CN101348840B - Large vault preassembling method - Google Patents

Large vault preassembling method Download PDF

Info

Publication number
CN101348840B
CN101348840B CN2008100126273A CN200810012627A CN101348840B CN 101348840 B CN101348840 B CN 101348840B CN 2008100126273 A CN2008100126273 A CN 2008100126273A CN 200810012627 A CN200810012627 A CN 200810012627A CN 101348840 B CN101348840 B CN 101348840B
Authority
CN
China
Prior art keywords
vault
single watt
riser
carriage
preassembling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008100126273A
Other languages
Chinese (zh)
Other versions
CN101348840A (en
Inventor
马丽
唐庆伟
黄群
霍方贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANGANG CONSTRUCTION CONSORTIUM Co Ltd
Original Assignee
ANGANG CONSTRUCTION CONSORTIUM Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANGANG CONSTRUCTION CONSORTIUM Co Ltd filed Critical ANGANG CONSTRUCTION CONSORTIUM Co Ltd
Priority to CN2008100126273A priority Critical patent/CN101348840B/en
Publication of CN101348840A publication Critical patent/CN101348840A/en
Application granted granted Critical
Publication of CN101348840B publication Critical patent/CN101348840B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a method for preassembling a large-sized vault. The method is characterized in that a preassembled terrace is paved; a bracket used for preassembling is built on the terrace; and single tiles of each part of the processed vault are arranged at corresponding positions of the bracket and adjacent single tiles are connected. The method brings convenience to the connection between the single tiles, solves the problem that the inner part of the vault has a welding trace due to the welding between the single tiles and a fixed support, and meets the design requirement under the condition that the welding is not permitted in the inner part of the vault.

