CN101306450A - Precise clicking technique of track link rail - Google Patents

Precise clicking technique of track link rail Download PDF

Info

Publication number
CN101306450A
CN101306450A CNA2008101226705A CN200810122670A CN101306450A CN 101306450 A CN101306450 A CN 101306450A CN A2008101226705 A CNA2008101226705 A CN A2008101226705A CN 200810122670 A CN200810122670 A CN 200810122670A CN 101306450 A CN101306450 A CN 101306450A
Authority
CN
China
Prior art keywords
die
precise
track link
link rail
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101226705A
Other languages
Chinese (zh)
Other versions
CN101306450B (en
Inventor
周永南
成功
朱德嵩
于丰
张进
刘德群
钱京义
倪方庆
任镇和
余永兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING AUTOMOBILE FORGING CO Ltd
Original Assignee
NANJING AUTOMOBILE FORGING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING AUTOMOBILE FORGING CO Ltd filed Critical NANJING AUTOMOBILE FORGING CO Ltd
Priority to CN2008101226705A priority Critical patent/CN101306450B/en
Publication of CN101306450A publication Critical patent/CN101306450A/en
Application granted granted Critical
Publication of CN101306450B publication Critical patent/CN101306450B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a precision die cutting technique for a caterpillar section, which is particularly applied to a caterpillar section forge piece with requirements of straight holes and straight edges. A set of nitrogen compressing die is added on an forged clipping press, a forge piece with a certain draft angle after the normal working procedures of edge-trimming and punching is subjected to deep processing by using a precision cutting die with a punch and a female in combination with the nitrogen compressing die, thereby forming a surface with the straight holes and the straight edges conforming to the final requirements, wherein the deep processing of the precision die cutting technique is carried out by the one-step punching forming via the nitrogen compressing die. Originally, two processes of milling the surfaces on two sides and drawing the surface on one side of two holes are required, after applying the precision die cutting technique of the invention to the actual production, the two processes are eliminated because the one-step punching forming procedure is added after forging, thereby greatly shortening the production flow, remarkably reducing the intermediate remanufactured products and remarkably reducing the cost.

