CN101334863A - Integrated session environment scheme generation system and method based on elemental analysis - Google Patents

Integrated session environment scheme generation system and method based on elemental analysis Download PDF

Info

Publication number
CN101334863A
CN101334863A CNA2007101179983A CN200710117998A CN101334863A CN 101334863 A CN101334863 A CN 101334863A CN A2007101179983 A CNA2007101179983 A CN A2007101179983A CN 200710117998 A CN200710117998 A CN 200710117998A CN 101334863 A CN101334863 A CN 101334863A
Authority
CN
China
Prior art keywords
scheme
masterplate
investigation
content
proposal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101179983A
Other languages
Chinese (zh)
Inventor
李敏花
赵明昌
李耀东
王春恒
戴汝为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Automation of Chinese Academy of Science
Original Assignee
Institute of Automation of Chinese Academy of Science
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Automation of Chinese Academy of Science filed Critical Institute of Automation of Chinese Academy of Science
Priority to CNA2007101179983A priority Critical patent/CN101334863A/en
Publication of CN101334863A publication Critical patent/CN101334863A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a system for proposal generation in a comprehensively integrated discussion environment based on the factor analysis and a method thereof. The system of the invention comprises a proposal model generation unit used for generating a new proposal model and deleting or amending and saving the new proposal, a proposal model filling unit used for generating a proposal evaluation model, a proposal evaluation sub-unit used for uploading the evaluation result to a database and a proposal analysis and summarization unit used for forming a final discussion proposal. The method of the invention first works out factors of the proposal according to the user demand so as to automatically generate a proposal model and then the information of proposal factors are filled out by discussion experts according to the factors of the proposal model; the system next summarizes the information of proposal factors filled out by each discussion expert; based on a proposal after the summarization, the proposal evaluation model is generated and experts of the client evaluate the information of proposal factors according to the proposal evaluation model so as to form an optimum proposal according to the evaluation results. The method and the system of the invention are scientific and reasonable and have convenient operation and also provide a powerful decision-making support to the solution of complex problems in the comprehensively integrated discussion environment.

