CN101349078A - Bamboo reinforcement rammed earth wall building technique - Google Patents

Bamboo reinforcement rammed earth wall building technique Download PDF

Info

Publication number
CN101349078A
CN101349078A CNA2008100588272A CN200810058827A CN101349078A CN 101349078 A CN101349078 A CN 101349078A CN A2008100588272 A CNA2008100588272 A CN A2008100588272A CN 200810058827 A CN200810058827 A CN 200810058827A CN 101349078 A CN101349078 A CN 101349078A
Authority
CN
China
Prior art keywords
bamboo reinforcement
bamboo
wall
reinforcement
rammed earth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008100588272A
Other languages
Chinese (zh)
Other versions
CN101349078B (en
Inventor
陶忠
潘文
杨晓东
白羽
曹净
何玲
高智能
陈志寿
焦春节
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN2008100588272A priority Critical patent/CN101349078B/en
Publication of CN101349078A publication Critical patent/CN101349078A/en
Application granted granted Critical
Publication of CN101349078B publication Critical patent/CN101349078B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention relates to a bamboo reinforcement rammed earth wall building technology, belonging to the field of civil engineering, in particular to the technical field of earth building construction. During the prior construction of rammed earth walls, the distribution of bamboo strips are not controlled, so the bamboo reinforcement layer of the wall body becomes a weak link and does not bring into real play the tensile capability of rammed earth wall-inside horizontal stress bamboo reinforcement. The bamboo reinforcement rammed earth wall building technology comprises a rammed earth wall body and bamboo reinforcements, and during the conventional rammed earth building construction, the bamboo reinforcements are arranged on the cross section of the wall body according to proper reinforcement ratio, so that the shock strength of the wall body is obviously improved. The building technology is worth promotion and application for new buildings in rural areas.

Description

Bamboo reinforcement rammed earth wall building technique
Technical field
The present invention relates to a kind of bamboo reinforcement rammed earth wall building technique, belong to the immature soil house and the building technology field, civil structure house (comprising the rammed earth wall building) of civil engineering.
Background technology
Earth building is at vast rural area ubiquity.As traditional immature soil body of wall of load-bearing and maintenance, in all previous earthquake, destroy the most serious.Though the minority body of wall is furnished with bamboo reinforcement, lack reasonably design and build (bamboo reinforcement configuration quantity and position are improper, and the bamboo reinforcement anchoring is improper etc.), and do not reach expected effect, become body of wall antidetonation weak link.Modern reinforced concrete shear wall (seismic structural wall, earthquake resistant wall) building technology is told us, and reasonably design of reinforcement and corresponding construction measure can make body of wall have very high ductility and antidetonation bearing capacity.Test and calculating show, dispose rational bamboo reinforcement and corresponding construction measure by being controlled at rammed earth wall, can reach the ductility and the antidetonation bearing capacity that improve immature soil body of wall.
Summary of the invention:
The object of the invention is exactly in order to overcome rammed earth wall becomes weak link without the bamboo reinforcement layer of specialized designs or verification experimental verification problem, the tension effect of the stressed bamboo reinforcement of level in the real performance rammed earth wall, improve the effect (promptly improve rammed earth wall opposing horizontal earthquake action ability as lateral resistant member) of traditional rammed earth wall opposing, and then improve the anti-seismic performance of traditional rammed earth wall house integral body from the horizontal earthquake component in the face.
Bamboo reinforcement rammed earth wall building technique of the present invention is: comprise body of wall (5) and bamboo reinforcement, it is characterized in that: body of wall (5) thickness is t, the quantity of every layer of stressed bamboo reinforcement of configuration level is n row, horizontal bamboo reinforcement (1) is arranged n=t/100 row along the wall thickness direction, the bamboo bar that the stressed bamboo reinforcement of level (1) cross section 10mm is wide, 4mm is thick, row spacing be 100mm, with the exterior wall back gauge be 50mm; It is 5mm * 5mm that thickness connects bamboo reinforcement (3) cross sectional dimensions, length is the bamboo bar of 300mm, along body of wall (5) thickness direction and the stressed bamboo reinforcement of level (1) square crossing, press 600 equidistant placement along body of wall (5) width, the connection bamboo reinforcement (3) at two ends is 100mm with body of wall width exterior wall limit spacing, the stressed bamboo reinforcement of level (1) be connected with thickness bamboo reinforcement layer that bamboo reinforcement (3) forms along body of wall (5) short transverse according to spacing 200mm layered arrangement, first floor bamboo reinforcement is apart from basic end face 300mm; Vertical anchoring bamboo reinforcement (2) cross sectional dimensions is 5mm * 5mm, length is the bamboo bar of 300mm, vertical anchoring bamboo reinforcement (2) is arranged vertically n row along thickness of wall body direction and the stressed bamboo reinforcement of level, be connected vertical connection of bamboo reinforcement layer of bamboo reinforcement (3) with thickness in the stressed bamboo reinforcement of bamboo reinforcement midpoint and level (1), three kinds of bamboo reinforcement infalls are fixed with straw (4) or iron wire or other material colligation.
The minimum steel ratio of bamboo reinforcement is 0.024%, and maximum reinforcement ratio is 0.511%.
Bamboo reinforcement rammed earth wall building technique is the theoretical product that combines with test that calculates.The bamboo reinforcement quantity (promptly asking reinforcement ratio) by calculating required laying in the rammed earth wall at first, excessive or too small reinforcement ratio can cause in the middle of the similar concrete structure overreinforced or few muscle to destroy.Specifically, bamboo reinforcement rammed earth wall bamboo bar too much causes at first destroying at this layer, and the bamboo bar is just insignificant to the contribution of whole body of wall at least excessively.So find the rational reinforcement ratio scope particular importance that seems.Below be computational process and technical scheme:
One, the calculating of minimum steel ratio
Suppose: f yWith f cBe respectively the normal intensity of reinforcing bar and concrete; F ' yWith f ' cBe respectively the normal intensity of bamboo reinforcement and sun-dried mud brick.A SWith A ' sBe respectively the section area of reinforcing bar and bamboo reinforcement; A and A ' are respectively the cross section gross area of steel bar concrete seismic structural wall, earthquake resistant wall and bamboo reinforcement adobe wall.
A S A = f y ′ A s ′ f y f c ′ A ′ f c ≥ 0.2 % (the horizontal steel bar rate of steel bar concrete seismic structural wall, earthquake resistant wall)
Order: C 1 = f y ′ f y = 234.8 N / mm 2 235 N / mm 2 = 0.99
C 2 = f c ′ f c = 1.6 N / mm 2 13.4 N / mm 2 = 0.12
Then: A s A = C 1 A S ′ C 2 A ′ ≥ 0.2 %
A S ′ A ′ ≥ 0.024 %
Promptly calculate to such an extent that the minimum steel ratio of rammed earth wall is 0.024% by seismic structural wall, earthquake resistant wall 0.2% horizontal steel bar rate
Two, maximum reinforcement ratio is calculated
The horizontal bamboo reinforcement of bamboo reinforcement rammed earth wall is 200mm along the high spacing of wall, apart from bamboo reinforcement layer top and bottom 100mm retrieval unit layer.Suppose that the tension bearing capacity of the horizontal bamboo reinforcement of this elementary layer equals the horizontal shear-carrying capacity of half soil body, for calculating the critical condition of maximum reinforcement ratio.Because learnt by test, wall body slit is at first carried out to approximately along body of wall length l direction midpoint, and then bamboo reinforcement is just started working, so get half long calculating.Design formulas is as follows:
F=f y·A
V = t · l 2 · τ
F = V
⇒ ρ max = A 200 t = l · τ 2 f y × 200 = 1600 × 0.3 2 × 234.8 × 200 = 0.511 %
(wherein: A is the cross-sectional area of elementary layer, and t is a wall thickness, and l is examination
Test the wall length of a film, τ is native shear strength, f yBe bamboo reinforcement tensile strength.)
So far, to go out the minimum steel ratio of rammed earth wall be 0.024% to primary Calculation, and maximum reinforcement ratio is 0.511%.Reinforcement ratio is comparatively rational between 0.024% to 0.511%.
In the middle of actual engineering, the most general rammed earth wall thickness is 600mm, for being applicable to different wall thicknesses, make that wall thickness is t, then every layer need bamboo reinforcement quantity be n=t/100 row, the cross sectional dimensions of the stressed bamboo reinforcement of level is 4mm * 10mm, and evenly arrange along the wall thickness direction, the stressed bamboo reinforcement of every row of horizontal is along the elongated layout of wall length direction (extensible when length is not enough, suitable 100mm~the 200mm of lap length, and with straw or iron wire or the 4 firm colligations of other colligation material), attention will be imbedded along bamboo bar width and ram in the soil.The stressed bamboo reinforcement of level row spacing is 100mm, with the exterior wall back gauge be 50mm.The cross sectional dimensions that thickness connects bamboo reinforcement is 5mm * 5mm, and long is 300mm, along thickness of wall body direction and the stressed bamboo reinforcement square crossing of level, presses the 600mm equidistant placement along the body of wall width, and the connection bamboo reinforcement 3 and the body of wall width exterior wall limit spacing at two ends are 100mm.The stressed bamboo reinforcement of level be connected with thickness bamboo reinforcement layer that bamboo reinforcement forms along the body of wall short transverse according to spacing 200mm layered arrangement, but first floor bamboo reinforcement is apart from basic end face 300mm.The cross sectional dimensions of vertical anchoring bamboo reinforcement is 5mm * 5mm, and long is 300mm.Vertical anchoring bamboo reinforcement is arranged vertically n row along thickness of wall body direction and the stressed bamboo reinforcement of level, is connected vertical connection of bamboo reinforcement layer of bamboo reinforcement with thickness in the stressed bamboo reinforcement of bamboo reinforcement midpoint and level.Horizontal bamboo reinforcement, vertical anchoring bamboo reinforcement are connected bamboo reinforcement node place to be fixed with straw or iron wire or other colligation material with thickness.
Bamboo reinforcement rammed earth wall building technique of the present invention, its reinforcement ratio is configured through after the calculating of science, making that the level of rammed earth wall is stressed strengthens greatly, anti seismic efficiency is remarkable, make things convenient for not only that the resident draws materials, economy, popularize easily, and do not pollute the environment after discarded, really guaranteeing the environmental protection of novel cob, is to alleviate the approach that the world today faces resource exhaustion, ecological deterioration dual-pressure.
Bamboo reinforcement rammed earth wall building technique of the present invention, it comprises rammed earth wall body and bamboo reinforcement, is that wall section is arranged bamboo reinforcement according to suitable reinforcement ratio, makes the shock strength of body of wall obviously improve in traditional cob construction.This building technology is worth applying when the newly-built house in rural area.
Description of drawings
Fig. 1 is the elementary layer schematic diagram that calculates the maximum reinforcement ratio intercepting of the horizontal bamboo reinforcement of rammed earth wall;
Fig. 2 is the vertical view that the stressed bamboo reinforcement of rammed earth wall level is arranged;
Fig. 3 is the cross-sectional view that the stressed bamboo reinforcement of rammed earth wall level is arranged;
Fig. 4 is the connection detail drawing that the stressed bamboo reinforcement of rammed earth wall level, vertical anchoring bamboo reinforcement and thickness connect bamboo reinforcement.
Among the figure: 1. the stressed bamboo reinforcement of level; 2. vertical anchoring bamboo reinforcement; 3. thickness connects bamboo reinforcement; 4. colligation material; 5. body of wall; 6. desirable crack.
The specific embodiment:
Bamboo reinforcement rammed earth wall building technique comprises body of wall 5 and bamboo reinforcement, and every layer of quantity of reinforcement of body of wall can be determined according to the difference of thickness of wall body t.Horizontal bamboo reinforcement 1 is arranged along the wall thickness direction, every layer needs bamboo reinforcement quantity is n=t/100 row, and stressed bamboo reinforcement 1 cross section of level is the bamboo bar that 10mm is wide, 4mm is thick, the too narrow too thin manual processing that is not easy, too thickly too slightly be not easy to control reinforcement ratio, so by repeatedly attempting fixing this size.The stressed bamboo reinforcement of level 1 row's spacing is 100mm, with the exterior wall back gauge be 50mm.It is 5mm * 5mm that thickness connects bamboo reinforcement 3 cross sectional dimensions, length is the bamboo bar of 300mm, along body of wall 5 thickness directions and stressed bamboo reinforcement 1 square crossing of level, press the 600mm equidistant placement along body of wall 5 width, the connection bamboo reinforcement 3 and the body of wall width exterior wall limit spacing at two ends are 100mm.The stressed bamboo reinforcement 1 of level be connected with thickness bamboo reinforcement layer that bamboo reinforcement 3 forms along body of wall 5 short transverses according to spacing 200mm layered arrangement, but first floor bamboo reinforcement is apart from basic end face 300mm.Vertical anchoring bamboo reinforcement 2 cross sectional dimensions are 5mm * 5mm, and long is 300mm.Vertical anchoring bamboo reinforcement 2 is arranged vertically n row along thickness of wall body direction and the stressed bamboo reinforcement of level, is connected vertical connection of bamboo reinforcement layer of bamboo reinforcement 3 with thickness in the stressed bamboo reinforcement 1 of bamboo reinforcement midpoint and level.Three class bamboo reinforcement node places use straw or iron wire or other colligation material 4 fixing.As thickness of wall body t is 600mm, and then n is 6 rows.Vertical anchoring bamboo reinforcement 2 is a lot of than stressed bamboo reinforcement 1 weak point of level, the length of getting 300mm is because compare with elongated perpendicular muscle, though can not constitute globality well " bamboo reinforcement rack ", but also can reach the effect of the stressed bamboo reinforcement 1 of fixed level that requires in advance, elementary layer also has the 100mm lap length up and down.The stressed bamboo reinforcement 1 of level has been shared the rammed earth wall lateral resisting, and can with the co-ordination well of plain soil, vertical anchoring bamboo reinforcement 2 plays the effect of the stressed bamboo reinforcement 1 of fixed level, make it under the side direction effect, be unlikely to slippage and lost efficacy, fully the stressed bamboo reinforcement of assurance level is brought into play due effect, thereby improve rammed earth wall opposing horizontal earthquake action ability, and then improve the anti-seismic performance of traditional rammed earth wall house integral body as lateral resistant member.
The wooden model height of rammed earth wall is 300mm, before building, earlier straw was soaked 1 to 2 hour by rammer, ram then and build the thick elementary layer of bottom 300mm, bamboo reinforcement position (wherein the layout of vertical anchoring bamboo reinforcement with the reinforcing bar punching, is inserted vertical bamboo reinforcement again and tamped hole earlier) is reserved on the native surface after compacting.The rammer process of building will be estimated the surface dust requirement, avoids surface dust to make troubles too much.Will be after rammer is built and finished according to weather condition maintenance 1 to 2 months.

Claims (2)

1. bamboo reinforcement rammed earth wall building technique, comprise body of wall (5) and bamboo reinforcement, it is characterized in that: body of wall (5) thickness is t, the quantity of every layer of stressed bamboo reinforcement of configuration level is n row, horizontal bamboo reinforcement (1) is arranged n=t/100 row along the wall thickness direction, the bamboo bar that the stressed bamboo reinforcement of level (1) cross section 10mm is wide, 4mm is thick, row spacing be 100mm, with the exterior wall back gauge be 50mm; It is 5mm * 5mm that thickness connects bamboo reinforcement (3) cross sectional dimensions, length is the bamboo bar of 300mm, along body of wall (5) thickness direction and the stressed bamboo reinforcement of level (1) square crossing, press 600 equidistant placement along body of wall (5) width, the connection bamboo reinforcement (3) at two ends is 100mm with body of wall width exterior wall limit spacing, the stressed bamboo reinforcement of level (1) be connected with thickness bamboo reinforcement layer that bamboo reinforcement (3) forms along body of wall (5) short transverse according to spacing 200mm layered arrangement, first floor bamboo reinforcement is apart from basic end face 300mm; Vertical anchoring bamboo reinforcement (2) cross sectional dimensions is 5mm * 5mm, length is the bamboo bar of 300mm, vertical anchoring bamboo reinforcement (2) is arranged vertically n row along thickness of wall body direction and the stressed bamboo reinforcement of level, be connected vertical connection of bamboo reinforcement layer of bamboo reinforcement (3) with thickness in the stressed bamboo reinforcement of bamboo reinforcement midpoint and level (1), three kinds of bamboo reinforcement infalls are fixed with straw (4) or iron wire or other material colligation.
2. bamboo reinforcement rammed earth wall building technique according to claim 1 is characterized in that: the minimum steel ratio of bamboo reinforcement is 0.024%, and maximum reinforcement ratio is 0.511%.
CN2008100588272A 2008-08-18 2008-08-18 Bamboo reinforcement rammed earth wall building technique Expired - Fee Related CN101349078B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100588272A CN101349078B (en) 2008-08-18 2008-08-18 Bamboo reinforcement rammed earth wall building technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100588272A CN101349078B (en) 2008-08-18 2008-08-18 Bamboo reinforcement rammed earth wall building technique

Publications (2)

Publication Number Publication Date
CN101349078A true CN101349078A (en) 2009-01-21
CN101349078B CN101349078B (en) 2010-09-22

Family

ID=40268029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100588272A Expired - Fee Related CN101349078B (en) 2008-08-18 2008-08-18 Bamboo reinforcement rammed earth wall building technique

