CN101302932A - 一种巷道开口掘进和硐室掘进的方法 - Google Patents
一种巷道开口掘进和硐室掘进的方法 Download PDFInfo
- Publication number
- CN101302932A CN101302932A CNA2008100552976A CN200810055297A CN101302932A CN 101302932 A CN101302932 A CN 101302932A CN A2008100552976 A CNA2008100552976 A CN A2008100552976A CN 200810055297 A CN200810055297 A CN 200810055297A CN 101302932 A CN101302932 A CN 101302932A
- Authority
- CN
- China
- Prior art keywords
- coal
- perforating
- adopt
- supporting
- driving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明涉及一种巷道开口掘进和硐室掘进的方法,采用打眼、放炮落煤、光面爆破;装煤、运煤;打眼与支护等工艺;特点是所述装煤、运煤;打眼与支护工艺使用煤巷钻装运锚一体化机、及刮板运输机系统,可实现单、双巷掘进,更加灵活、便捷,更加高产、高效,提高了掘进工作面的机械化装备水平,可适应于大型煤矿、中小煤矿。
Description
技术领域
本发明属于井下煤炭掘进技术,特别涉及大型煤矿、中小煤矿使用综合机械化掘进装备进行巷道开口掘进和硐室掘进的方法。
背景技术
目前,我国各类煤矿巷道掘进普遍采用炮掘,综掘和连采等掘进技术,这些技术存在以下问题:
1、巷道掘进不能自行开口:巷道开口需要人工开口,造成开口进尺低,用人多,工人劳动强度大,辅助工序增加,效率低等一系列问题;
2、装机功率大,能耗高:综掘工作面装机功率大部分都在250kw以上;连采机装机功率则高达2000kw以上;
3、支护困难:炮掘、综掘支护目前仍为人工支护;
4、效率低:由于机械截割落煤比放炮落煤所用时间长,炮掘、综掘支护为人工支护,用人多,所以速度慢,效率低;
5、适应性差:一种综掘机机型很难适应各种断面;
6、辅助工作量大;
7、顶板问题:目前各种掘进方式都在空顶下作业,无法实现超前支护。
发明内容
本发明的目的是对上述井下掘进技术中存在的问题,提供一种可掘进煤矿井下任意巷道,使掘进速度快,巷道支护成本低,设备装机功率小,生产安全可靠,并集打眼、装煤、运煤、支护于一体的巷道开口掘进和硐室掘进的方法。
为了实现上述目的本发明的技术方案是:
一种巷道开口掘进和硐室掘进的方法,采用打眼、放炮落煤、光面爆破;装煤、运煤;打眼与支护等工艺;其特征是:所述装煤、运煤;打眼与支护工艺使用一体化机、及刮板运输机系统,具体工艺与步骤为:
1、打眼:按照作业规程要求和爆破图表由一体化机上的两台液压钻机,实施炮眼施工;
2、装药、放炮:由人工装药放炮,实施光面爆破,光爆成型;
3、装煤:采用一体化设备的铲板与盘式爬爪,对工作面放炮落下的煤炭进行扒装;
4、运煤:采用一体化设备中间设置的两部皮带溜子,把装在铲板上的煤炭向外运输;
5、超前支护:为了保证操作人员的安全,采用一体化设备的超前支护装置,对顶板进行有效的超前支护;
6、支护:采用一体化设备上的两台钻机完成铺网、上托梁、打眼和注锚等支护工艺;
本发明提供的一种巷道开口掘进和硐室掘进的方法与现有方法相比较,具有突出的实质性的特点和技术进步是:
1、集掘进工作面主要工序为一身的综合机械化一体装备,一台设备完成了打眼、装煤、运煤、支护各道工序。提高了掘进装备的集中性、灵活性、系统性。从而减少了短距离掘进的机械搬运、安装、拆卸工作,减少了工人劳动强度,提高了掘进工效。
2、提高了掘进工作面的机械化装备水平,使机械化装备水平达到了97%以上,比综掘50%的机械化装备水平提高了47个百分点。
3、节能降耗。由于整机装机功率小,能耗大幅度下降,同时采用了打眼放炮落煤,比截割落煤能耗也大幅度降低。
