CN101343856A - Novel steel braced girder composite structure - Google Patents

Novel steel braced girder composite structure Download PDF

Info

Publication number
CN101343856A
CN101343856A CNA2008100488518A CN200810048851A CN101343856A CN 101343856 A CN101343856 A CN 101343856A CN A2008100488518 A CNA2008100488518 A CN A2008100488518A CN 200810048851 A CN200810048851 A CN 200810048851A CN 101343856 A CN101343856 A CN 101343856A
Authority
CN
China
Prior art keywords
steel
span
concrete
subsection
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100488518A
Other languages
Chinese (zh)
Inventor
高宗余
徐伟
刘汉顺
张敏
杜萍
陈英
兰阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Original Assignee
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Reconnaissance and Design Institute Co Ltd filed Critical China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority to CNA2008100488518A priority Critical patent/CN101343856A/en
Publication of CN101343856A publication Critical patent/CN101343856A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a novel steel truss beam composite structure. A steel-concrete combined bridge surface subsection is arranged at the side span or at the middle span of a main truss according to the requirements, and an all-steel beam structure subsection can be arranged at the middle span or at the side span of the main truss according to the requirements. In the invention, the all-steel truss beam subsection is adopted at the section with the deadweight required to be reduced, and the steel-concrete combined bridge surface subsection is adopted when the deadweight is required to be increased or the rigidness of the bridge beam is required to be increased. The characteristics of strong integrity and great rigidity of the steel truss beam-concrete combination are fully utilized in the invention, and problems of rigidity of the all-steel truss beam and negative reaction of the side span are solved. Therefore, the invention has the advantages that the stress rationality of double-purpose continual steel truss beams of wide-span highways and railways can be guaranteed, the material performance of steel and concrete is fully utilized, the cross section of each rod is reduced, and the requirements for the steel beams and thick sheets are reduced, so the steel material can be purchased easily. So the reduction of the whole project cost is realized.

Description

A kind of novel steel braced girder composite structure
Technical field
The present invention relates to a kind of large span combined bridge.
Background technology
In recent decades, along with the Chinese society rapid development of economy, having train, the mechanical transport amount of striding river demand over strait rapidly increases, and the bridge location resource is limited, owing to the navigation requirement in river, the span of bridge also constantly increases, and is more and more higher to the requirement of bridge functional performance simultaneously.The highway and railway dual-purpose truss steel beam bridge has that span is big, in light weight, the supporting capacity advantages of higher, usually becomes to stride the primary form of structure of selecting of river bridge spanning the sea.In the design of this bridge type, often run into following problem: 1, because bridge span is bigger, or under various external condition restrictions, striding the footpath arranges unreasonable, negative reaction appears in bearing easily, or mobile load is bigger, if full-bridge all adopts steel truss girder may cause the unreasonable of structure stress and use aspect in some cases; 2, equal steel-mixing structure then may be excessive and uneconomical owing to conducting oneself with dignity if full-bridge adopts, even makes structure be difficult to design.
Summary of the invention
The objective of the invention is at above-mentioned present situation, it is strong to aim to provide a kind of globality, and rigidity is big, have good resistance to lateral bending and torsional rigidity, can bear the huge axle power of beam bridge, can efficiently solve the bearing negative reaction, a kind of novel steel braced girder composite structure that construction costs is low.
The implementation of the object of the invention is, a kind of novel steel braced girder composite structure, the end bay of main truss or in stride layout steel truss girder-concrete in conjunction with the bridge floor sections, in main truss, stride or end bay adopts all steel girder construction sections.
The present invention adopts all steel trusses sections at the section that needs alleviate deadweight, when maybe needing to increase bridge rigidity, needs increasing deadweight adopt steel-concrete in conjunction with the bridge floor sections, adopt this kind form of structure, can increase bridge rigidity on the one hand, the negative reaction that can utilize the dead-weight balanced bridge load of steel truss girder-concrete combined structure to produce on the other hand again at the end bay bearing; For striding in being arranged in or all steel girder construction sections of end bay, can increase bridge span, alleviate the system deadweight, thereby reach the purpose that makes full use of steel and concrete material performance.
The present invention had both made full use of the characteristics that globality is strong, rigidity is big of steel truss girder-concrete combination, had solved all steel trusses rigidity and end bay bearing negative reaction problem again.Not only guaranteed the stressed reasonability of the combined continuous steel girder of large span, and can make full use of steel and concrete material property, reduced bar cross section, reduced demand, made steel be easy to buying the girder steel slab.Thereby realized reducing the purpose of whole construction costs.
Description of drawings
Fig. 1 is a main truss elevation of the present invention;
Fig. 2 is that the A-A of Fig. 1 is to view;
Fig. 3 is that the B-B of Fig. 1 is to view.
The specific embodiment
The present invention is at the end bay of main truss 1, strides in also may being as required and arrange that steel-concrete in conjunction with bridge floor sections 2, strides in main truss 1, also may arrange all steel girder construction sections 3 at end bay as required.
With reference to Fig. 1, main truss 1 of the present invention has 6 bridge piers 4, arranges steel-concrete in conjunction with bridge floor sections 2 at end bay length L 1=168 rice, arranges all steel trusses sections 3 at middle span length's degree L2=756 rice.
Fig. 2 is arranged in all steel trusses sections 3 standard cross-sections of striding in the main truss 1 in the L2 scope.
Fig. 3 is arranged in steel-concrete in the end bay L1 scope of main truss 1 in conjunction with bridge floor sections 2 standard cross-sections.
The present invention adopts all steel trusses sections at the section that needs alleviate deadweight, when maybe needing to increase bridge rigidity, needs increasing deadweight adopt steel-concrete in conjunction with the bridge floor sections, adopt this kind form of structure, can increase bridge rigidity on the one hand, the negative reaction that can utilize the dead-weight balanced bridge load of steel truss girder-concrete combined structure to produce on the other hand again at the end bay bearing; For striding in being arranged in or all steel girder construction sections of end bay, can increase bridge span, alleviate the system deadweight, thereby reach the purpose that makes full use of steel and concrete material performance.

Claims (1)

1, a kind of novel steel braced girder composite structure, it is characterized in that the end bay of main truss or in stride and arrange steel-concrete in conjunction with the bridge floor sections, stride in the main truss or end bay is arranged all steel girder construction sections.
CNA2008100488518A 2008-08-18 2008-08-18 Novel steel braced girder composite structure Pending CN101343856A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100488518A CN101343856A (en) 2008-08-18 2008-08-18 Novel steel braced girder composite structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100488518A CN101343856A (en) 2008-08-18 2008-08-18 Novel steel braced girder composite structure

Publications (1)

Publication Number Publication Date
CN101343856A true CN101343856A (en) 2009-01-14

Family

ID=40245963

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100488518A Pending CN101343856A (en) 2008-08-18 2008-08-18 Novel steel braced girder composite structure

Country Status (1)

Country Link
CN (1) CN101343856A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101603288B (en) * 2009-07-03 2012-05-30 中铁大桥局股份有限公司 Three-truss main girder structure of highway and railway bi-purpose cable-stayed bridge and installation method thereof
CN103225263A (en) * 2013-05-08 2013-07-31 中铁大桥勘测设计院集团有限公司 Orthotropic steel box bridge deck with track steel .truss girder for railway ballastless
CN103225255A (en) * 2013-04-27 2013-07-31 中铁二院工程集团有限责任公司 Steel truss girder constitution for large-span six-line double-layered railway bridge
CN103343507A (en) * 2013-07-03 2013-10-09 中铁大桥勘测设计院集团有限公司 Composite structure of three main trusses, longitudinal beams, transverse beams and concrete slabs
CN103924502A (en) * 2014-04-24 2014-07-16 林同棪国际工程咨询(中国)有限公司 Multi-layer bridge face highway-light railway dual-purpose bridge

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101603288B (en) * 2009-07-03 2012-05-30 中铁大桥局股份有限公司 Three-truss main girder structure of highway and railway bi-purpose cable-stayed bridge and installation method thereof
CN103225255A (en) * 2013-04-27 2013-07-31 中铁二院工程集团有限责任公司 Steel truss girder constitution for large-span six-line double-layered railway bridge
CN103225263A (en) * 2013-05-08 2013-07-31 中铁大桥勘测设计院集团有限公司 Orthotropic steel box bridge deck with track steel .truss girder for railway ballastless
CN103343507A (en) * 2013-07-03 2013-10-09 中铁大桥勘测设计院集团有限公司 Composite structure of three main trusses, longitudinal beams, transverse beams and concrete slabs
CN103343507B (en) * 2013-07-03 2015-04-29 中铁大桥勘测设计院集团有限公司 Composite structure of three main trusses, longitudinal beams, transverse beams and concrete slabs
CN103924502A (en) * 2014-04-24 2014-07-16 林同棪国际工程咨询(中国)有限公司 Multi-layer bridge face highway-light railway dual-purpose bridge
CN103924502B (en) * 2014-04-24 2016-08-31 林同棪国际工程咨询(中国)有限公司 Multilayer deck rail-cum-road bridge beam

Similar Documents

Publication Publication Date Title
CN201459588U (en) Midheight combined-structure arch bridge
CN101343856A (en) Novel steel braced girder composite structure
CN104499415A (en) Main girder structure system of double-layer bridge deck cable-stayed bridge
CN101158143A (en) Double-deck bridge floor combined trussed girder bridge
CN103410082B (en) Double-layer bridge floor cable-stayed bridge
CN100395410C (en) Grooved steel-concrete combination beam
CN102268856A (en) Box-truss combined structured girder of large-span railway cable-stayed bridge and construction method of box-truss combined structured girder
CN106958189B (en) A kind of cable-stayed type suspension bridge structure suitable for Ultra-Long Spans
CN201891069U (en) Through steel pipe-concrete open type truss combination beam bridge
CN103161122B (en) Longitudinal mixed continuous beam system with concrete beams and corrugated steel web concrete beams
CN106567320A (en) Local gravity rigidity and assisting stay cable structural system of long-span cable-stayed bridge
CN206256364U (en) Base-supporting freely-supported steel box tied arch bridge arch springing structure
CN108060634A (en) Duplexing font ultra-high performance concrete-normal concrete composite beam bridge girder construction and its construction method
Alampalli et al. Rehabilitation and field testing of an FRP bridge deck on a truss bridge
CN201722594U (en) Extradosed railway cable-stayed bridge
CN204325893U (en) The only tower of railway mixes girder stayed-cable bridge structure
CN101200872B (en) Bottom bearing box beam for rail traffic station
CN106968160A (en) The short side that a kind of steel truss girder is mixed with beams of concrete is across Cable-Stayed Bridge Structure
CN102747684A (en) Compound-section bridge tower for long-span bridge
CN203212999U (en) Vertical mixed continuous beam system of concrete beam and corrugated steel web concrete beam
CN105155400A (en) Concrete beam-corrugated steel web beam combined continuous beam bridge
Kumar et al. Design of Pre-Stressed Concrete T-Beams
CN204266110U (en) A kind of double-layer bridge-floor cable stayed bridge main beam structure system
CN211142772U (en) Highway-railway same-layer hybrid beam suspension cable stayed cooperative bridge
CN202187282U (en) Box-purlin combined structure girder of large-span railway cable-stayed bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090114