CN101363883A - Distortion electric field measurement method in extra-high voltage AC circuit - Google Patents

Distortion electric field measurement method in extra-high voltage AC circuit Download PDF

Info

Publication number
CN101363883A
CN101363883A CNA2008101970368A CN200810197036A CN101363883A CN 101363883 A CN101363883 A CN 101363883A CN A2008101970368 A CNA2008101970368 A CN A2008101970368A CN 200810197036 A CN200810197036 A CN 200810197036A CN 101363883 A CN101363883 A CN 101363883A
Authority
CN
China
Prior art keywords
citizen
electric field
high voltage
house owed
balcony
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008101970368A
Other languages
Chinese (zh)
Inventor
邬雄
万保权
张小武
张广洲
张泽平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUOWANG WUHAN HIGH VOLTAGE INST
Original Assignee
GUOWANG WUHAN HIGH VOLTAGE INST
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUOWANG WUHAN HIGH VOLTAGE INST filed Critical GUOWANG WUHAN HIGH VOLTAGE INST
Priority to CNA2008101970368A priority Critical patent/CN101363883A/en
Publication of CN101363883A publication Critical patent/CN101363883A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Measurement Of Current Or Voltage (AREA)

Abstract

The invention relates to a method for measuring a distorted electric field under a 1000KV ultra-high voltage AC line, which comprises three parts, namely a method for measuring the power-frequency distorted electric field in a residential building under the 1000KV ultra-high voltage AC line, a method for measuring the power-frequency distorted electric field on the balcony of the residential building under the 1000KV ultra-high voltage AC line and a method for measuring the field strength on the roof platform of the residential building under the 1000KV ultra-high voltage AC line. The method has the important practical significance in specifying the measurement of the power-frequency distorted electric field in the national power transmission and distribution project and scientifically carrying out the environmental protection and the environmental evaluation of the power transmission and distribution project, and solves the embroilment problem due to the electromagnetic environment of the power transmission and distribution project.