Country Status (1)

Country Link
CN (1) CN101349078B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359286A (en) * 2011-09-04 2012-02-22 上海同济城市规划设计研究院 Anti-seismic thermal-insulation Sinkiang rural residential system and building method thereof
CN103967176A (en) * 2014-04-14 2014-08-06 北京工业大学 Raw soil wall with L-shaped section and built-in steel-wood mesh and manufacturing method
CN106381947A (en) * 2016-11-22 2017-02-08 郑州大学 Rammed earth wall with built-in rib strips and tied foam blocks and construction technique thereof
CN108412093A (en) * 2018-03-30 2018-08-17 泛华建设集团有限公司 A kind of Modern Landscape decoration loam wall and its construction method
CN111005588A (en) * 2019-12-26 2020-04-14 阳光学院 Local repair method for rammed earth wall
CN111270869A (en) * 2020-02-20 2020-06-12 阳光学院 Rammed earth wall reinforcing method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359286A (en) * 2011-09-04 2012-02-22 上海同济城市规划设计研究院 Anti-seismic thermal-insulation Sinkiang rural residential system and building method thereof
CN103967176A (en) * 2014-04-14 2014-08-06 北京工业大学 Raw soil wall with L-shaped section and built-in steel-wood mesh and manufacturing method
CN106381947A (en) * 2016-11-22 2017-02-08 郑州大学 Rammed earth wall with built-in rib strips and tied foam blocks and construction technique thereof
CN106381947B (en) * 2016-11-22 2018-06-08 郑州大学 Embedded twigs of the chaste tree drawknot foam block loam wall and its construction technology
CN108412093A (en) * 2018-03-30 2018-08-17 泛华建设集团有限公司 A kind of Modern Landscape decoration loam wall and its construction method
CN111005588A (en) * 2019-12-26 2020-04-14 阳光学院 Local repair method for rammed earth wall
CN111270869A (en) * 2020-02-20 2020-06-12 阳光学院 Rammed earth wall reinforcing method
CN111270869B (en) * 2020-02-20 2022-02-25 阳光学院 Rammed earth wall reinforcing method

Also Published As

Publication number Publication date
CN101349078B (en) 2010-09-22

Similar Documents

Publication Publication Date Title
CN101349078B (en) Bamboo reinforcement rammed earth wall building technique
CN205653944U (en) Prestressed concrete truss superimposed sheet
CN201254768Y (en) Net bamboo reinforcement rammed earth wall
CN101294396A (en) Different-stiffness composite pile composite foundation and processing method
CN107815977B (en) Pre-stressed steel plate and presstressed reinforcing steel composite reinforcement large-span concrete beam construction method
CN113431415A (en) Lattice brick wall and building method thereof
CN102561212A (en) Method for strengthening vertical crack of single-pillar concrete pier
JP3834637B2 (en) Permanent and emergency seismic reinforcement method for wall columns
Sun et al. Seismic behavior and mechanism analysis of innovative precast shear wall involving vertical joints
CN204356937U (en) The shear wall strengthened bottom a kind of integral reinforcing
CN106087976A (en) A kind of prefabricated friction pile of new concrete and pile sinking process
CN105735666A (en) Method for reinforcing concrete column rapidly
CN212714329U (en) Joint bar top-connected type composite foundation structure
CN205712123U (en) A kind of foundation ditch permanent support structure based on double pile for prestressed pipe
CN201794215U (en) Pretensioning method prestress reinforced concrete prefabricated beam
CN111827704A (en) Reinforced concrete structure and reinforcing method
CN202370089U (en) Pre-stressed confined concrete structure
CN205676899U (en) A kind of foundation ditch permanent support structure based on double bored concrete pile
CN212835888U (en) Vertical seam board that draws of assembled autoclaved aerated concrete
CN111254973B (en) Method for repairing extruded deformation of cutting retaining wall
CN104264782A (en) Assembling integral pre-stress framework structure and construction method thereof
CN114232656A (en) UHPC (ultra high performance polycarbonate) assembled soil nailing wall structure and construction method
CN104878855A (en) Wallboard interlayer connection for use at bottom enhanced part of laminated shear wall structure
CN204662708U (en) Position wallboard interlayer connection node is strengthened bottom a kind of overlaid plate type shear wall structure
CN107178216B (en) Big height brick-concrete composite buildings reinforcing construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100922

Termination date: 20130818