4、用人少、工效高。劳动定员是炮掘的0.83倍,但是工效却是炮掘的3.11倍。
5、可实现自动拐弯和完成横贯施工,实现单、双巷掘进。
6、实现了安全生产。
为此,本发明为煤矿井下掘进提供了新的工艺和装备,使掘进装备更加精练、集中,更加灵活、便捷,更加高产、高效,可适应于大型煤矿、中小煤矿的巷道开口掘进和硐室掘进。
附图说明:
图1是单巷掘进一体化机布置示意图;
图2是双巷掘进一体化机布置示意图;
图3是工作面断面及支护的示意图;
图4是本发明所使用的一体化机主视图;
图5是本发明所使用的一体化机俯视图。
具体实施方式
以下结合附图说明本发明的具体实施方式。
巷道开口掘进和硐室掘进是采用打眼、放炮落煤、光面爆破、装煤、运煤;打眼、机械支护等工艺;如图1所示,是单巷掘进一体化机布置示意图;本发明巷道开口掘进和硐室掘进的方法所使用的机械设备有一体化机、综掘机及刮板运输机(皮带溜子)系统,所述具体工艺为:
1、打眼:按照作业规程要求和爆破图表由一体化机上的两台液压钻机,实施炮眼施工;
2、装药、放炮:由人工装药放炮,实施光面爆破,光爆成型;
3、装煤:采用一体化设备的铲板与盘式爬爪,对工作面放炮落下的煤炭进行扒装;
4、运煤:采用一体化设备中间设置的两部皮带溜子,把装在铲板上的煤炭向外运输;
5、超前支护:为了保证操作人员的安全,采用一体化设备的超前支护装置,对顶板进行有效的超前支护;
6、支护:采用一体化设备上的两台钻机完成铺网、上托梁、打眼和注锚等支护工艺;如图3所示,为工作面断面及支护的示意图。
7、劳动组织:(每个生产班)班长1人,炮工1人,运输、支护综合工4人,每班合计6人。
如图2所示,是双巷掘进一体化机布置示意图,本发明巷道开口掘进和硐室掘进的方法,在双巷掘进中一个巷道使用的机械设备有一体化机、及刮板运输机(皮带溜子)系统,一体化机是岩巷掘进与支护施工钻机,可采用打眼、放炮落煤、光面爆破工艺;另一个巷道使用综掘机及刮板运输机(皮带溜子)系统,在两个巷道中也可以交替使用综掘机与岩巷掘进与支护施工钻机,用以完成双巷掘进、装煤、运煤,打眼与支护。
本发明所使用的一体化机为煤巷钻装运锚一体化机,如图4和图5所示,它包括履带行走部分1与刮板运输机部分、一台临时支护部分3、两台可升降与摆动的顶帮锚杆锚索钻机部分(4)与液压与操作系统8;所述的运输部分是由耙爪2、第一刮板运输机9与第二刮板运输机10构成,其耙爪装在所述履带行走部分的前方,铲板之上;第一刮板运输机安装在铲板的后方与履带行走部的中间,履带行走部分的上方装有操作平台5;其特征是:在操作平台上面有两个旋转基座6,用于固定顶帮锚杆锚索钻机部分,一个固定座7用于固定临时支护部分,所述的临时支护部分的固定座在操作平台的中间,而所述的两台可升降与摆动的顶帮锚杆锚索钻机部分的基座在操作平台的两侧,所述的液压与操作系统8设置在操作平台5与顶帮锚杆锚索钻机部分4之上。第二刮板运输机安装于第一刮板运输机的尾部,可以在一定的范围内摆动,以达到转载的目的。
本发明与炮掘主要技术经济指标对比见如如下附表。
附表:本发明与炮掘主要技术经济指标对比
对比顶目 | 闫氏掘进准备法① | 炮掘② | 对比效果③=①/② |
定编(定员) | 50(35) | 60(46) | 0.83 |
工序时间 | 1、循环进度2m2、打眼40/2*3=60分钟3、装药放炮60分钟4、出煤20*2=40分钟5、支护30*2=60分钟6、合计220分钟 | 1、循环进度2m2、打眼150分钟3、装药、放炮60分钟4、出煤180分钟5、支护120分钟6、合计510分钟 | 0.43 |
班进度 | 360/220*2=3.3m | 360/510*2=1.4 | 2.3 |
日进 | 3.3*3=9.9m | 1.4*3=4.2m | 2.3 |
工效 | 0.28m/工 | 0.09/工 | 3.11 |
备注 |
Claims (1)
1、一种巷道开口掘进和硐室掘进的方法,采用打眼、放炮落煤、光面爆破;装煤、运煤;打眼与支护等工艺;其特征是:所述装煤、运煤;打眼与支护工艺使用煤巷钻装运锚一体化机、及刮板运输机系统,具体工艺与步骤为:
(1)、打眼:按照作业规程要求与爆破图表由一体化机上的两台液压钻机,实施炮眼施工;
(2)、装药、放炮:由人工装药放炮,实施光面爆破,光爆成型;
(3)、装煤:采用一体化设备的铲板与盘式爬爪,对工作面放炮落下的煤炭进行扒装;
(4)、运煤:采用一体化设备中间设置的两部皮带溜子,把装在铲板上的煤炭向外运输;
(5)、超前支护:为了保证操作人员的安全,采用一体化设备的超前支护装置,对顶板进行有效的超前支护;
(6)、支护:采用一体化设备上的两台钻机完成铺网、上托梁、打眼和注锚等支护工艺。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008100552976A CN101302932A (zh) | 2008-06-25 | 2008-06-25 | 一种巷道开口掘进和硐室掘进的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008100552976A CN101302932A (zh) | 2008-06-25 | 2008-06-25 | 一种巷道开口掘进和硐室掘进的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101302932A true CN101302932A (zh) | 2008-11-12 |
Family
ID=40112998
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2008100552976A Pending CN101302932A (zh) | 2008-06-25 | 2008-06-25 | 一种巷道开口掘进和硐室掘进的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101302932A (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009155776A1 (zh) * | 2008-06-25 | 2009-12-30 | Yan Zhendong | 一种煤巷钻装运锚一体化机 |
CN101812988A (zh) * | 2010-03-22 | 2010-08-25 | 王书铭 | 缓倾斜至急倾斜厚大矿体采矿法 |
CN101824986A (zh) * | 2010-04-20 | 2010-09-08 | 闫振东 | 钻装运锚一体化机采煤工艺 |
CN102061924A (zh) * | 2010-12-22 | 2011-05-18 | 山西晋城无烟煤矿业集团有限责任公司 | 顺槽巷道迎头拐横贯施工方法 |
CN102373929A (zh) * | 2010-08-20 | 2012-03-14 | 新汶矿业集团有限责任公司翟镇煤矿 | 煤矿顺槽巷道普通掘进作业方法 |
CN109281674A (zh) * | 2018-12-11 | 2019-01-29 | 淮南矿业(集团)有限责任公司 | 一种采用钻装机的硬岩巷道掘进方法 |
CN111379561A (zh) * | 2020-04-07 | 2020-07-07 | 北京中矿创新联盟能源环境科学研究院 | 采煤系统及基于该采煤系统的无煤柱自成巷开采方法 |
-
2008
- 2008-06-25 CN CNA2008100552976A patent/CN101302932A/zh active Pending
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009155776A1 (zh) * | 2008-06-25 | 2009-12-30 | Yan Zhendong | 一种煤巷钻装运锚一体化机 |
CN101812988A (zh) * | 2010-03-22 | 2010-08-25 | 王书铭 | 缓倾斜至急倾斜厚大矿体采矿法 |
CN101824986A (zh) * | 2010-04-20 | 2010-09-08 | 闫振东 | 钻装运锚一体化机采煤工艺 |
CN101824986B (zh) * | 2010-04-20 | 2012-05-30 | 闫振东 | 钻装运锚一体化机采煤工艺 |
CN102373929A (zh) * | 2010-08-20 | 2012-03-14 | 新汶矿业集团有限责任公司翟镇煤矿 | 煤矿顺槽巷道普通掘进作业方法 |
CN102061924A (zh) * | 2010-12-22 | 2011-05-18 | 山西晋城无烟煤矿业集团有限责任公司 | 顺槽巷道迎头拐横贯施工方法 |
CN102061924B (zh) * | 2010-12-22 | 2012-12-05 | 山西晋城无烟煤矿业集团有限责任公司 | 顺槽巷道迎头拐横贯施工方法 |
CN109281674A (zh) * | 2018-12-11 | 2019-01-29 | 淮南矿业(集团)有限责任公司 | 一种采用钻装机的硬岩巷道掘进方法 |
CN111379561A (zh) * | 2020-04-07 | 2020-07-07 | 北京中矿创新联盟能源环境科学研究院 | 采煤系统及基于该采煤系统的无煤柱自成巷开采方法 |
CN111379561B (zh) * | 2020-04-07 | 2021-10-29 | 北京中矿创新联盟能源环境科学研究院 | 采煤系统及基于该采煤系统的无煤柱自成巷开采方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201236704Y (zh) | 一种煤巷钻装运锚一体化机 | |
CN1932240B (zh) | 一次全高、后退、分体移动、全跨落综合机械化采煤方法 | |
CN107060795B (zh) | 一种地下矿井tbm组装施工方法 | |
CN101302931B (zh) | 一种仓房采煤后的复采和边角煤回采的方法 | |
CN101881162B (zh) | 钻装机 | |
CN102472100B (zh) | 地下采矿 | |
CN101302932A (zh) | 一种巷道开口掘进和硐室掘进的方法 | |
CN102996131A (zh) | 一种预掘两巷前进式固体充填采煤方法 | |
CN105952450B (zh) | 一种地下矿山井下双采场协同开采的新方法 | |
CN102587914A (zh) | 一种建筑物下压煤条带式旺格维利采煤方法 | |
CN101169036B (zh) | 履带式可升降顶帮锚杆锚索施工钻机单巷快速掘进工艺 | |
CN104251139A (zh) | 采煤工作面冒落区充填开采方法 | |
CN101403302B (zh) | 履带式可升降顶帮锚杆锚索施工钻机及双巷快速掘进工艺 | |
CN101302933B (zh) | 一种岩巷综合机械化开拓作业的开拓方法 | |
CN102889084A (zh) | 露天煤矿薄煤层的连续开采工艺方法 | |
CN104564089A (zh) | 一种冲击破碎式岩巷掘进机的岩巷快速掘进工艺 | |
CN101025086A (zh) | 放炮落煤与装煤、运煤和锚杆支护机械一体化作业方法及装置 | |
CN107191191A (zh) | 一种三锤冲击破碎式岩巷掘锚机的岩巷快速掘进工艺 | |
CN101824986B (zh) | 钻装运锚一体化机采煤工艺 | |
CN101824990B (zh) | 四臂液压钻车与破装运喷一体化机的岩巷掘进工艺 | |
CN107829741A (zh) | 一种缓倾斜薄矿体开采方法 | |
CN201401166Y (zh) | 钻装机 | |
CN111980709B (zh) | 一种用于大倾角厚煤层边帮煤的连续开采方法 | |
CN108457652B (zh) | 一种分区块段式全风压短壁连采充填方法 | |
CN105422102A (zh) | 一种垂直中深孔落矿小分段进路充填采矿法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20081112 |