Description

A kind of large vault preassembling method
Technical field
The present invention relates to a kind of vault manufacturing technology, particularly a kind of large-scale vault is carried out pre-assembled method.
Background technology
Carry out in the pre-assembling process at large-scale vault, the mode that adopts the vault interior welds to support is usually assembled in advance.As ground moral formula hotblast stove, its vault mainly is made up of several parts such as segment, spherical zone and awl bands, and every part can be divided into some single watt again.Ground moral formula hotblast stove in the past allows the vault interior welds to support in design, by support and single watt of inwall between welding single watt is fixed on the corresponding position in a certain order.So, not only increase the assembling back and removed the operation of vault inner support, but also can on every single watt internal surface, leave the welding scar, destroyed the single watt of original smooth finish of inwall, having to, the internal surface to every single watt carries out grinding process before dispatching from the factory, and has wasted manpower and materials.The more important thing is, in case when the user has higher the requirement to the vault enclosure interior (not allowing welding as vault inside), this packaging technology can't satisfy the requirement in the design.
Summary of the invention
The object of the present invention is to provide a kind of large vault preassembling method, solution leaves the problem of welding scar because of welding the vault inside of being caused between single watt and the fixed support, so that under the situation that does not allow to weld in vault inside, still can meet design requirement, realize pre-assembling vault.
The object of the present invention is achieved like this, and a kind of large vault preassembling method is characterized in that: lay pre-assembly platform; On platform, build the carriage of pre-assembling usefulness; Single watt of the vault each several part that processes is placed on the corresponding position of carriage and and connects adjacent single watt.When building pre-assembling carriage, at first on pre-assembly platform, carrying out horizontal shape of the mouth as one speaks projection line according to the geometrical dimension of vault; Carry out blanking with the circumferential weld place that band is connected according to the geometrical dimension of vault at the vault band then; Be assembled into the carriage of being formed by some circular arc supporting beams with section bar at last.
Since the present invention the vault band be with the circumferential weld place be connected, geometrical dimension blanking according to vault, build the carriage that every band is assembled usefulness in advance with section bar, made things convenient for single watt with single watt between be connected, avoided leaving the problem of welding scar, also satisfied the design requirements that does not allow in vault inside under the welding situation simultaneously because of the vault inside that welding caused between single watt and the fixed support.
Description of drawings
Fig. 1 is a ground moral formula hotblast stove vault synoptic diagram;
Fig. 2 is the pre-assembled process flow diagram of ground moral formula hotblast stove vault;
Fig. 3 is the structural representation that is welded on the board-like regulator riser in vertical circumferential weld both sides on the single watt of outside surface;
Fig. 4 is the structural representation of the board-like regulator web plate that matches with riser;
Fig. 5 is the structural representation of board-like regulator punching pin.
Embodiment
The present invention is an example with a kind of ground moral formula hotblast stove vault shown in Figure 1, and large vault preassembling method is described further.
As shown in Figure 1, ground moral formula hotblast stove vault by big segment 1, big spherical zone 2, awl be with 3, zona glomerulosa 4, bead lack 5 and form.Big segment 1 is made up of Habenaria dipionema Sohltr, and spherical zone 2 has three bands greatly, and every band is by ten pieces watts of compositions, awl is with 3 four bands are arranged, wherein two bands by Herba Chloranthi Henryi (Herba Choranthi seu Lysimachiae) forms, other two bands are made up of Herba Oxalidis Griffithii, zona glomerulosa 4 has a band, form by seven pieces watts, bead lacks 5 and forms by one piece watt.Vault is assembled in advance in factory, and vault inside did not allow welding when Design Requirement Drawing was assembled in advance, assembles in advance to take apart with single watt form after qualified to dispatch from the factory.It is 14mm that big segment 1, big spherical zone 2, zona glomerulosa 4, bead lack 5 thicknesss of slab, and it is 25mm that awl is with 3 thicknesss of slab, the internal surface alignment.
As shown in Figure 2, a kind of large vault preassembling method of the present invention may further comprise the steps:
The one, according to the design paper requirement single watt of vault each several part (big segment 1, big spherical zone 2, awl with 3, zona glomerulosa 4, bead lack 5) is carried out work in-process processing, be numbered according to the position at every single watt of place;
The 2nd, lay the pre-assembly platform of vault (order of first two steps is in no particular order);
The 3rd, on pre-assembly platform, carry out the horizontal shape of the mouth as one speaks projection line of vault according to the geometrical dimension of vault, at the circumferential weld place that vault band and band (big spherical zone 2, awl with 3, zona glomerulosa 4) are connected, geometrical dimension according to vault is carried out blanking, be assembled into the carriage of being formed by some circular arc supporting beams with section bar, the radian of the circular arc supporting beam vault internal surface pairing with it of carriage matches, and guarantees single watt internal surface alignment;
The 4th,, single watt of position is adjusted on the single watt of corresponding position that is placed in carriage by numbering, and adjacent single watt is connected by board-like regulator, make vault reach Design Requirement Drawing.
Shown in Fig. 3,4,5, board-like regulator is made up of the riser 6, web plate 8 and the punching pin 11 that are welded on vertical circumferential weld both sides on the single watt of outside surface.Riser 6 is provided with a through hole 7; Respectively there is an oblong aperture 10 that is slightly larger than riser 6 width at the two ends of web plate 8, are welded with cushion block 9 around each oblong aperture 10.During use, earlier riser 6 is welded on the corresponding position on vertical circumferential weld both sides, then web plate 8 is enclosed within on the riser 6, order of accuarcy according to single watt of position, punching pin 11 is aimed at the hole 7 of riser 6, impact punching pin 11 with hand hammer and adjust single watt position, simultaneously adjacent single watt is coupled together, make vault reach Design Requirement Drawing.
In addition, the hoop adjustment is indulged in single watt of position also can be cooperated with chock and adjust by " L " plate that falls that is welded on the single watt of outside surface, and connect by angle steel and the fitted bolt that is welded on single watt of outside surface upper limb, make vault reach Design Requirement Drawing.

Claims (5)

1. a large vault preassembling method is characterized in that: lay pre-assembly platform; On platform, build the carriage of pre-assembling usefulness; Single watt of the vault each several part that processes is placed on the corresponding position of carriage and and connects adjacent single watt; Build pre-assembling when using carriage, at first on pre-assembly platform, carrying out horizontal shape of the mouth as one speaks projection line according to the geometrical dimension of vault; Carry out blanking with the circumferential weld place that band is connected according to the geometrical dimension of vault at the vault band then; Be assembled into the carriage of being formed by some circular arc supporting beams with section bar at last.
2. a kind of large vault preassembling method according to claim 1 is characterized in that: the radian of the circular arc supporting beam vault internal surface pairing with it of carriage matches.
3. a kind of large vault preassembling method according to claim 1 is characterized in that: single watt of the vault each several part requires to carry out work in-process processing according to design paper, and is numbered according to the position at every single watt of place.
4. a kind of large vault preassembling method according to claim 1 is characterized in that: will be placed on the carriage corresponding position single watt and adjust by board-like regulator and connect.
5. a kind of large vault preassembling method according to claim 4 is characterized in that: board-like regulator is made up of the riser (6), web plate (8) and the punching pin (11) that are welded on vertical circumferential weld both sides on the single watt of outside surface; Riser (6) is provided with a through hole (7); Respectively there is an oblong aperture (10) that is slightly larger than riser (6) width at the two ends of web plate (8), are welded with cushion block (9) around each oblong aperture (10); During use, earlier riser (6) is welded on the corresponding position on vertical circumferential weld both sides, then web plate (8) is enclosed within on the riser (6), order of accuarcy according to single watt of position, punching pin (11) is aimed at the hole (7) of riser (6), impact punching pin (11) with hand hammer and adjust single watt position, simultaneously adjacent single watt is coupled together.
CN2008100126273A 2008-08-01 2008-08-01 Large vault preassembling method Expired - Fee Related CN101348840B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100126273A CN101348840B (en) 2008-08-01 2008-08-01 Large vault preassembling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100126273A CN101348840B (en) 2008-08-01 2008-08-01 Large vault preassembling method

Publications (2)

Publication Number Publication Date
CN101348840A CN101348840A (en) 2009-01-21
CN101348840B true CN101348840B (en) 2010-06-16

Family

ID=40267814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100126273A Expired - Fee Related CN101348840B (en) 2008-08-01 2008-08-01 Large vault preassembling method

Country Status (1)

Country Link
CN (1) CN101348840B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107297587A (en) * 2017-06-26 2017-10-27 五冶集团上海有限公司 A kind of installation method of horizontal cylindrical apparatus

Also Published As

Publication number Publication date
CN101348840A (en) 2009-01-21

Similar Documents

Publication Publication Date Title
CN101524804B (en) Steel member manufacturing method
CN102069307B (en) Method for welding bottom plate of large flat-bottom storage tank
CN102182302B (en) Building construction all-steel mold plate and manufacturing and assembling method thereof
CN103056610A (en) H-shaped steel online continuous production method
CN201394707Y (en) Automatic template welding system
CN102161144A (en) Welding supporting table for joints
CN204657793U (en) A kind of device preventing Steel plate bridge unit making welding deformation
CN100999053B (en) Convex type electric generator casing group welding technology
CN202894651U (en) Clamping fixture for cone-shaped housing member
CN107931797A (en) A kind of welding method of H profile steel component
CN209035666U (en) A kind of round tube internal partition automatic soldering device
CN1654162A (en) Automatic manufacturing technique of large sized steel pipe
CN101693336A (en) Technique for processing circular ring box type beam of lifting tool
CN101348840B (en) Large vault preassembling method
CN105239779B (en) The construction method and Core Walls Structure of Core Walls Structure
CN202788021U (en) Honeycomb grid column steel frame building foundation steel column deviation rectification structure
CN102922096A (en) On-site assembly welding method for large aluminum tower
CN204524579U (en) Front triangular frame of bicycle robot welding workstation
KR102589793B1 (en) Safety Scaffolding Automatic Welding System
CN201693320U (en) Installed and welded clamp platform of well column pile reinforcement cage framework
CN204263134U (en) Numerical control punching machine work substage
CN202239065U (en) Gantry vertical hydraulic roller type correction device
CN206998165U (en) A kind of both sides plate hole coaxial welding positioning tool
CN104475994A (en) Method for manufacturing slab rib units
CN204983463U (en) Convex metal sheet package post structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100616

Termination date: 20160801

CF01 Termination of patent right due to non-payment of annual fee