Description

Based on scheme generation system and method in the comprehensive integration investigation environment of factor analysis
Technical field
The present invention relates to scheme generation method in the swarm intelligence decision system, relate in particular to scheme generation method in the comprehensive integration investigation environment.
Background technology
The synthesis integration deliberation hall system is the methodology of the open complex gigantic system of the processing that proposes such as China scientist Qian Xuesen.Its essence is that expert colony (relevant expert of different field), data and various information and computer technology are combined, and the scientific theory of diverse discipline and people's experimental knowledge is combined the research of acting in conjunction in challenge.Politics, the economic decision-making of country, the development strategy decision-making of enterprise and military strategy decision-making all belong to open complex gigantic system, all should use the man-machine combination of scientist's propositions such as Qian Xuesen, with artificial master, solve this class problem from the method for the synthesis integration deliberation hall of qualitative to quantitative.
In comprehensive integration investigation environment, investigation person can carry out qualitative investigation to certain problem with the form of literal, audio frequency, video, also can questionnaire, the form of ballot carries out qualitative assessment.No matter adopt which kind of mode to discuss, when the investigation meeting will finish, at the investigation problem, it was necessary forming a concrete available investigation scheme, also is necessary.
Existing achievement in research to comprehensive integration investigation environmental program is just carried out dimensionality reduction with the expert to the multidimensional data group of a plurality of evaluate alternatives suggestions, and the result behind the dimensionality reduction carried out visable representation in the low-dimensional data space, to the visable representation of expert opinion suggestion in lower dimensional space, can intuitively observe the cluster situation of expert's community opinion by this.(synthesis integration deliberation hall expert colony assessment result visual. pattern-recognition and artificial 200518 (1) 6-11).This method has been carried out cluster to expert's evaluate alternatives suggestion, can not form final investigation scheme.In the present electronic meeting system, be merely able to realize that the expert carries out online investigation, also do not form the concrete grammar of investigation scheme.
Summary of the invention
The method of prior art can't generate final investigation scheme automatically, makes troubles to use; In order to solve prior art problems, the objective of the invention is in the based on network comprehensive integration investigation environment, a kind of method need be provided, not only can generate the investigation scheme automatically, and can effectively assess the various schemes that expert in the investigation process provides, result according to assessment forms optimum investigation scheme, for this reason, the invention provides a kind of based on scheme generation system and method in the comprehensive integration investigation environment of factor analysis.
For achieving the above object, first aspect present invention provides as follows based on the technical scheme of scheme generation system in the comprehensive integration investigation environment of factor analysis:
Scheme masterplate generation unit is used for meeting is generated new departure masterplate, deletion or modification masterplate, preservation;
The scheme masterplate is filled in the unit, the meeting presiding end will be saved in the scheme masterplate in the database, be associated with in the comprehensive integration investigation conferencing environment that is carried out, form with questionnaire is distributed to each investigation expert end, investigation expert end is filled in the every key element in the scheme, fill in and the result is uploaded in the database after finishing, system gathers analyzing according to the content of the scheme key element that each investigation expert end is filled in; By the similarity of the every content of alternative key element, the scheme factor content that content is similar or identical merges and gathers, and according to the scheme content that gathers, according to certain evaluation index, generates the scheme evaluation masterplate;
The evaluate alternatives subelement, the meeting presiding end is distributed to investigation expert end with the scheme evaluation masterplate, and investigation expert end carries out analysis and evaluation according to evaluation index to the every content that gathers the scheme key element, and filling in finishes uploads to assessment result in the database; And
Program analysis gathers the unit, and the scheme factor content of filling in according to each investigation expert end and the assessment result of the every content of scheme key element are determined final scheme factor content, form final investigation scheme.
According to embodiments of the invention, described comprehensive integration investigation environment is any Web conference chamber or electronic boardroom.
According to embodiments of the invention, described scheme masterplate generation unit comprises:
Scheme masterplate manager, the scheme that is used for meeting is generated is carried out unified management, and scheme masterplate manager generates a new scheme masterplate or deletion or revises the scheme masterplate that has existed; And
Scheme masterplate editing machine, to the scheme masterplate editor that makes amendment, at first, result according to investigation, determine to revise the number of the key element that comprises in the edit scenario, the modification edit scenario key element number that system determines according to the user generates a scheme and fills in masterplate, and the user can determine the title of each modification edit scenario key element as required, is saved in the database after scheme masterplate editor finishes.
According to embodiments of the invention, described program analysis gathers the unit, analyzes by more every scheme factor content similarity and gathers, and generates final investigation scheme.
For achieving the above object, second aspect present invention provides based on scheme generation method in the comprehensive integration investigation environment of factor analysis, and step comprises:
(1) enters scheme masterplate generation unit;
(2) judge whether the scheme template exists,, then enter step 4,, then enter step 3 if the scheme template does not exist if the scheme template exists;
