CN101376091A - Integral hinge beam forging structure of hexahedron top press - Google Patents

Integral hinge beam forging structure of hexahedron top press Download PDF

Info

Publication number
CN101376091A
CN101376091A CNA2008101415162A CN200810141516A CN101376091A CN 101376091 A CN101376091 A CN 101376091A CN A2008101415162 A CNA2008101415162 A CN A2008101415162A CN 200810141516 A CN200810141516 A CN 200810141516A CN 101376091 A CN101376091 A CN 101376091A
Authority
CN
China
Prior art keywords
hinge
hinge beam
cavity
hinge sleeve
piston
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008101415162A
Other languages
Chinese (zh)
Inventor
刘建设
汪曙光
孟为民
赵荪贺
谭广明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Huanghe Whirlwind Co Ltd
Original Assignee
HENAN HUANGHE INDUSTRIAL GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN HUANGHE INDUSTRIAL GROUP Co Ltd filed Critical HENAN HUANGHE INDUSTRIAL GROUP Co Ltd
Priority to CNA2008101415162A priority Critical patent/CN101376091A/en
Publication of CN101376091A publication Critical patent/CN101376091A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forging (AREA)

Abstract

The invention relates to an integrated hinge sleeve forging structure for a cubic hinge press in ultra-high pressure synthesis field and comprises a hinge sleeve. A guiding sleeve is arranged in the cavity of the hinge sleeve through a connecting bolt; a piston is movably arranged in the guiding sleeve and carries out forward-backward movement in the hinge sleeve driven by oil pressure; a working cavity is formed between the piston and the cavity of the hinge sleeve; and a high-pressure connecting joint is connected to the working cavity and high-pressure oil is transmitted to the working cavity of the hinge sleeve through the high-pressure connecting joint. The integrated hinge sleeve forging structure can realize large cavity synthesis and has the advantages of convenient installation, low using and maintenance cost, light weight and long service life, thereby achieving high performance-cost ratio in the aspect of synthesizing large cavity.

Description

The integral hinge beam forging structure of cubic hinge press
Technical field
The present invention relates to the integral hinge beam forging structure of the cubic hinge press that uses on a kind of cubic hinge press in the synthetic field of super-pressure.
Background technology
At present, generally use the cubic apparatus hinged press in the synthetic field of super-pressure, the hinge beam is one of vital part of cubic hinge press.In this field, along with synthetic cavity constantly enlarges, require the bearing capacity of cubic hinge press to continue to increase, but generally use cubic hinge press hinge beam to exist following defective: 1, service life is short; 2, defective such as working service cost height; 3, weight is big; 4, device fabrication cost height.
Summary of the invention
The objective of the invention is to overcome the deficiencies in the prior art and provide a kind of life-span long, in light weight, low cost of manufacture, the integral hinge beam forging structure of the easy for installation and cubic hinge press that the working service cost is low.
The object of the present invention is achieved like this: comprise the hinge beam, it is characterized in that: in the inner chamber of hinge beam, be provided with fairlead by connecting bolt, in fairlead, be movably installed with piston, piston seesaws by oil pressure actuated in the hinge beam, form working chamber between the inner chamber of piston and hinge beam, connecting on working chamber has high pressure connection, and hydraulic oil is input in the hinge beam working chamber by high pressure connection.
The hinge beam is the hinge beam of forging molding.
The present invention has following good effect: integral hinge beam forging structure can realize that big cavity is synthetic, and easy for installation, the working service cost is low, and is in light weight, and long service life is having very high cost performance aspect the synthetic big cavity.
Description of drawings
Fig. 1 is a profile front view of the present invention.
Fig. 2 is a profile side view of the present invention.
Fig. 3 is a structural representation of the present invention.
The specific embodiment
As shown in Figure 1, 2, 3, the present invention includes hinge beam 1, it is characterized in that: in the inner chamber of hinge beam 1, be provided with fairlead 2 by connecting bolt 3, in fairlead 2, be movably installed with piston 4, piston 4 seesaws by oil pressure actuated in hinge beam 1, form working chamber between the inner chamber of piston 4 and hinge beam 1, connecting on working chamber has high pressure connection 5, and hydraulic oil is input in hinge beam 1 working chamber by high pressure connection 5.
Hinge beam 1 is the hinge beam of forging molding.Fairlead 2 is connected with hinge beam 1 by connecting bolt 3, and piston 4 seesaws in hinge beam 1, and the motion of piston 4 is oil pressure actuated, and hydraulic oil is input in hinge beam 1 working chamber by high pressure connection 5.