Description

Distortion electric field measurement method in extra-high voltage AC circuit
Technical field
The invention belongs to high voltage power transmission and transforming engineering electromagnetic compatibility field, is a kind of 1000KV distortion electric field measurement method in extra-high voltage AC circuit specifically.
Background technology
Along with improving constantly of the continuous quickening of power grid construction paces, people's living standard, power grid construction also constantly runs into the puzzlement of environmental protection aspect problem.The electromagnetic problems initiation complaint and the dispute of house owed by a citizen take place to close on, cross over because of transmission line of electricity throughout the country frequently, the incident of group's visit in recent years constantly rises, even the masses obstruct the incident of project of transmitting and converting electricity construction to happen occasionally, this brings difficulty not only for the construction of electrical network, and has had a strong impact on the safe operation of electrical network.
Eliminate the electromagnetic environment influence of the defeated Cheng Zaocheng that exchanges work for maximum magnitude ground; the environmental protection inspection and acceptance stage after the project of transmitting and converting electricity construction environmental evaluation stage in early stage, construction; carry out electromagnetic environment monitor work; and project of transmitting and converting electricity put into operation the back actual environment index is scientifically measured evaluation, be the fundamental state policy of China environmental protection.Because high-voltage alternating aerial power transmission line power frequency distortion electric field measurement method disunity; make that different results appears in different mechanism for monitoring when concrete engineering being carried out environmental monitoring and estimating; cause measurement data and judge very big deviation occurring; unnecessary misunderstanding and many disputes have been caused with this; this not only scientifically protects environment unfavorable to China, and has seriously hindered the construction and the operation of the defeated journey of exchanging work of China.
Summary of the invention
The objective of the invention is measurement for standard China project of transmitting and converting electricity power frequency distortion electric field, and solve the dispute problem that causes owing to the project of transmitting and converting electricity electromagnetic environment, and power frequency distortion electric field measurement method under a kind of scientific and effective 1000KV extra-high voltage AC circuit is provided.
To achieve these goals, the present invention includes three parts: power frequency distortion electric field measurement method in the house owed by a citizen under the 1000KV extra-high voltage AC circuit; Power frequency distortion electric field measurement method on the house owed by a citizen balcony under the 1000KV extra-high voltage AC circuit; Field intensity measuring method on the house owed by a citizen roof platform under the 1000KV extra-high voltage AC circuit, wherein:
Power frequency distortion electric field measurement method in the house owed by a citizen: the power frequency electric field in the room, area inner measuring place outside distance wall and other fixed objects 1.5m, and measure maximal value, as estimating foundation.As not satisfying above-mentioned and the requirement metope distance, then get the floor space planar central as measurement point, but the 1m at least of the distance between measurement point and peripheric fixture body;
Power frequency distortion electric field measurement method on the house owed by a citizen balcony: when the physical dimension of balcony satisfied in the house owed by a citizen field intensity measurement point arrangement requirement, the field strength measurement method on the balcony was identical with field intensity measuring method in the house owed by a citizen; If the physical dimension of balcony does not satisfy field intensity measurement point arrangement requirement in the house owed by a citizen, then should measure at the balcony middle position;
Field intensity measuring method on the house owed by a citizen roof platform: the area inner measuring power frequency electric field outside wall and other fixed objects 1.5m around the distance, and draw the measurement maximal value, if the physical dimension of house owed by a citizen roof platform does not satisfy this condition, then should measure at the platform middle position.
The present invention is the measurement of standard China project of transmitting and converting electricity power frequency distortion electric field, scientifically carries out the environmental evaluation of environmental protection and project of transmitting and converting electricity, and solves because the dispute problem that the project of transmitting and converting electricity electromagnetic environment causes has important practical significance.
Description of drawings
Fig. 1 is power frequency distortion electric field measurement method synoptic diagram in the house owed by a citizen of the present invention.
Fig. 2 is field intensity measuring method synoptic diagram on the house owed by a citizen roof platform of the present invention.
Embodiment
The present invention is further detailed explanation below in conjunction with drawings and Examples, but this embodiment should not be construed as limitation of the present invention.
Standard of the present invention under the 1000KV extra-high voltage AC circuit power frequency distortion electric field measure
Power frequency distortion electric field measurement method in the house owed by a citizen:
As shown in Figure 1, the power frequency electric field in the room, area inner measuring place outside distance wall and other fixed objects 1.5m, and measure maximal value, as estimating foundation.As not satisfying above-mentioned and the requirement metope distance, then get the floor space planar central as measurement point, but the 1m at least of the distance between measurement point and peripheric fixture body;
Power frequency distortion electric field measurement method on the house owed by a citizen balcony:
When the physical dimension of balcony satisfied in the house owed by a citizen field intensity measurement point arrangement requirement, the field strength measurement method on the balcony was identical with field intensity measuring method in the house owed by a citizen; If the physical dimension of balcony does not satisfy field intensity measurement point arrangement requirement in the house owed by a citizen, then should measure at the balcony middle position
Field intensity measuring method on the house owed by a citizen roof platform:
As shown in Figure 2, the area inner measuring power frequency electric field outside wall and other fixed objects 1.5m around the distance, and draw the measurement maximal value, if the physical dimension of house owed by a citizen roof platform does not satisfy this condition, then should measure at the platform middle position.
The content that is not described in detail in this instructions belongs to this area professional and technical personnel's known prior art.

Claims (1)

1, a kind of distortion electric field measurement method in extra-high voltage AC circuit comprises three parts: power frequency distortion electric field measurement method in the house owed by a citizen under the 1000KV extra-high voltage AC circuit; Power frequency distortion electric field measurement method on the house owed by a citizen balcony under the 1000KV extra-high voltage AC circuit; Field intensity measuring method on the house owed by a citizen roof platform under the 1000KV extra-high voltage AC circuit, wherein:
Power frequency distortion electric field measurement method in the house owed by a citizen: the power frequency electric field in the room, area inner measuring place outside distance wall and other fixed objects 1.5m, and measure maximal value, as estimating foundation.As not satisfying above-mentioned and the requirement metope distance, then get the floor space planar central as measurement point, but the 1m at least of the distance between measurement point and peripheric fixture body;
Power frequency distortion electric field measurement method on the house owed by a citizen balcony: when the physical dimension of balcony satisfied in the house owed by a citizen field intensity measurement point arrangement requirement, the field strength measurement method on the balcony was identical with field intensity measuring method in the house owed by a citizen; If the physical dimension of balcony does not satisfy field intensity measurement point arrangement requirement in the house owed by a citizen, then should measure at the balcony middle position;
Field intensity measuring method on the house owed by a citizen roof platform: the area inner measuring power frequency electric field outside wall and other fixed objects 1.5m around the distance, and draw the measurement maximal value, if the physical dimension of house owed by a citizen roof platform does not satisfy this condition, then should measure at the platform middle position.
CNA2008101970368A 2008-09-19 2008-09-19 Distortion electric field measurement method in extra-high voltage AC circuit Pending CN101363883A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008101970368A CN101363883A (en) 2008-09-19 2008-09-19 Distortion electric field measurement method in extra-high voltage AC circuit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008101970368A CN101363883A (en) 2008-09-19 2008-09-19 Distortion electric field measurement method in extra-high voltage AC circuit

Publications (1)

Publication Number Publication Date
CN101363883A true CN101363883A (en) 2009-02-11

Family

ID=40390359

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008101970368A Pending CN101363883A (en) 2008-09-19 2008-09-19 Distortion electric field measurement method in extra-high voltage AC circuit

Country Status (1)

Country Link
CN (1) CN101363883A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114004124A (en) * 2021-11-03 2022-02-01 华北电力大学(保定) Safety evaluation method for distortion field intensity of civil house platform under constraint of multiple conditions
CN114089050A (en) * 2021-11-15 2022-02-25 清华大学 Online measurement method and device for surface charge distortion electric field of GIS insulator

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114004124A (en) * 2021-11-03 2022-02-01 华北电力大学(保定) Safety evaluation method for distortion field intensity of civil house platform under constraint of multiple conditions
CN114004124B (en) * 2021-11-03 2024-05-28 华北电力大学(保定) Safety assessment method for civil house platform distortion field intensity under multi-condition constraint
CN114089050A (en) * 2021-11-15 2022-02-25 清华大学 Online measurement method and device for surface charge distortion electric field of GIS insulator

Similar Documents

Publication Publication Date Title
CN101221202A (en) Method for appraising electromagnetic environment level of 1000KV ultrahigh voltage alternating current transmission lines
CN104375112B (en) One kind is based on SF6The voltage transformer on-line testing system of parallel plate capacitor
CN106546859A (en) A kind of on-line monitoring system for cable arrester
CN203299270U (en) Device for accurately measuring CVT grid-side voltage harmonic wave
CN204230724U (en) Can the packaged type intelligent substation of remote online monitoring
CN107064615A (en) HVAC power transmission line voltage class measuring method, apparatus and system
CN101363883A (en) Distortion electric field measurement method in extra-high voltage AC circuit
CN105486464A (en) Substation roof plate rain leakage on-line monitoring system and monitoring method
CN104377581A (en) Movable type intelligent transformer substation capable of being monitored remotely on line
CN104459370A (en) Converter transformer broadband electromagnetic transient analysis model based on double transmission line structures
CN204832317U (en) Split type electric leakage measuring apparatu
CN204188712U (en) Based on transformer station's environmental impact assessment early warning system of compressed sensing restructing algorithm
CN202372652U (en) Meteorological data observation device of power system
CN203705561U (en) All-weather power-frequency electric field measuring device
CN205958653U (en) High voltage transmission line's corona loss measuring equipment
CN204788717U (en) Inside temperature -detecting device of transformer based on fiber grating
CN206161829U (en) Capacitance type potential transformer's status monitoring device and system
CN210775664U (en) Metering device for line loss
CN207798955U (en) Alternating current circuit sensitive spot distortion electric field measuring system based on wireless telecommunications
CN103377819B (en) A kind of current-voltage transformer
CN204044251U (en) A kind of earth resistance device
CN104330646A (en) Transformer substation environment assessment early warning system and method based on compressed-sensing reconstruction algorithm
CN203299292U (en) Professional inspection equipment for insulation state of transformer
CN102393539A (en) Meteorological data observing device for electric power system
CN203119949U (en) A railway communication iron tower monitoring device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090211