Description

Precise clicking technique of track link rail
Technical field
The present invention relates to side cut, the punching technology of technical field of forging, relate in particular to a kind of accurate punching processing technology with engineering machinery of straight hole straight flange requirement with the track link rail forging.
Background technology
The track link rail forging products is one of requisite major part of caterpillar engineering vehicles driving system.Generally the crawler belt of every vehicle bottom need use nearly about 200 at chain rail joint altogether, and its consumption is relatively large.This track link rail one side is connected by screw with creeper tread, and opposite side then is set on the driving wheel and rolls.Based on the requirement that realizes function, a side in track link rail both sides and middle two holes need form the plane, and requires loose relatively to the degree of roughness on these planes.Because the forging and molding process of this forging has determined these planes that certain depanning gradient is all arranged, these characteristics make it can't directly satisfy the actual needs that use, traditional processing technology has proposed processing method targetedly to this: promptly process these planes with machining apparatus after forging heat treatment, wherein the plane of both sides generally processes with milling machine, the plane of middle two holes one side generally processes with broaching machine, by the processing of this two aspect, the depanning hypotenuse on each required plane of track link rail is eliminated.Yet, being subjected to the influence of the various market factors, the cost of this forging products is constantly increasing, and the competitiveness of product in market is greatly limited.
The front has illustrated and has had the way of handling the depanning gradient on the track link rail forging products now, the higher shortcoming of its cost is apparent, thereby, further seek the approach of depanning gradient on the low-cost processes forging products, be the important R﹠D direction that the sector technical staff seek assiduously.
Summary of the invention
The object of the present invention is to provide the process of a kind of forging close trim, punching, substitute to have now and finish plane processing, reduce the cost of track link rail forging products by the common machine processing method.
Purpose of the present invention will be achieved through the following technical solutions:
Precise clicking technique of track link rail, at the track link rail forging that is applied to have the requirement of straight hole straight flange, described die-cut operation is to utilize precision that the nitrogen compaction mold carries out one-step punching forming towards straight hole with cut the straight flange operation, for finishing the forging that has certain depanning gradient after normal punching and the side cut operation, carry out the deep processing of accurate punching, thereby form the machined surface of final technological requirement.
Further, precise clicking technique of track link rail, it comprises upper and lower die holder wherein said nitrogen compaction mold, fixed head, backing plate, punch-die, die, die block, pressure die fixed head, pressure die, drift, guide bar bolt, stripper etc., two cylinders are installed on described upper bolster at least, have the air flue that is interconnected in upper bolster, described air flue is connected with cylinder, be filled with nitrogen in the air flue, cylinder and air flue constitute the high-pressure system of a complete seal.
Further, precise clicking technique of track link rail, wherein said pressure die are fixed on the pressure die fixed head, and the pressure die fixed head is connected with upper bolster by guide bar bolt; The non-impact end of described drift is fixedlyed connected with upper bolster by fixed head, backing plate; Described die is fixed on the die block, and die block is fixedlyed connected with upper bolster with backing plate by fixed head; Described stripper floats with die shoe with stage clip by bolt and is connected.
Further, precise clicking technique of track link rail, an end of wherein said air flue is equipped with sealing-plug, and the other end is equipped with Pressure gauge, and the pressure in the air flue is 2MPa-4MPa.
Further, precise clicking technique of track link rail, wherein said cylinder number are 2n, wherein n 〉=1.
Further, precise clicking technique of track link rail, the drift of wherein said precise clicking technique mould and die adopt is that the trade mark is that the die steel material manufacturing of H13 (4CrMoSiVl) forms.
Further, precise clicking technique of track link rail, the cutting edge of wherein said drift and die partly are that mode manufacturing by No. 6 wear resistance electrodes of built-up welding Si Taili cobalt-based forms.
Precise clicking technique of track link rail of the present invention, its beneficial effect that has is embodied in: by increase an accurate punching operation after forging, save the original required two procedures of milling two side planes and drawing two holes, one side plane, the production flow process shortens dramatically, middle reproduced goods significantly reduce, and it is remarkable that cost reduces effect.
The purpose of precise clicking technique of track link rail of the present invention, feature and advantage will be done further to specifically describe in conjunction with respective drawings by a following preferred embodiment, to deepen the understanding to essence of the present invention.
Description of drawings
Fig. 1 is the forging products outward appearance front view that the present invention produces;
Fig. 2 is the cross sectional side view of the present invention's forging products one punching place of producing.
Fig. 3 is the structural representation of nitrogen compaction mold of the present invention.
The specific embodiment
Precise clicking technique of track link rail of the present invention, at the track link rail forging that is applied to have the requirement of straight hole straight flange, after it is finished in regular turn and includes blank heating operation, flattening process, blocking operation, finish-forging operation, common die-cut operation, carry out precise clicking technique, described precise clicking technique is to utilize precision that the nitrogen compaction mold carries out one-step punching forming towards straight hole with cut the straight flange operation, to finishing the forging that has certain depanning gradient after normal side cut and the punching operation, carry out the deep processing of accurate punching, thereby form the machined surface of final technological requirement.
The present invention in the specific implementation, close trim that provides and punching technology at object, mainly be that a circular blank is heated to the temperature that is fit to forging, resulting track link rail forging intermediate products after forging press flattening, blocking, finish-forging, forcing press side cut and punching.As shown in Figure 1, these track link rail forging products 18 basic profiles are oblong, upper and lower both sides are respectively applied for the creeper tread and being set on the driving wheel of being spirally connected, cut into plane 181,182 respectively, its inside also is formed with two perforation by punching technology, and cuts formation plane 183,184 respectively in two perforation, one side.Finished parts often has the depanning gradient in the middle of this chain rail joint, for the assembling of chain rail joint and use and caused considerable influence.So precise clicking technique of the present invention, promptly provide a kind of efficient, easy and can significantly cost-effective deep processing means at this defective.Particularly, on clipping press after the forging, increase by a cover nitrogen compaction mold, carry out the deep processing of an accurate punching for finishing the forging that has certain depanning gradient after normal side cut, the punching operation, thereby form the final processing plane that requires.Wherein, as shown in Figure 3, nitrogen compaction mold of the present invention, it comprises upper and lower die holder 2,17, fixed head 5, backing plate 4, punch-die 13, die 14, die block 8, pressure die fixed head 7, pressure die 12, drift 6, guide bar bolt 9, stripper 11, two cylinders 3 are installed on described upper bolster 2 at least, in upper bolster 2, have the air flue 19 that is interconnected, described air flue 19 is connected with cylinder 3, be filled with nitrogen in the air flue 19, cylinder 3 and air flue 19 constitute the high-pressure system of a complete seal.Pressure die 12 is fixed on the pressure die fixed head 7, and pressure die fixed head 7 is connected with upper bolster 2 by mould guide rod 9; The non-impact end of described drift 6 is fixedlyed connected with upper bolster 2 by fixed head 5, backing plate 4; Described die 14 is fixed on the die block 8, and die block 8 is fixedlyed connected with upper bolster 2 by fixed head 5, backing plate 4 in regular turn; Described stripper 11 floats with die shoe 17 with stage clip 15 by bolt 16 and is connected.One end of described air flue 19 is equipped with sealing-plug 1, and the other end is equipped with Pressure gauge 10, and the pressure in the air flue 19 is 2MPa-4MPa.Described cylinder number is 2n, wherein n 〉=1.Guide bar bolt 9 symmetries are located at the two ends between the upper and lower die holder 2,17, and the pressure die fixed head 7 about guide bar bolt 9 passes and is located between the die holder is fixedlyed connected with upper bolster, and the other end of cylinder 3 is withstanding on the pressure die fixed head 7 under the effect of its pressure.
To wait in actual applications to cut edge, the forging products 18 of punching is placed on the punch-die 13, the part of the upper die moves downward with the lathe slide block, pressure die 12 at first contacts with forging products 18, along with further moving downward of part of the upper die, the piston of cylinder 3 is compressed, pressure affacts on forging 18 products by pressure die fixed head 7 and pressure die 12, treat that forging products 18 is compacted after, the drift 6 and the die 14 that are contained on the upper bolster 2 begin to dash, cut the gross weight and the overlap of forging products.Dash, cut into back punching head 6 and die 14 moves upward with upper bolster 2 and lathe slide block, in the process that moves upward, pressure die 12 keeps enough pressure to forging products 18 all the time, break away from forging products 18 fully up to drift 6 and die 14, along with the continuation of lathe slide block is up, pressure die 12 finally also breaks away from forging products, and whole impulse stroke finishes.In this process, along with moving upward of die 14, stripper 11 pushes away punch-die 13 with overlap under the effect of spring 15, and gross weight falls in the fore-and-aft direction through hole of die shoe 17 centres.
This nitrogen compaction mold includes parts such as drift and die, it is that the die steel material manufacturing of H13 (4CrMoSiVl) forms that this drift and die body all adopt the trade mark, forms and the cutting edge of drift and die partly is a mode manufacturing by No. 6 wear resistance electrodes of built-up welding Si Taili cobalt-based.Thereby guaranteed that drift and die have wear-resisting preferably, high temperature resistant, anti-thermal shock and impact, so guaranteed dash, the quality in section.
More in depth, the forging intermediate products of gained after first subnormal side cut, the punching are put into accurate punching make its work with nitrogen compaction mold and opening device, then the die of mould can be with the upper side edge 181 of track link rail and cutting away more than material of lower side 182 places; The drift of mould is cutting away more than material two perforated side 183,184 places respectively then.As shown in Figure 2, the material area 20 of punched removal among the figure is the aforementioned depanning hypotenuse that has a strong impact on the assembling of track link rail forging, by precise clicking technique of the present invention, not only promoted track link rail forging quality, and save the original required two procedures of milling two side planes and drawing two holes, one side plane, the production flow process shortens dramatically, and middle reproduced goods significantly reduce, and it is remarkable that cost reduces effect.And the operating type that adopts nitrogen to compress has further guaranteed the size and the form and position tolerance of forging itself.
In addition, this close trim and punching technology are suitable equally to the forging that other has similar requirement, only need to change mould parts such as corresponding punch, die, drift, can implement to finish different requirements.
More than be concrete example of the present invention, this case protection domain do not constituted any limitation that all employing equivalents or equivalence are replaced and the technical scheme of formation, all drop within the rights protection scope of the present invention.

Claims (7)

1. precise clicking technique of track link rail, at the track link rail forging that is applied to have the requirement of straight hole straight flange, it is characterized in that described accurate punching operation be utilize precision that the nitrogen compaction mold carries out one-step punching forming towards straight hole, cut the straight flange operation, to finishing the forging that has certain depanning gradient after normal punching and the side cut operation, carry out the deep processing of accurate punching, thereby form the machined surface of final technological requirement.
2. precise clicking technique of track link rail according to claim 1, it comprises upper and lower die holder to it is characterized in that described nitrogen compaction mold, fixed head, backing plate, punch-die, die, die block, pressure die fixed head, pressure die, drift, guide bar bolt, stripper etc., two cylinders are installed on described upper bolster at least, in upper bolster, have the air flue that is interconnected, described air flue is connected with cylinder, be filled with nitrogen in the air flue, cylinder and air flue constitute the high-pressure system of a complete seal.
3. precise clicking technique of track link rail according to claim 1 and 2 is characterized in that described pressure die is fixed on the pressure die fixed head, and the pressure die fixed head is connected with upper bolster by guide bar bolt; The non-impact end of described drift is fixedlyed connected with upper bolster by fixed head, backing plate; Described die is fixed on the die block, and die block is fixedlyed connected with upper bolster with backing plate by fixed head; Described stripper floats with die shoe with stage clip by bolt and is connected.
4. precise clicking technique of track link rail according to claim 3 is characterized in that: an end of described air flue is equipped with sealing-plug, and the other end is equipped with Pressure gauge, and the pressure in the air flue is 2MPa-4MPa.
5. precise clicking technique of track link rail according to claim 3 is characterized in that: described cylinder number is 2n, wherein n 〉=1.
6. precise clicking technique of track link rail according to claim 3 is characterized in that: the drift of described precise clicking technique mould and die adopt is that the trade mark is that the die steel material manufacturing of H13 (4CrMoSiV1) forms.
7. precise clicking technique of track link rail according to claim 3 is characterized in that: the cutting edge of described drift and die partly is that the mode manufacturing by No. 6 wear resistance electrodes of built-up welding Si Taili cobalt-based forms.
CN2008101226705A 2008-06-05 2008-06-05 Precise clicking technique of track link rail Active CN101306450B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101226705A CN101306450B (en) 2008-06-05 2008-06-05 Precise clicking technique of track link rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101226705A CN101306450B (en) 2008-06-05 2008-06-05 Precise clicking technique of track link rail

Publications (2)

Publication Number Publication Date
CN101306450A true CN101306450A (en) 2008-11-19
CN101306450B CN101306450B (en) 2012-04-25

Family

ID=40123249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101226705A Active CN101306450B (en) 2008-06-05 2008-06-05 Precise clicking technique of track link rail

Country Status (1)

