CN101311082B - Large sized spiral double- fold occlusal tank intensity reinforcing device and mounting method - Google Patents
Large sized spiral double- fold occlusal tank intensity reinforcing device and mounting method Download PDFInfo
- Publication number
- CN101311082B CN101311082B CN2007100687254A CN200710068725A CN101311082B CN 101311082 B CN101311082 B CN 101311082B CN 2007100687254 A CN2007100687254 A CN 2007100687254A CN 200710068725 A CN200710068725 A CN 200710068725A CN 101311082 B CN101311082 B CN 101311082B
- Authority
- CN
- China
- Prior art keywords
- tank
- shaped steel
- tank body
- vertical shaped
- spiral double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The invention relates to a device for strengthening the occlusion strength of a large-sized tank body with a helical double flanging and a method thereof. The technical problem to be solved by the invention includes partially strengthening the strength of the large-sized helical double flanged occlusion tank body constructed by the current technique by adopting technical means and preventing and reducing the expansion and deformation of a lower tank wall and an occluded tendon. The strengthening device of the invention comprises a tank body (1) with a helical double flanging occlusion tendon (2) and is characterized in that the interior or the exterior of the tank body are provided with a plurality of vertical-shaped steels (5) connected with a plurality of clamping bands (4) that are fixed with the transverse double flanging occlusion tendon (2), or the vertical-shaped steels (5) are welded with the inner wall of the tank at interval.
Description
Technical field
The present invention relates to a kind of large sized spiral double-fold occlusal tank intensity stiffening device and method, application diameter 15m is above, above, the volume 3000m of height 16m
3More than, or diameter 30m is above, above, the volume 6000m of height 6m
3Above tank body.
Background technology
The spiral double-fold occlusal technology is work hardening principle and the thin shell structure principle of utilizing in the Metal Forming, by the special technology and equipment steel plate that 2.0~4.3mm is thick (or high strength galvanized steel plate), adopt " spiral, two-fold limit, seaming " technology to build tank body.The tank body that adopts this kind technology to build has sizable hoop tensile strength, can bear the hoop tension that tank interior liquid produces.And this kind technology has advantages such as short construction period, cost is relatively low, quality is better.Be subjected to the interlock process limitation, build steel plate that spiral double-fold occlusal tank adopts at present and roll and the thicklyest can not surpass 4.3mm, thereby the tank body maximum volume also can only be accomplished 6000m
3About.When the tank body ratio of height to diameter surpassed 1, the volume maximum can only be accomplished 3000m
3When surpassing above-mentioned volume, because it is bigger to bear pressure, the distortion of double-fold occlusal influential point of tendons, the bulging distortion can appear in the bottom tank skin.
Summary of the invention
The technical issues that need to address of the present invention are that the large sized spiral double-fold occlusal tank intensity that adopts technological means that existing technology is built carries out the part and strengthens, and stops and reduce the bulging distortion of bottom tank skin and interlock muscle.
Another technical matters that the present invention need solve is that a kind of installation method of stiffening device is provided.
The technical solution adopted for the present invention to solve the technical problems is: adopt a reinforcement of the jar outside or a jar inboard reinforcement dual mode that spiral double-fold occlusal tank is carried out intensity and strengthen.
Large sized spiral double-fold occlusal tank intensity stiffening device of the present invention, the tank body of a band spiral double-fold occlusal muscle, it is characterized in that in tank body or outside some vertical shaped steel are arranged, be connected with some clips on the vertical shaped steel and fix, or vertical shaped steel uniformly-spaced welds with a jar inwall with horizontal double-fold occlusal muscle.
Stiffening device can have multiple scheme.
One of preferred, on the tank skin between the double-fold occlusal muscle of described tank body middle and lower part, being arranged with stiffening band spirally, the two ends of stiffening band are individually fixed on the same vertical shaped steel; Limit of described vertical shaped steel and horizontal double-fold occlusal muscle near.Wherein respectively there is fixed block at the stiffening band two ends, have the bolt top to be stuck on the same vertical shaped steel on it.
Preferred described reinforcement bandwidth 30~80mm, thick 2~3mm, winding height 1~3m at the bottom of jar.
Since stiffening band because of the hoop tension of self can be tightly around the tank skin outside, thereby stoped the bulging of tank skin between the double-fold occlusal muscle effectively, the bearing capacity of whole tank body and stability are enhanced.
