CN101311111B - Electric calcined graphitization furnace - Google Patents

Electric calcined graphitization furnace Download PDF

Info

Publication number
CN101311111B
CN101311111B CN2007102006765A CN200710200676A CN101311111B CN 101311111 B CN101311111 B CN 101311111B CN 2007102006765 A CN2007102006765 A CN 2007102006765A CN 200710200676 A CN200710200676 A CN 200710200676A CN 101311111 B CN101311111 B CN 101311111B
Authority
CN
China
Prior art keywords
slag pocket
furnace
guide wire
gas guide
circumferentially
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2007102006765A
Other languages
Chinese (zh)
Other versions
CN101311111A (en
Inventor
陈宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2007102006765A priority Critical patent/CN101311111B/en
Publication of CN101311111A publication Critical patent/CN101311111A/en
Application granted granted Critical
Publication of CN101311111B publication Critical patent/CN101311111B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses an electrically calcined graphitized furnace. The circumference of an inner lining of the furnace (7) is provided with a gas guiding pipe (1) which is communicated with a circumferential communication pipe (2); the communication pipe (2) is communicated with a slag chamber (3) at the furnace side; the outer side of the slag chamber (3) is provided with a vacuum pumping pipe (4) and a cleaning door (5). The invention is capable of smoothly discharging impurity contained in raw material, thus ensuring product purity and capacity. The furnace of the invention has simple structure, lower application cost, stable performance, long service life, high heat utilization rate and low running and maintaining cost.