Claims (2)

1, a kind of integral hinge beam forging structure of cubic hinge press, comprise hinge beam (1), it is characterized in that: in the inner chamber of hinge beam (1), be provided with fairlead (2) by connecting bolt (3), in fairlead (2), be movably installed with piston (4), piston (4) seesaws by oil pressure actuated in hinge beam (1), form working chamber between the inner chamber of piston (4) and hinge beam (1), connecting on working chamber has high pressure connection (5), and hydraulic oil is input in hinge beam (1) working chamber by high pressure connection (5).
2, the integral hinge beam forging structure of cubic hinge press according to claim 1 is characterized in that: hinge beam (1) is the hinge beam of forging molding.
CNA2008101415162A 2008-10-07 2008-10-07 Integral hinge beam forging structure of hexahedron top press Pending CN101376091A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008101415162A CN101376091A (en) 2008-10-07 2008-10-07 Integral hinge beam forging structure of hexahedron top press

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008101415162A CN101376091A (en) 2008-10-07 2008-10-07 Integral hinge beam forging structure of hexahedron top press

Publications (1)

Publication Number Publication Date
CN101376091A true CN101376091A (en) 2009-03-04

Family

ID=40419930

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008101415162A Pending CN101376091A (en) 2008-10-07 2008-10-07 Integral hinge beam forging structure of hexahedron top press

Country Status (1)

Country Link
CN (1) CN101376091A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102126032A (en) * 2011-03-25 2011-07-20 洛阳齐瑞金刚石设备制造有限公司 Device for precisely boring lug hole of hinge beam
CN102580619A (en) * 2012-03-06 2012-07-18 河南飞孟金刚石工业有限公司 Hinge sleeve for cubic presses and manufacturing method thereof
CN103007828A (en) * 2012-12-28 2013-04-03 桂林桂冶重工股份有限公司 Forge welding structure hinge beam for cubic hydraulic machine

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102126032A (en) * 2011-03-25 2011-07-20 洛阳齐瑞金刚石设备制造有限公司 Device for precisely boring lug hole of hinge beam
CN102126032B (en) * 2011-03-25 2013-04-24 洛阳齐瑞金刚石设备制造有限公司 Device for precisely boring lug hole of hinge beam
CN102580619A (en) * 2012-03-06 2012-07-18 河南飞孟金刚石工业有限公司 Hinge sleeve for cubic presses and manufacturing method thereof
CN102580619B (en) * 2012-03-06 2013-12-18 河南飞孟金刚石工业有限公司 Hinge sleeve for cubic presses and manufacturing method thereof
CN103007828A (en) * 2012-12-28 2013-04-03 桂林桂冶重工股份有限公司 Forge welding structure hinge beam for cubic hydraulic machine

Similar Documents

Publication Publication Date Title
CN202251163U (en) Gas and liquid transformation pressurizing cylinder
CN101376091A (en) Integral hinge beam forging structure of hexahedron top press
CN202199002U (en) Portable hydraulic spreader
CN201275479Y (en) Integral hinge beam forging structure of hexahedron top press
CN202639811U (en) Stroke control part for two-stage bolt stretcher
CN203031251U (en) Bolt tensioner
CN103009671B (en) Ball head gap adjusting mechanism of high-speed press
CN202732541U (en) Double-cushion strong-sealing hydraulic oil cylinder
CN202152771U (en) Hydraulic cylinder
CN203321937U (en) Buffer oil cylinder
CN203892291U (en) Hinged inner rod type single-action cylinder
CN202228571U (en) Adjustable hydraulic brake
CN104006021A (en) Hinged inner rod type single-acting cylinder
CN204470509U (en) A kind of fixture of forging press travelling table oil cylinder
CN203413122U (en) Hydraulic sealing structure
CN201368084Y (en) Single-action piston type hydraulic cylinder for avoiding differential pressure shaking
CN101191481A (en) Drill pump hydraulic end
CN202752370U (en) Extrusion device
CN202625725U (en) Matching parts hard-hermetical pneumatic lifting machine for hydraulic jack
CN202074028U (en) Novel half end-surface sealing and thin-wall split-structure working cylinder
CN207178354U (en) A kind of oil cylinder locking device
CN208252484U (en) A kind of metallurgy hydraulic cylinder
CN209164213U (en) A kind of Horizontal hydraulic dual cylinder supercharging device
CN2907864Y (en) Long cylinder type composite cavity cubic apparatus press
CN202117893U (en) Check valve of compressor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HENAN HUANG HE WHIRL WIND GROUP CO., LTD.

Free format text: FORMER OWNER: HENAN HUANGHE ENTERPRISES GROUP CO., LTD.

Effective date: 20100712

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20100712

Address after: 461500 No. 200 Renmin Road, Henan, Changge

Applicant after: Henan Huanghe Whirlwind Co., Ltd.

Address before: 461500 No. 200 Renmin Road, Henan, Changge

Applicant before: Henan Huanghe Industrial Group Co., Ltd.

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090304