CN101355385B - Method and system for automatically recovering maintenance and control of optical communication apparatus remotely - Google Patents
Method and system for automatically recovering maintenance and control of optical communication apparatus remotely Download PDFInfo
- Publication number
- CN101355385B CN101355385B CN2008101416381A CN200810141638A CN101355385B CN 101355385 B CN101355385 B CN 101355385B CN 2008101416381 A CN2008101416381 A CN 2008101416381A CN 200810141638 A CN200810141638 A CN 200810141638A CN 101355385 B CN101355385 B CN 101355385B
- Authority
- CN
- China
- Prior art keywords
- control
- control unit
- setup time
- network element
- maintenance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The invention discloses a method for the remote self recovery for maintenance and control of light communication equipment and a system thereof. The system comprises a net management system connected with a remote net element, wherein the remote net element particularly comprises a net element control plate, service single plates and a maintenance control unit; the remote net element also comprises a timing control unit; the net element control plate is used to receive maintenance control commands sent by the net management system, and retransmits the commands to other service single plates in the net element; the timing control unit is used to receive maintenance control commands sent by the net element control plate, and periodically retransmits the commands to the maintenance control unit; and, the maintenance control unit is used to process the maintenance control commands sent downward by the net management system. In the invention, the timing control unit is additionally arranged on the service plate, when the DCC byte of the service plate is obstructed due to the performing of the maintenance control and the remote recovery can not be preformed due to no net management, the service plate can automatically cancel the maintenance control, recover the communication function of the DCC byte and further recover the remote net management control.
Description
Technical field
The present invention relates to the optical communication technology field, relate in particular to a kind of at safeguarding control cause having no progeny in DCC (Data Communications Channel) communication link method and system of remotely automatic recovering in the optical communication equipment.
Background technology
In optical communication equipment, for orientation problem needs, provide some to safeguard control command usually, for example loopback setting, insertion alarm, insertion error code, shutoff laser etc.Because webmaster is to transmit by the DCC byte in the expense to the control command of long-range optical communication equipment, and the above-mentioned control command of safeguarding often may cause business board DCC byte obstructed, and the obstructed meeting of business board DCC byte causes webmaster to take off pipe, causing cancelling the order of safeguarding control can't issue, cancellation this moment safeguards that issuing of control command needs the DCC byte logical, and logical need the cancellation of DCC byte safeguards that control command issues, the two has been absorbed in a dead ring, thus cause professional and webmaster control all can't remote recovery.
Equipment for the processing mode of this problem is at present, minimizing may cause optical communication equipment to take off the maintenance control of pipe, for example insert alarm, insert error code, the operation that loopback is not supported port level is set, but obvious this way can't be avoided the problems referred to above fully, has also reduced the function of safeguarding control command simultaneously.
Summary of the invention
Technical problem to be solved by this invention provides a kind of method and system of automatically recovering maintenance and control of optical communication apparatus remotely, this method can guarantee to safeguard that control command can both normal configuration, can remotely automatic recovering and safeguard that optical communication equipment that the control configuration causes takes off pipe.
For solving the problems of the technologies described above, the present invention is achieved by the following technical solutions:
A kind of automatically recovering maintenance and control of optical communication apparatus remotely system, comprising: the network management system that is connected with remote network element, described remote network element specifically comprise network element control plate, service board, safeguard control unit, timing control unit;
The network element control plate is used to receive the control command of safeguarding that network management system sends over, and it is forwarded to other service board in the network element;
Timing control unit is used to receive the control command of safeguarding that the network element control plate sends over, and regularly is transmitted to and safeguards control unit;
Safeguard that control unit is used to handle the control command of safeguarding that network management system issues.
A kind of method of automatically recovering maintenance and control of optical communication apparatus remotely may further comprise the steps:
A: receive and regularly to safeguard control command, timing control unit is preserved configuration information, preserves T1 and cancellation T2 setup time setup time simultaneously;
B: timing control unit carries out automatic regular polling operation, with current time T and T1 and cancel setup time T2 and compare setup time, if satisfy T1<=T<T2, then carries out the processing of current configuration; If satisfy T1<T2<=T, then cancel the processing of current configuration.
Wherein, regularly safeguard that control command comprises described in the step a: alarm insertion, error code insertion, loopback setting or laser control.
The present invention has following beneficial effect:
The present invention is by increasing by a timing control unit at business board, when owing to safeguard that control causes that business board DCC byte is obstructed, webmaster takes off pipe and can't the situation of remote recovery under, business board can be safeguarded the cancellation of control automatically, recover DCC byte communication function, thereby recover remote network management control.