Country Link
CN (1) CN101306450B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102284596A (en) * 2011-06-22 2011-12-21 重庆理工大学 Closed extruding fine blanking die based on floating female die structure
CN102806295A (en) * 2011-05-31 2012-12-05 四川振强模锻有限公司 Punching trimming die for turnbuckle crane
CN102814412A (en) * 2012-08-14 2012-12-12 济南轨道交通装备有限责任公司 Small hole punching trimmed composite mould
CN103071719A (en) * 2011-10-26 2013-05-01 苏州汉扬精密电子有限公司 Stamping die mechanism
CN103978090A (en) * 2014-05-19 2014-08-13 安徽大昌科技股份有限公司 Trimming die of rear suspension mounting support
CN105290205A (en) * 2015-11-28 2016-02-03 孙新梅 Abutting type punching device
CN112453297A (en) * 2020-10-23 2021-03-09 北京北方车辆集团有限公司 Forging and forming method of connected track shoe forging hammer
CN114850370A (en) * 2022-05-23 2022-08-05 山东豪迈精锻科技有限公司 Automatic separation device for trimming flash of caterpillar track section

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102806295A (en) * 2011-05-31 2012-12-05 四川振强模锻有限公司 Punching trimming die for turnbuckle crane
CN102284596A (en) * 2011-06-22 2011-12-21 重庆理工大学 Closed extruding fine blanking die based on floating female die structure
CN102284596B (en) * 2011-06-22 2014-02-26 重庆理工大学 Closed extruding fine blanking die based on floating female die structure
CN103071719A (en) * 2011-10-26 2013-05-01 苏州汉扬精密电子有限公司 Stamping die mechanism
CN102814412A (en) * 2012-08-14 2012-12-12 济南轨道交通装备有限责任公司 Small hole punching trimmed composite mould
CN102814412B (en) * 2012-08-14 2014-11-26 济南轨道交通装备有限责任公司 Small hole punching trimmed composite mould
CN103978090A (en) * 2014-05-19 2014-08-13 安徽大昌科技股份有限公司 Trimming die of rear suspension mounting support
CN105290205A (en) * 2015-11-28 2016-02-03 孙新梅 Abutting type punching device
CN112453297A (en) * 2020-10-23 2021-03-09 北京北方车辆集团有限公司 Forging and forming method of connected track shoe forging hammer
CN114850370A (en) * 2022-05-23 2022-08-05 山东豪迈精锻科技有限公司 Automatic separation device for trimming flash of caterpillar track section

Also Published As

Publication number Publication date
CN101306450B (en) 2012-04-25

Similar Documents

Publication Publication Date Title
CN101306450B (en) Precise clicking technique of track link rail
DE102008034996B4 (en) Apparatus for thermoforming, press hardening and cutting of a semifinished product of hardenable steel
CN101239629B (en) Method for producing guiding wheel
CN101758147B (en) Fine cutting and trimming process for auto brake shoe pad stop and die
CN101386045A (en) Method and device for manufacturing stamping parts with a larger functional area
CN201201030Y (en) Nitrogen compacting mould for hot trimming and punching forgings
CN103691813B (en) The special bending machine die of a kind of special R based plate
CN205869215U (en) Thin material high -speed punching mould
CN106077210A (en) Integrated die trim and method
CN202114158U (en) Ultra-thick composite punching die
CN202667454U (en) Mechanical integrated forming mould for automobile axle housing
CN205833960U (en) A kind of mould for automobile rear wall outside plate
CN103282685A (en) Method for producing a brake lining carrier
EP2528711B1 (en) Punching tool
US9770749B2 (en) Hybrid stamping system
CN1273238C (en) Cylindric push-cutting and edging composite tool for cutting and punching
RU2342445C1 (en) Strengthening technique of shearing die
CN106040849A (en) Compound forming die for machining circlips of automobile shock absorbers
CN1817503A (en) Precisioning forging method of crawler belt plate
CN1530569A (en) Machining method for symmetrical stepped gear shaft
CN210358773U (en) High-precision integrated die
CN1739878A (en) On-line cold bending steel cutting mold and its cutting method
CN215614436U (en) Gear blank punching and trimming composite die frame
CN204996909U (en) Cutting off tool of ultrahigh strength steel material part
CN211360319U (en) Double-phase steel composite pressing die

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant