CN101307599B - 一种预制空心桩的沉桩方法 - Google Patents

一种预制空心桩的沉桩方法 Download PDF

Info

Publication number
CN101307599B
CN101307599B CN2007100544091A CN200710054409A CN101307599B CN 101307599 B CN101307599 B CN 101307599B CN 2007100544091 A CN2007100544091 A CN 2007100544091A CN 200710054409 A CN200710054409 A CN 200710054409A CN 101307599 B CN101307599 B CN 101307599B
Authority
CN
China
Prior art keywords
pile
stake
soil
point
precast hollow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007100544091A
Other languages
English (en)
Other versions
CN101307599A (zh
Inventor
郝运成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2007100544091A priority Critical patent/CN101307599B/zh
Publication of CN101307599A publication Critical patent/CN101307599A/zh
Application granted granted Critical
Publication of CN101307599B publication Critical patent/CN101307599B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种预制空心桩的沉桩方法,先将桩尖安装在预制空心桩端部,将预制空心桩置于桩机上,桩机就位后,快速压桩穿过杂填土层,继续压桩的同时,桩尖内取土,距设计标高0.5~1.0米时,停止取土,最后继续压桩到设计标高。采用这种方法,在静压预制桩端部安装桩尖,桩尖具备三种功能:切割土、混合器,挤土效应的控制器。用高压水或泥浆在桩尖(混合器)内把土变为泥浆,通过桩的空心体,把土取走。通过把普通的挤土预制桩变为“挤土—非挤土”可控制的桩,大大的减少压桩阻力,适用范围加大,质量稳定,无污染。在一定的地质条件下,可节省投资,减少工程事故。

Description

一种预制空心桩的沉桩方法 
技术领域
本发明属于桩的施工方法,尤其涉及一种预制空心桩的沉桩方法。 
背景技术
在建筑桩基施工中,静压预制空心桩被广泛地使用。其优点是造价低、施工速度快、无污染。缺点有两点:一、遇密实砂层或硬土层压不下去,或叫沉桩困难,造成承载力下降,或无法使用。二、过分挤土引起断桩或桩沉降过大。为此,人们又采用了引孔静压桩、水冲(气举)沉桩法等措施,这些措施在一定程度上是有效的,但对桩周土扰动的程度不易控制或根本无法控制,使桩侧阻力离散性大,对施工及承载力影响大。 
发明内容
本发明的目的是提供一种预制空心桩的沉桩方法,此方法施工难度小,且离散性小,质量稳定,可减少工程事故,节约投资。 
为实现上述目的,本发明采用如下技术方案: 
一种预制空心桩的沉桩方法,先将桩尖安装在预制空心桩端部,桩尖的外径不大于预制空心桩的外径且不小于预制空心桩的内径,将预制空心桩置于桩机上,桩机就位后,快速压桩穿过杂填土层,继续压桩的同时,桩尖内取土,距设计标高0.5~1.0米时,停止取土,最后继续压桩到设计标高,所述的桩尖内取土过程是高压水管自桩的空心体下至桩尖内,高压水切割桩尖内土,使其变成泥浆,泥浆经桩的空心体至桩顶排水管流出;安装在预制空心桩端部的桩尖用强度较高、遇水易散的土封闭。 
高压水管端部的出水口位于管壁上。 
上述技术方案中,在静压预制桩端部安装桩尖,桩尖具备三种功能:切割土、混合器,挤土效应的控制器。用高压水或泥浆在桩尖(混合器)内把土变为泥浆,通过桩的空心体,把土取走。通过把普通的挤土预制桩变为“挤土-非挤土”可控制的桩,大大的减少压桩阻力,适用范围加大,质量稳定,无污染。在一定的地质条件下,可节省投资,减少工程事故。 
附图说明
图1为本发明的工作原理图。 
图2为桩尖的结构示意图。 
图3为图2的A-A向视图。 
图4为图2的B-B向视图。 
具体实施方式
先制作桩尖,如图2、图3、图4所示,桩尖1的端部装有切刀7,用强度 较高、遇水易散的土封闭桩尖,比如:把黄土和成泥,把泥填入桩尖的空腔内,晾干。将桩尖1焊接在预制空心桩2端部,用螺丝固定桩顶排水集水桶5及排水管4。桩尖的外径d不大于预制空心桩的外径D且不小于预制空心桩的内径。将预制空心桩2置于桩机3上,桩机3就位后,快速压桩穿过杂填土层,由于桩尖内有干泥,桩尖外的土无法进入桩尖内。然后慢速压桩,同时,将高压水管4自桩的空心体下至桩尖内,开始冲水,高压水管端部的出水口位于管壁上,也就是说,高压水在桩尖内水平喷射。水将桩尖内原来填塞的干泥冲成泥浆,桩尖外的土经桩尖切割进人桩尖内,高压水切割桩尖内土,使其变成泥浆,泥浆经桩的空心体至桩顶排水管流出。接桩时先停止沉桩,将桩尖及桩体内土取净后再接桩。送桩器应与桩截面相同,端头有钢板及相同螺丝孔,也可用桩作送桩器。距设计标高0.5~1.0米时,停止取土,取出送水水管,最后继续压桩到设计标高。桩机移位,重复上述过程,完成桩基工程。 
当然,从高压水管端部的出水口喷出的高压水也可以稍向下倾斜一定角度,但以不超出桩尖为限。 
非挤土桩用桩尖直径d与预制桩外径D相等的桩尖,挤土桩选用桩尖直径d小于预制桩外径D的桩尖。 
采用《建筑地基处理技术规范》中高压旋喷桩单管法参数,桩较长或砂层较厚时用膨润土泥浆代替水,膨润土泥浆中膨润土的加入比例为2~12%。压桩速度S(米/分钟)与供水量L(升/秒)按下式匹配: 
S=KL/(d*d) 
其中K是系数,依据土质不同取0.015—0.075,d是桩尖直径。 
本发明的工作原理简述如下: 
一、由静压预制桩沉桩过程可以证实:桩侧阻力的动摩擦力远小于其静摩擦力,沉桩困难的主要原因是桩端阻力大,因土塞效应更加大了沉桩阻力。桩尖内取土使沉桩过程中,无土塞效应,且引起有桩端阻力的面积大大减小,从而大大减小桩端阻力,有效地克服了静压预制桩缺点之一的沉桩困难。 
二、当桩尖直径d与预制桩外径D相等时,控制高压水的压力及供水量与沉桩速度协调,使静压预制桩由挤土桩变为非挤土桩。用桩尖直径d的大小可调控预制桩的挤土效应。使静压预制空心桩的第二缺点“过分挤土”不再存在。 
三、因桩周土的扰动可控,使桩侧阻力稳定;或者说与普通静压预制桩相同。因沉桩到设计标高前停止取土,桩端阻力不减小,土塞效应仍存在,桩承载力高。

Claims (2)

1.一种预制空心桩的沉桩方法,其特征在于:先将桩尖安装在预制空心桩端部,桩尖的外径不大于预制空心桩的外径且不小于预制空心桩的内径,将预制空心桩置于桩机上,桩机就位后,快速压桩穿过杂填土层,继续压桩的同时,桩尖内取土,距设计标高0.5~1.0米时,停止取土,最后继续压桩到设计标高,所述的桩尖内取土过程是高压水管自桩的空心体下至桩尖内,高压水切割桩尖内土,使其变成泥浆,泥浆经桩的空心体至桩顶排水管流出;安装在预制空心桩端部的桩尖用强度较高、遇水易散的土封闭。
2.如权利要求1所述的预制空心桩的沉桩方法,其特征在于:高压水管端部的出水口位于管壁上。
CN2007100544091A 2007-05-16 2007-05-16 一种预制空心桩的沉桩方法 Expired - Fee Related CN101307599B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007100544091A CN101307599B (zh) 2007-05-16 2007-05-16 一种预制空心桩的沉桩方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100544091A CN101307599B (zh) 2007-05-16 2007-05-16 一种预制空心桩的沉桩方法

Publications (2)

Publication Number Publication Date
CN101307599A CN101307599A (zh) 2008-11-19
CN101307599B true CN101307599B (zh) 2010-12-01

Family

ID=40124242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100544091A Expired - Fee Related CN101307599B (zh) 2007-05-16 2007-05-16 一种预制空心桩的沉桩方法

Country Status (1)

Country Link
CN (1) CN101307599B (zh)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898911A (zh) * 2014-04-16 2014-07-02 哈尔滨亿海管桩有限公司 粗细硬沙层混凝土管桩静压施工方法
CN103981865B (zh) * 2014-05-20 2015-09-23 青岛科技大学 一种便携式自动进料手动打桩装置及打桩方法
CN105133576B (zh) * 2015-08-17 2018-08-17 中亿丰建设集团股份有限公司 一种开口型弱挤土预制桩
CN110714464A (zh) * 2019-10-25 2020-01-21 江苏地基工程有限公司 一种管桩在密实砂层中的施工设备及施工方法
CN110820789A (zh) * 2019-11-21 2020-02-21 太原理工大学 一种灰土挤密桩同步注水增湿装置
CN110820790B (zh) * 2019-11-21 2022-07-05 太原理工大学 一种灰土挤密桩同步注水增湿施工工艺
CN112726574A (zh) * 2020-12-11 2021-04-30 江苏鸿基节能新技术股份有限公司 一种利用土塞效应的开口钢管桩及其施工方法

Also Published As

Publication number Publication date
CN101307599A (zh) 2008-11-19

Similar Documents

Publication Publication Date Title
CN101307599B (zh) 一种预制空心桩的沉桩方法
CN100519953C (zh) 同步注浆静压预制桩沉桩方法
CN204112308U (zh) 一种基于大卵石、高渗透系数地层的简易袖阀注浆装置
CN101812976B (zh) 可调式多级螺旋挤扩钻具
CN102011399B (zh) 一种基于phc桩的多重高喷扩底桩施工方法
CN203924036U (zh) 一种外包活性材料桩体的预应力管桩
CN201024899Y (zh) 双向螺旋封闭挤扩钻头
CN104947660A (zh) 反向螺丝钉桩及其施工方法
CN102650128A (zh) 一种先排水预压后注浆劲芯水泥搅拌桩及其施工方法
CN104005404A (zh) 一种外包活性材料桩体的预应力管桩及施工方法
CN202194162U (zh) 钻孔桩声测管通管器
CN112726574A (zh) 一种利用土塞效应的开口钢管桩及其施工方法
CN107653889A (zh) 一种型钢压灌水泥土帷幕支护桩的施工方法
CN201214787Y (zh) 刚性排水桩
CN202187340U (zh) 钢管混凝土芯柱嵌岩桩
CN103114576A (zh) 一种用于混凝土灌注桩的后压浆施工方法
CN202559340U (zh) 一种先排水预压后注浆劲芯水泥搅拌桩
CN112663615A (zh) 一种用于加固软弱土体的双螺旋管、注浆成桩设备及其施工方法
CN104196013A (zh) 一种复合y形桩及其施工方法
CN102619223A (zh) 粘结力增强式刚柔组合桩及施工方法
CN207004431U (zh) 软土地基激振打井装置
CN201132955Y (zh) 同步注浆静压预制桩装置
CN204753577U (zh) 反向螺丝钉桩
CN102605775B (zh) 一种柔性桩与刚性桩上下同体组合桩及成桩方法
CN202899121U (zh) 粘结力增强式刚柔组合桩

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101201