Description of drawings
Fig. 1 is a system construction drawing of the present invention;
Fig. 2 is the inventive method flow chart.
Embodiment
The present invention is by providing a kind of method and system of automatically recovering maintenance and control of optical communication apparatus remotely, owing to safeguard that control causes that business board DCC byte is obstructed, webmaster takes off pipe and can't the situation of remote recovery under, business board can be safeguarded the cancellation of control automatically, recover DCC byte communication function, thereby recover remote network management control.
Among the present invention for safeguarding control command interpolation time control, comprise one setup time T1 and cancellation T2 setup time (T1<T2), the current time is T.
Timing system of business board inner setting, receive configuration order after,
If T<T1<T2, T1 safeguards the configuration of control in the setup time of appointment, cancels the configuration of safeguarding control at cancellation T2 setup time of appointment;
If T1<=T<=T2 then safeguards the control configuration immediately, cancel the configuration of safeguarding control at cancellation T2 setup time of appointment;
If T1<T2<=T thinks invalid control, carry out invalidation.
The present invention is described in further detail below in conjunction with drawings and the specific embodiments:
See also shown in Figure 1ly, comprising: specifically comprise network element control plate 102, service board 103, timing control unit 104, safeguard control unit 105 with network management system 101, the remote network element of remote network element wireless connections;
Network element control plate 102 is used to receive the control command of safeguarding that network management system 101 sends over, and it is forwarded to other service board 103 in the network element;
Timing control unit 104 is used to receive the control command of safeguarding that network element control plate 102 sends over, and regularly is transmitted to and safeguards control unit 105;
Safeguard that control unit 105 is used to handle the control command of safeguarding that network management system 101 issues.
See also shown in Figure 2ly, comprising:
Step 201: receive the timing controlled order and also preserve configuration information, preserve T1 and cancellation T2 setup time setup time simultaneously;
Below in conjunction with specific embodiment, introduce searching method step of the present invention.
Embodiment 1:
Be example with the optical interface business board on the SDH network element device below, describe concrete implementation step in detail:
Step 1: webmaster is provided with the interface to alarm insertion, error code insertion, loopback setting, the newly-increased timing controlled of laser control setting;
Step 2: business board adds a timing control unit, receive after timing that alarm insertions, error code insertion, loopback setting, laser control safeguards control command, timing control unit is preserved configuration information, preserves the time (T1) of configuration and the time (T2) of cancellation configuration simultaneously;
Step 3: timing control unit carries out the automatic regular polling operation, and current time (T) and two control times (T1 and T2) are compared, if satisfy T1<=T<T2, then carries out the processing of current configuration;
Step 4: carry out polling operation, current time (T) and two control times (T1 and T2) are compared,, then cancel the processing of current configuration if satisfy T1<T2<=T.
Above embodiment is only unrestricted in order to technical scheme of the present invention to be described, only with reference to preferred embodiment the present invention is had been described in detail.Those of ordinary skill in the art should be appreciated that and can make amendment or be equal to replacement technical scheme of the present invention, and do not break away from the spirit and scope of technical solution of the present invention, all should be encompassed in the middle of the claim scope of the present invention.
Claims (3)
1. automatically recovering maintenance and control of optical communication apparatus remotely system, comprising: the network management system that is connected with remote network element, described remote network element specifically comprise network element control plate, service board, safeguard control unit; It is characterized in that, also comprise: preserve setup time T1 and the cancellation setup time T2 timing control unit;
The network element control plate is used to receive the control command of safeguarding that network management system sends over, and it is forwarded to other service board in the network element;
Timing control unit is used to receive the control command of safeguarding that the network element control plate sends over, and with current time T and setup time T1 and cancellation T2 setup time compare, if satisfy T1<=T<T2, will safeguard then that control command is transmitted to safeguard control unit; If satisfy T1<T2<=T, then the forwarding of control command is safeguarded in cancellation;
Safeguard that control unit is used to handle the control command of safeguarding that network management system issues.
2. the method for an automatically recovering maintenance and control of optical communication apparatus remotely is characterized in that, may further comprise the steps:
A: receive and regularly to safeguard control command, timing control unit is preserved configuration information, preserves T1 and cancellation T2 setup time setup time simultaneously;
B: timing control unit carries out automatic regular polling operation, with current time T and T1 and cancel setup time T2 and compare setup time, if satisfy T1<=T<T2, then carries out the processing of current configuration; If satisfy T1<T2<=T, then cancel the processing of current configuration.