Description

Electric calcined graphitization furnace
Technical field
The present invention relates to a kind of electric calcined graphitization furnace.
Background technology
At present, the electric calcined graphitization furnace production requirement is forged back Jiao with raw material and is calcined to high temperature and greying more than 2000 ℃, and the purity for the greying product has higher requirement simultaneously.Jiaozhuo was resistance material energising heating after the general using graphitizing furnace will be forged in the prior art, and the impurity discharger is not set.The consequence that causes like this is: under the nearly 3000 ℃ high temperature action of furnace high-temperature section, impurity such as the sulphur in the raw material, silicon, aluminium, iron all exist with gaseous form, when these foreign gases are moved upwards up to lesser temps section more than the upper electrode, again solidify out into is solid-state and attached on the not graphited raw material, and along with discharge carries out, these not graphited raw materials that contain high impurity are moved down into high temperature section, through high temperature action, impurity distils again, moves up and adsorbs, and goes round and begins again.This not only influences the purity and the production capacity of greying product, and has wasted a large amount of energy, also because the frequent absorption of impurity causes the coking crust, influences the smooth and easy of discharge and carries out simultaneously, even cause accidents such as electricity calcining bias current, short circuit.Obviously, existing electric calcined graphitization furnace production equipment is not ideal enough.
Summary of the invention
The technical problem to be solved in the present invention is: a kind of new electric calcined graphitization furnace is provided, and this stove can in time be got rid of impurity in the raw material, and product purity is improved greatly, heat energy utilization rate height, and operation and maintenance cost are low, to overcome the deficiency that prior art exists
The present invention constitutes like this: it comprises furnace lining (7), gas guide wire (1) is set on the inwall circumference of furnace lining (7), gas guide wire (1) with circumferentially be communicated with communicating pipe (2), circumferentially be communicated with the slag pocket (3) of furnace side communicating pipe (2), slag pocket (3) arranged outside has vaccum suction tube (4) and cleaning door (5).
The above 500mm of the lower end~1500mm place of upper electrode (8) when gas guide wire (1) entrance height position is positioned at normal the operation.
The upward perforate of gas guide wire (1), with horizontal plane angle be 60 °~85 °.
Gas guide wire (1) internal diameter is φ 30~φ 100mm.
Gas guide wire (1) is along circumferentially evenly arranging 4~12.
Circumferentially (2) internal diameter is φ 50~φ 150mm communicating pipe.
The interior outage degree of slag pocket (3) is 2000mm~4000mm, and interior empty length and width size respectively is 500mm~1500mm.
(2) inlet communicating is downward-sloping to slag pocket (3) with circumferential communicating pipe, and this inlet is not less than 60 ° near the domatic and horizontal plane angle under the side direction of furnace chamber inwall.
The inboard flame retardant coating thickness of being separated by with furnace chamber of slag pocket (3) is about 300mm~1000mm.
The interior vacant lot face of slag pocket (3) is higher than the upper end of lower electrode (6).
Vaccum suction tube (4) is in slag pocket (3) external wall bottom, and its height is more than cleaning door (5).
In 500mm~1000mm scope that vaccum suction tube (4) outlet is counted from slag pocket (3) external wall water jacket is set.
Cleaning door (5) is positioned at slag pocket (3) external wall bottom, and vacant lot face is concordant with vacant lot face in the slag pocket in it, and sealing is set between metope.
Compared with prior art, the present invention makes that impurity is able to smooth and easy eliminating in the raw material, thereby product purity and production capacity are all guaranteed; This furnace structure is simple, and implementation cost is lower; Use properties is stable, high life; Heat energy utilization rate height; Operation and maintenance cost are low.
Description of drawings
Fig. 1 is structural representation of the present invention, front view, and this stove other parts same as the prior art are not illustrated.
Fig. 2 is the vertical view of Fig. 1.
Embodiment
Embodiments of the invention: as shown in Figure 1, when normal operation more than the termination of upper electrode 8 on the furnace lining 7 at about 1000mm place, along 8 gas guide wires 1 upwards are set in week, gas guide wire 1 and circumferentially directly perforate realization on the stove liner of communicating pipe 2 promptly adopt special shaped brick with holes to build the region of interest of stove liner by laying bricks or stones.These guide wires 1 link to each other with the slag pocket 3 of furnace side after circumferentially being communicated with communicating pipe 2, and slag pocket 3 arranged outside have water-cooled vaccum suction tube 4 and cleaning door 5; Gas guide wire 1 internal diameter is φ 100mm, upward perforate, with horizontal plane angle be 60 °, circumferentially internal diameter is φ 100mm communicating pipe 2; The outage degree is 3600mm in the slag pocket 3, interior empty length and width size respectively is about 1000mm, inlet is close to circumferential communicating pipe 2, inlet side down is sloping shape transition, this domatic and horizontal plane angle are 75 °, the inboard flame retardant coating thickness of being separated by with furnace chamber of slag pocket is about 800mm, and the interior vacant lot face of slag pocket 3 is more than the upper end of lower electrode 6; Vaccum suction tube 4 is on slag pocket 3 external walls, and height location is in cleaning door more than 5, and the about 1200mm of floor level in the slag pocket is provided with water jacket in the about 500mm scope of vaccum suction tube outlet; Cleaning door 5 is positioned at slag pocket 3 external walls bottoms, and vacant lot face should be concordant with vacant lot face in the slag pocket in it, adopts between cleaning door flange and metope steel plate that bolt is connected, vacuum rubber seals.
During work, under the nearly 3000 ℃ high temperature action of furnace high-temperature section, all distilling as impurity such as sulphur, silicon, aluminium, iron in the raw material becomes gaseous state and moves up, and the trend that is full of whole furnace inner space is arranged; When these gases went upward to gas guide wire 1 place, partial impurities gas was through gas guide wire 1 and circumferentially communicating pipe 2 enter slag pocket 3, and this moment, the foreign gas temperature was still very high, kept gaseous state; In the middle and lower part of slag pocket 3, along with gas temperature is reduced to below the zero pour, impurity begins to solidify and deposits on slag pocket ground with solid-state form; Along with the deposition of solidifying of impurity, form the parital vacuum state in the slag pocket 3, cause the foreign gas in the electric calciner constantly to gush, and constantly solidify deposition; In the gas of pouring into slag pocket 3, except that impurity such as above-mentioned sulphur, silicon, aluminium, iron, also exist certain as CO X, NO X, SO X, H 2Gases such as S do not occupy the volume of slag pocket for making this class gas, need regularly or continuously it be extracted out, and this work is finished by the vaccum suction tube 4 that an end connects vacuum pump; Though the temperature in the slag pocket 3 greatly reduce than temperature in the stove, but still 1000 ℃ the high temperature of having an appointment, so vaccum suction tube 4 will adopt water jacket to cool off; Stove is opened cleaning door 5 after the operation certain period under the blowing out state, empty indoor impurity, and refractory materials is repaired.

Claims (1)

1. electric calcined graphitization furnace, it comprises furnace lining (7), it is characterized in that: gas guide wire (1) circumferentially is set at furnace lining (7), gas guide wire (1) with circumferentially be communicated with communicating pipe (2), circumferentially be communicated with the slag pocket (3) of furnace side communicating pipe (2), slag pocket (3) arranged outside has vaccum suction tube (4) and cleaning door (5); The above 500mm of the lower end~1500mm place of upper electrode (8) when gas guide wire (1) entrance height position is positioned at normal the operation; Upward perforate of gas guide wire (1) and horizontal plane angle are 60 o~85 oGas guide wire (1) internal diameter is φ 30~φ 100mm; Gas guide wire (1) is circumferentially evenly arranged 4~12 along furnace lining (7); Circumferentially (2) internal diameter is φ 50~φ 150mm communicating pipe; The interior outage degree of slag pocket (3) is 2000mm~4000mm, and interior empty length and width size respectively is 500mm~1500mm; Domatic and horizontal plane angle under slag pocket (3) and the close side direction of furnace chamber inwall of circumferential communicating pipe (2) inlet communicating is not less than 60 oThe inboard flame retardant coating thickness of being separated by with furnace chamber of slag pocket (3) is about 300mm~1000mm; The interior vacant lot face of slag pocket (3) is higher than the upper end of lower electrode (6); Vaccum suction tube (4) is in slag pocket (3) external wall bottom, and its height is more than cleaning door (5); In 500mm~1000mm scope that vaccum suction tube (4) outlet is counted from slag pocket (3) external wall water jacket is set; Cleaning door (5) is positioned at slag pocket (3) external wall bottom, and vacant lot face is concordant with vacant lot face in the slag pocket in it, and sealing is set between metope.
CN2007102006765A 2007-05-22 2007-05-22 Electric calcined graphitization furnace Active CN101311111B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007102006765A CN101311111B (en) 2007-05-22 2007-05-22 Electric calcined graphitization furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007102006765A CN101311111B (en) 2007-05-22 2007-05-22 Electric calcined graphitization furnace

Publications (2)

Publication Number Publication Date
CN101311111A CN101311111A (en) 2008-11-26
CN101311111B true CN101311111B (en) 2010-08-25

Family

ID=40099969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007102006765A Active CN101311111B (en) 2007-05-22 2007-05-22 Electric calcined graphitization furnace

Country Status (1)

Country Link
CN (1) CN101311111B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101886878A (en) * 2010-07-19 2010-11-17 索通发展有限公司 Discharging method for tank-type calcining furnace
CN103159207B (en) * 2011-12-14 2015-04-08 贵阳铝镁设计研究院有限公司 An electric calcining furnace for a graphite carbon material

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4160813A (en) * 1975-07-01 1979-07-10 Graphite Synthesis Company Method for heat treating carbonaceous material in a fluidized bed
CN1211719A (en) * 1997-06-05 1999-03-24 石川岛播磨重工业株式会社 Graphitizing electric furnace
CN1252126A (en) * 1997-04-14 2000-05-03 埃尔凯姆公司 Method and calcining furnace for electric calcining of carbonaceous material
CN201077766Y (en) * 2007-07-31 2008-06-25 贵阳铝镁设计研究院 Electric calcining graphitization stove

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4160813A (en) * 1975-07-01 1979-07-10 Graphite Synthesis Company Method for heat treating carbonaceous material in a fluidized bed
CN1252126A (en) * 1997-04-14 2000-05-03 埃尔凯姆公司 Method and calcining furnace for electric calcining of carbonaceous material
CN1211719A (en) * 1997-06-05 1999-03-24 石川岛播磨重工业株式会社 Graphitizing electric furnace
CN201077766Y (en) * 2007-07-31 2008-06-25 贵阳铝镁设计研究院 Electric calcining graphitization stove

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开2000-16807A 2000.01.18

Also Published As

Publication number Publication date
CN101311111A (en) 2008-11-26

Similar Documents

Publication Publication Date Title
CN101311111B (en) Electric calcined graphitization furnace
CN103993116A (en) Double tower flash iron making furnace and iron making method
CN201265017Y (en) Blast furnace hearth furnace bottom lining structure
CN201077766Y (en) Electric calcining graphitization stove
CN201952236U (en) High-efficiency graphitizing furnace
CN214735335U (en) A keep off brick structure for basalt electric melting furnace
CN201883178U (en) Directional solidification furnace provided with improved crucible covering part
CN204211788U (en) There is the fuming furnace of collection lead-expelling function
CN215261180U (en) Refractory material lining brick structure
CN207570343U (en) It is molten to divide stove
CN104628004A (en) Preparation tank, preparation furnace kiln and preparation method of silicon-based negative electrode material for batteries
CN112723734A (en) Electric melting furnace for producing continuous basalt fibers
CN201368676Y (en) Furnace cover of non-pressure water-cooled electric arc furnace
CN111271974A (en) Movable carbon slag smelting furnace
CN201945162U (en) Kilneye protecting structure of rotary kiln
WO2017024535A1 (en) Melting separation furnace and method for treating material to be melted and separated with same
CN106082589A (en) Glass melting equipment
CN201077765Y (en) Charging stock inside lining firing space structure of electric calcining graphitization stove
US8142710B2 (en) Reduction apparatus, reduction apparatus manufacture method, and vacuum smelting reduction furnace using the same
CN101311112A (en) Electric calcined graphitization furnace material liner hearth structure
WO2016045522A1 (en) Fuming furnace with lead collecting and discharging function
CN102384653A (en) Method for changing refractory brick at tapping hole of direct current electric arc furnace
CN204678908U (en) Dumpage type electric arc furnaces
CN215725068U (en) A multi-functional clean energy stove for rock wool production
CN207792712U (en) It is a kind of produce calcium carbide melt bath bed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER NAME: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP03 Change of name, title or address

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.