CN101306577A - Method for cooling and shaping continuous extruded plastic products and intermediate cooling device - Google Patents
Method for cooling and shaping continuous extruded plastic products and intermediate cooling device Download PDFInfo
- Publication number
- CN101306577A CN101306577A CNA2007101083317A CN200710108331A CN101306577A CN 101306577 A CN101306577 A CN 101306577A CN A2007101083317 A CNA2007101083317 A CN A2007101083317A CN 200710108331 A CN200710108331 A CN 200710108331A CN 101306577 A CN101306577 A CN 101306577A
- Authority
- CN
- China
- Prior art keywords
- cooling
- profile
- width
- cooling chamber
- moving direction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Moulds For Moulding Plastics Or The Like (AREA)
- Extrusion Moulding Of Plastics Or The Like (AREA)
Abstract
Description
技术领域 technical field
本发明涉及一种对连续挤出塑料制品进行高效冷却定型的方法和装置。The invention relates to a method and a device for efficiently cooling and shaping continuously extruded plastic products.
背景技术 Background technique
塑料型材是通过挤出模具挤压成型的。目前常用的挤出模具主要由模头、干式定型模、湿式真空水箱三大部分组成。原材料在挤出机料筒内熔融塑化后经过模头获得一定形状的熔坯,进入到干式定型模中,在真空吸附力的作用下,型坯与定型模充分接触,型坯携带的热量与定型模进行热交换,再由定型模内的冷却水带走。由于湿式真空水箱中排布的支撑型材的定型块之间间隙较大,如果制品在定型模内不能得到充分冷却,在水箱真空作用下,制品会因为内热使其在定型块之间的间隙处发生变形。因此,只有当型坯外壁厚度的90%达到玻璃化温度以下时,才能引入到湿式真空水箱中,由冷却水直接对其进一步的冷却与定型,最后通过切割获得所需形状和长度的制品。由于型坯携带的热量是通过定型模传递后由冷却水带走的,单位时间内移走的热量有限,使得型材的生产速度受到约束。如果要提高型材牵引速度,势必要增加干式定型模的长度,而定型模的长度不能无限制地延长。在定型模总长超过100cm后,定型模长度的增加对牵引速度的提高影响较为缓慢:一方面是因为定型模对制品存在真空吸附力,增加定型模长度使制品在定型模内滞留的时间延长,造成制品在牵引过程中的阻力加大。另一方面由于加工设备的限制,每节定型模不能设计太长。定型模分段又会造成装配误差,分段太多导致累计误差加大,影响最终制品的形状及尺寸。且定型模的加工成本高,加长的定型模部分对模具成本影响很大。因此,目前生产上所采用的定型模总长度一般不超过135cm,正常牵引速度在2.5~3.5米/分钟,牵引速度一般不高于4.0米/分钟。Plastic profiles are extruded through extrusion dies. At present, the commonly used extrusion die is mainly composed of three parts: the die head, the dry setting die, and the wet vacuum water tank. After the raw materials are melted and plasticized in the barrel of the extruder, a molten billet of a certain shape is obtained through the die head, and then enters the dry shaping die. Under the action of vacuum adsorption, the parison is fully in contact with the shaping die, and the The heat is exchanged with the calibrating mold, and then taken away by the cooling water in the calibrating mold. Due to the large gap between the shaping blocks of the supporting profiles arranged in the wet vacuum water tank, if the product cannot be cooled sufficiently in the shaping mold, under the action of the vacuum of the water tank, the product will be in the gap between the shaping blocks due to internal heat. deformed. Therefore, only when 90% of the thickness of the outer wall of the parison reaches below the glass transition temperature, it can be introduced into the wet vacuum water tank, further cooled and shaped by the cooling water directly, and finally the product of the desired shape and length can be obtained by cutting. Since the heat carried by the parison is taken away by the cooling water after passing through the shaping die, the heat removed per unit time is limited, which limits the production speed of the profile. If the drawing speed of the profile is to be improved, the length of the dry calibrating die must be increased, and the length of the calibrating die cannot be extended without limit. After the total length of the calibrator exceeds 100cm, the increase in the length of the calibrator has a relatively slow effect on the improvement of the traction speed: on the one hand, because the calibrator has a vacuum adsorption force on the product, increasing the length of the calibrator prolongs the retention time of the product in the calibrator. The resistance of the product in the traction process is increased. On the other hand, due to the limitation of processing equipment, each section of the setting mold cannot be designed too long. Segmentation of the stereotypes will cause assembly errors. Too many segments will increase the cumulative error and affect the shape and size of the final product. And the processing cost of the calibrating die is high, and the elongated calibrating die part has a great influence on the mold cost. Therefore, the total length of the stereotypes used in production is generally no more than 135cm, the normal traction speed is 2.5-3.5 m/min, and the traction speed is generally not higher than 4.0 m/min.
发明内容 Contents of the invention
为了解决上述连续挤出塑料制品生产速度难以提高的问题,本发明提供了一种对连续挤出塑料制品冷却定型的方法及中间冷却装置,可以提高型坯的冷却成型效率,从而在不增加型材牵引力的情况下提高型材的牵引速度,提高型材的生产速度。In order to solve the above-mentioned problem that the production speed of continuous extruded plastic products is difficult to increase, the present invention provides a method for cooling and shaping continuous extruded plastic products and an intermediate cooling device, which can improve the efficiency of cooling and forming of parisons, thereby increasing the profile without increasing In the case of traction, the traction speed of the profile is increased, and the production speed of the profile is increased.
本发明方法是这样实现的:在干式定型模和湿式真空水箱之间设置一段中间冷却装置;熔坯在经过干式定型模冷却至其外壁厚度的1/4~1/3达到玻璃化温度以下时导入到该中间冷却装置中。该中间冷却装置为一密封的箱体,箱体在型材移动方向上设有若干个可通入和导出冷却水的冷却室,各冷却室上方相通并与箱体外的负压源相通;各冷却室在型材移动方向的宽度相等或递增,型材导入的第一个冷却室宽度不大于3mm,并且相邻冷却室宽度差不大于3mm。The method of the present invention is realized in the following way: a section of intermediate cooling device is set between the dry calibrating mold and the wet vacuum water tank; the molten body reaches the vitrification temperature after being cooled by the dry calibrating mold to 1/4 to 1/3 of its outer wall thickness The following are introduced into the intercooler. The intermediate cooling device is a sealed box. The box is provided with several cooling chambers in the moving direction of the profile, which can lead in and out of cooling water. The top of each cooling chamber communicates with the negative pressure source outside the box; The width of the cooling chamber in the moving direction of the profile is equal or increasing, the width of the first cooling chamber into which the profile is introduced is not greater than 3mm, and the width difference between adjacent cooling chambers is not greater than 3mm.
当制品即型材通过上述中间冷却装置时,制品在各冷却室中整体浸泡在冷却水中,由冷却水吸收制品携带的热量并将其导出,同时箱体内各冷却室宽度很小,排列紧密的定型块对制品起到定型作用,不会使制品变形。因制品整体浸泡在冷却水中,单位时间内带走的热量比定型模高,因此,模具的冷却和定型效率得到显著提高,型材的牵引速度可以提高。用该装置可以替代一部分定型模,使得定型模的总长度可以减少。When the product, that is, the profile, passes through the above-mentioned intermediate cooling device, the product is immersed in cooling water as a whole in each cooling chamber, and the heat carried by the product is absorbed by the cooling water and exported. The block plays a role in shaping the product without deforming the product. Because the whole product is immersed in the cooling water, the heat taken away per unit time is higher than that of the shaping mold, so the cooling and shaping efficiency of the mold is significantly improved, and the pulling speed of the profile can be increased. The device can replace a part of the calibrating die, so that the total length of the calibrating die can be reduced.
本发明用来实现上述方法的中间冷却装置为一密封的箱体,箱体在型材移动方向上设有若干个由定型块隔分开的可通入和导出冷却水的冷却室,定型块在制品牵引方向上加工有与型材尺寸相匹配的型腔,各冷却室上方相通并与箱体外的负压源相通;各冷却室在型材移动方向的宽度相等或递增,型材导入的第一个冷却室宽度不大于3mm。The intermediate cooling device used to realize the above method in the present invention is a sealed box body, and the box body is provided with several cooling chambers separated by shaped blocks in the moving direction of the profile, which can lead into and export cooling water. A cavity matching the size of the profile is processed in the traction direction, and the top of each cooling chamber communicates with the negative pressure source outside the box; the width of each cooling chamber in the moving direction of the profile is equal or increasing, and the first cooling chamber imported by the profile The chamber width is not greater than 3mm.
型材导入的第一个冷却室宽度宜为1.5-2.5mm,各冷却室的宽度在型材移动方向连续递增或相隔数个冷却室递增。如果第一个冷却室宽度过宽,则必然要求由定型模导出的型坯温度较低,冷却较充分,否则型坯强度较低,进入本装置后易变形;但其宽度也不宜过小,小于1.5mm时,冷却水流动不畅,冷却效果不理想。The width of the first cooling chamber into which the profile is introduced should be 1.5-2.5 mm, and the width of each cooling chamber increases continuously in the moving direction of the profile or increases incrementally after several cooling chambers. If the width of the first cooling chamber is too wide, it must be required that the temperature of the parison derived from the shaping die is low and the cooling is sufficient, otherwise the strength of the parison is low and it is easy to deform after entering the device; but its width should not be too small. When it is less than 1.5mm, the cooling water will not flow smoothly and the cooling effect will be unsatisfactory.
箱体的两个侧板分别由两个内外侧板组成,左右外侧板内侧开有供排液用的蓄水槽,在型材上方的冷却室两侧的左右内侧板上开有与蓄水槽相通的溢流口,左右外侧板上设有与蓄水槽相通的抽气管;左右外侧板内侧底部开有进液槽,在冷却室两侧底部的左右内侧板上开有与进液槽相通的进液孔,左右外侧板上设有与进液槽相通的进水接头。The two side plates of the box body are composed of two inner and outer plates respectively. There are water storage tanks for liquid drainage on the inner sides of the left and right outer plates. The overflow port, the left and right outer plates are provided with air extraction pipes communicating with the water storage tank; the inner bottom of the left and right outer plates are opened with liquid inlets, and the left and right inner plates at the bottom of both sides of the cooling chamber are opened with liquid inlets connected with the liquid inlets hole, and the left and right outer plates are provided with water inlet joints communicated with the liquid inlet tank.
箱体两侧内壁上开有定型块插槽,插槽的宽度大于定型块的宽度,使得定型块在插槽内在型材移动方向前后移动。There are shaped block slots on the inner walls on both sides of the box body, and the width of the slot is greater than that of the shaped block, so that the shaped block moves back and forth in the direction of profile movement in the slot.
本发明有以下有益效果:The present invention has following beneficial effect:
1、中间冷却装置比干式定型模冷却效率高。干式定型模对制品的冷却是利用冷却介质通过进水压力在模具钢材内的流动,来带走制品传导给模具钢材的热量。该装置的冷却方式是制品与冷却水直接接触带走热量。由于水的比热容是钢的9倍,在升高相同温度时吸收的热量比钢材要大,所以冷却水直接接触制品冷却效果要好。另一方面,水可以和制品充分接触发挥其冷却功效。而且通过进水压力、水自下而上的对流和外置的抽气管来加速其流动,更大幅度地提高了冷却效果。因此在干式定型模后面增加该装置,可以在保持牵引速度不变的情况下使定型模的总长大大缩短,如对于壁厚为0.25cm的制品,在牵引速度为6米/分钟下,干式定型模总长由135cm减少到60cm以内;对于壁厚为0.25cm的制品,干式定型模长度为100cm时,增加该装置后牵引速度可达7米/分钟。1. The cooling efficiency of the intermediate cooling device is higher than that of the dry calibrating die. The cooling of the product by the dry calibrating die is to use the cooling medium to flow in the mold steel through the water pressure to take away the heat transmitted from the product to the mold steel. The cooling method of the device is that the product is in direct contact with the cooling water to take away the heat. Since the specific heat capacity of water is 9 times that of steel, when the same temperature rises, the heat absorbed is larger than that of steel, so the cooling effect of cooling water directly contacting the product is better. On the other hand, water can fully contact the product to exert its cooling effect. Moreover, the flow is accelerated by water inlet pressure, water convection from bottom to top and external air extraction pipe, which greatly improves the cooling effect. Therefore, adding this device behind the dry calibrating mold can greatly shorten the total length of the calibrating mold while keeping the traction speed constant. The total length of the dry-type calibrator is reduced from 135cm to less than 60cm; for products with a wall thickness of 0.25cm, when the length of the dry-type calibrator is 100cm, the traction speed can reach 7 m/min after adding this device.
2、中间冷却装置在前半段冷却室宽度可以设在为1~3mm范围内,相当于干式定型模中的真空气槽,制品在通过此极小段间隙时不会发生较大变形。该装置在工作时始终处在真空负压状态下,通过真空表与真空气阀来调节该装置的负压,来控制产品形状。通过装置内可靠的密封措施,在工作状态下可保持稳定的负压值。2. The width of the cooling chamber in the first half of the intermediate cooling device can be set within the range of 1-3mm, which is equivalent to the vacuum air groove in the dry calibrating mold, and the product will not deform greatly when passing through this extremely small gap. The device is always in a vacuum negative pressure state when it is working, and the negative pressure of the device is adjusted through a vacuum gauge and a vacuum valve to control the shape of the product. Through reliable sealing measures in the device, a stable negative pressure value can be maintained under working conditions.
3、中间冷却装置中的定型块可以采用整体式,不设置分型面。与干式定型模相比,减少了因分型而造成的装配偏差。定型块在装置内采用浮动式定位,定型块在横向和纵向均能作少量移动。干式定型模因存在装配偏差,不能保证型腔在挤出方向上的直线度,使得牵引时阻力加大,易造成制品弯曲变形。另外,定型块可以采用浮动式定位方式,充分保证了牵引过程中型腔的直线度。3. The shaping block in the intermediate cooling device can adopt the integral type without setting the parting surface. Compared with the dry setting mold, the assembly deviation caused by parting is reduced. The shaping block adopts floating positioning in the device, and the shaping block can move a little in both horizontal and vertical directions. Due to the assembly deviation of the dry-type shaping mold, the straightness of the cavity in the extrusion direction cannot be guaranteed, which increases the resistance during traction and easily causes bending and deformation of the product. In addition, the shaping block can adopt a floating positioning method, which fully guarantees the straightness of the cavity during the traction process.
4、冷却水由定型块之间的间隙处注入,分若干进液孔喷射入装置中,保证输入了平稳的冷却水流,使输入的冷却水不会对型材表面产生大的冲击。4. The cooling water is injected from the gap between the shaped blocks, and sprayed into the device through several liquid inlet holes to ensure a stable cooling water flow, so that the input cooling water will not have a large impact on the profile surface.
5、左右两侧单独供水,因而左右两侧的进水流量是分别可调,对于非对称制品可以通过调节两侧进水量的大小来调整制品不同区域的冷却效率,从而有效克服牵引过程中制品的弯曲现象。5. The left and right sides are supplied with water separately, so the water flow on the left and right sides can be adjusted separately. For asymmetric products, the cooling efficiency of different areas of the product can be adjusted by adjusting the water inflow on both sides, so as to effectively overcome the dragging process of the product. bending phenomenon.
6、中间冷却装置与同长度的干式定型相比制造成本较低,维护方便。该装置材料成本及制造费用偏低,相当于同长度的干式定型模的60%左右。该装置在冷却定型方面效率的提高,又大大缩短了定型段的总长度。该装置采用插片式定型块,拆装容易,模具日常维护方便。6. The manufacturing cost of the intermediate cooling device is lower than that of the same length dry type setting, and the maintenance is convenient. The material cost and manufacturing cost of the device are on the low side, which is equivalent to about 60% of that of a dry calibrator with the same length. The improvement of the efficiency of the device in cooling and shaping also greatly shortens the total length of the shaping section. The device adopts the plug-in shaped block, which is easy to disassemble and assemble, and the daily maintenance of the mold is convenient.
附图说明 Description of drawings
图1为本发明工作状态示意图。Fig. 1 is a schematic diagram of the working state of the present invention.
图2为本发明中间冷却装置结构示意图。Fig. 2 is a structural schematic diagram of the intermediate cooling device of the present invention.
图3为图2中沿A-A线剖面图。Fig. 3 is a sectional view along line A-A in Fig. 2 .
图4为图2中沿B-B线剖视图。Fig. 4 is a sectional view along line B-B in Fig. 2 .
图5为图2中沿C-C线剖视图。Fig. 5 is a sectional view along line C-C in Fig. 2 .
上述图中:1、定型模;2、中间冷却装置,3、湿式真空水箱,4、型材,5、进口板,6、顶板,7、真空气阀,8、真空接头,9、真空表,10、插槽,11、溢流口,12、密封定型块,13、出口板,14、抽气孔,15、冷却室,16、定型块,17、底板,18、进液槽,19、抽气孔,20、右内侧板,21、右外侧板,22、左内侧板,23、左外侧板,24、抽气管,25、蓄水槽,26、进水接头,27、带调节阀的出水口,28、进液孔,29、气槽。In the above figure: 1. Calibration mold; 2. Intermediate cooling device, 3. Wet vacuum water tank, 4. Profiles, 5. Inlet plate, 6. Top plate, 7. Vacuum air valve, 8. Vacuum joint, 9. Vacuum gauge, 10. Slot, 11. Overflow port, 12. Sealing and shaping block, 13. Outlet plate, 14. Air extraction hole, 15. Cooling chamber, 16. Shaping block, 17. Bottom plate, 18. Liquid inlet tank, 19. Pumping Air hole, 20, right inner panel, 21, right outer panel, 22, left inner panel, 23, left outer panel, 24, exhaust pipe, 25, water storage tank, 26, water inlet joint, 27, water outlet with regulating valve , 28, liquid inlet hole, 29, air groove.
具体实施方式 Detailed ways
如图1所示,本发明中间冷却装置2串联在干式定型模1与湿式真空水箱3之间。As shown in FIG. 1 , the
如图2-5所示,中间冷却装置由底板17、顶板6、两个侧板以及设在型材4进出口端的进口板5、出口板13组成一个包覆的箱体,箱体的两个侧板分别由两个内外侧板20、21、22、23组成,左右内侧板20、22内侧开有若干定型块插槽10,定型块16通过插槽10安装在箱体内,相邻定型块之间的间隙为冷却室15,箱体进出口两端的定型块为密封定型块12,将箱体内腔与两端的进口板5、出口板13分隔开,密封定型块上设有气槽29,两端的进口板5和出口板13上设有与气槽相通的抽气孔19和14。两个密封定型块12之间的各定型块16与顶板6之间有间隙,使得各冷却室上方相通,插槽10的宽度大于定型块16的宽度,使得定型块在插槽内能够上下浮动和在型材移动方向前后移动;顶板6上设有与箱体内相通的真空接头8,真空接头与负压源相通;左右外侧板21、23内侧沿型材移动方向开有供排液用的蓄水槽25,在型材上方的冷却室15两侧的左右内侧板20、22上开有与蓄水槽25相通的溢流口11,左右外侧板21、23上设有与蓄水槽25相通的抽气管24。左右外侧板21、23内侧底部开有进液槽18,在冷却室15两侧底部的左右内侧板20、22上开有与进液槽18相通的进液孔28,左右外侧板21、23上设有与进液槽18相通的进水接头26。箱体的底板上开有出水口27中,出水口27上装有流量调节阀。As shown in Figure 2-5, the intermediate cooling device consists of a
各冷却室在型材移动方向的宽度相等或数个冷却室递增。本例中,箱体内前半段各冷却室宽度相同,其宽度为1~3mm,相当于干式定型模中的真空气槽;后半段冷却室宽度相同,其宽度为4~6mm,加强了冷却液与制品的热交换。在定型块放置的横向与纵向位置上,均留有活动间隙,有效消除了因装配误差所带来的直线度偏差。装置通过设在顶板6上的真空表9、真空气阀7和底板下的带调节阀的出水口27来调节箱体的真空度及液面高度。冷却水由可调式进水接头26进入左右外侧板的进液槽18中,通过进液孔28进入定型块16之间的冷却室15内,自下而上对制品进行冷却。定型块16在型材4的牵引方向上设计了与型材形状相似的型腔,型腔的尺寸由大到小呈阶梯型排布。在真空接头8和抽气管24工作时,装置始终保持在一个相对恒定的真空负压状态下,该负压促使型材4的外壁与定型块16的型腔贴合,并通过冷却液的冷却,达到使制品定型的效果。The width of each cooling chamber in the moving direction of the profile is equal or the width of several cooling chambers increases. In this example, the widths of the cooling chambers in the first half of the box are the same, with a width of 1 to 3 mm, which is equivalent to the vacuum air groove in the dry calibrating mold; Heat exchange between cooling liquid and product. In the horizontal and vertical positions where the shaped blocks are placed, there are movable gaps, which effectively eliminates the straightness deviation caused by assembly errors. The device adjusts the vacuum degree and liquid level of the box body through the
对型材冷却的工作原理如下:冷却水由装置两侧的可调式进水接头26进入左右外侧板的进液槽18中,通过进液孔28进入冷却室15内,与制品进行热量交换,然后,冷却水由型材上方的溢流口11排入蓄水槽25中,在抽气管24的抽吸作用下排出。通过密封定型块12的型腔渗入到气槽29中的冷却水由抽真空装置通过抽气孔抽走,可以保证箱体内密封。The working principle of profile cooling is as follows: the cooling water enters the
在60cm干式定型模后面增加该装置,对于壁厚为0.25cm的制品,牵引速度可以达到6米/分钟,每小时的产量超过400千克。Add this device behind the 60cm dry calibrator, for products with a wall thickness of 0.25cm, the pulling speed can reach 6m/min, and the output per hour can exceed 400kg.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200710108331 CN101306577B (en) | 2007-05-18 | 2007-05-18 | Process for cooling and fixing continuous extrusion plastic products and intercooler unit |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200710108331 CN101306577B (en) | 2007-05-18 | 2007-05-18 | Process for cooling and fixing continuous extrusion plastic products and intercooler unit |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101306577A true CN101306577A (en) | 2008-11-19 |
| CN101306577B CN101306577B (en) | 2011-04-13 |
Family
ID=40123355
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 200710108331 Expired - Fee Related CN101306577B (en) | 2007-05-18 | 2007-05-18 | Process for cooling and fixing continuous extrusion plastic products and intercooler unit |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101306577B (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101767439A (en) * | 2010-03-05 | 2010-07-07 | 连云港杰瑞模具技术有限公司 | Water immersion full-sealing negative pressure shaping system of extrusion mold |
| CN101947850A (en) * | 2010-09-19 | 2011-01-19 | 铜陵格瑞特挤出技术有限公司 | Intermediate cooling water tank capable of being used for high-speed extrusion mold |
| CN102328424A (en) * | 2011-10-13 | 2012-01-25 | 铜陵中发三佳科技股份有限公司 | Plastic profile extrusion mold water tank capable of locking molding block rapidly |
| CN103302836A (en) * | 2013-05-17 | 2013-09-18 | 张李忠 | Method for producing plastic-steel section by using low-cold-stress coextrusion die |
| CN108357075A (en) * | 2018-04-27 | 2018-08-03 | 张家港卡福新材料有限公司 | The water-cooling system of Wood-plastic floor extrusion moulding |
| CN109878058A (en) * | 2019-04-16 | 2019-06-14 | 洛阳市建园模具制造有限公司 | A modular plate structure shaping device for negative pressure forming |
| CN111391269A (en) * | 2020-04-14 | 2020-07-10 | 铜陵格瑞特挤出技术有限公司 | Adjusting device of die mounting platform |
-
2007
- 2007-05-18 CN CN 200710108331 patent/CN101306577B/en not_active Expired - Fee Related
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101767439A (en) * | 2010-03-05 | 2010-07-07 | 连云港杰瑞模具技术有限公司 | Water immersion full-sealing negative pressure shaping system of extrusion mold |
| CN101947850A (en) * | 2010-09-19 | 2011-01-19 | 铜陵格瑞特挤出技术有限公司 | Intermediate cooling water tank capable of being used for high-speed extrusion mold |
| CN101947850B (en) * | 2010-09-19 | 2012-10-03 | 铜陵格瑞特挤出技术有限公司 | Intermediate cooling water tank capable of being used for high-speed extrusion mold |
| CN102328424A (en) * | 2011-10-13 | 2012-01-25 | 铜陵中发三佳科技股份有限公司 | Plastic profile extrusion mold water tank capable of locking molding block rapidly |
| CN103302836A (en) * | 2013-05-17 | 2013-09-18 | 张李忠 | Method for producing plastic-steel section by using low-cold-stress coextrusion die |
| CN108357075A (en) * | 2018-04-27 | 2018-08-03 | 张家港卡福新材料有限公司 | The water-cooling system of Wood-plastic floor extrusion moulding |
| CN108357075B (en) * | 2018-04-27 | 2024-05-28 | 张家港卡福新材料有限公司 | Water cooling system for extrusion molding of wood plastic floor |
| CN109878058A (en) * | 2019-04-16 | 2019-06-14 | 洛阳市建园模具制造有限公司 | A modular plate structure shaping device for negative pressure forming |
| CN111391269A (en) * | 2020-04-14 | 2020-07-10 | 铜陵格瑞特挤出技术有限公司 | Adjusting device of die mounting platform |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101306577B (en) | 2011-04-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101306577B (en) | Process for cooling and fixing continuous extrusion plastic products and intercooler unit | |
| CN205853286U (en) | A kind of structure of controlling temperature of hot runner mould | |
| CN201792482U (en) | Intermediate cooling water tank for high-speed extrusion die | |
| CN121572564B (en) | A shaping and cooling device and method for plastic hollow boards | |
| CN207711354U (en) | A kind of PVC profile dry and wet mixing vacuum sizing device | |
| CN200967253Y (en) | Mould cooling mechanism | |
| CN217098864U (en) | A hollow core-pulling blow mold | |
| CN205058546U (en) | Velocity of flow degree adjustable extrusion die is expected to plastic profile single armed part | |
| CN206550223U (en) | A kind of rear cross beam mould | |
| CN202241940U (en) | A shaping die for cooling and shaping the inside of a profile | |
| CN211307193U (en) | A precision mold for forming plastic products | |
| CN205364497U (en) | PVC tubular product cooling shaping device | |
| CN101947850B (en) | Intermediate cooling water tank capable of being used for high-speed extrusion mold | |
| CN212979111U (en) | A kind of injection pipe fittings mold | |
| CN201249520Y (en) | Built-in dry type stock mold for brightening surface of section bar | |
| CN205763024U (en) | A kind of liquid nitrogen die channel structure being suitable for cooling | |
| CN207669641U (en) | Strip molding die | |
| CN212764631U (en) | 3D printing die of piece of bending | |
| CN212982778U (en) | Mould for producing glass bottles quickly and efficiently in heat dissipation | |
| CN206528051U (en) | Packing tube sizing module | |
| CN201776902U (en) | Plastic profile stock mold device | |
| CN203937172U (en) | A kind of cooling device of plastic molding press forming module | |
| CN106965394A (en) | A kind of high-efficient automatic plastic shape-forming mould | |
| CN220499912U (en) | Integrated cooling adjusting device of single-wall section bar | |
| CN104400985B (en) | Stock mould for high-speed plastic Profile Extrusion mould |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110413 Termination date: 20170518 |