3. the method for automatically recovering maintenance and control of optical communication apparatus remotely as claimed in claim 2 is characterized in that, regularly safeguards that control command comprises described in the step a: alarm insertion, error code insertion, loopback setting or laser control.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101416381A CN101355385B (en) | 2008-07-18 | 2008-07-18 | Method and system for automatically recovering maintenance and control of optical communication apparatus remotely |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101416381A CN101355385B (en) | 2008-07-18 | 2008-07-18 | Method and system for automatically recovering maintenance and control of optical communication apparatus remotely |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101355385A CN101355385A (en) | 2009-01-28 |
CN101355385B true CN101355385B (en) | 2011-06-22 |
Family
ID=40308004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008101416381A Expired - Fee Related CN101355385B (en) | 2008-07-18 | 2008-07-18 | Method and system for automatically recovering maintenance and control of optical communication apparatus remotely |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101355385B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1492627A (en) * | 2002-10-24 | 2004-04-28 | 华为技术有限公司 | Failure warning method in network manager's central failure system |
EP1715602A1 (en) * | 2005-04-21 | 2006-10-25 | Alcatel Alsthom Compagnie Generale D'electricite | Network management system for an optical network |
EP1879308A1 (en) * | 2006-07-11 | 2008-01-16 | Alcatel Lucent | Method and apparatus for monitoring optical links in an optical transparent network |
CN101197621A (en) * | 2007-12-07 | 2008-06-11 | 中兴通讯股份有限公司 | Method and system for remote diagnosing and locating failure of network management system |
-
2008
- 2008-07-18 CN CN2008101416381A patent/CN101355385B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1492627A (en) * | 2002-10-24 | 2004-04-28 | 华为技术有限公司 | Failure warning method in network manager's central failure system |
EP1715602A1 (en) * | 2005-04-21 | 2006-10-25 | Alcatel Alsthom Compagnie Generale D'electricite | Network management system for an optical network |
EP1879308A1 (en) * | 2006-07-11 | 2008-01-16 | Alcatel Lucent | Method and apparatus for monitoring optical links in an optical transparent network |
CN101197621A (en) * | 2007-12-07 | 2008-06-11 | 中兴通讯股份有限公司 | Method and system for remote diagnosing and locating failure of network management system |
Also Published As
Publication number | Publication date |
---|---|
CN101355385A (en) | 2009-01-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102045229B (en) | Topology management method and system of Ethernet multi-loop network | |
CN102415056A (en) | Pon system, station-end apparatus and subscriber-end apparatus | |
CN103268243B (en) | A kind of performance element on the spot remote online upgrade-system of chain type current transformer | |
CA2357219A1 (en) | System for servicing and maintaining heat supply equipment | |
CN100403696C (en) | Storage management method and system for realizing data collocation between network element and network management | |
CN102025562A (en) | Path detection method and device | |
CN103825764B (en) | Data collecting instrument monitoring system based on cloud calculation and method for enhancing communication stability of data collecting instrument monitoring system based on cloud calculation | |
EP2469770B1 (en) | Method and system for preventing repeated updating of address table in ethernet ring network protection | |
CN103095703A (en) | Method and equipment and system for achieving data interaction between network and serial port | |
CN103944814A (en) | Data exchange method and system and gateway server | |
CN101183901A (en) | Method of implementing transmission equipment power-off alarm and alarm recovery | |
CN101340377B (en) | Method, apparatus and system for data transmission in double layer network | |
CN101777996B (en) | Device and method for realizing switching primary and spare services | |
CN101217331B (en) | A device and method for repositioning and recovery of embedded communication failures of control channel | |
CN101267351B (en) | Realization method, system and device for online software upgrade based on application architecture | |
CN101355385B (en) | Method and system for automatically recovering maintenance and control of optical communication apparatus remotely | |
CN109120063B (en) | Plug-and-play sensor monitoring method, system and acquisition unit thereof | |
CN102407868A (en) | Hot-standby dual-connection method suitable for communication protocol of modern monitoring system of rail transit | |
CN101047700B (en) | Method and device for raising reliability of LMP control channel | |
CN101977078A (en) | Method and system for processing remote failure device in optical transfer network | |
CN102281158A (en) | Line fault processing method and device | |
CN111459517A (en) | Master-slave equipment online program upgrading method under optical fiber ring network architecture | |
CN102843265B (en) | Not resetting without the hot standby dual link method of perturbation of a kind of communication protocol | |
CN104767974A (en) | Intelligent remote monitoring terminal with video monitoring function and control method thereof | |
CN102045600A (en) | Link protection method and device of Ethernet accessed to SDH (Synchronous Digital Hierarchy) optical network |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110622 Termination date: 20190718 |
|
CF01 | Termination of patent right due to non-payment of annual fee |