(3) under the non-existent situation of scheme template, increase new departure template;
(4) open this new departure template, enter scheme masterplate editing machine and carry out edit-modify, generate modification;
(5) determine the number of the element of modification;
(6) each key element title in the modification is edited, generate the scheme template;
(7) the scheme template is submitted in the database;
(8) judge whether the scheme template that is submitted in the database is associated with in the meeting, enters step 10 if be associated with meeting, if be not associated with meeting, then enters step 9;
(9) the scheme template is associated with meeting, enters step 10 then;
(10) the meeting presiding end is issued each investigation expert end with the scheme template;
(11) each investigation expert end carries out filling in of scheme factor content according to the scheme masterplate, fill in finish after, the content of filling in is submitted in the database;
(12) the scheme factor content of filling in according to each expert's end is held the similarity of every scheme factor content of filling in to analyze automatically to each investigation expert and is gathered, generate the scheme evaluation masterplate according to the scheme factor content that gathers;
(13) scheme and scheme evaluation masterplate after the meeting presiding end will gather with the form of distributing questionnaire are distributed to investigation expert end;
(14) investigation expert end is assessed every content of scheme key element according to evaluation index according to the scheme evaluation masterplate, after assessment is finished, will assess content and be submitted in the database;
(15) program analysis gathers the result of the automatic analysis and evaluation in unit, determines the scheme factor content, generates final investigation scheme;
(16) the investigation scheme is uploaded to database, preserve.
According to embodiments of the invention, the forming process of scheme realizes by the form of meeting presiding end distribution questionnaire.
The present invention generates the scheme template automatically according to the scheme key element, is distributed to the investigation expert with the form of questionnaire and fills in scheme factor content and assessment content for the expert, and is easy to operate, user-friendly.The present invention not only can generate scheme automatically, and can carry out analysis and assessment to each scheme, the formation of scheme and assessment comprehensive integration colony expertise, and all operations all is online carrying out, and has avoided making and has carried out the loaded down with trivial details of schemes synthesis by hand.The formation of scheme is scientific and reasonable, for comprehensive integration investigation environment provides convenience strong decision support tool.
Description of drawings
Fig. 1 is that system of the present invention forms structural drawing;
Fig. 2 scheme generation method synoptic diagram;
Fig. 3 is the embodiment process flow diagram of the method for the invention;
Embodiment
Describe each related detailed problem in the technical solution of the present invention in detail below in conjunction with accompanying drawing.Be to be noted that described embodiment only is intended to be convenient to the understanding of the present invention, and it is not played any qualification effect.
Development environment of the present invention is Visual Studio 2005, and development language is the c# programming language, and system framework adopts the architecture mode of client/server, and database adopts Microsoft SQL Server2000.
Form shown in the structural drawing as Fig. 1 system of the present invention, this invention mainly comprises four parts based on the scheme generation system in the comprehensive integration investigation environment of factor analysis: scheme masterplate generation unit 1, the scheme masterplate is filled in unit 2, and evaluate alternatives unit 3 and program analysis gather unit 4.These 4 unit connect each other, and be the prerequisite of the latter half previous stage, form all linked with one another, an indivisible integral body.The operational scheme of total system is: fill in unit 2->evaluate alternatives unit 3->program analysis by masterplate generation unit 1->scheme masterplate and gather unit 4 side.Wherein, scheme masterplate generation unit 1 and program analysis gather unit 4 is called by the meeting presiding end, and the scheme masterplate fills in unit 2 and evaluate alternatives unit 3 is called by investigation expert end.
Scheme masterplate generation unit 1 comprises scheme masterplate manager 11 and scheme masterplate editing machine 12, wherein:
Scheme masterplate manager 11 major functions are that the scheme masterplate that generates in the meeting and preserved is carried out unified management, scheme masterplate manager is listed all scheme masterplates in the meeting with the form of tabulation, in scheme masterplate manager 11, can generate a new scheme masterplate, also can delete or revise the scheme masterplate that has existed; If in the tabulation of scheme masterplate, the scheme masterplate that meets customer requirements is arranged, then do not need to carry out the editor of scheme masterplate, directly this scheme masterplate is associated with in the meeting of being carried out and distributes.If do not meet the masterplate of customer requirements in the tabulation of scheme masterplate, can generate a new scheme masterplate or revise existing scheme masterplate, concrete scheme masterplate editing is finished by scheme masterplate editing machine.Deletion scheme masterplate is directly deleted the scheme masterplate of preserving from masterplate manager and database.
Scheme masterplate editing machine 12 mainly is to newly-generated scheme masterplate or the scheme masterplate content that the existed editor that makes amendment, when editing for newly-generated scheme masterplate, the number of the key element that comprises at first definite scheme masterplate, the scheme key element number that system determines according to the user generates a scheme and fills in masterplate, and the user can determine the title of each scheme key element as required.For the editor of the scheme masterplate that has existed, can directly make amendment to the number and the title of the key element in the scheme masterplate.After finishing, scheme masterplate editor is saved in the database.
The scheme masterplate is filled in unit 2, the meeting presiding end will be saved in the scheme masterplate in the database, be associated with in the meeting of being carried out, form with questionnaire is distributed to each investigation expert, investigation expert end is filled in the every key element in the scheme, in carrying out scheme, during the filling in of every factor content,, then fill in successively according to the clauses and subclauses of factor content if the scheme factor content of filling in has many contents.Fill in and the result is uploaded in the database after finishing, each bar content of the scheme key element that system fills in according to each investigation expert end is analyzed and is gathered.By the similarity of the every content of alternative key element, the scheme factor content that content is similar or identical merges and gathers, and according to the scheme content that gathers, according to certain evaluation index, generates the scheme evaluation masterplate.
Evaluate alternatives unit 3, meeting presiding end will gather the scheme of merging and scheme evaluation masterplate and be distributed to the investigation expert with the form of questionnaire, and investigation expert end carries out analysis and evaluation according to certain evaluation index to the every content that gathers the scheme key element.Filling in finishes uploads to assessment result in the database.
Program analysis gathers unit 4, the scheme factor content of filling in according to each investigation expert end and the assessment result of the every content of scheme key element are selected evaluation of estimate factor content preferably, give up the relatively poor scheme factor content of evaluation of estimate, determine final scheme factor content, form whole investigation scheme.
With Fig. 2 is example, the method that the explanation scheme generates automatically, scheme among the present invention generates and method of summary is all distributed questionnaire with the meeting presiding end, and the form that investigation expert end fills in questionnaires is carried out, and the questionnaire among the present invention is meant the scheme masterplate and the scheme evaluation masterplate of generation.Among the present invention, dissimilar questionnaires is provided with different style number, and the scheme masterplate is two kinds of different questionnaires with the scheme evaluation masterplate, has different questionnaire style number.By the questionnaire style number, distinguish dissimilar questionnaires.The different questionnaires of same type are distinguished by the name and corresponding description of questionnaire.During meeting presiding end distribution questionnaire the style number of questionnaire and questionnaire name and description are distributed to investigation expert end, investigation expert end is according to the style number and the questionnaire name of questionnaire and describe questionnaire is resolved, and reads corresponding questionnaire from database.
The method flow that scheme generates automatically is: at first the meeting presiding end enters scheme masterplate generation unit, according to the investigation result, the key element quantity and the title of definite scheme that will form, generate a scheme template and be saved in the database according to the quantity of key element and title, the user need import the name and the description of this scheme masterplate during preservation, simultaneously with the style number of scheme masterplate and name and describe and be saved in the database together.Then the scheme template is associated with in the meeting, with the form of questionnaire the style number of questionnaire and questionnaire name and description are distributed to investigation expert end by meeting presiding, the investigation expert holds according to questionnaire style number and questionnaire name and describes questionnaire is resolved, from database, obtain questionnaire, the scheme masterplate of entering is filled in the unit every content of scheme key element in the scheme masterplate questionnaire is filled in, and is submitted to database after finishing.Discuss every content of the scheme key element of filling in of expert's end according to each, the scheme masterplate is filled in the unit can carry out automatic Macro or mass analysis, same or analogous scheme factor content is merged, generate a scheme that gathers, and generate scheme evaluation masterplate and corresponding questionnaire style number and name and the description of assessing masterplate, be saved in the database.The meeting presiding end is associated with meeting with scheme evaluation masterplate questionnaire, then the questionnaire style number of scheme evaluation masterplate and questionnaire name and description are distributed to investigation expert end, investigation expert end is according to style number and the questionnaire name and the description of questionnaire, questionnaire is resolved, obtain scheme evaluation masterplate questionnaire, enter the scheme evaluation unit, every content of scheme key element is assessed, upload to database after assessment is finished.The assessment result of the every content of submitting to according to the expert of scheme key element, the meeting presiding end enters program analysis and gathers the unit assessment content is analyzed and gathered, and determines final scheme factor content, forms the investigation scheme, upload to database, the generative process of scheme finishes.
Fig. 3 is the embodiment process flow diagram of the method for the invention.According to Fig. 3, at first the meeting presiding end enters scheme masterplate generation unit in step 1; Step 2 judges in scheme masterplate generation unit whether the scheme template exists, if the scheme template exists, then enters step 4, if the scheme template does not exist, then enters step 3; Step 3 under the non-existent situation of scheme template, increases a scheme template newly, enters step 5 after the increase scheme template; Step 4 is directly opened this scheme template under the situation that the scheme template has existed, enter scheme masterplate editing machine and carry out edit-modify.Step 5, enter the scheme Template Editors after, determine the number of the main element of scheme; Step 6, system generate a scheme masterplate automatically according to the number of scheme key element, and each key element title in the scheme masterplate is edited; Step 7 after the scheme edit model is finished, submits to the scheme template in database, and simultaneously, the questionnaire style number of scheme masterplate and questionnaire name and description are saved in database together.Step 8 judges whether the scheme template that is submitted in the database has been associated with meeting, enters step 10 if be associated with meeting, if be not associated with meeting, then enters step 9; Step 9, the meeting presiding end is associated with meeting with the scheme template, enters step 10 then; Step 10, the meeting presiding end is distributed to each investigation expert end with the form of questionnaire with the style number of questionnaire and name and description with the scheme template; Step 11, each investigation expert holds according to the style number of questionnaire and name and describes questionnaire is resolved, acquisition scheme masterplate questionnaire content, enter the scheme masterplate then and fill in the unit, number and title according to the scheme key element, carry out filling in of scheme factor content, fill in finish after, the content of filling in is submitted in the database; Step 12, hold the scheme factor content of filling in according to each investigation expert, the scheme masterplate is filled in the unit and can be carried out the analysis of scheme factor content automatically and gather, with close or similar the lumping together of content, generate scheme evaluation masterplate questionnaire and corresponding questionnaire style number and name WD according to the scheme that gathers simultaneously; Step 13, the meeting presiding end is distributed to investigation expert end with the questionnaire style number of the form scheme evaluation masterplate of questionnaire and questionnaire name and description; Step 14, investigation expert end, according to the style number of questionnaire and questionnaire name and describe questionnaire is resolved, obtain the content of scheme evaluation masterplate questionnaire, enter the scheme evaluation unit, the scheme factor content that gathers is assessed according to certain evaluation index, after assessment is finished, will be assessed content and be submitted in the database; Step 15, program analysis cover sheet unit analyzes the result who gathers assessment according to investigation expert end automatically to the assessed value of every content of scheme key element, the net assessment value of the every content of numerical procedure key element, net assessment value according to each scheme factor content is selected final scheme factor content, forms the investigation scheme; Step 16 to database, is preserved final investigation scheme content uploading, and scheme generates and gathers assessment and finish.
In the present embodiment, when meeting presiding enters in the scheme masterplate generation unit scheme masterplate content is edited, the quantity of scheme key element and title, can customize as required, for example, a certain scheme need customize 4 key elements, and then scheme masterplate generation unit generates a scheme masterplate that comprises four elements, can carry out edit-modify to the title of the four elements of scheme masterplate, suppose that the title of this four elements is respectively:
(1) personnel that will finishing of task, (2) are finished the work and needed, the technology that (3) are finished the work and needed, (4) budgetary resources.
After the scheme masterplate generates, be distributed to the investigation expert by the meeting presiding end, investigation expert end is filled in respectively according to four key elements in (1) (2) (3) (4) scheme.After the expert filled in and finishes submission, the identical or similar clauses and subclauses of these four factor contents that each expert's end is filled in merged, and form a scheme that gathers.
The scheme factor content is merged method of summary adopt the relatively method of content similarity, similarity is high more, represents that two contents are similar more, and similarity is low more, represents that two contents are dissimilar more.In concrete process relatively, a suitable threshold is set, when similarity during, content is merged greater than this threshold value, when similarity is lower than this threshold value, do not merge.The content calculation of similarity degree adopts the computing formula based on distance, sees formula 1.
SIM = [ Σ k = 1 M w k | V 1 ( k ) - v 2 ( k ) | 2 ] 1 / 2 , q > 0 (formula 1)
V wherein 1 (k), V 2 (k), be the K item content of two scheme factor content vectors that will compare, w kBe the shared weight of every content.
In the scheme evaluation unit, to the assessment of every content of scheme key element, carry out according to certain index, for example can adopt four indices to carry out: strong factor degree, unfavorable factor degree, chance factor degree and hazards degree.Investigation expert end respectively to each scheme factor content according to the assessment of giving a mark of this four indices, every index can have different weights.After investigation expert end carried out the marking assessment of four indexs to every content of scheme key element, the scheme evaluation unit calculated the score of this factor content.Certain expert can adopt following computing formula to the assessment of a certain content of scheme key element, sees formula (2):
S = Σ k = 1 M w k s k (formula 2)
Wherein, s kBe the assessed value of k item index, w kBe the shared weight of k item index, M is the number of evaluation index, the assessed value that S calculates the marking situation of this scheme key element according to M index for certain expert.
The scheme evaluation unit carries out analysis integrated to all experts to the scoring of the every content of scheme key element, obtain the net assessment value of every content of scheme key element at last, according to the net assessment value, determine that this scheme factor content is to keep or give up, determine final scheme factor content, form final investigation scheme.The net assessment value of a certain content of scheme key element can adopt following computing formula to see formula (3):
S ave = Σ k = 1 M S k M (formula 3)
Wherein, S kBe the assessed value of k expert to this scheme factor content.M is for participating in expert's number of this factor content assessment, S AveNet assessment value for this scheme factor content of calculating.
In a word, the present invention can generate the scheme template automatically according to the scheme key element, can analyze automatically with the assessment content the scheme of investigation expert submission and gather, and for solving challenge in the comprehensive integration investigation environment, provides strong intelligent decision support facility.
The above; only be the embodiment among the present invention; but protection scope of the present invention is not limited thereto; anyly be familiar with the people of this technology in the disclosed technical scope of the present invention; can understand conversion or the replacement expected; all should be encompassed in of the present invention comprising within the scope, therefore, protection scope of the present invention should be as the criterion with the protection domain of claims.

Claims (6)

1, scheme generation system in the environment is discussed in a kind of comprehensive integration based on factor analysis, it is characterized in that, comprising:
Scheme masterplate generation unit is used for meeting is generated new departure masterplate, deletion or modification masterplate, preservation;
The scheme masterplate is filled in the unit, the meeting presiding end will be saved in the scheme masterplate in the database, be associated with in the comprehensive integration investigation conferencing environment that is carried out, form with questionnaire is distributed to each investigation expert end, investigation expert end is filled in the every key element in the scheme, fill in and the result is uploaded in the database after finishing, system gathers analyzing according to the content of the scheme key element that each investigation expert end is filled in; By the similarity of the every content of alternative key element, the scheme factor content that content is similar or identical merges and gathers, and according to the scheme content that gathers, according to certain evaluation index, generates the scheme evaluation masterplate;
The evaluate alternatives subelement, the meeting presiding end is distributed to investigation expert end with the scheme evaluation masterplate, and investigation expert end carries out analysis and evaluation according to evaluation index to the every content that gathers the scheme key element, and filling in finishes uploads to assessment result in the database; And
Program analysis gathers the unit, and the scheme factor content of filling in according to each investigation expert end and the assessment result of the every content of scheme key element are determined final scheme factor content, form final investigation scheme.
2, evaluation system according to claim 1 is characterized in that: described comprehensive integration investigation environment is any Web conference chamber or electronic boardroom.
3, evaluation system according to claim 1 is characterized in that: described scheme masterplate generation unit comprises:
Scheme masterplate manager 11, the scheme that is used for meeting is generated is carried out unified management, and scheme masterplate manager 11 generates a new scheme masterplate or deletion or revises the scheme masterplate that has existed; And
Scheme masterplate editing machine 12, to the scheme masterplate editor that makes amendment, at first, result according to investigation, determine to revise the number of the key element that comprises in the edit scenario, the modification edit scenario key element number that system determines according to the user generates a scheme and fills in masterplate, and the user can determine the title of each modification edit scenario key element as required, is saved in the database after scheme masterplate editor finishes.
4, evaluation system according to claim 1 is characterized in that: described program analysis gathers the unit, analyzes by more every scheme factor content similarity and gathers, and generates final investigation scheme.
5, a kind of based on scheme generation method in the comprehensive integration investigation environment of factor analysis, it is characterized in that: generate step and comprise
(1) enters scheme masterplate generation unit;
(2) judge whether the scheme template exists,, then enter step 4,, then enter step 3 if the scheme template does not exist if the scheme template exists;
(3) under the non-existent situation of scheme template, increase new departure template;
(4) open this new departure template, enter scheme masterplate editing machine and carry out edit-modify, generate modification;
(5) determine the number of the element of modification;
(6) each key element title in the modification is edited, generate the scheme template;
(7) the scheme template is submitted in the database;
(8) judge whether the scheme template that is submitted in the database is associated with in the meeting, enters step 10 if be associated with meeting, if be not associated with meeting, then enters step 9;
(9) the scheme template is associated with meeting, enters step 10 then;
(10) the meeting presiding end is issued each investigation expert end with the scheme template;
(11) each investigation expert end carries out filling in of scheme factor content according to the scheme masterplate, fill in finish after, the content of filling in is submitted in the database;
(12) the scheme factor content of filling in according to each expert's end is held the similarity of every scheme factor content of filling in to analyze automatically to each investigation expert and is gathered, generate the scheme evaluation masterplate according to the scheme factor content that gathers;
(13) scheme and scheme evaluation masterplate after the meeting presiding end will gather with the form of distributing questionnaire are distributed to investigation expert end;
(14) investigation expert end is assessed every content of scheme key element according to evaluation index according to the scheme evaluation masterplate, after assessment is finished, will assess content and be submitted in the database;
(15) program analysis gathers the result of the automatic analysis and evaluation in unit, determines the scheme factor content, generates final investigation scheme;
(16) the investigation scheme is uploaded to database, preserve.
6, scheme generation method according to claim 5 is characterized in that: the forming process of scheme realizes by the form of meeting presiding end distribution questionnaire.
CNA2007101179983A 2007-06-27 2007-06-27 Integrated session environment scheme generation system and method based on elemental analysis Pending CN101334863A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101179983A CN101334863A (en) 2007-06-27 2007-06-27 Integrated session environment scheme generation system and method based on elemental analysis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101179983A CN101334863A (en) 2007-06-27 2007-06-27 Integrated session environment scheme generation system and method based on elemental analysis

Publications (1)

Publication Number Publication Date
CN101334863A true CN101334863A (en) 2008-12-31

Family

ID=40197449

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101179983A Pending CN101334863A (en) 2007-06-27 2007-06-27 Integrated session environment scheme generation system and method based on elemental analysis

Country Status (1)

Country Link
CN (1) CN101334863A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106991503A (en) * 2017-05-04 2017-07-28 智业家(北京)科技发展有限公司 A kind of intelligent method for customizing of the big data science popularization science and education scheme based on STEP
CN109190102A (en) * 2018-09-12 2019-01-11 张连祥 The system and method that project of inviting outside investment negotiation scheme automatically generates
CN110266996A (en) * 2019-06-17 2019-09-20 国家电网有限公司 Video conference control method, device and terminal device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106991503A (en) * 2017-05-04 2017-07-28 智业家(北京)科技发展有限公司 A kind of intelligent method for customizing of the big data science popularization science and education scheme based on STEP
CN109190102A (en) * 2018-09-12 2019-01-11 张连祥 The system and method that project of inviting outside investment negotiation scheme automatically generates
CN110266996A (en) * 2019-06-17 2019-09-20 国家电网有限公司 Video conference control method, device and terminal device
CN110266996B (en) * 2019-06-17 2021-05-18 国家电网有限公司 Video conference control method and device and terminal equipment

Similar Documents

Publication Publication Date Title
CN101315680B (en) Group qualitative analysis tool based on automatic investigation questionnaire and implementing method thereof
Austin et al. A data flow model to plan and manage the building design process
CN103226743B (en) Aircraft equipment technology maturity based on TRL assesses information processing method
CN101330388B (en) Synergic editing method based on synthesis integration deliberation hall
Yates Construction decision support system for delay analysis
US6952660B1 (en) Collaboration session recording model
CN106716416A (en) Data retrieval apparatus, program and recording medium
CN102411540B (en) Automatic management system of workflow-based common software testing process
CN110599839A (en) Online examination method and system based on intelligent paper grouping and text analysis review
CN110489749B (en) Business process optimization method of intelligent office automation system
CN101661493A (en) Interactive electronic technical manual browsing system
CN101751400A (en) System and method of technical data analysis and system of patent analysis
CN101334863A (en) Integrated session environment scheme generation system and method based on elemental analysis
CN101441645B (en) The System and method for of technical data analysis
Chakhchoukh et al. Understanding how in-visualization provenance can support trade-off analysis
Joyfong et al. Preparation of Smart Card Data for Food Purchase Analysis of Students through Process Mining
CN101330389A (en) Method and system for composing group decision plan based on question disintegration
CN115409541A (en) Cigarette brand data processing method based on data blood relationship
CN105373996A (en) Modeling system based on approval data
CN104794010A (en) Optimization method for information interaction in system
Ascheri et al. A knowledge-based framework for automated layout design in an industrial environment
Sena et al. Intelligence systems: a sociotechnical systems perspective
Fokaefs et al. 2D and 3D visualizations in WikiDev2. 0
Choudhary et al. Knowledge discovery for moderating collaborative projects
Reich Computational quality function deployment is knowledge intensive engineering

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20081231