN101388805A
CN101388805A CNA200710154051XA CN200710154051A CN101388805A CN 101388805 A CN101388805 A CN 101388805A CN A200710154051X A CNA200710154051X A CN A200710154051XA CN 200710154051 A CN200710154051 A CN 200710154051A CN 101388805 A CN101388805 A CN 101388805A
Authority
CN
China
Prior art keywords
test
module
detecting
service end
testing tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA200710154051XA
Other languages
Chinese (zh)
Other versions
CN101388805B (en
Inventor
罗梓桂
陈志丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou Langmi Intelligent Technology Co ltd
Original Assignee
Inventec Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inventec Corp filed Critical Inventec Corp
Priority to CN200710154051XA priority Critical patent/CN101388805B/en
Publication of CN101388805A publication Critical patent/CN101388805A/en
Application granted granted Critical
Publication of CN101388805B publication Critical patent/CN101388805B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a test monitoring method and a system, which is applied to a testing system which is connected with a service end and a plurality of user ends through a network, the testing system is provided with a testing module for testing the service end and a plurality of the user ends and generating testing results, the test monitoring method comprises the following steps: firstly building a database to memorize the name of testing tools of the testing system and testing process identifying information which is corresponding to the name of the testing tools, secondly, selecting the name of the to-be monitored testing tools from the database and searching the testing process identifying information which is corresponding to the name of the testing tools from the database according to the selected name of the testing tools, and respectively monitoring whether a plurality of the user ends and the testing module of the service end finish the testing operation according to the identifying information, thirdly collecting the testing results of the testing module of a plurality of the user ends and the service end through the network when the testing module of a plurality of the user ends and the service end is monitored finishing the testing operation, and then memorizing the results to a preset memory, finally implementing the shutdown operation to close the user ends and the service end to save electrical energy.

Description

Test monitoring method and system
Technical field
The present invention relates to a kind of test monitoring method and system, refer to a kind of test monitoring method and system that is applied to see through in the test macro that network is connected with service end and several clients especially.
Background technology
Computer personal lifestyle and work each side use more and more widely, as if become daily necessities indispensable in the modern society.Because computer uses under the high situation of popularity rate, removes speed-up computation machine development of science and technology, also drives the progress of the network technology, so make the computer dealer drop into the exploitation of server especially energetically.
Whether the operational effectiveness that no matter is computer installations such as personal computer or server promotes, the user pay attention to the most nothing more than the reliability and stability that are system.So the computer factory chamber of commerce carries out the stability or the performance test of multinomial computer installation to computer installation before product appears on the scene, to guarantee the quality of product.For instance, by the required various operating voltages of set-up and calculated machine and the test of working temperature, promptly, make computer installation work in that (for example operating voltage is less than normal voltage 10% under the more harsh operational environment, working temperature is 40 degree Celsius), and make computer installation carry out the software program (for example, windowing software) of high capacity or the hardware testing project of repeatability etc.
Yet; when in the prior art computer installation being tested; especially when utilizing network to be connected with server and several client computer to carry out test operation; run into such situation through regular meeting; that is; the test that has been through with of the test program of some client computer; but server and several client computer are but also working on; particularly the tester is not under the situation of test site; can't implement shutdown in time to server and several client computer of finishing test operation, will cause the profligacy of electric power resource like this.With the server of a 750W, add relevant testing equipment, its power consumption is generally about 2000W, after finishing test,, will have more the power wastage of 2000W so if move one hour more, if things go on like this, the power cost that causes will be a surprising numeral.
Meanwhile,, not only can shorten the life-span of dependence test equipment as untimely server and several client computer of finishing test operation of closing, but also can be because remaining in operation of testing equipment produces very big noise pollution.
Therefore, how to provide a kind of method and system that can implement monitoring to this test macro, make it can in time close the computer installation of finishing test operation, remedy above-mentioned disadvantages, real is the present problem demanding prompt solution of dealer of association area.
Summary of the invention
For solving the disappearance of above-mentioned prior art, one of the present invention purpose is to provide a kind of test monitoring method and system, uses the saving electric power energy.
Another object of the present invention is to provide a kind of test monitoring method and system, to avoid noise pollution.
For reaching above-mentioned purpose and other purposes, the present invention promptly discloses a kind of test monitoring method and system, and this test monitoring method is applied to see through network and is connected with in the test macro of service end and several clients.And this test macro has in order to test this service end and this several clients and to generate the test module of test result, and this test monitoring method comprises: at first set up a database with the testing tool title of storing this test macro and with the pairing test process identifying information of this testing tool title; Thereafter in this database, select testing tool title to be monitored and the selected testing tool title of foundation, search this testing tool title pairing test process identifying information in this database, and whether the test module of detecting these several clients and this service end has according to this respectively all finished test operation; When the test module of detecting this service end and these several clients has all been finished test operation, see through this network collect these these several clients and service end test module test result and be stored in the default memory; Close this several clients at last, and confirm whether these several clients all close, and after affirmation is finished, close this service end and use the saving electric power energy.
Test monitor system of the present invention, being applied to see through network is connected with in the test macro of service end and several clients, and this test macro has in order to test this service end and this several clients and to generate the test module of test result, and this test monitor system comprises: database, select module, detecting module, collection module and shutdown control module.This database storage have this test macro the testing tool title and with the pairing test process identifying information of this testing tool title; This selects module, selects testing tool title to be monitored certainly in this database, and exports a detecting information; This detecting module, after receiving the detecting information of this selection module output, according to this testing tool title of selecting module to select, the pairing test process identifying information of this testing tool title of search in this database is detected this test module according to this and whether has been finished test operation certainly; And the detecting result is this test module when having finished test operation, exports an acquisition of information; After this collection module receives the acquisition of information of this detecting module output, collect the test result of this test module and store this test result to default memory, and export a pass machine information; And the control module of should shutting down, be used to accept the pass machine information that collection module is exported, close this client and service end and use the saving electric power energy.
Compared to prior art, test monitoring method of the present invention and system at first create one store this test macro the testing tool title and with the database of the pairing test process identifying information of this testing tool title; Thereafter in this database, select the testing tool title, and detect this test module according to the test process identifying information in this database and whether finished test operation, if, then collect the test result of this test module and be saved in the default memory, export one at last and close machine information, to carry out power-off operation to close this client and service end, so not only saved electric power energy, also avoided noise pollution.
Description of drawings
Fig. 1 shows the flow chart of test monitoring method of the present invention; And
Fig. 2 shows the functional block diagram of test monitor system of the present invention.
[main element symbol description]
1 test macro
10 test modules
11 test monitor systems
110 databases
111 select module
112 detecting modules
113 collection modules
114 shutdown control modules
116 judging units
S1~S15 step
Embodiment
Below by specific instantiation explanation embodiments of the present invention, those of ordinary skill in the art can by content that this specification disclosed easily Liao separate other advantages of the present invention and effect.The present invention also can be implemented or used by other different instantiations, and the every details in this specification also can be carried out various modifications and change based on different viewpoints and application under not departing from spirit of the present invention.
See also Fig. 1, Fig. 1 shows that test monitoring method of the present invention starves flow chart.Test monitoring method of the present invention is applied to see through network and is connected with in the test macro of service end and several clients (not shown), and this test macro has in order to test this service end and this several clients and to generate the test module of test result.In the present embodiment, this service end and client are respectively server and client computer; This test macro can be and various computer installation carried out the multinomial computer installation stability or the test macro of performance, and the emphasis that this non-the application discusses is not so give unnecessary details.In the present embodiment, this test module (not shown) also has record cell and carries out record with the result to test, and this test monitoring method may further comprise the steps:
As shown in Figure 1, at first execution in step S1 creates a database, this database be used to store this test macro the testing tool title and with the pairing test process identifying information of this testing tool title; In the present embodiment, this test process identifying information is used to discern for example LinuxVss-〉ctc, Netherc-〉the pairing test process of test program such as smb; This database can add or delete this testing tool title and with the related information of the pairing test process of this testing tool title.Then proceed to step S2;
In step S2, select testing tool title to be monitored certainly in this database; In the present embodiment, this selection step is an input action, i.e. input test instrument title.Then proceed to step S3;
In step S3, export a detecting information; Then proceed to step S4;
In step S4, after receiving this detecting information, carry out the first detecting operation, in the present embodiment, this first detecting operation pairing test process identifying information of this testing tool title of search in this database is detected the test module of these several clients respectively and whether has all been finished test operation, if, then proceed to step S5, if not, then return to step S3;
In step S5, export an acquisition of information; Then proceed to step S6;
In step S6, receive this acquisition of information after, carry out first and collect operation, in the present embodiment, after the test module that this first collection operates in this client is finished test operation, collect the test result of the test module of this client, and store this test result to default memory; The test result of the test module of this collection sees through default storing path and is saved in this default memory; Then proceed to step S7;
In step S7, export a detecting information again; Then proceed to step S8;
In step S8, after receiving this detecting information, carry out the second detecting operation, in the present embodiment, this second detecting operation pairing test process identifying information of this testing tool title of search in this database is detected the test module of this service end and whether has been finished test operation, if, then proceed to step S9, if not, then return to step S7;
Need to be with specifying, in this first detecting operation of execution and this second detecting operation of present embodiment, judge whether this test module 10 has been finished the foundation of test operation and whether had this test process for this test module 10 of detecting.If have, then the proof test is also being carried out, if not, then the proof test is finished, for example, judge this Linux Vss-〉whether the ctc test program finish, and this tests whether finished test then only need whether also just can to judge Linux Vss in the system the inside to this process of ctc.
In step S9, output is an acquisition of information again; Then proceed to step S10;
In step S10, receive acquisition of information after, carry out second and collect operation, in the present embodiment, after the test module that this second collection operates in this service end is finished test operation, collect the test result of the test module of this service end, and store this test result to default memory; The test result of the test module of this collection sees through default storing path and is saved in this default memory; Then proceed to step S11;
Need to be with specifying, in the present embodiment, should default memory can for example be arranged in this service end, client or any one and have third party's terminal electronics (for example mobile phone, personal digital assistant PDA etc.) of network data transmission function, and this memory can be the hard disk that is arranged in this service end, client or the third party's terminal electronics or for being connected in the carry-on dish of above-mentioned each electronic installation with this service end.
In step S11, machine information is closed in output one; In the present embodiment, this pass machine information is the first pass machine information, then proceeds to step S12;
In step S12, receive this first close machine information after, close this several clients respectively; Then proceed to step S13;
In step S13, judge whether all these several clients close, if then proceed to step S14; If not, then return to step S11;
In step S14, machine information is closed in output one, and in the present embodiment, this pass machine information is the second pass machine information, then proceeds to step S15;
In step S15, receive this second close machine information after, close this service end.So far, this test monitoring method step is finished, and saves the purpose of electric power energy to reach closing machine.
See also Fig. 2, Fig. 2 is the functional block diagram of test monitor system 11 of the present invention.What should be specified is, test monitor system 11 of the present invention can comprise other members in addition, is simplicity of illustration and explanation, and basic framework herein only shows the member relevant with the present invention.Test monitor system 11 is applied to see through in the test macro 1 that network is connected with service end (not shown) and several clients (not shown), and test macro 1 has in order to test this service end and this several clients and to generate the test module 10 of test result.In the present embodiment, this service end and client are respectively server and client computer; Test macro 1 can be and various computer installation carried out the multinomial computer installation stability or the test macro of performance, and the emphasis that this non-the application discusses is not so give unnecessary details.In the present embodiment, test module 10 also has record cell so that the result who tests is carried out record.
Test monitor system 11 comprises: database 110, select module 111, detecting module 112, collection module 113 and shutdown control module 114.
Database 110 store this test macro 1 the testing tool title and with the pairing test process identifying information of this testing tool title; In the present embodiment, this test process identifying information is used to discern for example Linux Vss-〉ctc, Netherc-〉the pairing test process of test program such as smb; This database 110 can add or delete this testing tool title and with the related information of the pairing test process of this testing tool title.
Select module 111 in this database, to select testing tool title to be monitored, and export a detecting information; In the present embodiment, select module 111 for input action is provided, i.e. input test instrument title.
After detecting module 112 receives the detecting information of these selection module 111 outputs, according to this testing tool title of selecting module 111 to select, the pairing test process identifying information of this testing tool title of search is detected this test module 10 according to this and whether has been finished test operation in this database 110; And the detecting result is this test module 10 when having finished test operation, exports an acquisition of information.In the present embodiment, judge whether this test module 10 has been finished the foundation of test operation and whether had this test process for this test module 10 of detecting.If have, then the proof test is also being carried out, if not, then the proof test is finished, for example, judge this Linux Vss-〉whether the ctc test program finish, and this tests whether finished test then only need whether also just can to judge Linux Vss in the system the inside to this process of ctc.
Of particular note, the detecting of this detecting module 112 operation is divided into the first detecting operation and the second detecting operation.Wherein, this first detecting operation pairing test process identifying information of this testing tool title of search in this database 110 is detected the test module 10 of these several clients respectively and whether has all been finished test operation, if, then export acquisition of information, if not, then continue the detecting operation; This second detecting operation pairing test process identifying information of this testing tool title of search in this database 110 is detected the test module 10 of this service end and whether has been finished test operation, if, then export acquisition of information, if not, then continue the detecting operation; And this first detecting operator precedence is in this second detecting operation, i.e. this first detecting operation is carried out prior to this second detecting operation.
Collection module 113 is collected the test result of this test module 10 and is stored this test result to this service end after receiving the acquisition of information of these detecting module 112 outputs, and exports a pass machine information; In the present embodiment, the test result of the test module 10 of collection module 113 collections is saved in the default memory through default storing path.
Of particular note, the collection of this collection module 113 operation to should the first detecting operation and the second detecting operation have first respectively and collect operation and second and collect operation, wherein, after the test module 10 that this first collection operates in this client is finished test operation, collect the test result of the test module of this client, and store this test result to the memory that should preset; After the test module 10 that this second collection operates in this service end is finished test operation, collect the test result of the test module of this service end, and store this test result to the memory that should preset.And this first collection operator precedence is in this second collection operation, i.e. this first collection operation is operated prior to this second collection and carried out.
Of particular note, in the present embodiment, should default memory can for example be arranged in this service end, client or any one and have third party's terminal electronics (for example mobile phone, personal digital assistant PDA etc.) of network data transmission function, and this memory can be the hard disk that is arranged in this service end, client or the third party's terminal electronics or for being connected in the carry-on dish of above-mentioned each electronic installation with this service end.
Shutdown control module 114 is used to accept collection module 113 and exports the hungry machine information that closes, and closes this client and service end.In the present embodiment, this shutdown control module 114 also comprises a judging unit 116, and this judging unit 116 judges whether all these several clients close, if, then close this service end, if not, then close all not pent as yet clients again.
In sum, test monitoring method of the present invention and system at first create one store this test macro the testing tool title and with the database of the pairing test process identifying information of this testing tool title; Thereafter in this database, select the testing tool title, and detect this test module according to the test process identifying information in this database and whether finished test operation, if, then collect the test result of this test module and be saved in the default memory, export one at last and close machine information, to carry out power-off operation to close this client and service end, so not only saved electric power energy, also avoided noise pollution.Therefore, use aforementioned many shortcomings that the present invention can overcome prior art, and the tool high industrial utilization.
The foregoing description only is illustrative principle of the present invention and effect thereof, but not is used to limit the present invention.Any have the knack of those skilled in the art all can be under spirit of the present invention and category, the foregoing description is modified and is changed.Therefore, the scope of the present invention should be listed as claim.

Claims (12)

1. test monitoring method, being applied to see through network is connected with in the test macro of service end and several clients, and this test macro has in order to test this service end and this several clients and to generate the test module of test result, and this test monitoring method may further comprise the steps:
Set up database with the testing tool title of storing this test macro and with the pairing test process identifying information of this testing tool title;
In this database, select testing tool title to be monitored;
According to selected testing tool title, the pairing test process identifying information of this testing tool title of search in this database certainly, and whether the test module of detecting these several clients and this service end has according to this respectively all finished test operation;
When the test module of this service end of detecting and these several clients has all been finished test operation, see through this network and collect the test result of the test module of these these several clients and service end, and be stored in the default memory;
Close this several clients; And
Confirm whether these several clients all close, and after affirmation is finished, close this service end.
2. test monitoring method as claimed in claim 1 also comprises a determining step, is after closing these several clients, judges whether all these several clients close, if, then close this service end, if not, then close all not pent as yet clients again.
3. test monitoring method as claimed in claim 1, wherein, this database can add or delete this test macro the testing tool title and with the pairing test process identifying information of this testing tool title.
4. test monitoring method as claimed in claim 1, wherein, the test result of the test module of this collection sees through default storing path and is saved in this default memory.
5. test monitoring method as claimed in claim 1, wherein, this detecting step is divided into the first detecting operation and the second detecting operation, this first detecting operation pairing test process identifying information of this testing tool title of search in this database, detect the test module of these several clients respectively and whether all finished test operation, if then export acquisition of information, if not, then continue the detecting operation; This second detecting operation pairing test process identifying information of this testing tool title of search in this database is detected the test module of this service end and whether has been finished test operation, if, then export acquisition of information, if not, then continue the detecting operation; And this first detecting operator precedence is in this second detecting operation.
6. test monitoring method as claimed in claim 5, wherein, this collection step to should first detecting operation and the second detecting operation have first respectively and collect operation and second and collect operation, after the test module that this first collection operates in this client is finished test operation, collect the test result of the test module of this client, and store this test result to the memory that should preset; After the test module that this second collection operates in this service end is finished test operation, collect the test result of the test module of this service end, and store this test result to the memory that should preset; And this first collection operator precedence is in this second collection operation.
7. test monitor system, being applied to see through network is connected with in the test macro of service end and several clients, and this test macro has in order to test this service end and this several clients and to generate the test module of test result, and this test monitor system comprises:
Database, store this test macro the testing tool title and with the pairing test process identifying information of this testing tool title;
Select module, select testing tool title to be monitored certainly in this database, and export a detecting information;
Detecting module, after accepting the detecting information of this selection module output, according to this testing tool title of selecting module to select, the pairing test process identifying information of this testing tool title of search in this database, detect this test module according to this and whether finished test operation, and when the detecting result has finished test operation for this test module, export an acquisition of information;
Collection module, accept the acquisition of information of this detecting module output after, collect the test result of this test module and store this test result to default memory, and export one and close machine information; And
The shutdown control module is used to accept the pass machine information that collection module is exported, and closes this client and service end.
8. test monitor system as claimed in claim 7, wherein, this shutdown control module also comprises a judging unit, whether all these several clients of this judgment unit judges close, if then close this service end, if not, then close all not pent as yet clients again.
9. test monitor system as claimed in claim 7, wherein, this database can add or delete this test macro the testing tool title and with the pairing test process identifying information of this testing tool title.
10. test monitor system as claimed in claim 7, wherein, the test result of the test module that this collection module is collected sees through default storing path and is saved in this default memory.
11. test monitor system as claimed in claim 7, wherein, the detecting operation of this detecting module is divided into the first detecting operation and the second detecting operation, this first detecting operation pairing test process identifying information of this testing tool title of search in this database, detect the test module of these several clients respectively and whether all finished test operation, if then export acquisition of information, if not, then continue the detecting operation; This second detecting operation pairing test process identifying information of this testing tool title of search in this database is detected the test module of this service end and whether has been finished test operation, if, then export acquisition of information, if not, then continue the detecting operation; And this first detecting operator precedence is in this second detecting operation.
12. test monitor system as claimed in claim 11, wherein, the collection of this collection module operation to should the first detecting operation and the second detecting operation have first respectively and collect operation and second and collect operation, after the test module that this first collection operates in this client is finished test operation, collect the test result of the test module of this client, and store this test result to the memory that should preset; After the test module that this second collection operates in this service end is finished test operation, collect the test result of the test module of this service end, and store this test result to the memory that should preset; And this first collection operator precedence is in this second collection operation.
CN200710154051XA 2007-09-13 2007-09-13 Test monitoring method and system Expired - Fee Related CN101388805B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710154051XA CN101388805B (en) 2007-09-13 2007-09-13 Test monitoring method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710154051XA CN101388805B (en) 2007-09-13 2007-09-13 Test monitoring method and system

Publications (2)

Publication Number Publication Date
CN101388805A true CN101388805A (en) 2009-03-18
CN101388805B CN101388805B (en) 2011-06-15

Family

ID=40478001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710154051XA Expired - Fee Related CN101388805B (en) 2007-09-13 2007-09-13 Test monitoring method and system

Country Status (1)

Country Link
CN (1) CN101388805B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101694634A (en) * 2009-10-30 2010-04-14 迈普通信技术股份有限公司 Device allocation method in automatic test system
CN102880532A (en) * 2011-07-13 2013-01-16 财团法人资讯工业策进会 Cloud technology-based test system and method
CN103473175A (en) * 2013-09-11 2013-12-25 江苏中科梦兰电子科技有限公司 Extraction method for software testing case set
CN104426715A (en) * 2013-09-03 2015-03-18 北京信威通信技术股份有限公司 Distributed testing tool control method
CN105593826A (en) * 2013-09-30 2016-05-18 Mts系统公司 Mobile application interactive user interface for a remote computing device monitoring a test device
US10445202B2 (en) 2012-02-07 2019-10-15 Mts Systems Corporation Mobile communication platform for test system applications
US10796108B2 (en) 2017-12-07 2020-10-06 Mts Systems Corporation Integrated machine information management with application interactive user interface

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1355435A (en) * 1919-10-04 1920-10-12 Farm Specialty Mfg Company Hog-feeder
CN100426746C (en) * 2005-12-20 2008-10-15 英业达股份有限公司 System and method for control on-and-off machine

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101694634B (en) * 2009-10-30 2013-06-26 迈普通信技术股份有限公司 Device allocation method in automatic test system
CN101694634A (en) * 2009-10-30 2010-04-14 迈普通信技术股份有限公司 Device allocation method in automatic test system
CN102880532A (en) * 2011-07-13 2013-01-16 财团法人资讯工业策进会 Cloud technology-based test system and method
CN102880532B (en) * 2011-07-13 2015-11-25 财团法人资讯工业策进会 Cloud technology-based test system and method
US10445202B2 (en) 2012-02-07 2019-10-15 Mts Systems Corporation Mobile communication platform for test system applications
CN104426715B (en) * 2013-09-03 2018-03-09 北京信威通信技术股份有限公司 A kind of distributed testing tool control method
CN104426715A (en) * 2013-09-03 2015-03-18 北京信威通信技术股份有限公司 Distributed testing tool control method
CN103473175A (en) * 2013-09-11 2013-12-25 江苏中科梦兰电子科技有限公司 Extraction method for software testing case set
US10255156B2 (en) 2013-09-30 2019-04-09 Mts Systems Corporation Mobile application interactive user interface for a remote computing device monitoring a test device
CN105593826A (en) * 2013-09-30 2016-05-18 Mts系统公司 Mobile application interactive user interface for a remote computing device monitoring a test device
CN105593826B (en) * 2013-09-30 2019-11-19 Mts系统公司 A kind of method for the test that long-range monitoring executes in a test device and calculate equipment
US10671503B2 (en) 2013-09-30 2020-06-02 Mts Systems Corporation Mobile application interactive user interface for a remote computing device monitoring a test device
US10796108B2 (en) 2017-12-07 2020-10-06 Mts Systems Corporation Integrated machine information management with application interactive user interface

Also Published As

Publication number Publication date
CN101388805B (en) 2011-06-15

Similar Documents

Publication Publication Date Title
CN101388805B (en) Test monitoring method and system
CN108255649B (en) Diagnosis strategy design method based on modeling simulation cooperative analysis
CN111507611A (en) Method and system for determining electricity stealing suspected user
CN104166619A (en) Performance measuring method and terminal of application program
CN111240876B (en) Fault positioning method and device for micro-service, storage medium and terminal
CN112666480A (en) Battery life prediction method based on charging process characteristic attention
Haridy et al. An optimisation design of the combined np-CUSUM scheme for attributes
WO2018080523A1 (en) Data cost effective fast similarity search with priority access
CN105740122A (en) Method and system for monitoring mobile phone memory leak
CN114140034B (en) Quality monitoring method based on working conditions and related device
CN110991884A (en) Fatigue monitoring and service life assessment system for nuclear power plant
CN109162856B (en) Method and system for monitoring state of hydroelectric generating set
Wang et al. A multi-source data feature fusion and expert knowledge integration approach on lithium-ion battery anomaly detection
CN109683040B (en) Method, device and equipment for detecting reliability of flexible direct-current transmission converter valve
CN115660507B (en) Intelligent load detection method and system for regional power
Xue et al. A new tool for dynamic security assessment of power systems
CN114523337A (en) Cutter wear state identification method and device, electronic equipment and storage medium
CN114090540A (en) Data management system, data management method, and recording medium having program recorded thereon
CN103577312A (en) Method and device for detecting time performance of software
CN113065234A (en) Batch reliability risk level assessment method and system for intelligent electric meters
Wang et al. Testability modeling and test point optimization method of multi-State system
Li et al. Fuzzy feature fusion and multimodal degradation prognosis for mechanical components
Szabo et al. Vibration and temperature sensor network solutions: Case study for industry 4.0
CN104199935A (en) Large-volume data collecting method and device and analysis and search system for swimming pool
CN106779265B (en) Online state safety detection method based on electric power intelligent mobile terminal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Hu Mihua

Inventor before: Luo Zigui

Inventor before: Chen Zhifeng

TR01 Transfer of patent right

Effective date of registration: 20180130

Address after: Room 118, creation center, 750 Nathan Road, Mong Kok, Kowloon, Hongkong, China

Patentee after: Hu Mihua

Address before: Taipei City, Taiwan, China

Patentee before: Yingda Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180208

Address after: Hanjiang District Jiangsu city Yangzhou province 268 Wenhui Road No. 1-401

Patentee after: Yangzhou langmi Intelligent Technology Co.,Ltd.

Address before: Room 118, creation center, 750 Nathan Road, Mong Kok, Kowloon, Hongkong, China

Patentee before: Hu Mihua

CF01 Termination of patent right due to non-payment of annual fee