Preferred two, be periphery around the described tank body some vertical shaped steel and with the double-fold occlusal muscle near, be connected with some clips on the every vertical shaped steel and the double-fold occlusal muscle is fixed.Preferably on vertical shaped steel, be provided with the V-arrangement lacing wire.
Since the double-fold occlusal muscle both be subjected to vertical shaped steel near, fixed by the clip on the vertical shaped steel again, be positioned at firmly on the vertical shaped steel, stressed effect is fairly good, has effectively stoped the loosening distortion of double-fold occlusal muscle.If on vertical shaped steel, tiltedly drawn the V-arrangement lacing wire again, then stoped the deformation better effects if.
Preferred three, some vertical shaped steel is periphery and is close to inner tank wall, and all there is weld nugget on the shaped steel both sides, and weld nugget is between two circle double-fold occlusal muscle.Spacing between preferred two vertical shaped steel is 0.5~3m.
Shaped steel supports and horizontal double-fold occlusal muscle formation cellular structure longitudinally, and this cellular structure has strengthened the bearing capacity and the stability of tank body bottom.
As preferably, vertical shaped steel is channel-section steel or angle steel, one (or two) bar limit of angle steel (or channel-section steel) be used for the double-fold occlusal muscle near, the simplest and reliable.
One of preferred Unit Installation method is characterized in that:
1) outer vertical shaped steel of predetermined fixed of tank body;
2) winding stiffening band spirally on tank wall is stuck on the same vertical shaped steel bolt top of the fixed block at stiffening band two ends;
3) tight a bolt gradually, stiffening band is close on the tank skin;
4) tighten on the vertical shaped steel all that clips are fixed on the double-fold occlusal muscle, finish installation.
The invention has the beneficial effects as follows: the bottom intensity of spiral double-fold occlusal tank is strengthened, thereby whole bearing capacity of tank body and stability are improved.Make and build diameter 15~50m, volume 4000~10000m
3Single tank body become possibility.
Description of drawings
Fig. 1 is the stiffening device scheme drawing of embodiment 1;
Fig. 2 is the fixing of A portion stiffening band among Fig. 1 and connects enlarged diagram;
Fig. 3 is the fixedly scheme drawing at stiffening band two ends among Fig. 1;
Fig. 4 is the stiffening device scheme drawing of embodiment 2;
Fig. 5 is the fixing of B portion shaped steel and clip among Fig. 4 and is connected enlarged diagram;
Fig. 6 is a jar interior stiffening device scheme drawing.Wherein:
1-tank body; 2-double-fold occlusal muscle; 3-stiffening band;
4-clip; 5-vertical shaped steel; 6-bolt of rear end plate;
7-fixed block; 8-bolt; 9-lacing wire;
10-weld seam.
The specific embodiment
The present invention is further described below in conjunction with drawings and Examples.
Embodiment 1.The stiffening device of spiral winding stiffening band.
General tank body top relies on original steel plate just can satisfy requirement of strength because suffered pressure is less.So stiffening band 3 generally is located at the tank body bottom, reinforced region is 1~3m at the bottom of jar.Distance in the prior art between the double-fold occlusal muscle 2 is 0.365m, so stiffening band 3 is general around tank body winding 3~9 circles.
This routine spiral double-fold tank body 1 design has 1 channel- section steel 5, and 6 clips 4 (commercially available prod) are arranged on the channel-section steel, sees Fig. 1, Fig. 2.Installation steps are as follows:
1) outer vertical channel-section steel 5 of predetermined fixed of tank body;
2) stiffening band 3 makes bolt 8 tops of the fixed block 7 at stiffening band two ends be stuck in (see figure 3) on the same vertical channel-section steel 5 behind tank skin upper edge double-fold occlusal muscle 2 spiral rising windings 4 circles;
3) tight a bolt 8 gradually, stiffening band 3 is close on the tank skin;
4) limit that guarantees channel-section steel 5 is close to double-fold occlusal muscle 2, tightens that whole clips 4 are fixed on the double-fold occlusal muscle 2 on the angle steel, finishes installation.
Embodiment 2.Adopt fixing shaped steel externally to the stiffening device of tank body bottom.
As Fig. 4 and Fig. 5, with diameter 16m, the tank body of high 16m is an example, is spacing with 1m around the spiral double-fold tank body 1,50 angle steel 5 that vertically have been periphery, angle steel and double-fold occlusal muscle 2 near; It is fixing with double-fold occlusal muscle 2 by bolt of rear end plate 6 to be connected with 6 clips 4 on the every angle steel.Tiltedly draw V-arrangement lacing wire 9 on the angle steel in the bottom three circle spiral back gauges, formed waveform.
Embodiment 3.Adopt steel structure to be supported on interior stiffening device.
See Fig. 6.This example is with diameter 16m, and the tank body of high 16m is an example, is spacing with 1m in the spiral double-fold tank body 1, the 50 vertical channel-section steels 5 that are periphery, and odd number root channel-section steel length is contour with the 5th circle spiral limit, and it is contour that even number root channel-section steel length and the 8th is enclosed the spiral limit.Channel-section steel 5 is close to inwall and welding, and the weld encloses between the spiral limits two weld seams 10 about each weld has two.
Claims (8)
1. large sized spiral double-fold occlusal tank intensity stiffening device, described tank body is the tank body (1) of a band spiral double-fold occlusal muscle (2), it is characterized in that having outside tank body some vertical shaped steel (5), it is fixing with horizontal spiral double-fold occlusal muscle (2) to be connected with some clips (4) on the vertical shaped steel.
2. tank intensity reinforcing device according to claim 1 is characterized in that being arranged with stiffening band (3) spirally on the tank skin between the spiral double-fold occlusal muscle of described tank body middle and lower part, and the two ends of stiffening band are individually fixed on the same vertical shaped steel (5); Limit of described vertical shaped steel (5) and horizontal spiral double-fold occlusal muscle (2) near.
3. tank intensity reinforcing device according to claim 2 is characterized in that at described stiffening band two ends fixed block (7) being arranged respectively, has bolt (8) top to be stuck on the same vertical shaped steel (5) on it.
4. tank intensity reinforcing device according to claim 2 is characterized in that the wide 30~80mm of described stiffening band (3), thick 2~3mm, winding height 1~3m at the bottom of jar.
5. tank intensity reinforcing device according to claim 1, it is characterized in that being periphery around the described tank body some vertical shaped steel (5) and with spiral double-fold occlusal muscle (2) near, it is fixing with spiral double-fold occlusal muscle (2) to be connected with some clips (4) on the every vertical shaped steel (5).
6. tank intensity reinforcing device according to claim 5 is characterized in that being provided with V-arrangement lacing wire (9) on vertical shaped steel (5).
7. according to each described tank intensity reinforcing device of claim 1 to 6, it is characterized in that described vertical shaped steel (5) is channel-section steel or angle steel.
8. installation method as claim 2 or 3 or 4 described large sized spiral double-fold occlusal tank intensity stiffening devices is characterized in that:
1) the outer vertical shaped steel of predetermined fixed (5) of tank body;
2) winding stiffening band (3) spirally on tank wall is stuck on the same vertical shaped steel (5) bolt (8) top of the fixed block (7) at stiffening band two ends;
3) tight a bolt gradually (8), stiffening band (3) is close on the tank skin;
4) tighten on the vertical shaped steel all that clips (4) are fixed on the spiral double-fold occlusal muscle (2), finish installation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007100687254A CN101311082B (en) | 2007-05-22 | 2007-05-22 | Large sized spiral double- fold occlusal tank intensity reinforcing device and mounting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007100687254A CN101311082B (en) | 2007-05-22 | 2007-05-22 | Large sized spiral double- fold occlusal tank intensity reinforcing device and mounting method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101311082A CN101311082A (en) | 2008-11-26 |
CN101311082B true CN101311082B (en) | 2011-05-11 |
Family
ID=40099947
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2007100687254A Active CN101311082B (en) | 2007-05-22 | 2007-05-22 | Large sized spiral double- fold occlusal tank intensity reinforcing device and mounting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101311082B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104326187B (en) * | 2014-09-15 | 2017-04-12 | 杭州能源环境工程有限公司 | Occlusion tank reinforcing structure and large-sized spiral double-flange occlusion tank applying spiral double-flange occlusion tank reinforcing structure |
CN113028268B (en) * | 2021-03-30 | 2022-07-08 | 中冶南方工程技术有限公司 | Gas tank, gas tank side plate and manufacturing method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4429654A (en) * | 1981-07-10 | 1984-02-07 | Smith Sr Richard H | Helical seam structural vessel, method and apparatus of forming same |
CN88202118U (en) * | 1988-03-29 | 1988-11-09 | 北京市粮食局设计室 | Spiral curl steel plate storehouse |
US5289942A (en) * | 1988-11-21 | 1994-03-01 | Fawley Norman | Reinforced storage tanks |
CN2312909Y (en) * | 1997-06-07 | 1999-04-07 | 李彦红 | Assembling-type barn of glassfiber reinforced plastics |
CN1480386A (en) * | 2003-07-15 | 2004-03-10 | 无锡市恒灵防腐设备有限公司 | Integral 3D meshwork vertical plastic tank |
CN201052902Y (en) * | 2007-05-22 | 2008-04-30 | 杭州能源环境工程有限公司 | Large-scale screw double-flanging bonded tank strength reinforced device |
-
2007
- 2007-05-22 CN CN2007100687254A patent/CN101311082B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4429654A (en) * | 1981-07-10 | 1984-02-07 | Smith Sr Richard H | Helical seam structural vessel, method and apparatus of forming same |
CN88202118U (en) * | 1988-03-29 | 1988-11-09 | 北京市粮食局设计室 | Spiral curl steel plate storehouse |
US5289942A (en) * | 1988-11-21 | 1994-03-01 | Fawley Norman | Reinforced storage tanks |
CN2312909Y (en) * | 1997-06-07 | 1999-04-07 | 李彦红 | Assembling-type barn of glassfiber reinforced plastics |
CN1480386A (en) * | 2003-07-15 | 2004-03-10 | 无锡市恒灵防腐设备有限公司 | Integral 3D meshwork vertical plastic tank |
CN201052902Y (en) * | 2007-05-22 | 2008-04-30 | 杭州能源环境工程有限公司 | Large-scale screw double-flanging bonded tank strength reinforced device |
Non-Patent Citations (4)
Title |
---|
胡志军等.利浦筒仓的有限元静力分析.四川建筑科学研究32 4.2006,32(4),23-25. |
胡志军等.利浦筒仓的有限元静力分析.四川建筑科学研究32 4.2006,32(4),23-25. * |
蔡磊.德国利浦制罐技术在大中型沼气工程中的应用.中国沼气15 2.1997,15(2),29-32. |
蔡磊.德国利浦制罐技术在大中型沼气工程中的应用.中国沼气15 2.1997,15(2),29-32. * |
Also Published As
Publication number | Publication date |
---|---|
CN101311082A (en) | 2008-11-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101311082B (en) | Large sized spiral double- fold occlusal tank intensity reinforcing device and mounting method | |
CN215435996U (en) | Gas cylinder installation assembly and overhead hydrogen storage installation device | |
CN201052902Y (en) | Large-scale screw double-flanging bonded tank strength reinforced device | |
CN110900077A (en) | Fixing platform for welding flange | |
CN210475912U (en) | Galvanized welded pipe device with additional strengthening | |
CN202249083U (en) | Reinforced taper concrete pole | |
CN110667977A (en) | Exempt from lacing wire module welding water tank | |
CN216780843U (en) | Simple clamp for welding and clamping condenser flat tube | |
CN215590840U (en) | Frame and vehicle | |
CN207272578U (en) | A kind of motorcycle main support Fixing fixture for welding | |
CN219840893U (en) | High-strength alloy welded pipe | |
CN206769054U (en) | The square tube beam body steel construction of reinforcement structure in a kind of band | |
CN205820082U (en) | A kind of powder tank car tank body | |
CN207282568U (en) | A kind of power battery box structure | |
CN216308611U (en) | Large-diameter furnace body is with strengthening barrel and by its furnace body of constituteing | |
CN216973454U (en) | Detachable cofferdam cross steel pipe inner support force transmission component | |
CN217344282U (en) | Device for preventing welding deformation of connecting pipe | |
CN110356221A (en) | A kind of gas cylinder lightweight prevention fixing device and the LNG vehicle using it | |
CN221251024U (en) | Pipeline fixed bolster and mining dump truck | |
CN214059946U (en) | Pre-arching device for HPB sewage treatment on-line reconstruction | |
CN220666348U (en) | Detachable cab structure of loader | |
CN211943505U (en) | Auxiliary frame faucet mounting structure | |
CN203158358U (en) | Externally-reinforced weldless water tank | |
CN217618783U (en) | Device for preventing tube plate from surfacing deformation | |
CN216994074U (en) | Lightweight tank car without auxiliary beam structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |